2024-00020 Gunter Cisco C9500-48Y4C Switches Upgrade SOR.pdf

PDF 72 KB Posted

Attached to
Cisco Switches, Maxwell AFB, AL
Solicitation number
FA330024P1002
Issued by

About this file

This document is a Statement of Requirement (SOR) for the acquisition of two Cisco Catalyst 9500 series switches by the 42nd Communications Squadron at Maxwell Air Force Base, Alabama.

The SOR states the justification for the requirement, which is to provide more Virtual Routing and Forwarding (VRF) and improve the implementation of Software Defined Networking (SDN) at Maxwell AFB and Gunter Annex. The contractor shall provide the specified Cisco switches and a Performance Management Plan (PMP) outlining the timeline for ordering and delivery. The switches will be shipped to the IT Warehouse at Maxwell AFB, with Brian Tillery and Gregory Fenn identified as the technical points of contact. The warranty for the equipment is covered under the JELA Contract. The security requirements indicate unclassified services only, with no CAC required.

View the file

Other files

File Type Posted
Sources Sought Switches - SAM.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF REQUIREMENT

Maxwell/Gunter_42CS_Cisco Switches

26 March 2024

Introduction and Background. The 42nd Communications Squadron at Maxwell AFB, AL has a requirement to acquire Two Cisco C9500 Series Switches. Justification: These switches will provide more Virtual Routing and Forwarding (VRF) and the ability to better implement Software Defined

Networking (SDN) on Maxwell AFB and Gunter Annex.

DESCRIPTION OF THE ITEMS. The new requirement consists of Cisco Catalyst 9500 series switches.

3.0 Networking Equipment: The contractor shall provide the following switches:

3.0.1. Cisco Systems (CISCOPRO) Catalyst 9500 48-port x1/10/25G+ 4-port 40/100G, Advantage.

4.0 Performance Management Plan (PMP): ): The contractor shall provide a PMP that shows a timeline from issuance of the contract to delivery of the communications equipment to the delivery location identified in this solicitation. The PMP may be expressed in terms of

“days after contract”. This PMP shall include, at a minimum, a timeline for:

Description Days After Contract

Ordering

Delivery

5.0. Warranty:

5.0.1. Covered under the JELA Contract.

6.0 Technical POCs:

6.0.1. Brian Tillery, 42 CS/SCOL, 953-9777, brian.tillery.ctr@us.af.mil

6.0.2. Gregory Fenn, 42 CS/SCXP, 953-9407, gregory.fenn.ctr@us.af.mil

7.0. Shipping Information: The switches will be shipped to 455 S Kelly St Bldg. 1154/IT

Warehouse Maxwell AFB, AL 36112 upon purchase. Attn. of Brian Tillery.

8.0. Security

8.0.1. Security Requirements For Unclassified Services Only, No CAC Required

1. Contractor Notification Responsibilities: Not applicable.

2. Installation Access Requirements: No installation access required.

3. Reporting Requirements: Not applicable.

4. Traffic Laws: Not applicable.

5. Random Installation Entry/Exit Checks: Not applicable.

6. Cellular Phone Operation Policy: Not applicable.

7. Wireless Electronic Devices: Not applicable.

8. Firearms and Ammunition: Not applicable.

9. Illegal Weapons. Not applicable.

File details come from the government source that posted it. Updated .