2023 schedule_of_items.docx

DOCX document 17 KB Posted

Attached to
Amador and Placerville Ranger District pumping services
Solicitation number
Sol_127EAS24Q0021
Issued by

About this file

This document outlines a schedule of items for pumping services at nine recreation sites on the Eldorado National Forest. The contractor will be responsible for pumping vault toilets at campgrounds, rest areas, trailheads, and off-highway vehicle areas. Services are required from January 1, 2024 through December 31, 2024. The schedule lists each site, indicating whether it has single or double vaults, the number of pumpings required per year, and the total estimated number of vaults. Pricing will be based on pumping individual vaults on an each occurrence basis. The related federal contract opportunity posted is solicitation number 127EAS24Q0018 seeking these pumping services for the Amador and Placerville Ranger Districts through the Department of Agriculture Forest Service.

View the file

Other files

File Type Posted
Sol_127EAS24Q0021.pdf PDF
MVUMAmadorSide02.pdf PDF
Location Description .docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1, SCHEDULE OF ITEMS

SECTION B

SUPPLIES OR SERVICES, AND PRICES/COSTS

PROJECT
Restroom Pumping
UNIT
Eldorado National Forest, Amador R.D.

Solicitation. #127EAS24Q0018

ITEM NO.
DESCRIPTION
UNIT
QUANTITY
UNIT PRICE
TOTAL PRICE

SERVICE LOCATIONS 01/01/2024 – 12/31/2024

$ -
$ -
1
Cole Creek Campground (CC)

Single 1000-gallon vault. 1 pumping per year.

EA1
1 Vault

1 Toilet

2
Lumberyard Rest Area (LY)

Double 1000-gallon vaults. 1 pumping per year

EA1
2 Vault

2 Toilet

3
Shot Rock Vista (SRV)

Double 1000-gallon vaults. 1 pumping per year.

EA1
2 vault
4
Woods Creek Fishing Access

Parking Lot (WCT) Single 500-gallon vault.1 pumping per year.

EA1
1 Vault
5
Meiss Trailhead (MT)

2 single unit toilets with 1000-gallon vaults each. 4 pumping’s per year

EA4
2 Vault
6
Carson Pass Trailhead (CPT)

Double 1000-gallon vaults. 4 pumping’s per year.

EA4
2 Vault
7
Iron Mountain Day Use (IM) Single 1000-gallon vault. 1 pumping per year.
EA1
1 Vault
8
Gold Note OHV (GN)

Singe 1000-gallon vault. 1 pumping per year.

EA1
1 Vault
9
Elkins Flat OHV (EF) Single 1000-gallon vault. 1 pumping per year.
EA1
1 Vault
TOTAL
$ -

File details come from the government source that posted it. Updated .