About this file
This document is an Electrical Calculations Report prepared by AERO Systems Engineering for the City of Eugene, Oregon regarding the Eugene Airport Terminal Building Passenger Boarding Bridges (PBB) Electrical Upgrade project. The project involves adding new air conditioning equipment to existing airport terminal passenger boarding bridges, requiring comprehensive electrical analysis including short circuit calculations, service load analysis, and load flow calculations. The calculations were performed using SKM Power Tools for Windows (PTW) Version 9.0.0.7 computer software based on project drawings and equipment specifications. The report documents that the project will add six PCA units with a combined capacity of 102 kVA per unit at 0.8 power factor, totaling 489.6 kW of new electrical demand. The calculations are based on utility data from Eugene Water & Electric Board (EWEB) indicating a maximum available fault current of 20,871 amperes at 480 volts, three-phase service. The document was submitted as part of the 90% design phase submittal in September 2022.
The analysis identifies that existing distribution panels A2 through A6 must be upgraded to 14 kA amperes interrupting capacity (AIC) to handle maximum short circuit currents, as they currently have only 5 kA ratings and are deemed inadequate. The existing main service entrance switchboard SB1, rated at 2,500 amperes, is confirmed adequate for the future service load of approximately 1,850 amperes when calculated using NEC Article 220.87 methodology. Load flow calculations confirm that voltage drops remain within the recommended 5% limit across all distribution points, with the main switchboard experiencing 1.06% voltage drop and individual PCA units ranging from 3.02% to 4.06% voltage drop. The report indicates that an arc flash hazard analysis will be provided separately during construction to determine personal protective equipment requirements for workers. The short circuit calculations exclude the on-site 350 kW diesel generator from analysis since its available short circuit current of approximately 5,000 amperes is significantly less than the utility contribution of 21,000 amperes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid documents-final~1.pdf | ||
| Bid tabulation~3.pdf | ||
| NOIA-Interested parties.pdf | ||
| Addendum 1_10.13.2022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AERO Systems Eng
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
Electrical Calculations (IFC Submittal)
City of Eugene Eugene, Oregon
AERO Systems Engineering
EUGENE AIRPORT TERMINAL BUILDING
PASSENGER BOARDING BRIDGES ELECTRICAL UPGRADE
SHORT CIRCUIT, SERVICE LOAD, &
LOAD FLOW CALCULATIONS
September 2022
TABLE OF CONTENTS
1.0 Introduction Page 2
2.0 Short Circuit Calculations Page 4
2.1 Basis of Short Circuit Calculations
2.2 Methodology
2.3 Data Used in Calculations
2.4 Calculation Results
3.0 Service Load Calculation Page 10
3.1 Basis of Service Load Calculation
3.2 Methodology
3.3 Calculation Results
4.0 Load Flow Calculations Page 13
4.1 Basis of Load Flow Calculations
4.2 Methodology
4.3 Calculation Results
5.0 APPENDICES Page 17
Appendix A: Project Drawings Appendix B: SKM PTW Computer Model & Input Report Appendix C: SKM PTW Short Circuit Report Appendix D: SKM PTW Load Flow Report
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
Electrical Calculations (IFC Submittal)
SECTION 1.0
INTRODUCTION:
Discussion of Study Scope
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
City of Eugene Eugene, Oregon
AERO Systems Engineering
Eugene Airport Terminal Building PBB Electrical Upgrade
Short Circuit Analysis, Electrical Demand Load Analysis, and Voltage Drop Analysis
September 2022
(IFC Submittal)
1.0 INTRODUCTION
Electrical calculations were performed for the Eugene airport terminal building passenger boarding bridges electrical upgrade project in Eugene, Oregon. This project will add new air conditioning (PCA) equipment to the existing airport terminal passenger boarding bridges (PBB).
Computer-aided engineering (CAE) electrical calculations were performed using SKM Power Tools for Windows (PTW), Version 9.0.0.7 computer program. The computer model & calculations are attached in the Appendices:
• Computer model is based on the project drawings in the Appendix A.
• Computer input data and model in the Appendix B.
• Computer short circuit calculation results in the Appendix C.
• Computer load flow calculation results in the Appendix D.
Updated short circuit data provided by EWEB had been included in the 90% study report submitted last month.
An arc flash hazard analysis and adhesive labels will also be provided during construction in a separate report. The arc flash hazard analysis determines the flash hazard boundaries, incident energies, and personal protective equipment (PPE) required for installation work, commissioning, or maintenance of any energized equipment within this project’s scope of work. The incident energy is the amount of heat energy that would be impressed on a worker’s face or torso should an electrical arc fault occur while working on or near exposed energized equipment. The calculated incident energy determines the PPE level needed to prevent 2nd degree burns to a worker’s face or torso.
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
SECTION 2.0
SHORT CIRCUIT CALCULATIONS:
Discussion of Basis, Methodology, and
Results
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
Electrical Calculations (IFC Submittal)
2.0 SHORT CIRCUIT CALCULATIONS
Short circuit calculations were performed for the new electrical equipment using computer aided engineering (CAE). CAE models the power system to calculate the maximum short circuit currents at selected fault points to confirm circuit breaker short circuit interrupting ratings. The balanced 3-phase symmetrical RMS fault current is typically considered to be the maximum available fault current. Under certain conditions and locations, such as at transformers with solidly grounded neutrals, the line-to-ground fault current magnitude can be greater than the 3-phase current. Therefore, the higher of the two calculated fault currents should be used as the basis for the selection of the protective device interrupting ratings.
The existing 350-kW on-site diesel-engine generator was not considered in these short circuit calculations since the available short circuit current from this generator (~5kA) would be significantly less than that from the utility (~21kA).
2.1 BASIS OF SHORT CIRCUIT CALCULATIONS
Electrical distribution equipment must be able to withstand and/or interrupt the most severe fault duty that it may be subjected to at its location in the system. The NFPA 70 (National Electrical Code), Article 110.9 requires that electrical equipment have ratings sufficient for interrupting the maximum fault current present at the line side terminals of the equipment.
This section calculates maximum available RMS symmetrical, short-circuit currents at certain equipment locations in the system. The calculation procedures are based on recommendations included in ANSI/IEEE/IEC Standards: 399, 551, 62271-37-013 (supersedes C37.013), C37.04, C37.13, & C37.010.
Equipment short-circuit ratings are expressed in symmetrical RMS current. However, actual fault currents encountered in the field are typically both symmetrical and asymmetrical due to the system inductance, which introduces asymmetry at the beginning of a fault.
The magnitude and duration of the asymmetrical portion of the short circuit current depends upon several factors, including at what exact point on the current waveform where the fault begins. The level of asymmetry may also differ between the phases in a three-phase system. Because of the uncertainty in asymmetry for any particular fault event, the capability of devices to interrupt an asymmetrical fault current is based on the maximum possible asymmetrical fault current level at the point of application. The more inductive the circuit, as measured by the calculated system X/R ratio, the more asymmetrical the fault current will be. If the calculated X/R level exceeds a certain level, then the increased asymmetrical duty should be considered when breaker ratings are specified.
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
Electrical Calculations (IFC Submittal)
Low-voltage circuit breakers and fuses are tested to establish their short circuit interrupting ratings based on a test circuit, with a defined X/R ratio, as specified in various product standards (UL and ANSI). Different classes of low-voltage breakers have different test X/R values. Design test circuit power factors and associated X/R ratios are as shown in Table 1.
Table 1: Summary of Test Power Factor and X/R Values for LV Devices.
Device pf X/R Ratio
Power circuit breaker, unfused 0.15 6.591
Power circuit breaker, fused 0.20 4.899
Molded case breaker, interrupting rating greater than 20000 A 0.15-0.20 6.591-4.899
Molded case breaker, interrupting rating 10001 to 20000 A 0.25-0.30 3.9-3.18
Molded case breaker, interrupting rating 10000 A and less 0.45-0.50 2.0-1.732
For power circuit breakers, the power factors are taken from ANSI/IEEE C37.13. For molded case breakers, the power factors are taken from NEMA standard AB1. Since the NEMA standard specifies a range of test circuit power factors, the highest value (lowest X/R ratio) is used to determine the multiplying factor. This produces the most conservative (largest) factor. See IEEE 1015-1997, IEEE Recommended Practice for Applying Low-Voltage Circuit Breakers Used in Industrial and Commercial Power Systems, for additional details.
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
Electrical Calculations (IFC Submittal)
2.2 METHODOLOGY
Short-circuit calculations were performed with computer-aided engineering (CAE) using SKM Power Tools for Windows (PTW), Version 9.0.0.7 computer program. The short circuit calculation methodology uses a computer (one-line) circuit model, which defines all electrical characteristics of the power system under study. The computer one-line diagram is the basis for the power system database (utility sources, induction motors, transformers, cables, protective devices, etc.) used for the CAE model. When the study is run, the computer algorithm calculates the bolted short circuit (fault) currents for each bus location.
See the Appendix B for the computer (one-line) circuit model and input data report for this project. The data generated by the computer program consists of the following:
• One-Line Computer Model
Show each of the relevant power system components (utility and generator sources, induction motors, transformers, cables, protective devices, etc.) and their interconnections.
• Input Data Report
Provide summary of the bus-to-bus interconnections and data used in performing the Short Circuit Study. The identification of buses was taken from the PCA units project documents. Each bus represents one of the following: a utility contribution point, a generator contribution point, a service end box, a switchboard bus, a distribution panelboard bus, a panelboard bus, motor connection point, load connection point.
• Fault Analysis Summary Reports
Provide the RMS symmetrical short circuit current for each major point (bus) in the power system when fed by utility power in the normal switched configuration.
The computer program used simulates bolted faults at every point of consideration in the system and calculates the maximum available short-circuit current at that point, without any reduction due to current-limiting overcurrent devices that may be present.
The calculated short-circuit current values are RMS symmetrical amperes that are comparable with the RMS symmetrical short-circuit current ratings of the electrical distribution equipment and circuit breakers under consideration.
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
2.3 Data Used in the Calculations
The computer (one-line) circuit model is a simplified version of the system drawings, showing only a portion of the airport terminal building electrical system under consideration. The various circuit locations on the diagram have been labeled with bus identification numbers so that input data could be supplied to the computer and the computer output could be readily interpreted.
Power Company Data
The maximum available fault current from the EWEB service point at the main switchboard SB1 is 20,871 Amperes, 480-Volts, 3-phase. This data was provided by Brad Rudler at EWEB on August 2, 2022. The normal configuration was used for this short circuit calculation where the terminal building is fed from the incoming EWEB electrical service. Actual short circuit data from EWEB was not available when this report was written.
Cable Data
The conductor data used for each circuit segment includes the circuit length, number of conductors per phase, conductor size, conductor material, cable insulation type, and conduit material.
Resistance values are based on ambient (no load) temperatures rather than the full load temperatures, because short-circuits can occur when the circuit is initially energized or lightly loaded, as well as when fully loaded.
Transformer Data
Typical transformer percent impedance and typical X/R ratio values were used for the utility service transformer. Actual transformer data was not available and was therefore estimated for these calculations.
Motor Contribution to Short-Circuit Current
Motors that are connected and running at the time a fault occurs will contribute short circuit current for a short time (a few cycles) into the fault. Large motor (> 50 hp) short-circuit contributions were included in this short-circuit analysis, so that the calculated results represent the highest short-circuit current to which the equipment might be subjected.
All connected chiller motors as shown on the one-line drawings were assumed to be running at the time of the fault. For this study, each chiller load was modeled as one induction motor load connected directly to the low voltage SB1 main switchboard bus using sub-transient reactance values from C37.010, C37.13, and IEEE Std. 141.
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
Electrical Calculations (IFC Submittal)
Generator Contribution to Short-Circuit Current
There is a 350-kW standby diesel engine-generator set associated with the existing terminal building distribution system. Since the short circuit current that would be available from the on-site 350-kW generator (estimated to be < 5,000 Amperes short circuit current) will be significantly less than the short circuit current from the EWEB utility system (reported to be 21,000 Amperes short circuit current per Brad Rudler’s email on August 2, 2022)), this element was not included in this short circuit analysis.
2.4 STUDY RESULTS
Detailed input and output computer generated reports for the normally configured operating scenario of this short circuit analysis is included in the Appendix B.
The short circuit current calculation results are included in the Appendix C and are used to confirm the electrical distribution equipment short circuit rating requirements for the Eugene airport PBB electrical upgrade project:
EUGENE AIRPORT PBB SHORT CIRCUIT CALCULATION SUMMARY:
EUGENE PBB SHORT CIRCUIT EVALUATION TABLE
EQUIPMENT
NOMINAL
L - L
VOLTS
AIC OR
WCR
MAXIMUM
SCA
X/R
RATIO
EVALUATION
SB1 480 42,000 23,675 5.20 ADEQUATE
DP4 480 30,000 16,939 2.93 ADEQUATE
A1 480 35,000 10,307 1.06 ADEQUATE
A2 480 5,000 7,740 0.97 INADEQUATE
A3 480 5,000 6,708 0.88 INADEQUATE
A4 480 5,000 5,757 0.81 INADEQUATE
A5 480 5,000 6,708 0.88 INADEQUATE
A6 480 5,000 10,696 1.02 INADEQUATE
Note that AIC is defined as Amperes interrupting capacity, WCR is defined as withstand current rating, and SCA is defined as short circuit Amperes. As indicated in the above table, existing panels A2 through A6 must be upgraded to 14kA AIC to handle the maximum short circuit currents. This report can be revised after the equipment panels have been upgraded.
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
SECTION 3.0
SERVICE LOAD CALCULATION:
Discussion of Basis, Methodology, and
Results
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
3.0 SERVICE LOAD CALCULATION
Electrical distribution equipment and conductors must be able to safely supply the electrical demand. The Eugene airport PBB electrical upgrade project will add new electrical loads to the existing airport terminal building electrical distribution system. This load calculation is used to confirm that service entrance switchboard has adequate capacity to support the new loads.
3.1 BASIS OF SERVICE LOAD CALCULATION
NFPA 70 (National Electrical Code), Article 220 provides requirements for calculating branch circuit, feeder, and service loads. The record one-line diagram indicates that EWEB electrical service lateral directly feeds the terminal building main service entrance switchboard SB1. Therefore, the total maximum load current calculation must be less than the current rating of SB1.
3.2 METHODOLOGY
A hand calculation based on NFPA 70 Article 220.87 was performed to confirm that the existing terminal building electrical service capacity is adequate to support the new PBB electrical upgrade project. NFPA 70 Article 220.87 permits using the existing building electrical demand to calculate the future service load as follows:
Future service load = existing load (previous 1-year peak demand) x 1.25 + new loads
Existing load = Previous 1-year peak demand = 644 kW.
(644 kW was the reported previous winter peak demand) (571 kW was the reported previous summer peak demand)
New loads = 6-PCA units = 6 x 102 kVA x 0.8 = 489.6 kW.
Future service load = existing load x 1.25 + new load = 1295 kW.
Existing service rating = 2,500 Amperes, 480-Volts, 3-Phase, 4-Wire.
IF future service load < existing service rating, then existing service is adequate.
3.3 STUDY RESULTS
The hand calculated service load for this project based on NFPA 70, Article 220.87 was calculated to be 1295 kW or approximately 1,850 Amperes at 480-Volts, 3-phase. The existing main service entrance switchboard SB1 is rated for 2,500 Amperes, which is adequate for the future service load current of 1,850 Amperes after this project has been completed and operational.
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
SECTION 4.0
LOAD FLOW CALCULATIONS: Discussion of Basis, Methodology, and Results
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
Electrical Calculations (IFC Submittal)
4.0 LOAD FLOW CALCULATIONS
This project will add new electrical loads to the existing airport terminal building where excessive voltage loss can cause inefficient operation or a malfunction of electrical equipment. These Load flow calculations are used to confirm that the proposed feeder and branch circuit conductors are adequate for load and voltage drop.
4.1 BASIS OF LOAD FLOW CALCULATIONS
Load flow calculations are a common power system analysis computation used to determine component and circuit loading, steady state bus voltages, reactive power flows, transformer tap settings, system losses, generator voltage setpoints, and operating scenarios under alternate switching or emergency conditions.
• Computer aided engineering using SKM Power Tools for Windows (PTW), Version 9.0.0.7 computer program was used as the basis for the voltage drop calculations for the new distribution panelboard and branch conductors within the scope of this project.
• NFPA 70 (National Electrical Code), Article 210.19, Informational Note 3 and Article 310.14 A(A)(1), Informational Note 1 recommends that the voltage drop be limited to 5% at the furthest outlet for reasonable operational efficiency.
• Computer aided engineering using SKM Power Tools for Windows (PTW), Version 9.0.0.7 computer program was used as the basis for the electrical load calculations for the new distribution equipment and conductors that were added to support the PBB Electrical Upgrade scope of work.
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
Electrical Calculations (IFC Submittal)
4.2 METHODOLOGY
CAE load flow calculations were performed using SKM Power Tools for Windows (PTW), Version 9.0.0.7 computer program. The computer program iterative algorithm calculates load flow currents, system losses, and bus voltages for each bus and cable interconnection in the system. See the Appendix B for the computer model and data used for the load flow calculations.
IEEE Std. 399-1990, IEEE Recommended Practice for Power System Analysis, describes the load flow problem formulation in Chapter 6, 6.4.1. as a network solution problem where the voltages and currents are described by Equation 1:
[I] = [Y] [V] Eqn.1 where:
[I] = vector of total positive sequence currents flowing at the network buses.
[V] = vector of positive sequence voltages at the network buses.
[Y] = network admittance matrix.
The bus i current is related by Equation 2:
Ii = (Pi + jQi)*/Vi* Eqn. 2 where:
P = active power kW.
Q = reactive power kVAR.
Asterisk (*) designates the conjugate of a complex number.
The combination of load flow and bus current equations 1 & 2 describes the load flow problem in terms of the non-linear equation 3:
[P-jQ/V*] = [Y] [V] Eqn. 3
Equation 3 can be solved by iterative algorithms, such as Gauss-Seidel, Newton- Ralphson, or other variations of these that are commonly used in commercially available computer program algorithms.
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
Electrical Calculations (IFC Submittal)
4.3 STUDY RESULTS
The balanced load flow output report is attached in the Appendix D.
EUGENE AIRPORT PBB VOLTAGE DROP CALCULATION SUMMARY:
EUG PBB VOLTAGE DROP EVALUATION TABLE
NOMINAL
L - L
VOLTS
BUS
VOLTAGE
PU
LOAD
FLOW
VOLTS
%VD EVALUATION
SB1 480 0.99 475 1.06 ADEQUATE
DP4 480 0.98 468 2.43 ADEQUATE
PCA-1 480 0.97 466 3.02 ADEQUATE
PCA-2 480 0.97 463 3.46 ADEQUATE
PCA-3 480 0.96 462 3.73 ADEQUATE
PCA-4 480 0.96 460 4.06 ADEQUATE
PCA-5 480 0.96 462 3.73 ADEQUATE
PCA-6 480 0.97 465 3.07 ADEQUATE
Note that the load flow calculation voltages reported in this table assume a -2.5% primary tap setting for the utility transformer primary winding and a peak demand operating scenario.
EUGENE AIRPORT PBB LOAD FLOW CURRENT CALCULATION SUMMARY:
EUG PBB LOAD FLOW CALCULATION TABLE
FEEDER
CABLE
NOMINAL
L - L
VOLTS
RATING
AMPS
LOAD
FLOW
AMPS
%VD EVALUATION
SB1 480 2,500 1,578.3 0.3 ADEQUATE
DP4 480 800 762.9 1.37 ADEQUATE
PCA-1 480 150 126.5 0.59 ADEQUATE
PCA-2 480 150 127.1 1.04 ADEQUATE
PCA-3 480 150 127.4 1.31 ADEQUATE
PCA-4 480 150 127.9 1.64 ADEQUATE
PCA-5 480 150 127.4 1.31 ADEQUATE
PCA-6 480 150 126.6 0.65 ADEQUATE
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
SECTION 5.0
APPENDICES
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
APPENDIX A
EUGENE PBB PROJECT DRAWINGS
ONE LINE DIAGRAMS
ELECTRICAL LEGEND
LIGHTING FIXTURE LEGEND
MOUNTING HEIGHT ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE
M LIGHTING FIXTURE, DOWN LIGHT (MARK "M", CONTROLLED BY SWITCH "d")
LIGHTING FIXTURE, FLUORESCENT SURFACE MOUNT (LENGTH AND WIDTH AS SHOWN ON PLAN)
LIGHTING FIXTURES, WALL MOUNTED
EXIT LIGHTING FIXTURES, UNIVERSAL MOUNT. TWO FACES (LEFT), ONE FACE (RIGHT). DIRECTIONAL
ARROWS DEPENDANT UPON LOCATION. ORDER FIXTURES WITH FIELD SELECTABLE ARROWS.
LIGHTING FIXTURE, ON EMERGENCY CIRCUIT. WHEN DESIGNATED WITH NL, DO NOT SWITCH. WHEN NOT DESIGNATED WITH NL PROVIDE ABOVE CEILING RELAY TO ALLOW SWITCHING UNTIL LOSS OF
NORMAL POWER WHEN RELAY CROSSES FIXTURE POWER OVER TO EMERGENCY CIRCUIT. ONCE
NORMAL POWER IS RESTORED RELAY CROSSES FIXTURE POWER BACK TO NORMAL POWER
THUS RE-ENABLING SWITCHING.
LIGHTING CONTROL LEGEND
48" TO SWITCH, SINGLE - RED HANDLE FOR EMERGENCY CIRCUITS
48" TO SWITCH, 3 WAY, 4 WAY - RED HANDLE FOR EMERGENCY CIRCUITS
48" TO WALL SWITCH OCCUPANCY SENSOR, ALL DIGITAL, MULTI-TECHNOLOGY (ULTRASONIC & PIR)
SENSOR, EQUAL TO LIGHTHAWK LHMT.
CEILING MOUNTED OCCUPANCY SENSOR, ALL DIGITAL, MULTI-TECHNOLOGY (ULTRASONIC AND PIR)
AS MANUFACTURED BY LEVITON (ODC0S) OR APPROVED EQUAL.
R
PC
EMERGENCY LIGHTING RELAY AS MANUFACTURED BY WATTSTOPPER (ELCU-200) OR APPROVED
EQUAL.
PHOTOCELL MOUNTED FOR DAYLIGHT HARVESTING AS MANUFACTURED BY SENSORSWITCH (NLIGHT
NCM ADC(X)), HUBBELL (LUXSTATLS) OR APPROVED EQUAL.
ELECTRICAL SYSTEMS LEGEND
COMMUNICATION OUTLET - SEE NOTES 17 & 18. REFER TO TG001 TECHNOLOGY LEGEND FOR
ADDITIONAL INFORMATION.
COMMUNICATION OUTLET - SEE NOTES 17 & 18. REFER TO TG001 TECHNOLOGY LEGEND FOR
ADDITIONAL INFORMATION.
COMMUNICATION OUTLET - SEE NOTES 17 & 18. REFER TO TG001 TECHNOLOGY LEGEND FOR
ADDITIONAL INFORMATION.
COMMUNICATION OUTLET, RECESSED FLOOR MOUNTED - SEE NOTES 17 & 18. REFER TO TG001
TECHNOLOGY LEGEND FOR ADDITIONAL INFORMATION.
WALL PHONE OUTLET - SEE NOTES 17 & 18. REFER TO TG001 TECHNOLOGY LEGEND FOR
ADDITIONAL INFORMATION.
TV TV OUTLET - (1) TYPE F JACK WITH RG-11 CABLE AND (2) COMMUNICATION JACKS (DATA - GREY)
WITH (2) GREY CAT6 CABLES. UNO TERMINATE IN COMM ROOM CLOSEST TO OUTLET.
TELEPHONE TERMINAL BOARD (TTB), 8' X 8' PLYWOOD PAINTED WHITE WITH FIRE RETARDANT PAINT, (2)
COATS REQUIRED. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
48" TO
80" TO BOT
FACP
FIRE ALARM REMOTE ANNUNCIATOR
FARA
FIRE ALARM TERMINAL CABINET
FATC
SMOKE DETECTOR, OBCURATION TYPE, AT CEILING.
S D
DUCT SMOKE DETECTOR, IONIZATION TYPE WITH SAMPLING TUBE. LOCATE IN DUCT PER DIVISION
23 AND HVAC FLOOR PLANS.
FS
PS
TS
HEAT DETECTOR, SET TEMPERATURE (F); RATE OF RISE (R)
FIRE PROTECTION (SPRINKLER SYSTEM) FLOW SWITCH
FIRE PROTECTION (SPRINKLER SYSTEM) PRESSURE SWITCH
FIRE PROTECTION (SPRINKLER SYSTEM) TAMPER SWITCH
IFP-X
OPEN FRAME COMMUNICATIONS RACK, 19"
EQUIPMENT CABINET, SIZE(S) AS NOTED ON PLANS AND RISER DIAGRAMS
CEILING MOUNTED SPEAKER
2A
1507A
NOTE:
REFER TO TECHNOLOGY PLANS FOR TECHNOLOGY LEGEND WHICH INCLUDES PAGING, FIDS, CATV, AND TEL/DATA.
ABBREVIATIONS
A
AC
ACS
AFF
AFG
ATS
B
BC
BHS
BKR
C
CCTV
CH
CKT
CLG
AMP
ABOVE COUNTER
ACCESS CONTROL SYSTEM
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AUTOMATIC TRANSFER SWITCH
BOTTOM
BELOW COUNTER
BAGGAGE HANDLING SYSTEM
BREAKER
CONDUIT
CLOSED CIRCUIT TELEVISION
COUNTER HEIGHT
CIRCUIT
CEILING HEIGHT
CP
CPB
CR
CTR
CTS
D
D/S
DTC
E
ECB
EN
EPB
ER
ERP
COMMUNICATIONS PANEL
COMMUNICATIONS PULL BOX
CARD READER
CONTRACTOR
CCTV SWITCHING EQUIPMENT
DURESS
DISCONNECT SWITCH
DATA TERMINAL CABINET
EMERGENCY
ENCLOSED CIRCUIT BREAKER
EXISTING TO BE REPLACED
ELECTRICAL PULL BOX
EXISTING TO BE REMOVED
EXISTING IN RELOCATED POSITION
EWC
EWH
EX
EXP
EXR
FACP
FATC
FAAP
GCTC
GFCI
GND
HID
IDF
LCD
ELECTRICAL WATER COOLER
ELECTRIC WATER HEATER
EXISTING TO REMAIN
EXPLOSION PROOF
EXISTING TO BE RELOCATED
FIRE ALARM CONTROL PANEL
FIRE ALARM TERMINAL CABINET
FIRE ALARM ANNUNCIATOR PANEL
GATE CONTROL TERMINAL CABINET
GROUND FAULT CIRCUIT INTERRUPTER
GROUND
HIGH INTENSITY DISCHARGE
INTERMEDIATE DISTRIBUTION FRAME
LIQUID CRYSTAL DISPLAY
MDF
MH
NEC
NIC
NL
OHE
P
PATC
PL
POE
PTZ
SCP
SIDA
SSTC
MAIN DISTRIBUTION FRAME
MOUNTING HEIGHT
NATIONAL ELECTRICAL CODE
NOT IN CONTRACT
NIGHT LIGHT (UNSWITCHED)
OVERHEAD ELECTRIC
PUBLIC
PUBLIC ADDRESS TERMINAL CABINET
PILOT LIGHT
POWER OVER ETHERNET
PAN/TILT/ZOOM
SECURITY CONTROL PANEL
SECURITY IDENTIFICATION DISPLAY AREA
SOUND SYSTEM TERMINAL CABINET
STC
STR
T
TBB
TGB
TMGB
TVSS
TX
UGE
UNO
VDB
SECURITY TERMINAL CABINET
STARTER
TOP
TELEPHONE BACKBOARD
TELECOMMUNICATIONS GROUNDING BUS BAR
TELECOMMUNICATIONS MAIN GROUNDING BUS BAR
TRANSIENT VOLTAGE SURGE SUPPRESSION
TRANSFORMER
UNDERGROUND ELECTRIC
UNLESS NOTED OTHERWISE
VOICE/DATA BACKBOARD
W
WP
SECURITY ACCESS POINT ARCHITECTURAL DOOR NUMBER
80" TO BOT
78" TO
FIRE ALARM PULL STATION WITH CLEAR PLASTIC LIFT BOX
FIRE ALARM SPEAKER HORN AND STROBE LIGHT
FIRE ALARM SPEAKER HORN AND STROBE LIGHT
FIRE ALARM CONTROL PANEL
E
PER NEC
PER NEC
J
RECEPTACLE, RECESSED FLOOR MOUNTED, COMBINATION DOUBLE DUPLEX/DATA. IDF-X INDICATES COMM ROOM FOR TERMINATION OF DATA DROPS. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION.
RECEPTACLE, RECESSED FLOOR MOUNTED, DOUBLE DUPLEX, NEMA 5-20R
RECEPTACLE, RECESSED FLOOR MOUNTED, COMBINATION SPECIALTY/DATA. PROVIDE SIZE IN ACCORDANCE WITH CIRCUIT BREAKER AND NEMA CONFIGURATION PER EQUIPMENT REQUIREMENT. IDF-X INDICATES COMM ROOM FOR TERMINATION OF DATA DROPS. REFER TO FLOOR PLANS FOR ADDITIONAL INFORMATION.
RECEPTACLE, RECESSED FLOOR MOUNTED, SPECIALTY. PROVIDE SIZE IN ACCORDANCE WITH CIRCUIT
BREAKER AND NEMA CONFIGURATION PER EQUIPMENT REQUIREMENT.
NEMA L6-30R IN JUNCTION BOX MOUNTED ON UNISTRUT SYSTEM, INDEPENDENT OF LADDER RACK, ABOVE COMM
RACKS AND/OR CABINETS AS SHOWN ON PLANS.
NEMA L5-20R IN JUNCTION BOX MOUNTED ON UNISTRUT SYSTEM, INDEPENDENT OF LADDER RACK, ABOVE COMM
RACKS AND/OR CABINETS AS SHOWN ON PLANS.
JUNCTION BOX, 4" SQ. X 1 1/2" DEEP (MINIMUM), MOUNTED ON STUB UP (OR CEILING)
MOTOR STARTER, MANUAL 2 POLE
SAFETY SWITCH (30A FRAME WITH 20A FUSE, NF = NON FUSED)
SAFETY SWITCH (NON FUSED). PROVIDE SIZE BASED ON FEEDER CIRCUIT
BREAKER AND NEC.
EQUIPMENT CONNECTION, COMPLETE TO SUIT EQUIPMENT PER NEC.
PANELBOARD, 120/208 VOLT, PROVIDE SWITCHBOARD MATTING 48" DEEP X 12"
WIDER THAN PANEL (SALISBURY MATTING M48-2 OR APPROVED EQUAL) IN FRON OF
PANEL.
PANELBOARD, 277/480 VOLT, PROVIDE SWITCHBOARD MATTING 48" DEEP X 12"
WIDER THAN PANEL (SALISBURY MATTING M48-2 OR APPROVED EQUAL) IN FRON OF
PANEL.
TRANSFORMER, DRY TYPE
WALKERCELL HEADER DUCT (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)
WALKERCELL HEADER JUNCTION BOX (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)
WALKERCELL DUCT (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)
WALKERCELL JUCTION BOX (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)
WALKERDUCT NO. 2 DUCT WITH SQUARE PRESETS (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)
WALKERDUCT NO. 4 DUCT WITH SQUARE PRESETS (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)
WALKERDUCT JUNCTION BOX (AS MANUFACTURED BY LEGRAND/WIREMOLD OR EQUAL)
SECURITY INFRASTRUCTURE LEGEND
NOTE: ALL CABLING AND SECURITY HARDWARE TO BE OWNER FURNISHED OWNER
INSTALLED.
PROVIDE JUNCTION BOX AT LOCATION WITH 3/4"C BACK TO COMM ROOM.
PROVIDE JUNCTION BOX AT LOCATION WITH 3/4"C BACK TO COMM ROOM.
STUB AND CAP CONDUITS TO 3" BELOW CEILING AT LOCATIONS INDICATED
PROVIDE JUNCTION BOXES AND CONDUIT PER DETAILS SHOWN ON SHEET EY401
ACCORDING TO TYPE SHOWN ON PLANS
PROVIDE JUNCTION BOXES AND CONDUIT PER DETAILS SHOWN ON SHEET EY401
SECURITY ACCESS POINT IDENTIFICATION NUMBER
SECURITY ACCESS POINT ROUGH-IN TYPE, SEE ROUGH-IN DETAILS SHEET EY401
POWER DEVICE LEGEND
MOUNTING HEIGHT ABOVE FINISHED FLOOR UNLESS NOTED OTHERWISE
18" TO RECEPTACLE, DUPLEX, NEMA 5-20R, WALL MOUNTED WITH COVER PLATE
18" TO CLEAN POWER RECEPTACLE, DUPLEX, 20A, NEMA 5-20R (ORANGE)
18" TO CLEAN POWER RECEPTACLE, DOUBLE DUPLEX, 20A, NEMA 5-20R (ORANGE)
18" TO RECEPTACLE, DOUBLE DUPLEX, NEMA 5-20R, WALL MOUNTED WITH COVER PLATE
RECEPTACLE, SPECIALTY. PROVIDE SIZE IN ACCORDANCE WITH CIRCUIT BREAKER AND NEMA
CONFIGURATION PER EQUIPMENT REQUIREMENT.
RECEPTACLE, DUPLEX GFCI, NEMA 5-20R, WALL MOUNTED 6" ABOVE COUNTER OR BACKSPLASH WITH COVER
PLATE.
GENERAL NOTES
1. ALL ELECTRICAL WORK SHALL COMPLY WITH NATIONAL ELECTRICAL CODE, THE NATIONAL FIRE CODES, THE
AMERICANS DISABILITIES ACT, AND LOCAL CODES.
2. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE PROJECT TO ENSURE THAT ALL WORK SHALL MEET OR
EXCEED THE ABOVE REQUIREMENTS. ANY ALLEGED DISCREPENCIES SHALL BE BROUGHT TO THE ENGINEER'S
ATTENTION.
3. THE CONTRACTOR IS DIRECTED TO OBTAIN COPIES OF ALL RELATED PLANS, SPECIFICATIONS, SHOP
DRAWINGS AND ADDENDA TO COORDINATE THE RELATED WORK AND SCHEDULING.
4. THE CONTRACTOR IS REMINDED THAT ELECTRICAL SERVICE TO AND FOR MECHANICAL, KITCHEN AND OTHER EQUIPMENT IS BASED ON EQUIPMENT DESIGN DATA. THE ACTUAL VALUES MAY DIFFER DEPENDING UPON THE EQUIPMENT TO BE FURNISHED. ANY MODIFICATION TO THE ELECTRICAL INSTALLATION, BASED UPON ACTUAL
EQUIPMENT SELECTION, SHALL RESULT IN ADDITIONAL COST TO THE OWNER.
5. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE ARCHITECTURAL AND MECHANICAL PLANS TO ASSURE THAT ELECTRICAL SERVICE FOR ALL ITEMS AND/OR EQUIPMENT NOT PROVIDED WITH ELECTRICAL SERVICE, REQUIRING ELECTRICAL SERVICE, SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION.
6. MECHANICAL, FIRE PROTECTION AND ELECTRICAL EQUIPMENT HAVE BEEN LOCATED AND ARRANGED TO MINIMIZE THE INTERFERENCES OF EQUIPMENT AND STRUCTURE. THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE HIMSELF/HERSELF WITH THE WORK TO BE PERFORMED BY OTHER TRADES AND THE PHYSICAL CHARACTERISTICS OF THE STRUCTURE IN ORDER TO SCHEDULE AND INSTALL EQUIPMENT AND TO MINIMIZE POSSIBLE INTERFERENCE. FAILURE TO PROPERLY COMMUNICATE AND SCHEDULE WORK WITH OTHER TRADES THAT RESULTS IN ADDITIONAL WORK AND MATERIAL, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE MODIFICATIONS REQUIRED TO RESOLVE THE CONFLICT SHALL BE DECIDED BY THE
ENGINEER.
7. ALL PANELBOARDS SHALL BE PROVIDED WITH A TYPEWRITTEN SCHEDULE SHOWING CIRCUIT NUMBERS AND A
COMPLETE DESCRIPTION OF EACH CIRCUIT.
8. MINIMUM TRADE SIZE FOR HOME RUN CONDUIT PERMITTED SHALL BE 3/4 INCH UNLESS NOTED OTHERWISE.
FITTINGS SHALL BE COMPRESSION TYPE.
9. ALL CONDUCTORS SHALL BE COPPER WITH 600 VOLT INSULATION TYPE THHN (MINIMUM SIZE SHALL #12 AWG).
CONTRACTOR SHALL ADJUST WIRE AND CONDUIT SIZES IF OTHER INSULATION TYPES ARE USED.
10. ALL LIGHT SWITCHES AND DUPLEX RECEPTACLES SHALL BE RATED FOR 20 AMPERES AT 120/277 VOLTS AC.
WIRING DEVICES SHALL BE MANUFACTURED BY HUBBELL OR APPROVED EQUAL, SPECIFICATION GRADE.
11. ALL ELECTRICAL WIRING DEVICES INDICATED TO BE INSTALLED IN MASONRY WALLS OR FLOORS SHALL BE FLUSH MOUNTED, INCLUDING BRANCH CIRCUIT PANELBOARDS, UNLESS NOTED OTHERWISE. THE CONDUITS
TO ASSOCIATED ELECTRICAL EQUIPMENT SHALL BE CONCEALED IN WALLS OR FLOORS.
12. ALL CONDUIT RUNS SHALL BE CONCEALED UNLESS SPECIFICALLY NOTED OTHERWISE.
13. THE FIXTURE SCHEDULE IS FOR REFERENCE ONLY. MODEL NUMBERS LISTED MAY NOT INCLUDE ALL
REQUIRED OPTIONS HOWEVER THESE OPTIONS SHALL BE PROVIDED WITH FIXTURES. ALL SUBSTITUTIONS ARE
SUBJECT TO PRIOR APPROVAL AS EQUAL BY THE ENGINEER.
14. ALL EXIT LIGHTS SHALL BE PROVIDED WITH UNIVERSAL MOUNTING BRACKETS. THE CONTRACTOR SHALL
VERIFY ALL DIRECTIONAL ARROWS PRIOR TO ORDERING FIXTURES.
15. THE CONTRACTOR SHALL FURNISH THE AIR CONDITIONING SUBCONTRACTOR COPIES OF APPROVED LIGHT
FIXTURE SHOP DRAWINGS.
16. ALL RECESSED LIGHTING FIXTURES IN FIRE RATED CEILINGS SHALL BE TENTED TO COMPLY WITH THE
APPLICABLE CEILING RATING. THE CONTRACTOR SHALL VERIFY REQUIREMENTS.
17. ALL COMMUNICATIONS OUTLET BOXES SHALL BE MIN. 4" WIDE BY 4" HIGH BY 2 1/2" DEEP WITH SINGLE GANG
MUD RING.
18. UNLESS NOTED OTHERWISE, PROVIDE 1"C FROM COMMUNICATIONS OUTLET TO THE ACCESSIBLE CEILING SPACE. CONTRACTOR SHALL FURNISH AND INSTALL CABLING AS REQUIRED. CABLE ROUTING WILL BE VIA CONDUIT (INACCESSIBLE SPACES) OR "J" HOOKS AND CABLE TRAY SYSTEM (ACCESSIBLE SPACES) TO COMM ROOM OR ROOM OF TERMINATION. PROVIDE RACEWAY SYSTEM OVER THE INACCESSIBLE CEILING SPACE AS INDICATED ON PLANS. TEL/DATA CONDUITS ARE TO BE LONG RADIUS TYPE AND SHALL CONTAIN MULE TAPE MIN 1/2" 100LB. PROVIDE PLATES FOR ALL OUTLETS. CAT6 CABLES SHALL BE PLENUM RATED.
19. ALL SPECIAL PURPOSE OUTLETS SHALL BE PROVIDED TO MATCH EQUIPMENT TO BE SUPPLIED.
20. THE PLANS INDICATE THE DESIRED ARRANGEMENT AND GENERAL LOCATIONS OF LIGHT FIXTURES. THE
ARCHITECTURAL CEILING PLANS INDICATE ADDITIONAL DATA AS TO THE FINAL FIXTURE PLACEMENT.
21. ALL PANELBOARDS, SWITCHES AND CIRCUIT BREAKERS SHALL BE SIEMENS, SQUARE D, GE OR CUTLER
HAMMER OR APPROVED EQUAL.
22. ALL CONDUITS SHALL INCLUDE A SEPARATE GREEN EQUIPMENT GROUND CONDUCTOR.
23. ANY EXISTING UTILITIES LOCATED IN THE AREA OF CONSTRUCTION THAT REQUIRE RELOCATION BY THE
OWNER SHALL BE COORDINATED WITH THE OWNER'S REPRESENTATIVE A MINIMUM OF TEN DAYS IN ADVANCE.
24. ALL DISCONNECT SWITCHES SHALL BE THE HEAVY DUTY TYPE, FUSED DISCONNECTS SHALL HAVE LITTLEFUSE
TIME DELAY, TYPE RK5 AND SHALL INDICATE TYPE RK5.
25. THE CONTRACTOR SHALL CHECK THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION AND/OR DIMENSIONS
FOR INSTALLATION OF ALL ELECTRICAL ITEMS. ALL QUESTIONABLE LOCATIONS SHALL BE APPROVED BY
OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION.
26. ALL EMPTY CONDUITS SHALL CONTAIN MULE TAPE MIN 1/2" 1800LB.
27. ALL WORK SHOWN ON THE ELECTRICAL PLANS SHALL BE PERFORMED BY THE CONTRACTOR UNLESS NOTED
OTHERWISE.
28. ALL EXIT FIXTURES SHALL BE CONNECTED TO THE BUILDING ESSENTIAL BRANCH PANEL.
29. ALL SURGE PROTECTED OUTLETS SHALL BE EQUAL TO HUBBEL #5352.
30. EQUIPMENT INSTALLED WITHIN CONCEALED SPACES SHALL HAVE REASONABLE ACCESS PANELS PROVIDED
NEARBY FOR INSPECTION, TESTING AND SERVICE CONSIDERATIONS.
31. SECURITY WIRING SHALL BE IN CONDUIT SHALL BE A SEPARATE, COMPLETE AND FULLY FUNCTIONING SYSTEM.
32. THE FIRE ALARM MANUFACTURERE SHALL PROVIDE CERTIFIED TECHNICIAN TO SUPERVISE THE INSTALLATION, FINAL CONNECTIONS AND TESTING OF THE FIRE ALARM SYSTEM AT THE COMPLETTION OF THE PROJECT. THE MANUFACTURER SHALL INSPECT THE SYSTEM AND CERTIFY THAT IT IS INSTALLED IN ACCORDANCE WITH NFPA
72. ALL FIRE ALARM COMPONENTS SHALL COMPLY WITH ADA REQUIREMENTS.
33. THE CONTRACTOR SHALL VERIFY CEILING TYPES AND INSTALLATION REQUIREMENTS PRIOR TO ORDERING
LIGHT FIXTURES.
34. WHERE CABLES OR CONDUITS ARE REQUIRED TO PASS THROUGH FIRE RATED WALL, FLOOR OR CEILING THEY SHALL BE SEALED WITH 3M FIRE STOP OR APPROVED EQUAL. THE APPROVED FIRE STOP METHOD SHALL COMPLY WITH ARTICLES 300.21 OF NEC AND SHALL BE UL LISTED UNDER "THROUGH-PENETRATION FIRE STOP SYSTEM (XHEZ)" IN UL FIRE RESISTANCE DIRECTORY. ALL INTERIOR CORRIDORS HAVE FIRE RATED WALLS. ANY PENETRATION THROUGH THESE WALLS AND OTHER FIRE RATED WALLS SHALL BE SEALED WITH FIRE STOP.
35. SPARE CONDUITS, WIREWAYS AND CABLE TRAYS SHALL BE SUPPORTED FROM BUILDING STRUCTURE AND
NOT FROM OTHER PIPES, DUCTS OR EXISTING RACKS UNLESS SHOWN ON DRAWINGS.
36. EXTERIOR BURIED CONDUIT RUNS SHALL BE MINIMUM 24" BELOW FINISHED GRADE. PROVIDE CAUTION TAPE
12" BELOW GRADE.
37. PROVIDE GROUND STRAP ACROSS ALL CABLE TRAY JOINTS. GROUND CABLE TRAY TO SERVICE GROUND WITH
#1/0 AWG BARE COPPER IN 1" PLENUM RATED CARLON PLENUM GUARD CONDUIT.
38. ALL CONDUIT BENDS FOR COMMUNICATIONS WIRING SHALL BE SMOOTH LONG RADIUS TYPE. "LB" TYPE
FITTINGS SHALL NOT BE USED.
39. DO NOT LOCATE ELECTRICAL OUTLETS AND DEVICES ON WALL PANEL JOINTS. REFER TO ARCHITECTURAL
BUILDING ELEVATIONS FOR WALL PANEL LAYOUT AND PANEL JOINT LOCATIONS.
40. ALL 120 VOLT/20 AMP BRANCH CIRCUITS SHALL BE PROVIDED A SEPARATE NEUTRAL CONDUCTOR FOR EACH
PHASE CONDUCTOR.
41. GALVANIZED CONDUIT, FITTINGS, BOXES, STEEL AND FASTENERS TO BE USED FOR ALL WORK EXPOSED TO
THE WEATHER.
42. POWER CHANGE EXPENSES RESULTING FROM EQUIPMENT SUBSTITUTIONS THAT DIFFER FROM ITEMS CALLED FOR IN DRAWINGS OR SPECIFICATIONS SHALL BE BORNE BY THE CONTRACTOR OR THEIR SUB. THESE SHALL INCLUDE CHANGES IN VOLTAGE OR FULL LOAD AMPS RESULTING IN LARGER FEEDERS AND OR CIRCUIT
BREAKERS.
43. COORDINATE FINAL ELECTRICAL DEVICE AND LIGHTING FIXTURE LOCATIONS WITH FINAL SPRINKLER HEAD
LOCATIONS TO COMPLY WITH NFPA REQUIREMENTS.
44. WATERPROOF RECEPTACLE COVER TO BE WEATHERPROOF WITH OR WITHOUT CORD PLUGGED IN.
45. UNO, ALL EXISTING ELECTRICAL DEVICES THAT ARE NOT SHOWN ARE EXISTING TO REMAIN.
46. COORDINATE WITH DIVISION 23 FOR DISCONNECT REQUIREMENTS ON MECHANICAL EQUIPMENT. REFER TO
MECHANICAL EQUIPMENT SCHEDULES (M-002 AND M-003) FOR INFORMATION. CONTRACTOR SHALL PROVIDE DISCONNECTS FOR THOSE DEVICES THAT DO NOT COME WITH FACTORY INSTALLED DISCONNECTS.
47. POWER CHANGE EXPENSES RESULTING FROM EQUIPMENT SUBSTITUTTIONS THAT DIFFER FROM ITEMS CALLED FOR IN DRAWINGS OR SPECIFICATIONS SHALL BE BORNE BY THE CONTRACTOR OR HIS SUB. THESE SHALL INCLUDE CHANGES IN VOLTAGE OR FULL LOAD AMPS RESULTING IN LARGER FEEDERS AND OR CIRCUIT
BREAKERS.
48. CONDUITS 2.5” AND LARGER AND RACEWAYS THAT ARE MORE THAN 12” BELOW STRUCTURE. ELECTRICAL EQUIPMENT AND TRANSFORMERS WEIGHING MORE THAN 100 LBS. PROVIDE VIBRATION ISOLATORS AND SWAY BRACING FOR ALL SUSPENDED EQUIPMENT, INCLUDING LUMINAIRES. PROVIDE NEOPRENE WASHER AND PAD
FOR ALL EQUIPMENT ANCHORED TO CONCRETE PADS.
THE FOLLOWING ARE USED IN CONJUNCTION WITH DEVICES
EX
ER
EN
EXR
ERP
EXISTING SHALL REMAIN
EXISTING SHALL BE REMOVED
EXISTING SHALL BE REPLACED WITH NEW DEVICE
EXISTING SHALL BE RELOCATED TO NEW LOCATION
EXISTING IN RELOCATED POSITION
EXISTING ITEMS NOT SHOWN SHALL REMAIN AS IS.
SD
RF
S
F F
F W
O S
O S
3 4
AC
G
FC
I
D C
R M d
WALL
WP WEATHERPROOF
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
CONTRACT NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
EU
G
EN
E
AI
R
PO
R
T
D
O U
G
LA
S D
R
EU
G
EN
E, O
R
PA
SS
EN
G
ER
B
O
AR
D
IN
G B
R
ID
G
ES
E
LE
C
TR
IC
AL
U
PG
R
AD
E
NOT FOR CONSTRUCTION
2700 DELK ROAD SE,
MARIETTA, GA 30067
(770) 423-4200 FAX:(770) 423-4203
www.theaerogroup.net
YSTEMS NGINEERINGS E
".... 15,000 GATES AND COUNTING"
2022-02776
05/31/22 SCHEMATIC
DESIGN
05/31/2022
07/15/22 60% DESIGN
08/17/22 90% DESIGN
EP001
TA
BD
BJ
ELECTRICAL
LEGEND, SYMBOLS,
AND ABBREVIATIONS
90% REVIEW - NOT FOR CONSTRUCTION
EX
M
ELEC/COMM RM 1221
CHILLER 1
480 V
177 KW
EXR WIREWAY
EX
2500 A
KWHD
EXISTING PAD MOUNTED
SERVICE TRANSFORMER
(UTILITY)
EXISTING KILOWATT HOUR DEMAND
METER WITH 15 MINUTE DEMAND &
INTERVAL REGISTER
3000 A, 3P 4W BUS (65 KAIC)
GROUND BAR
MAIN WATER
LINE SERVICE
MAIN SWITCHBOARD
SB1
RM 1506
EXISTING PRIMARY U/G POWER
SERVICE
EXISTING (7) 4" PVC CONDUIT
EX
EN
200 A
EX
220 A
EX
SPARE
200 A
EX
WIREWAY
CHILLER 2
480 V
177 KW
CHILLER 3
PULL
BOX
225 A
EX
125 A
EX EX
225 A
EX
250 A
EX
EX DP3
480Y/277
125A 3P 4W
RM 1620
EX DPN1
480Y/277
400A 3P 4W
RM 2100
EX M-2
480Y/277
225A 3P 4W
RM 1601
250 A
EX MCC-1
480Y/277
250A 3P 4W
RM 1601
450 A
EX
EX DP2
480Y/277
1000A 3P 4W
RM 1606
800 A
DP4
480 V 800A
3P 3W
RM 1606
800 A
EX
EX DPW4
480Y/277
100A 3P 4W
RM 1506
EX DPW3
480Y/277
800A 3P 4W
RM 1506
EX
SPARE 400 A
EX
800 A
EX
EX DPS3
480Y/277
400A 3P 4W
EX DP1
480 V 800A
RM 1506
N
L
EN
L
E
EX DPEX
480Y/277
200A 3P 4W
EX DPSX
480Y/277
300A 3P 4W
EM ELEC RM 1507
ATS ES
200 A 4P
ATS SB
300 A 4P
WIREWAY
300 A 200 A
GENERATOR RM 1508
480 V
350 KW
GENERATOR
G
5:
ASVS
V A
800 A
(EX) SB1 480 V, 3 PHASE, 4 WIRE, 2500 AMP
3 EA [ 3" C, 3-350 KCMIL, 1/0 GND ]
DP4 480 V, 3 PHASE, 3 WIRE, 800 AMP
EP002
150 A
SEE PBB ONE-LINE
DIAGRAM FOR
DETAILS
150 A
150 A
(E)PBB
VENDOR
PANEL
SEE PBB ONE-LINE
DIAGRAM FOR
DETAILS
150 A
SEE PBB ONE-LINE
DIAGRAM FOR
DETAILS
150 A
SEE PBB ONE-LINE
DIAGRAM FOR
DETAILS
150 A
SEE PBB ONE-LINE
DIAGRAM FOR
DETAILS
150 A
SEE PBB ONE-LINE
DIAGRAM FOR
DETAILS
1-1/2" C, 3-1/0, 6 GND (TYP)
150 A (E)PBB
VENDOR
PANEL
150 A (E)PBB
VENDOR
PANEL
150 A (E)PBB
VENDOR
PANEL
150 A (E)PBB
VENDOR
PANEL
150 A (E)PBB
VENDOR
PANEL
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
CONTRACT NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
EU
G
EN
E
AI
R
PO
R
T
D
O U
G
LA
S D
R
EU
G
EN
E, O
R
PA
SS
EN
G
ER
B
O
AR
D
IN
G B
R
ID
G
ES
E
LE
C
TR
IC
AL
U
PG
R
AD
E
NOT FOR CONSTRUCTION
2700 DELK ROAD SE,
MARIETTA, GA 30067
(770) 423-4200 FAX:(770) 423-4203
www.theaerogroup.net
YSTEMS NGINEERINGS E
".... 15,000 GATES AND COUNTING"
2022-02776
05/31/22 SCHEMATIC
DESIGN
05/31/2022
07/15/22 60% DESIGN
08/17/22 90% DESIGN
EP002
TA
BD
BJ
PROPOSED
EXISTING
DEMOLISH
LINE LEGEND
BUILDING ONE-LINE
DIAGRAM
PARTIAL ONE-LINE DIAGRAM
SCALE: NONE
1 NEW PCA UNITS
SCALE: NONE
90% REVIEW - NOT FOR CONSTRUCTION
VS
M 3 5:2000
EX
125 A
M
EX
EX K
480Y/277
225A 3P 4W
RM 1222
EX KP
208Y/120
150A 3P 4W
EX T-1
45 KVA
480 V/ 208 V
EX KP1
208Y/120
150A 3P 4W
RM 1222
EX KP2
208Y/120
150A 3P 4W
RM 1232
EX T-2
45 KVA
480 V/ 208 V
EX KP3
208Y/120
150A 3P 4W
RM 1232
EX T-3
45 KVA
480 V/ 208 V
EX T-4
45 KVA
480 V/ 208 V
EX KP4
208Y/120
150A 3P 4W
RM 1232
ER
REMOTE
SIGNAL
ER ANNUNCIATOR
RM 1313
GENERATOR
480 V
125 KW
G
ER
ER
GENERATOR RM 1508
N
L
DPEX
480Y/277
200A 3P 4W
EX T-GBX
45 KVA
480 V/ 208 V
RM 1506
EX GBX
208Y/120
150A 3P 4W
RM 1406
EX GLX
480Y/277
50A 3P 4W
RM 1601 EX DPX1
208Y/120
125A 3P 4W
RM 1506
EX SPX
208Y/120
50A 3P 4W
RM 1213
EX GPX
208Y/120
50A 3P 4W
RM 1601
EX NPX
208Y/120
100A 3P 4W
RM 2100
EX WPX
208Y/120
60A 3P 4W
RM 1309
EX NPX1
208Y/120
60A 3P 4W
RM 2100
T-E
45 KVA
480 V/ 208 V
RM 1506
ER
WLX
480Y/277
50A 3P 4W
RM 1309
NEW WLX
480Y/277
50A 3P 4W
RM 1309 ESPX
208Y/120
100A 3P 4W
SBPX
208Y/120
150A 3P 4W
EM ELEC RM 1507
T-ESPX
30 KVA
480 V/ 208 V
T-SBPX
45 KVA
480 V/ 208 V
UPS
208Y/120
100A 3P 4W
16 KVA
IT RM 2007
1UPS
120V 1PH
100A 1P 3W
E
ATS ES
200 A
4P
N
L
DPSX
480Y/277
300A 3P 4W
E
ATS SB
300 A 4P
350 KW
WIREWAY
G
REMOTE
GENERATOR
ANNUNCIATOR
RM 2007
ELEC/COMM RM 1221
300 A 200 A
GENERATOR
480 V
DPS4
208Y/120 150A
3P 4W
T-DPS4
45 KVA
480 V/ 208 V
EPX1
208Y/120
50A 3P 4W
T-EPX1
15 KVA
480 V/ 208 V
SPX1
208Y/120
100A 3P 4W
T-SPX1
30 KVA
480 V/ 208 V
DPX
200 A
ER
480Y/277
200A 3P 4W
RM 1506
EX ATS 1
200 A
CHILLER 2
480 V
177 KW
WIREWAY
NF
EX T-K
45 KVA
480 V/ 208 V CHILLER 1
480 V
177 KW
EX GP6
208Y/120
125A 3P 4W
RM 1620
EX T1
208Y/120
50A 3P 4W
RM 2606
EX T-GP6
45 KVA
480 V/ 208 V
RM 1620
EX NL1
480Y/277
100A 3P 4W
RM 2100
EX NP1
208Y/120
100A 3P 4W
RM 2100
EX T-1
112.5 KVA
480 V/ 208 V
RM 2100
EX DPN2
208Y/120
350A 3P 4W
RM 2100
DPG2
480Y/277
250A 3P 4W
RM 1601
EXR WIREWAY
PULL
BOX
CHILLER 3
EX DPN1
480Y/277
400A 3P 4W
RM 2100
EX DP3
480Y/277
125A 3P 4W
RM 1620
EX M-2
480Y/277
225A 3P 4W
RM 1601
EX MCC-1
480Y/277
250A 3P 4W
RM 1601
EX DP2
480Y/277
1000A 3P 4W
RM 1606
DPW3
480Y/277
800A 3P 4W
RM 1506
DPW4
480Y/277
100A 3P 4W
RM 1506
EX
2500 A EN
V A
KWHD AS
EX
200 A
EX
220 A
EX
200 A
EX
225 A
EX
125 A
EX
250 A
EX
225 A
EX
250 A
EX
450 A 800 A
EX
SPACE
400 A
EX CP1
208Y/120
100A 3P 4W
RM 1126
EX NP6
208Y/120
100A 3P 4W
RM 1107
EX NP5
208Y/120
100A 3P 4W
RM 1109
EX NP4
208Y/120
100A 3P 4W
RM 1115
EX NP3
208Y/120
100A 3P 4W
RM 1120
EX NP2
208Y/120
100A 3P 4W
RM 1125
DPS3
480Y/277 400A
3P 4W
DPS5
480Y/277
150A 3P 4W
ESLX
480Y/277
100A 3P 4W
SBLX
480Y/277
150A 3P 4W
E
L
N
EXISTING PAD MOUNTED SERVICE
TRANSFORMER (UTILITY)
EXISTING RESTAURANT/KITCHEN
BREAKER-METER UNIT
3000 A, 3P 4W BUS (65 KAIC)
GROUND BAR
MAIN WATER
LINE SERVICE
MAIN SWITCHBOARD
SB1
RM 1506
JUMPER CABLES
EXISTING PRIMARY U/G POWER
SERVICE
EXISTING (7) 4" PVC CONDUIT
SPARE
DP4
800A 3P 3W
RM 1606
800 A
DP1
800A 3P 3W
RM 1606
800 A
EX
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
CONTRACT NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
EU
G
EN
E
AI
R
PO
R
T
D
O U
G
LA
S D
R
EU
G
EN
E, O
R
PA
SS
EN
G
ER
B
O
AR
D
IN
G B
R
ID
G
ES
E
LE
C
TR
IC
AL
U
PG
R
AD
E
NOT FOR CONSTRUCTION
2700 DELK ROAD SE,
MARIETTA, GA 30067
(770) 423-4200 FAX:(770) 423-4203
www.theaerogroup.net
YSTEMS NGINEERINGS E
".... 15,000 GATES AND COUNTING"
2022-02776
05/31/22 SCHEMATIC
DESIGN
05/31/2022
07/15/22 60% DESIGN
08/17/22 90% DESIGN
EP101
TA
BD
BJ
PARTIAL ONE-LINE
POWER RISER
DIAGRAM
90% REVIEW - NOT FOR CONSTRUCTION
PROPOSED
EXISTING
DEMOLISH
LINE LEGEND
GENERAL NOTES
1. ALL ITEMS ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.
2. COORDINATE OUTAGES WITH OWNER/ARCHITECT.
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
APPENDIX B
PTW COMPUTER MODEL &
INPUT REPORT
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
APPENDIX C
PTW SHORT CIRCUIT REPORT
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
APPENDIX D
PTW DEMAND LOAD REPORT
Elcon Associates, Inc.
September 2022
City of Eugene, Oregon
Eugene Airport PBB Electrical Upgrade
APPENDIX E
PTW LOAD FLOW REPORT