SOW-Vault_Corridor_Flooring.docx
DOCX document 16 KB Posted
- Attached to
- Epoxy Floors Replacement
- Solicitation number
- 2023H418_EpoxyFloorReplacement
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Title: COMPARTMENTS FLOORING UPGRADE PROJECT
UNITED STATES MINT – WEST POINT STATEMENT OF WORK (SOW)
COMPARTMENTS FLOORING UPGRADE PROJECT
SCOPE:
Furnish all labor, parts, materials, and equipment for the following:
a. Contractor to supply materials and labor to match existing smart, smooth, stain, and wear resistant STONTEC EF (Smokey Mountains Small Flakes) flooring system from Stonhard Inc. or approved equal.
b. Contractor shall make all surface preparations necessary to accept the new floor, including removing existing VCT flooring, installing over existing epoxy flooring, and/or over painted concrete floors. Existing conditions for each compartment is listed below.
c. Contractor shall install the STONTEC EF (Smokey Mountains Small Flakes) flooring system in the areas of the US Mint.
d. Scheduling – To minimize disruption and down-time to the facility the contractor shall perform the work for each area on a Friday, Saturday, Sunday, sequenced schedule. The dates and times for each area will be scheduled with the Contracting Officer’s Representative (COR). Not more than one or two areas can be done at the same time. (NOTE: All areas listed may not be done).
e. No request for substitution shall be considered that would change the generic type of floor system specified. Equivalent materials of other manufactures may be considered only on approval of the COR.
f. All area dimensions shall be verified by the contractor.
g. All disturbed areas shall be restored to original or better condition. Contractor shall remove all debris, etc., generated and dispose of it offsite.
Existing Compartment Floor/Area conditions:
1. Compartment 1 – Existing Epoxy
2. Compartment 3 – Painted Concrete
3. Compartment 4 – Painted Concrete
4. Compartment 5 – Existing Epoxy
5. Compartment 6 – Existing Epoxy
6. Compartment 7 – Existing Epoxy
7. Compartment 8 – Existing Epoxy
8. Compartment 9 – VCT (1-layer)
9. Compartment 12 – VCT (1-layer)
10. Compartment 13 – Existing Epoxy
11. Compartment 14 – VCT (2-layers)
12. Compartment 15 – Painted Concrete
13. Compartment 16 – Existing Epoxy
14. Compartment 17 – Painted Concrete
15. Compartment 18 – Painted Concrete
16. Compartment 19 – Painted Concrete
17. Compartment 21 – Concrete
18. Compartment 22 – Painted Concrete
19. Compartment 23 – Painted Concrete
20. Loading Dock – Existing Epoxy
21. Sally Port Areas – Existing Epoxy
File details come from the government source that posted it.