This document is an Electrical Calculations Report prepared by AERO Systems Engineering for the City of Eugene, Oregon regarding the Eugene Airport Terminal Building Passenger Boarding Bridges (PBB) Electrical Upgrade project. The project involves adding new air conditioning equipment to existing airport terminal passenger boarding bridges, requiring comprehensive electrical analysis including short circuit calculations, service load analysis, and load flow calculations. The calculations were performed using SKM Power Tools for Windows (PTW) Version 9.0.0.7 computer software based on project drawings and equipment specifications. The report documents that the project will add six PCA units with a combined capacity of 102 kVA per unit at 0.8 power factor, totaling 489.6 kW of new electrical demand. The calculations are based on utility data from Eugene Water & Electric Board (EWEB) indicating a maximum available fault current of 20,871 amperes at 480 volts, three-phase service. The document was submitted as part of the 90% design phase submittal in September 2022.

The analysis identifies that existing distribution panels A2 through A6 must be upgraded to 14 kA amperes interrupting capacity (AIC) to handle maximum short circuit currents, as they currently have only 5 kA ratings and are deemed inadequate. The existing main service entrance switchboard SB1, rated at 2,500 amperes, is confirmed adequate for the future service load of approximately 1,850 amperes when calculated using NEC Article 220.87 methodology. Load flow calculations confirm that voltage drops remain within the recommended 5% limit across all distribution points, with the main switchboard experiencing 1.06% voltage drop and individual PCA units ranging from 3.02% to 4.06% voltage drop. The report indicates that an arc flash hazard analysis will be provided separately during construction to determine personal protective equipment requirements for workers. The short circuit calculations exclude the on-site 350 kW diesel generator from analysis since its available short circuit current of approximately 5,000 amperes is significantly less than the utility contribution of 21,000 amperes.

View the file

Other files

File Type Posted
Bid documents-final~1.pdf PDF
Bid tabulation~3.pdf PDF
NOIA-Interested parties.pdf PDF
Addendum 1_10.13.2022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AERO Systems Eng

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

Electrical Calculations (IFC Submittal)

City of Eugene Eugene, Oregon

AERO Systems Engineering

EUGENE AIRPORT TERMINAL BUILDING

PASSENGER BOARDING BRIDGES ELECTRICAL UPGRADE

SHORT CIRCUIT, SERVICE LOAD, &

LOAD FLOW CALCULATIONS

September 2022

TABLE OF CONTENTS

1.0 Introduction Page 2

2.0 Short Circuit Calculations Page 4

2.1 Basis of Short Circuit Calculations

2.2 Methodology

2.3 Data Used in Calculations

2.4 Calculation Results

3.0 Service Load Calculation Page 10

3.1 Basis of Service Load Calculation

3.2 Methodology

3.3 Calculation Results

4.0 Load Flow Calculations Page 13

4.1 Basis of Load Flow Calculations

4.2 Methodology

4.3 Calculation Results

5.0 APPENDICES Page 17

Appendix A: Project Drawings Appendix B: SKM PTW Computer Model & Input Report Appendix C: SKM PTW Short Circuit Report Appendix D: SKM PTW Load Flow Report

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

Electrical Calculations (IFC Submittal)

SECTION 1.0

INTRODUCTION:

Discussion of Study Scope

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

City of Eugene Eugene, Oregon

AERO Systems Engineering

Eugene Airport Terminal Building PBB Electrical Upgrade

Short Circuit Analysis, Electrical Demand Load Analysis, and Voltage Drop Analysis

September 2022

(IFC Submittal)

1.0 INTRODUCTION

Electrical calculations were performed for the Eugene airport terminal building passenger boarding bridges electrical upgrade project in Eugene, Oregon. This project will add new air conditioning (PCA) equipment to the existing airport terminal passenger boarding bridges (PBB).

Computer-aided engineering (CAE) electrical calculations were performed using SKM Power Tools for Windows (PTW), Version 9.0.0.7 computer program. The computer model & calculations are attached in the Appendices:

• Computer model is based on the project drawings in the Appendix A.

• Computer input data and model in the Appendix B.

• Computer short circuit calculation results in the Appendix C.

• Computer load flow calculation results in the Appendix D.

Updated short circuit data provided by EWEB had been included in the 90% study report submitted last month.

An arc flash hazard analysis and adhesive labels will also be provided during construction in a separate report. The arc flash hazard analysis determines the flash hazard boundaries, incident energies, and personal protective equipment (PPE) required for installation work, commissioning, or maintenance of any energized equipment within this project’s scope of work. The incident energy is the amount of heat energy that would be impressed on a worker’s face or torso should an electrical arc fault occur while working on or near exposed energized equipment. The calculated incident energy determines the PPE level needed to prevent 2nd degree burns to a worker’s face or torso.

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

SECTION 2.0

SHORT CIRCUIT CALCULATIONS:

Discussion of Basis, Methodology, and

Results

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

Electrical Calculations (IFC Submittal)

2.0 SHORT CIRCUIT CALCULATIONS

Short circuit calculations were performed for the new electrical equipment using computer aided engineering (CAE). CAE models the power system to calculate the maximum short circuit currents at selected fault points to confirm circuit breaker short circuit interrupting ratings. The balanced 3-phase symmetrical RMS fault current is typically considered to be the maximum available fault current. Under certain conditions and locations, such as at transformers with solidly grounded neutrals, the line-to-ground fault current magnitude can be greater than the 3-phase current. Therefore, the higher of the two calculated fault currents should be used as the basis for the selection of the protective device interrupting ratings.

The existing 350-kW on-site diesel-engine generator was not considered in these short circuit calculations since the available short circuit current from this generator (~5kA) would be significantly less than that from the utility (~21kA).

2.1 BASIS OF SHORT CIRCUIT CALCULATIONS

Electrical distribution equipment must be able to withstand and/or interrupt the most severe fault duty that it may be subjected to at its location in the system. The NFPA 70 (National Electrical Code), Article 110.9 requires that electrical equipment have ratings sufficient for interrupting the maximum fault current present at the line side terminals of the equipment.

This section calculates maximum available RMS symmetrical, short-circuit currents at certain equipment locations in the system. The calculation procedures are based on recommendations included in ANSI/IEEE/IEC Standards: 399, 551, 62271-37-013 (supersedes C37.013), C37.04, C37.13, & C37.010.

Equipment short-circuit ratings are expressed in symmetrical RMS current. However, actual fault currents encountered in the field are typically both symmetrical and asymmetrical due to the system inductance, which introduces asymmetry at the beginning of a fault.

The magnitude and duration of the asymmetrical portion of the short circuit current depends upon several factors, including at what exact point on the current waveform where the fault begins. The level of asymmetry may also differ between the phases in a three-phase system. Because of the uncertainty in asymmetry for any particular fault event, the capability of devices to interrupt an asymmetrical fault current is based on the maximum possible asymmetrical fault current level at the point of application. The more inductive the circuit, as measured by the calculated system X/R ratio, the more asymmetrical the fault current will be. If the calculated X/R level exceeds a certain level, then the increased asymmetrical duty should be considered when breaker ratings are specified.

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

Electrical Calculations (IFC Submittal)

Low-voltage circuit breakers and fuses are tested to establish their short circuit interrupting ratings based on a test circuit, with a defined X/R ratio, as specified in various product standards (UL and ANSI). Different classes of low-voltage breakers have different test X/R values. Design test circuit power factors and associated X/R ratios are as shown in Table 1.

Table 1: Summary of Test Power Factor and X/R Values for LV Devices.

Device pf X/R Ratio

Power circuit breaker, unfused 0.15 6.591

Power circuit breaker, fused 0.20 4.899

Molded case breaker, interrupting rating greater than 20000 A 0.15-0.20 6.591-4.899

Molded case breaker, interrupting rating 10001 to 20000 A 0.25-0.30 3.9-3.18

Molded case breaker, interrupting rating 10000 A and less 0.45-0.50 2.0-1.732

For power circuit breakers, the power factors are taken from ANSI/IEEE C37.13. For molded case breakers, the power factors are taken from NEMA standard AB1. Since the NEMA standard specifies a range of test circuit power factors, the highest value (lowest X/R ratio) is used to determine the multiplying factor. This produces the most conservative (largest) factor. See IEEE 1015-1997, IEEE Recommended Practice for Applying Low-Voltage Circuit Breakers Used in Industrial and Commercial Power Systems, for additional details.

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

Electrical Calculations (IFC Submittal)

2.2 METHODOLOGY

Short-circuit calculations were performed with computer-aided engineering (CAE) using SKM Power Tools for Windows (PTW), Version 9.0.0.7 computer program. The short circuit calculation methodology uses a computer (one-line) circuit model, which defines all electrical characteristics of the power system under study. The computer one-line diagram is the basis for the power system database (utility sources, induction motors, transformers, cables, protective devices, etc.) used for the CAE model. When the study is run, the computer algorithm calculates the bolted short circuit (fault) currents for each bus location.

See the Appendix B for the computer (one-line) circuit model and input data report for this project. The data generated by the computer program consists of the following:

• One-Line Computer Model

Show each of the relevant power system components (utility and generator sources, induction motors, transformers, cables, protective devices, etc.) and their interconnections.

• Input Data Report

Provide summary of the bus-to-bus interconnections and data used in performing the Short Circuit Study. The identification of buses was taken from the PCA units project documents. Each bus represents one of the following: a utility contribution point, a generator contribution point, a service end box, a switchboard bus, a distribution panelboard bus, a panelboard bus, motor connection point, load connection point.

• Fault Analysis Summary Reports

Provide the RMS symmetrical short circuit current for each major point (bus) in the power system when fed by utility power in the normal switched configuration.

The computer program used simulates bolted faults at every point of consideration in the system and calculates the maximum available short-circuit current at that point, without any reduction due to current-limiting overcurrent devices that may be present.

The calculated short-circuit current values are RMS symmetrical amperes that are comparable with the RMS symmetrical short-circuit current ratings of the electrical distribution equipment and circuit breakers under consideration.

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

2.3 Data Used in the Calculations

The computer (one-line) circuit model is a simplified version of the system drawings, showing only a portion of the airport terminal building electrical system under consideration. The various circuit locations on the diagram have been labeled with bus identification numbers so that input data could be supplied to the computer and the computer output could be readily interpreted.

Power Company Data

The maximum available fault current from the EWEB service point at the main switchboard SB1 is 20,871 Amperes, 480-Volts, 3-phase. This data was provided by Brad Rudler at EWEB on August 2, 2022. The normal configuration was used for this short circuit calculation where the terminal building is fed from the incoming EWEB electrical service. Actual short circuit data from EWEB was not available when this report was written.

Cable Data

The conductor data used for each circuit segment includes the circuit length, number of conductors per phase, conductor size, conductor material, cable insulation type, and conduit material.

Resistance values are based on ambient (no load) temperatures rather than the full load temperatures, because short-circuits can occur when the circuit is initially energized or lightly loaded, as well as when fully loaded.

Transformer Data

Typical transformer percent impedance and typical X/R ratio values were used for the utility service transformer. Actual transformer data was not available and was therefore estimated for these calculations.

Motor Contribution to Short-Circuit Current

Motors that are connected and running at the time a fault occurs will contribute short circuit current for a short time (a few cycles) into the fault. Large motor (> 50 hp) short-circuit contributions were included in this short-circuit analysis, so that the calculated results represent the highest short-circuit current to which the equipment might be subjected.

All connected chiller motors as shown on the one-line drawings were assumed to be running at the time of the fault. For this study, each chiller load was modeled as one induction motor load connected directly to the low voltage SB1 main switchboard bus using sub-transient reactance values from C37.010, C37.13, and IEEE Std. 141.

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

Electrical Calculations (IFC Submittal)

Generator Contribution to Short-Circuit Current

There is a 350-kW standby diesel engine-generator set associated with the existing terminal building distribution system. Since the short circuit current that would be available from the on-site 350-kW generator (estimated to be < 5,000 Amperes short circuit current) will be significantly less than the short circuit current from the EWEB utility system (reported to be 21,000 Amperes short circuit current per Brad Rudler’s email on August 2, 2022)), this element was not included in this short circuit analysis.

2.4 STUDY RESULTS

Detailed input and output computer generated reports for the normally configured operating scenario of this short circuit analysis is included in the Appendix B.

The short circuit current calculation results are included in the Appendix C and are used to confirm the electrical distribution equipment short circuit rating requirements for the Eugene airport PBB electrical upgrade project:

EUGENE AIRPORT PBB SHORT CIRCUIT CALCULATION SUMMARY:

EUGENE PBB SHORT CIRCUIT EVALUATION TABLE

EQUIPMENT

NOMINAL

L - L

VOLTS

AIC OR

WCR

MAXIMUM

SCA

X/R

RATIO

EVALUATION

SB1 480 42,000 23,675 5.20 ADEQUATE

DP4 480 30,000 16,939 2.93 ADEQUATE

A1 480 35,000 10,307 1.06 ADEQUATE

A2 480 5,000 7,740 0.97 INADEQUATE

A3 480 5,000 6,708 0.88 INADEQUATE

A4 480 5,000 5,757 0.81 INADEQUATE

A5 480 5,000 6,708 0.88 INADEQUATE

A6 480 5,000 10,696 1.02 INADEQUATE

Note that AIC is defined as Amperes interrupting capacity, WCR is defined as withstand current rating, and SCA is defined as short circuit Amperes. As indicated in the above table, existing panels A2 through A6 must be upgraded to 14kA AIC to handle the maximum short circuit currents. This report can be revised after the equipment panels have been upgraded.

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

SECTION 3.0

SERVICE LOAD CALCULATION:

Discussion of Basis, Methodology, and

Results

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

3.0 SERVICE LOAD CALCULATION

Electrical distribution equipment and conductors must be able to safely supply the electrical demand. The Eugene airport PBB electrical upgrade project will add new electrical loads to the existing airport terminal building electrical distribution system. This load calculation is used to confirm that service entrance switchboard has adequate capacity to support the new loads.

3.1 BASIS OF SERVICE LOAD CALCULATION

NFPA 70 (National Electrical Code), Article 220 provides requirements for calculating branch circuit, feeder, and service loads. The record one-line diagram indicates that EWEB electrical service lateral directly feeds the terminal building main service entrance switchboard SB1. Therefore, the total maximum load current calculation must be less than the current rating of SB1.

3.2 METHODOLOGY

A hand calculation based on NFPA 70 Article 220.87 was performed to confirm that the existing terminal building electrical service capacity is adequate to support the new PBB electrical upgrade project. NFPA 70 Article 220.87 permits using the existing building electrical demand to calculate the future service load as follows:

Future service load = existing load (previous 1-year peak demand) x 1.25 + new loads

Existing load = Previous 1-year peak demand = 644 kW.

(644 kW was the reported previous winter peak demand) (571 kW was the reported previous summer peak demand)

New loads = 6-PCA units = 6 x 102 kVA x 0.8 = 489.6 kW.

Future service load = existing load x 1.25 + new load = 1295 kW.

Existing service rating = 2,500 Amperes, 480-Volts, 3-Phase, 4-Wire.

IF future service load < existing service rating, then existing service is adequate.

3.3 STUDY RESULTS

The hand calculated service load for this project based on NFPA 70, Article 220.87 was calculated to be 1295 kW or approximately 1,850 Amperes at 480-Volts, 3-phase. The existing main service entrance switchboard SB1 is rated for 2,500 Amperes, which is adequate for the future service load current of 1,850 Amperes after this project has been completed and operational.

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

SECTION 4.0

LOAD FLOW CALCULATIONS: Discussion of Basis, Methodology, and Results

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

Electrical Calculations (IFC Submittal)

4.0 LOAD FLOW CALCULATIONS

This project will add new electrical loads to the existing airport terminal building where excessive voltage loss can cause inefficient operation or a malfunction of electrical equipment. These Load flow calculations are used to confirm that the proposed feeder and branch circuit conductors are adequate for load and voltage drop.

4.1 BASIS OF LOAD FLOW CALCULATIONS

Load flow calculations are a common power system analysis computation used to determine component and circuit loading, steady state bus voltages, reactive power flows, transformer tap settings, system losses, generator voltage setpoints, and operating scenarios under alternate switching or emergency conditions.

• Computer aided engineering using SKM Power Tools for Windows (PTW), Version 9.0.0.7 computer program was used as the basis for the voltage drop calculations for the new distribution panelboard and branch conductors within the scope of this project.

• NFPA 70 (National Electrical Code), Article 210.19, Informational Note 3 and Article 310.14 A(A)(1), Informational Note 1 recommends that the voltage drop be limited to 5% at the furthest outlet for reasonable operational efficiency.

• Computer aided engineering using SKM Power Tools for Windows (PTW), Version 9.0.0.7 computer program was used as the basis for the electrical load calculations for the new distribution equipment and conductors that were added to support the PBB Electrical Upgrade scope of work.

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

Electrical Calculations (IFC Submittal)

4.2 METHODOLOGY

CAE load flow calculations were performed using SKM Power Tools for Windows (PTW), Version 9.0.0.7 computer program. The computer program iterative algorithm calculates load flow currents, system losses, and bus voltages for each bus and cable interconnection in the system. See the Appendix B for the computer model and data used for the load flow calculations.

IEEE Std. 399-1990, IEEE Recommended Practice for Power System Analysis, describes the load flow problem formulation in Chapter 6, 6.4.1. as a network solution problem where the voltages and currents are described by Equation 1:

[I] = [Y] [V] Eqn.1 where:

[I] = vector of total positive sequence currents flowing at the network buses.

[V] = vector of positive sequence voltages at the network buses.

[Y] = network admittance matrix.

The bus i current is related by Equation 2:

Ii = (Pi + jQi)*/Vi* Eqn. 2 where:

P = active power kW.

Q = reactive power kVAR.

Asterisk (*) designates the conjugate of a complex number.

The combination of load flow and bus current equations 1 & 2 describes the load flow problem in terms of the non-linear equation 3:

[P-jQ/V*] = [Y] [V] Eqn. 3

Equation 3 can be solved by iterative algorithms, such as Gauss-Seidel, Newton- Ralphson, or other variations of these that are commonly used in commercially available computer program algorithms.

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

Electrical Calculations (IFC Submittal)

4.3 STUDY RESULTS

The balanced load flow output report is attached in the Appendix D.

EUGENE AIRPORT PBB VOLTAGE DROP CALCULATION SUMMARY:

EUG PBB VOLTAGE DROP EVALUATION TABLE

NOMINAL

L - L

VOLTS

BUS

VOLTAGE

PU

LOAD

FLOW

VOLTS

%VD EVALUATION

SB1 480 0.99 475 1.06 ADEQUATE

DP4 480 0.98 468 2.43 ADEQUATE

PCA-1 480 0.97 466 3.02 ADEQUATE

PCA-2 480 0.97 463 3.46 ADEQUATE

PCA-3 480 0.96 462 3.73 ADEQUATE

PCA-4 480 0.96 460 4.06 ADEQUATE

PCA-5 480 0.96 462 3.73 ADEQUATE

PCA-6 480 0.97 465 3.07 ADEQUATE

Note that the load flow calculation voltages reported in this table assume a -2.5% primary tap setting for the utility transformer primary winding and a peak demand operating scenario.

EUGENE AIRPORT PBB LOAD FLOW CURRENT CALCULATION SUMMARY:

EUG PBB LOAD FLOW CALCULATION TABLE

FEEDER

CABLE

NOMINAL

L - L

VOLTS

RATING

AMPS

LOAD

FLOW

AMPS

%VD EVALUATION

SB1 480 2,500 1,578.3 0.3 ADEQUATE

DP4 480 800 762.9 1.37 ADEQUATE

PCA-1 480 150 126.5 0.59 ADEQUATE

PCA-2 480 150 127.1 1.04 ADEQUATE

PCA-3 480 150 127.4 1.31 ADEQUATE

PCA-4 480 150 127.9 1.64 ADEQUATE

PCA-5 480 150 127.4 1.31 ADEQUATE

PCA-6 480 150 126.6 0.65 ADEQUATE

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

SECTION 5.0

APPENDICES

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

APPENDIX A

EUGENE PBB PROJECT DRAWINGS

ONE LINE DIAGRAMS

ELECTRICAL LEGEND

LIGHTING FIXTURE LEGEND

MOUNTING HEIGHT ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE

M LIGHTING FIXTURE, DOWN LIGHT (MARK "M", CONTROLLED BY SWITCH "d")

LIGHTING FIXTURE, FLUORESCENT SURFACE MOUNT (LENGTH AND WIDTH AS SHOWN ON PLAN)

LIGHTING FIXTURES, WALL MOUNTED

EXIT LIGHTING FIXTURES, UNIVERSAL MOUNT. TWO FACES (LEFT), ONE FACE (RIGHT). DIRECTIONAL

ARROWS DEPENDANT UPON LOCATION. ORDER FIXTURES WITH FIELD SELECTABLE ARROWS.

LIGHTING FIXTURE, ON EMERGENCY CIRCUIT. WHEN DESIGNATED WITH NL, DO NOT SWITCH. WHEN NOT DESIGNATED WITH NL PROVIDE ABOVE CEILING RELAY TO ALLOW SWITCHING UNTIL LOSS OF

NORMAL POWER WHEN RELAY CROSSES FIXTURE POWER OVER TO EMERGENCY CIRCUIT. ONCE

NORMAL POWER IS RESTORED RELAY CROSSES FIXTURE POWER BACK TO NORMAL POWER

THUS RE-ENABLING SWITCHING.

LIGHTING CONTROL LEGEND

48" TO SWITCH, SINGLE - RED HANDLE FOR EMERGENCY CIRCUITS

48" TO SWITCH, 3 WAY, 4 WAY - RED HANDLE FOR EMERGENCY CIRCUITS

48" TO WALL SWITCH OCCUPANCY SENSOR, ALL DIGITAL, MULTI-TECHNOLOGY (ULTRASONIC & PIR)

SENSOR, EQUAL TO LIGHTHAWK LHMT.

CEILING MOUNTED OCCUPANCY SENSOR, ALL DIGITAL, MULTI-TECHNOLOGY (ULTRASONIC AND PIR)

AS MANUFACTURED BY LEVITON (ODC0S) OR APPROVED EQUAL.

R

PC

EMERGENCY LIGHTING RELAY AS MANUFACTURED BY WATTSTOPPER (ELCU-200) OR APPROVED

EQUAL.

PHOTOCELL MOUNTED FOR DAYLIGHT HARVESTING AS MANUFACTURED BY SENSORSWITCH (NLIGHT

NCM ADC(X)), HUBBELL (LUXSTATLS) OR APPROVED EQUAL.

ELECTRICAL SYSTEMS LEGEND

COMMUNICATION OUTLET - SEE NOTES 17 & 18. REFER TO TG001 TECHNOLOGY LEGEND FOR

ADDITIONAL INFORMATION.

COMMUNICATION OUTLET - SEE NOTES 17 & 18. REFER TO TG001 TECHNOLOGY LEGEND FOR

ADDITIONAL INFORMATION.

COMMUNICATION OUTLET - SEE NOTES 17 & 18. REFER TO TG001 TECHNOLOGY LEGEND FOR

ADDITIONAL INFORMATION.

COMMUNICATION OUTLET, RECESSED FLOOR MOUNTED - SEE NOTES 17 & 18. REFER TO TG001

TECHNOLOGY LEGEND FOR ADDITIONAL INFORMATION.

WALL PHONE OUTLET - SEE NOTES 17 & 18. REFER TO TG001 TECHNOLOGY LEGEND FOR

ADDITIONAL INFORMATION.

TV TV OUTLET - (1) TYPE F JACK WITH RG-11 CABLE AND (2) COMMUNICATION JACKS (DATA - GREY)

WITH (2) GREY CAT6 CABLES. UNO TERMINATE IN COMM ROOM CLOSEST TO OUTLET.

TELEPHONE TERMINAL BOARD (TTB), 8' X 8' PLYWOOD PAINTED WHITE WITH FIRE RETARDANT PAINT, (2)

COATS REQUIRED. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

48" TO

80" TO BOT

FACP

FIRE ALARM REMOTE ANNUNCIATOR

FARA

FIRE ALARM TERMINAL CABINET

FATC

SMOKE DETECTOR, OBCURATION TYPE, AT CEILING.

S D

DUCT SMOKE DETECTOR, IONIZATION TYPE WITH SAMPLING TUBE. LOCATE IN DUCT PER DIVISION

23 AND HVAC FLOOR PLANS.

FS

PS

TS

HEAT DETECTOR, SET TEMPERATURE (F); RATE OF RISE (R)

FIRE PROTECTION (SPRINKLER SYSTEM) FLOW SWITCH

FIRE PROTECTION (SPRINKLER SYSTEM) PRESSURE SWITCH

FIRE PROTECTION (SPRINKLER SYSTEM) TAMPER SWITCH

IFP-X

OPEN FRAME COMMUNICATIONS RACK, 19"

EQUIPMENT CABINET, SIZE(S) AS NOTED ON PLANS AND RISER DIAGRAMS

CEILING MOUNTED SPEAKER

2A

1507A

NOTE:

REFER TO TECHNOLOGY PLANS FOR TECHNOLOGY LEGEND WHICH INCLUDES PAGING, FIDS, CATV, AND TEL/DATA.

ABBREVIATIONS

A

AC

ACS

AFF

AFG

ATS

B

BC

BHS

BKR

C

CCTV

CH

CKT

CLG

AMP

ABOVE COUNTER

ACCESS CONTROL SYSTEM

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

AUTOMATIC TRANSFER SWITCH

BOTTOM

BELOW COUNTER

BAGGAGE HANDLING SYSTEM

BREAKER

CONDUIT

CLOSED CIRCUIT TELEVISION

COUNTER HEIGHT

CIRCUIT

CEILING HEIGHT

CP

CPB

CR

CTR

CTS

D

D/S

DTC

E

ECB

EN

EPB

ER

ERP

COMMUNICATIONS PANEL

COMMUNICATIONS PULL BOX

CARD READER

CONTRACTOR

CCTV SWITCHING EQUIPMENT

DURESS

DISCONNECT SWITCH

DATA TERMINAL CABINET

EMERGENCY

ENCLOSED CIRCUIT BREAKER

EXISTING TO BE REPLACED

ELECTRICAL PULL BOX

EXISTING TO BE REMOVED

EXISTING IN RELOCATED POSITION

EWC

EWH

EX

EXP

EXR

FACP

FATC

FAAP

GCTC

GFCI

GND

HID

IDF

LCD

ELECTRICAL WATER COOLER

ELECTRIC WATER HEATER

EXISTING TO REMAIN

EXPLOSION PROOF

EXISTING TO BE RELOCATED

FIRE ALARM CONTROL PANEL

FIRE ALARM TERMINAL CABINET

FIRE ALARM ANNUNCIATOR PANEL

GATE CONTROL TERMINAL CABINET

GROUND FAULT CIRCUIT INTERRUPTER

GROUND

HIGH INTENSITY DISCHARGE

INTERMEDIATE DISTRIBUTION FRAME

LIQUID CRYSTAL DISPLAY

MDF

MH

NEC

NIC

NL

OHE

P

PATC

PL

POE

PTZ

SCP

SIDA

SSTC

MAIN DISTRIBUTION FRAME

MOUNTING HEIGHT

NATIONAL ELECTRICAL CODE

NOT IN CONTRACT

NIGHT LIGHT (UNSWITCHED)

OVERHEAD ELECTRIC

PUBLIC

PUBLIC ADDRESS TERMINAL CABINET

PILOT LIGHT

POWER OVER ETHERNET

PAN/TILT/ZOOM

SECURITY CONTROL PANEL

SECURITY IDENTIFICATION DISPLAY AREA

SOUND SYSTEM TERMINAL CABINET

STC

STR

T

TBB

TGB

TMGB

TVSS

TX

UGE

UNO

VDB

SECURITY TERMINAL CABINET

STARTER

TOP

TELEPHONE BACKBOARD

TELECOMMUNICATIONS GROUNDING BUS BAR

TELECOMMUNICATIONS MAIN GROUNDING BUS BAR

TRANSIENT VOLTAGE SURGE SUPPRESSION

TRANSFORMER

UNDERGROUND ELECTRIC

UNLESS NOTED OTHERWISE

VOICE/DATA BACKBOARD

W

WP

SECURITY ACCESS POINT ARCHITECTURAL DOOR NUMBER

80" TO BOT

78" TO

FIRE ALARM PULL STATION WITH CLEAR PLASTIC LIFT BOX

FIRE ALARM SPEAKER HORN AND STROBE LIGHT

FIRE ALARM SPEAKER HORN AND STROBE LIGHT

FIRE ALARM CONTROL PANEL

E

PER NEC

PER NEC

J

RECEPTACLE, RECESSED FLOOR MOUNTED, COMBINATION DOUBLE DUPLEX/DATA. IDF-X INDICATES COMM ROOM FOR TERMINATION OF DATA DROPS. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION.

RECEPTACLE, RECESSED FLOOR MOUNTED, DOUBLE DUPLEX, NEMA 5-20R

RECEPTACLE, RECESSED FLOOR MOUNTED, COMBINATION SPECIALTY/DATA. PROVIDE SIZE IN ACCORDANCE WITH CIRCUIT BREAKER AND NEMA CONFIGURATION PER EQUIPMENT REQUIREMENT. IDF-X INDICATES COMM ROOM FOR TERMINATION OF DATA DROPS. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION.

RECEPTACLE, RECESSED FLOOR MOUNTED, SPECIALTY. PROVIDE SIZE IN ACCORDANCE WITH CIRCUIT

BREAKER AND NEMA CONFIGURATION PER EQUIPMENT REQUIREMENT.

NEMA L6-30R IN JUNCTION BOX MOUNTED ON UNISTRUT SYSTEM, INDEPENDENT OF LADDER RACK, ABOVE COMM

RACKS AND/OR CABINETS AS SHOWN ON PLANS.

NEMA L5-20R IN JUNCTION BOX MOUNTED ON UNISTRUT SYSTEM, INDEPENDENT OF LADDER RACK, ABOVE COMM

RACKS AND/OR CABINETS AS SHOWN ON PLANS.

JUNCTION BOX, 4" SQ. X 1 1/2" DEEP (MINIMUM), MOUNTED ON STUB UP (OR CEILING)

MOTOR STARTER, MANUAL 2 POLE

SAFETY SWITCH (30A FRAME WITH 20A FUSE, NF = NON FUSED)

SAFETY SWITCH (NON FUSED). PROVIDE SIZE BASED ON FEEDER CIRCUIT

BREAKER AND NEC.

EQUIPMENT CONNECTION, COMPLETE TO SUIT EQUIPMENT PER NEC.

PANELBOARD, 120/208 VOLT, PROVIDE SWITCHBOARD MATTING 48" DEEP X 12"

WIDER THAN PANEL (SALISBURY MATTING M48-2 OR APPROVED EQUAL) IN FRON OF

PANEL.

PANELBOARD, 277/480 VOLT, PROVIDE SWITCHBOARD MATTING 48" DEEP X 12"

WIDER THAN PANEL (SALISBURY MATTING M48-2 OR APPROVED EQUAL) IN FRON OF

PANEL.

TRANSFORMER, DRY TYPE

WALKERCELL HEADER DUCT (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)

WALKERCELL HEADER JUNCTION BOX (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)

WALKERCELL DUCT (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)

WALKERCELL JUCTION BOX (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)

WALKERDUCT NO. 2 DUCT WITH SQUARE PRESETS (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)

WALKERDUCT NO. 4 DUCT WITH SQUARE PRESETS (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)

WALKERDUCT JUNCTION BOX (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)

SECURITY INFRASTRUCTURE LEGEND

NOTE: ALL CABLING AND SECURITY HARDWARE TO BE OWNER FURNISHED OWNER

INSTALLED.

PROVIDE JUNCTION BOX AT LOCATION WITH 3/4"C BACK TO COMM ROOM.

PROVIDE JUNCTION BOX AT LOCATION WITH 3/4"C BACK TO COMM ROOM.

STUB AND CAP CONDUITS TO 3" BELOW CEILING AT LOCATIONS INDICATED

PROVIDE JUNCTION BOXES AND CONDUIT PER DETAILS SHOWN ON SHEET EY401

ACCORDING TO TYPE SHOWN ON PLANS

PROVIDE JUNCTION BOXES AND CONDUIT PER DETAILS SHOWN ON SHEET EY401

SECURITY ACCESS POINT IDENTIFICATION NUMBER

SECURITY ACCESS POINT ROUGH-IN TYPE, SEE ROUGH-IN DETAILS SHEET EY401

POWER DEVICE LEGEND

MOUNTING HEIGHT ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE

18" TO RECEPTACLE, DUPLEX, NEMA 5-20R, WALL MOUNTED WITH COVER PLATE

18" TO CLEAN POWER RECEPTACLE, DUPLEX, 20A, NEMA 5-20R (ORANGE)

18" TO CLEAN POWER RECEPTACLE, DOUBLE DUPLEX, 20A, NEMA 5-20R (ORANGE)

18" TO RECEPTACLE, DOUBLE DUPLEX, NEMA 5-20R, WALL MOUNTED WITH COVER PLATE

RECEPTACLE, SPECIALTY. PROVIDE SIZE IN ACCORDANCE WITH CIRCUIT BREAKER AND NEMA

CONFIGURATION PER EQUIPMENT REQUIREMENT.

RECEPTACLE, DUPLEX GFCI, NEMA 5-20R, WALL MOUNTED 6" ABOVE COUNTER OR BACKSPLASH WITH COVER

PLATE.

GENERAL NOTES

1. ALL ELECTRICAL WORK SHALL COMPLY WITH NATIONAL ELECTRICAL CODE, THE NATIONAL FIRE CODES, THE

AMERICANS DISABILITIES ACT, AND LOCAL CODES.

2. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE PROJECT TO ENSURE THAT ALL WORK SHALL MEET OR

EXCEED THE ABOVE REQUIREMENTS. ANY ALLEGED DISCREPENCIES SHALL BE BROUGHT TO THE ENGINEER'S

ATTENTION.

3. THE CONTRACTOR IS DIRECTED TO OBTAIN COPIES OF ALL RELATED PLANS, SPECIFICATIONS, SHOP

DRAWINGS AND ADDENDA TO COORDINATE THE RELATED WORK AND SCHEDULING.

4. THE CONTRACTOR IS REMINDED THAT ELECTRICAL SERVICE TO AND FOR MECHANICAL, KITCHEN AND OTHER EQUIPMENT IS BASED ON EQUIPMENT DESIGN DATA. THE ACTUAL VALUES MAY DIFFER DEPENDING UPON THE EQUIPMENT TO BE FURNISHED. ANY MODIFICATION TO THE ELECTRICAL INSTALLATION, BASED UPON ACTUAL

EQUIPMENT SELECTION, SHALL RESULT IN ADDITIONAL COST TO THE OWNER.

5. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE ARCHITECTURAL AND MECHANICAL PLANS TO ASSURE THAT ELECTRICAL SERVICE FOR ALL ITEMS AND/OR EQUIPMENT NOT PROVIDED WITH ELECTRICAL SERVICE, REQUIRING ELECTRICAL SERVICE, SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION.

6. MECHANICAL, FIRE PROTECTION AND ELECTRICAL EQUIPMENT HAVE BEEN LOCATED AND ARRANGED TO MINIMIZE THE INTERFERENCES OF EQUIPMENT AND STRUCTURE. THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF/HERSELF WITH THE WORK TO BE PERFORMED BY OTHER TRADES AND THE PHYSICAL CHARACTERISTICS OF THE STRUCTURE IN ORDER TO SCHEDULE AND INSTALL EQUIPMENT AND TO MINIMIZE POSSIBLE INTERFERENCE. FAILURE TO PROPERLY COMMUNICATE AND SCHEDULE WORK WITH OTHER TRADES THAT RESULTS IN ADDITIONAL WORK AND MATERIAL, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE MODIFICATIONS REQUIRED TO RESOLVE THE CONFLICT SHALL BE DECIDED BY THE

ENGINEER.

7. ALL PANELBOARDS SHALL BE PROVIDED WITH A TYPEWRITTEN SCHEDULE SHOWING CIRCUIT NUMBERS AND A

COMPLETE DESCRIPTION OF EACH CIRCUIT.

8. MINIMUM TRADE SIZE FOR HOME RUN CONDUIT PERMITTED SHALL BE 3/4 INCH UNLESS NOTED OTHERWISE.

FITTINGS SHALL BE COMPRESSION TYPE.

9. ALL CONDUCTORS SHALL BE COPPER WITH 600 VOLT INSULATION TYPE THHN (MINIMUM SIZE SHALL #12 AWG).

CONTRACTOR SHALL ADJUST WIRE AND CONDUIT SIZES IF OTHER INSULATION TYPES ARE USED.

10. ALL LIGHT SWITCHES AND DUPLEX RECEPTACLES SHALL BE RATED FOR 20 AMPERES AT 120/277 VOLTS AC.

WIRING DEVICES SHALL BE MANUFACTURED BY HUBBELL OR APPROVED EQUAL, SPECIFICATION GRADE.

11. ALL ELECTRICAL WIRING DEVICES INDICATED TO BE INSTALLED IN MASONRY WALLS OR FLOORS SHALL BE FLUSH MOUNTED, INCLUDING BRANCH CIRCUIT PANELBOARDS, UNLESS NOTED OTHERWISE. THE CONDUITS

TO ASSOCIATED ELECTRICAL EQUIPMENT SHALL BE CONCEALED IN WALLS OR FLOORS.

12. ALL CONDUIT RUNS SHALL BE CONCEALED UNLESS SPECIFICALLY NOTED OTHERWISE.

13. THE FIXTURE SCHEDULE IS FOR REFERENCE ONLY. MODEL NUMBERS LISTED MAY NOT INCLUDE ALL

REQUIRED OPTIONS HOWEVER THESE OPTIONS SHALL BE PROVIDED WITH FIXTURES. ALL SUBSTITUTIONS ARE

SUBJECT TO PRIOR APPROVAL AS EQUAL BY THE ENGINEER.

14. ALL EXIT LIGHTS SHALL BE PROVIDED WITH UNIVERSAL MOUNTING BRACKETS. THE CONTRACTOR SHALL

VERIFY ALL DIRECTIONAL ARROWS PRIOR TO ORDERING FIXTURES.

15. THE CONTRACTOR SHALL FURNISH THE AIR CONDITIONING SUBCONTRACTOR COPIES OF APPROVED LIGHT

FIXTURE SHOP DRAWINGS.

16. ALL RECESSED LIGHTING FIXTURES IN FIRE RATED CEILINGS SHALL BE TENTED TO COMPLY WITH THE

APPLICABLE CEILING RATING. THE CONTRACTOR SHALL VERIFY REQUIREMENTS.

17. ALL COMMUNICATIONS OUTLET BOXES SHALL BE MIN. 4" WIDE BY 4" HIGH BY 2 1/2" DEEP WITH SINGLE GANG

MUD RING.

18. UNLESS NOTED OTHERWISE, PROVIDE 1"C FROM COMMUNICATIONS OUTLET TO THE ACCESSIBLE CEILING SPACE. CONTRACTOR SHALL FURNISH AND INSTALL CABLING AS REQUIRED. CABLE ROUTING WILL BE VIA CONDUIT (INACCESSIBLE SPACES) OR "J" HOOKS AND CABLE TRAY SYSTEM (ACCESSIBLE SPACES) TO COMM ROOM OR ROOM OF TERMINATION. PROVIDE RACEWAY SYSTEM OVER THE INACCESSIBLE CEILING SPACE AS INDICATED ON PLANS. TEL/DATA CONDUITS ARE TO BE LONG RADIUS TYPE AND SHALL CONTAIN MULE TAPE MIN 1/2" 100LB. PROVIDE PLATES FOR ALL OUTLETS. CAT6 CABLES SHALL BE PLENUM RATED.

19. ALL SPECIAL PURPOSE OUTLETS SHALL BE PROVIDED TO MATCH EQUIPMENT TO BE SUPPLIED.

20. THE PLANS INDICATE THE DESIRED ARRANGEMENT AND GENERAL LOCATIONS OF LIGHT FIXTURES. THE

ARCHITECTURAL CEILING PLANS INDICATE ADDITIONAL DATA AS TO THE FINAL FIXTURE PLACEMENT.

21. ALL PANELBOARDS, SWITCHES AND CIRCUIT BREAKERS SHALL BE SIEMENS, SQUARE D, GE OR CUTLER

HAMMER OR APPROVED EQUAL.

22. ALL CONDUITS SHALL INCLUDE A SEPARATE GREEN EQUIPMENT GROUND CONDUCTOR.

23. ANY EXISTING UTILITIES LOCATED IN THE AREA OF CONSTRUCTION THAT REQUIRE RELOCATION BY THE

OWNER SHALL BE COORDINATED WITH THE OWNER'S REPRESENTATIVE A MINIMUM OF TEN DAYS IN ADVANCE.

24. ALL DISCONNECT SWITCHES SHALL BE THE HEAVY DUTY TYPE, FUSED DISCONNECTS SHALL HAVE LITTLEFUSE

TIME DELAY, TYPE RK5 AND SHALL INDICATE TYPE RK5.

25. THE CONTRACTOR SHALL CHECK THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION AND/OR DIMENSIONS

FOR INSTALLATION OF ALL ELECTRICAL ITEMS. ALL QUESTIONABLE LOCATIONS SHALL BE APPROVED BY

OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION.

26. ALL EMPTY CONDUITS SHALL CONTAIN MULE TAPE MIN 1/2" 1800LB.

27. ALL WORK SHOWN ON THE ELECTRICAL PLANS SHALL BE PERFORMED BY THE CONTRACTOR UNLESS NOTED

OTHERWISE.

28. ALL EXIT FIXTURES SHALL BE CONNECTED TO THE BUILDING ESSENTIAL BRANCH PANEL.

29. ALL SURGE PROTECTED OUTLETS SHALL BE EQUAL TO HUBBEL #5352.

30. EQUIPMENT INSTALLED WITHIN CONCEALED SPACES SHALL HAVE REASONABLE ACCESS PANELS PROVIDED

NEARBY FOR INSPECTION, TESTING AND SERVICE CONSIDERATIONS.

31. SECURITY WIRING SHALL BE IN CONDUIT SHALL BE A SEPARATE, COMPLETE AND FULLY FUNCTIONING SYSTEM.

32. THE FIRE ALARM MANUFACTURERE SHALL PROVIDE CERTIFIED TECHNICIAN TO SUPERVISE THE INSTALLATION, FINAL CONNECTIONS AND TESTING OF THE FIRE ALARM SYSTEM AT THE COMPLETTION OF THE PROJECT. THE MANUFACTURER SHALL INSPECT THE SYSTEM AND CERTIFY THAT IT IS INSTALLED IN ACCORDANCE WITH NFPA

72. ALL FIRE ALARM COMPONENTS SHALL COMPLY WITH ADA REQUIREMENTS.

33. THE CONTRACTOR SHALL VERIFY CEILING TYPES AND INSTALLATION REQUIREMENTS PRIOR TO ORDERING

LIGHT FIXTURES.

34. WHERE CABLES OR CONDUITS ARE REQUIRED TO PASS THROUGH FIRE RATED WALL, FLOOR OR CEILING THEY SHALL BE SEALED WITH 3M FIRE STOP OR APPROVED EQUAL. THE APPROVED FIRE STOP METHOD SHALL COMPLY WITH ARTICLES 300.21 OF NEC AND SHALL BE UL LISTED UNDER "THROUGH-PENETRATION FIRE STOP SYSTEM (XHEZ)" IN UL FIRE RESISTANCE DIRECTORY. ALL INTERIOR CORRIDORS HAVE FIRE RATED WALLS. ANY PENETRATION THROUGH THESE WALLS AND OTHER FIRE RATED WALLS SHALL BE SEALED WITH FIRE STOP.

35. SPARE CONDUITS, WIREWAYS AND CABLE TRAYS SHALL BE SUPPORTED FROM BUILDING STRUCTURE AND

NOT FROM OTHER PIPES, DUCTS OR EXISTING RACKS UNLESS SHOWN ON DRAWINGS.

36. EXTERIOR BURIED CONDUIT RUNS SHALL BE MINIMUM 24" BELOW FINISHED GRADE. PROVIDE CAUTION TAPE

12" BELOW GRADE.

37. PROVIDE GROUND STRAP ACROSS ALL CABLE TRAY JOINTS. GROUND CABLE TRAY TO SERVICE GROUND WITH

#1/0 AWG BARE COPPER IN 1" PLENUM RATED CARLON PLENUM GUARD CONDUIT.

38. ALL CONDUIT BENDS FOR COMMUNICATIONS WIRING SHALL BE SMOOTH LONG RADIUS TYPE. "LB" TYPE

FITTINGS SHALL NOT BE USED.

39. DO NOT LOCATE ELECTRICAL OUTLETS AND DEVICES ON WALL PANEL JOINTS. REFER TO ARCHITECTURAL

BUILDING ELEVATIONS FOR WALL PANEL LAYOUT AND PANEL JOINT LOCATIONS.

40. ALL 120 VOLT/20 AMP BRANCH CIRCUITS SHALL BE PROVIDED A SEPARATE NEUTRAL CONDUCTOR FOR EACH

PHASE CONDUCTOR.

41. GALVANIZED CONDUIT, FITTINGS, BOXES, STEEL AND FASTENERS TO BE USED FOR ALL WORK EXPOSED TO

THE WEATHER.

42. POWER CHANGE EXPENSES RESULTING FROM EQUIPMENT SUBSTITUTIONS THAT DIFFER FROM ITEMS CALLED FOR IN DRAWINGS OR SPECIFICATIONS SHALL BE BORNE BY THE CONTRACTOR OR THEIR SUB. THESE SHALL INCLUDE CHANGES IN VOLTAGE OR FULL LOAD AMPS RESULTING IN LARGER FEEDERS AND OR CIRCUIT

BREAKERS.

43. COORDINATE FINAL ELECTRICAL DEVICE AND LIGHTING FIXTURE LOCATIONS WITH FINAL SPRINKLER HEAD

LOCATIONS TO COMPLY WITH NFPA REQUIREMENTS.

44. WATERPROOF RECEPTACLE COVER TO BE WEATHERPROOF WITH OR WITHOUT CORD PLUGGED IN.

45. UNO, ALL EXISTING ELECTRICAL DEVICES THAT ARE NOT SHOWN ARE EXISTING TO REMAIN.

46. COORDINATE WITH DIVISION 23 FOR DISCONNECT REQUIREMENTS ON MECHANICAL EQUIPMENT. REFER TO

MECHANICAL EQUIPMENT SCHEDULES (M-002 AND M-003) FOR INFORMATION. CONTRACTOR SHALL PROVIDE DISCONNECTS FOR THOSE DEVICES THAT DO NOT COME WITH FACTORY INSTALLED DISCONNECTS.

47. POWER CHANGE EXPENSES RESULTING FROM EQUIPMENT SUBSTITUTTIONS THAT DIFFER FROM ITEMS CALLED FOR IN DRAWINGS OR SPECIFICATIONS SHALL BE BORNE BY THE CONTRACTOR OR HIS SUB. THESE SHALL INCLUDE CHANGES IN VOLTAGE OR FULL LOAD AMPS RESULTING IN LARGER FEEDERS AND OR CIRCUIT

BREAKERS.

48. CONDUITS 2.5” AND LARGER AND RACEWAYS THAT ARE MORE THAN 12” BELOW STRUCTURE. ELECTRICAL EQUIPMENT AND TRANSFORMERS WEIGHING MORE THAN 100 LBS. PROVIDE VIBRATION ISOLATORS AND SWAY BRACING FOR ALL SUSPENDED EQUIPMENT, INCLUDING LUMINAIRES. PROVIDE NEOPRENE WASHER AND PAD

FOR ALL EQUIPMENT ANCHORED TO CONCRETE PADS.

THE FOLLOWING ARE USED IN CONJUNCTION WITH DEVICES

EX

ER

EN

EXR

ERP

EXISTING SHALL REMAIN

EXISTING SHALL BE REMOVED

EXISTING SHALL BE REPLACED WITH NEW DEVICE

EXISTING SHALL BE RELOCATED TO NEW LOCATION

EXISTING IN RELOCATED POSITION

EXISTING ITEMS NOT SHOWN SHALL REMAIN AS IS.

SD

RF

S

F F

F W

O S

O S

3 4

AC

G

FC

I

D C

R M d

WALL

WP WEATHERPROOF

SHEET NO.:

SHEET CONTENTS

DO NOT SCALE DRAWINGS

CONTRACT NO.:

DATE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUED

EU

G

EN

E

AI

R

PO

R

T

D

O U

G

LA

S D

R

EU

G

EN

E, O

R

PA

SS

EN

G

ER

B

O

AR

D

IN

G B

R

ID

G

ES

E

LE

C

TR

IC

AL

U

PG

R

AD

E

NOT FOR CONSTRUCTION

2700 DELK ROAD SE,

MARIETTA, GA 30067

(770) 423-4200 FAX:(770) 423-4203

www.theaerogroup.net

YSTEMS NGINEERINGS E

".... 15,000 GATES AND COUNTING"

2022-02776

05/31/22 SCHEMATIC

DESIGN

05/31/2022

07/15/22 60% DESIGN

08/17/22 90% DESIGN

EP001

TA

BD

BJ

ELECTRICAL

LEGEND, SYMBOLS,

AND ABBREVIATIONS

90% REVIEW - NOT FOR CONSTRUCTION

EX

M

ELEC/COMM RM 1221

CHILLER 1

480 V

177 KW

EXR WIREWAY

EX

2500 A

KWHD

EXISTING PAD MOUNTED

SERVICE TRANSFORMER

(UTILITY)

EXISTING KILOWATT HOUR DEMAND

METER WITH 15 MINUTE DEMAND &

INTERVAL REGISTER

3000 A, 3P 4W BUS (65 KAIC)

GROUND BAR

MAIN WATER

LINE SERVICE

MAIN SWITCHBOARD

SB1

RM 1506

EXISTING PRIMARY U/G POWER

SERVICE

EXISTING (7) 4" PVC CONDUIT

EX

EN

200 A

EX

220 A

EX

SPARE

200 A

EX

WIREWAY

CHILLER 2

480 V

177 KW

CHILLER 3

PULL

BOX

225 A

EX

125 A

EX EX

225 A

EX

250 A

EX

EX DP3

480Y/277

125A 3P 4W

RM 1620

EX DPN1

480Y/277

400A 3P 4W

RM 2100

EX M-2

480Y/277

225A 3P 4W

RM 1601

250 A

EX MCC-1

480Y/277

250A 3P 4W

RM 1601

450 A

EX

EX DP2

480Y/277

1000A 3P 4W

RM 1606

800 A

DP4

480 V 800A

3P 3W

RM 1606

800 A

EX

EX DPW4

480Y/277

100A 3P 4W

RM 1506

EX DPW3

480Y/277

800A 3P 4W

RM 1506

EX

SPARE 400 A

EX

800 A

EX

EX DPS3

480Y/277

400A 3P 4W

EX DP1

480 V 800A

RM 1506

N

L

EN

L

E

EX DPEX

480Y/277

200A 3P 4W

EX DPSX

480Y/277

300A 3P 4W

EM ELEC RM 1507

ATS ES

200 A 4P

ATS SB

300 A 4P

WIREWAY

300 A 200 A

GENERATOR RM 1508

480 V

350 KW

GENERATOR

G

5:

ASVS

V A

800 A

(EX) SB1 480 V, 3 PHASE, 4 WIRE, 2500 AMP

3 EA [ 3" C, 3-350 KCMIL, 1/0 GND ]

DP4 480 V, 3 PHASE, 3 WIRE, 800 AMP

EP002

150 A

SEE PBB ONE-LINE

DIAGRAM FOR

DETAILS

150 A

150 A

(E)PBB

VENDOR

PANEL

SEE PBB ONE-LINE

DIAGRAM FOR

DETAILS

150 A

SEE PBB ONE-LINE

DIAGRAM FOR

DETAILS

150 A

SEE PBB ONE-LINE

DIAGRAM FOR

DETAILS

150 A

SEE PBB ONE-LINE

DIAGRAM FOR

DETAILS

150 A

SEE PBB ONE-LINE

DIAGRAM FOR

DETAILS

1-1/2" C, 3-1/0, 6 GND (TYP)

150 A (E)PBB

VENDOR

PANEL

150 A (E)PBB

VENDOR

PANEL

150 A (E)PBB

VENDOR

PANEL

150 A (E)PBB

VENDOR

PANEL

150 A (E)PBB

VENDOR

PANEL

SHEET NO.:

SHEET CONTENTS

DO NOT SCALE DRAWINGS

CONTRACT NO.:

DATE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUED

EU

G

EN

E

AI

R

PO

R

T

D

O U

G

LA

S D

R

EU

G

EN

E, O

R

PA

SS

EN

G

ER

B

O

AR

D

IN

G B

R

ID

G

ES

E

LE

C

TR

IC

AL

U

PG

R

AD

E

NOT FOR CONSTRUCTION

2700 DELK ROAD SE,

MARIETTA, GA 30067

(770) 423-4200 FAX:(770) 423-4203

www.theaerogroup.net

YSTEMS NGINEERINGS E

".... 15,000 GATES AND COUNTING"

2022-02776

05/31/22 SCHEMATIC

DESIGN

05/31/2022

07/15/22 60% DESIGN

08/17/22 90% DESIGN

EP002

TA

BD

BJ

PROPOSED

EXISTING

DEMOLISH

LINE LEGEND

BUILDING ONE-LINE

DIAGRAM

PARTIAL ONE-LINE DIAGRAM

SCALE: NONE

1 NEW PCA UNITS

SCALE: NONE

90% REVIEW - NOT FOR CONSTRUCTION

VS

M 3 5:2000

EX

125 A

M

EX

EX K

480Y/277

225A 3P 4W

RM 1222

EX KP

208Y/120

150A 3P 4W

EX T-1

45 KVA

480 V/ 208 V

EX KP1

208Y/120

150A 3P 4W

RM 1222

EX KP2

208Y/120

150A 3P 4W

RM 1232

EX T-2

45 KVA

480 V/ 208 V

EX KP3

208Y/120

150A 3P 4W

RM 1232

EX T-3

45 KVA

480 V/ 208 V

EX T-4

45 KVA

480 V/ 208 V

EX KP4

208Y/120

150A 3P 4W

RM 1232

ER

REMOTE

SIGNAL

ER ANNUNCIATOR

RM 1313

GENERATOR

480 V

125 KW

G

ER

ER

GENERATOR RM 1508

N

L

DPEX

480Y/277

200A 3P 4W

EX T-GBX

45 KVA

480 V/ 208 V

RM 1506

EX GBX

208Y/120

150A 3P 4W

RM 1406

EX GLX

480Y/277

50A 3P 4W

RM 1601 EX DPX1

208Y/120

125A 3P 4W

RM 1506

EX SPX

208Y/120

50A 3P 4W

RM 1213

EX GPX

208Y/120

50A 3P 4W

RM 1601

EX NPX

208Y/120

100A 3P 4W

RM 2100

EX WPX

208Y/120

60A 3P 4W

RM 1309

EX NPX1

208Y/120

60A 3P 4W

RM 2100

T-E

45 KVA

480 V/ 208 V

RM 1506

ER

WLX

480Y/277

50A 3P 4W

RM 1309

NEW WLX

480Y/277

50A 3P 4W

RM 1309 ESPX

208Y/120

100A 3P 4W

SBPX

208Y/120

150A 3P 4W

EM ELEC RM 1507

T-ESPX

30 KVA

480 V/ 208 V

T-SBPX

45 KVA

480 V/ 208 V

UPS

208Y/120

100A 3P 4W

16 KVA

IT RM 2007

1UPS

120V 1PH

100A 1P 3W

E

ATS ES

200 A

4P

N

L

DPSX

480Y/277

300A 3P 4W

E

ATS SB

300 A 4P

350 KW

WIREWAY

G

REMOTE

GENERATOR

ANNUNCIATOR

RM 2007

ELEC/COMM RM 1221

300 A 200 A

GENERATOR

480 V

DPS4

208Y/120 150A

3P 4W

T-DPS4

45 KVA

480 V/ 208 V

EPX1

208Y/120

50A 3P 4W

T-EPX1

15 KVA

480 V/ 208 V

SPX1

208Y/120

100A 3P 4W

T-SPX1

30 KVA

480 V/ 208 V

DPX

200 A

ER

480Y/277

200A 3P 4W

RM 1506

EX ATS 1

200 A

CHILLER 2

480 V

177 KW

WIREWAY

NF

EX T-K

45 KVA

480 V/ 208 V CHILLER 1

480 V

177 KW

EX GP6

208Y/120

125A 3P 4W

RM 1620

EX T1

208Y/120

50A 3P 4W

RM 2606

EX T-GP6

45 KVA

480 V/ 208 V

RM 1620

EX NL1

480Y/277

100A 3P 4W

RM 2100

EX NP1

208Y/120

100A 3P 4W

RM 2100

EX T-1

112.5 KVA

480 V/ 208 V

RM 2100

EX DPN2

208Y/120

350A 3P 4W

RM 2100

DPG2

480Y/277

250A 3P 4W

RM 1601

EXR WIREWAY

PULL

BOX

CHILLER 3

EX DPN1

480Y/277

400A 3P 4W

RM 2100

EX DP3

480Y/277

125A 3P 4W

RM 1620

EX M-2

480Y/277

225A 3P 4W

RM 1601

EX MCC-1

480Y/277

250A 3P 4W

RM 1601

EX DP2

480Y/277

1000A 3P 4W

RM 1606

DPW3

480Y/277

800A 3P 4W

RM 1506

DPW4

480Y/277

100A 3P 4W

RM 1506

EX

2500 A EN

V A

KWHD AS

EX

200 A

EX

220 A

EX

200 A

EX

225 A

EX

125 A

EX

250 A

EX

225 A

EX

250 A

EX

450 A 800 A

EX

SPACE

400 A

EX CP1

208Y/120

100A 3P 4W

RM 1126

EX NP6

208Y/120

100A 3P 4W

RM 1107

EX NP5

208Y/120

100A 3P 4W

RM 1109

EX NP4

208Y/120

100A 3P 4W

RM 1115

EX NP3

208Y/120

100A 3P 4W

RM 1120

EX NP2

208Y/120

100A 3P 4W

RM 1125

DPS3

480Y/277 400A

3P 4W

DPS5

480Y/277

150A 3P 4W

ESLX

480Y/277

100A 3P 4W

SBLX

480Y/277

150A 3P 4W

E

L

N

EXISTING PAD MOUNTED SERVICE

TRANSFORMER (UTILITY)

EXISTING RESTAURANT/KITCHEN

BREAKER-METER UNIT

3000 A, 3P 4W BUS (65 KAIC)

GROUND BAR

MAIN WATER

LINE SERVICE

MAIN SWITCHBOARD

SB1

RM 1506

JUMPER CABLES

EXISTING PRIMARY U/G POWER

SERVICE

EXISTING (7) 4" PVC CONDUIT

SPARE

DP4

800A 3P 3W

RM 1606

800 A

DP1

800A 3P 3W

RM 1606

800 A

EX

SHEET NO.:

SHEET CONTENTS

DO NOT SCALE DRAWINGS

CONTRACT NO.:

DATE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUED

EU

G

EN

E

AI

R

PO

R

T

D

O U

G

LA

S D

R

EU

G

EN

E, O

R

PA

SS

EN

G

ER

B

O

AR

D

IN

G B

R

ID

G

ES

E

LE

C

TR

IC

AL

U

PG

R

AD

E

NOT FOR CONSTRUCTION

2700 DELK ROAD SE,

MARIETTA, GA 30067

(770) 423-4200 FAX:(770) 423-4203

www.theaerogroup.net

YSTEMS NGINEERINGS E

".... 15,000 GATES AND COUNTING"

2022-02776

05/31/22 SCHEMATIC

DESIGN

05/31/2022

07/15/22 60% DESIGN

08/17/22 90% DESIGN

EP101

TA

BD

BJ

PARTIAL ONE-LINE

POWER RISER

DIAGRAM

90% REVIEW - NOT FOR CONSTRUCTION

PROPOSED

EXISTING

DEMOLISH

LINE LEGEND

GENERAL NOTES

1. ALL ITEMS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.

2. COORDINATE OUTAGES WITH OWNER/ARCHITECT.

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

APPENDIX B

PTW COMPUTER MODEL &

INPUT REPORT

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

APPENDIX C

PTW SHORT CIRCUIT REPORT

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

APPENDIX D

PTW DEMAND LOAD REPORT

Elcon Associates, Inc.

September 2022

City of Eugene, Oregon

Eugene Airport PBB Electrical Upgrade

APPENDIX E

PTW LOAD FLOW REPORT