This document contains plans and specifications for the construction of traffic signal improvements at the intersection of Roswell Road/SR 9 and Lake Placid Drive in Sandy Springs, Georgia. The project will be constructed under Georgia Department of Transportation (GDOT) encroachment and signal permits, and the contractor will be responsible for obtaining any necessary permits from the City of Sandy Springs and GDOT prior to commencing work. The project scope includes the installation of new signal poles, mast arms, signal heads, pedestrian signals, detection equipment, and associated electrical work. The contractor must maintain existing traffic signals during construction and provide a new traffic controller to the City of Sandy Springs for programming and turnover. All existing signal equipment must be removed and returned to the City's warehouse.
The contract will be awarded by the City of Sandy Springs, and the contractor must comply with all applicable GDOT and City of Sandy Springs specifications and standards. Pricing terms, set-asides, and funding sources are not detailed in the provided documents. However, this project appears to be funded through state and local sources, and the contractor may be required to meet certain diversity and inclusion requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB_24_064 Addendum 1.pdf | ||
| 24_064 T2308 Traffic Signal Improvements at R.pdf | ||
| T2308 Special Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GEORGIA
SANDY SPRINGS PROJECT NUMBER
7:52:55 PM GPLOT-V8
gplotborder-V8i-PO.tbl
00T0019_3_27-0001.dgn
10/23/2015 GPLN
Peachtree Corners, Georgia 30092
Suite 350, 3930 East Jones Bridge Road
Engineering, Planning, and Environmental Consultants
REVISION DATES
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
10/18/2023 winnie.gobbel
TRAFFIC SIGNAL GENERAL NOTES
WHEN REOUIRED, AS DIRECTED BY THE ENGINEER.
WHEN ATTACHING SPAN WIRE OR FIBER OPTIC INTERCONNECT CABLE TO THE POLES,
11. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL NEW GUYS ON EXISTING POLES
THE CONTROLLER CABINET. SEE SHEET 27-0006 FOR DETAIL.
NEW RISER, CONDUIT, CONDUCTORS AND DISCONNECT TO PROVIDE POWER SERVICE INTO
10. WHEN APPLICABLE TO THE PLANS, CONTRACTOR WILL BE REQUIRED TO PROVIDE A
NEW SIGNAL ITEMS PRIOR TO REMOVING EXISTING SIGNALS FROM SERVICE.
9. WHEN APPLICABLE TO THE PLANS, THE CONTRACTOR MUST INSTALL AND TEST ALL
RAISE POWER LINES IF NECESSARY.
8. PROVIDE A MINIMUM OF 10 FEET CLEARANCE BETWEEN POWER LINES AND MAST ARMS.
FACES.
AND A MINIMUM OF 8 FEET MEASURED HORIZONTALLY BETWEEN CENTERS OF SIGNAL
THAN 19 FEET CLEARANCE FROM BOTTOM OF SIGNAL HEADS TO TOP OF ROAD SURFACE
7. SIGNAL HEADS SHALL BE ERECTED TO PROVIDE AT LEAST 17 FEET BUT NO MORE
RETAINED AS SHOWN ON THE PLANS.
OF PAVEMENT SHALL BE MAINTAINED. PLACEMENT OF THE SIGNAL HEADS MUST BE
ARE ACCEPTABLE TO AVOID UNDERGROUND UTILITIES. MINIMUM CLEARANCES FROM EDGE
5 FEET) IN LOCATION OF NEW SIGNAL POLES, AT THE DISCRETION OF THE ENGINEER,
TRAFFIC SIGNAL POLES BEFORE INSTALLATION. MINOR SHIFTS ( UP TO A MAXIMUM OF
6. THE CONTRACTOR SHALL LOCATE UNDERGROUND UTILITIES IN THE VICINITY OF NEW
MAST ARM POLE FOUNDATION SHEET.
5. FOR STRAIN POLE FOUNDATION SIZE AND REINFORCEMENT, SEE STRAIN POLE AND
SIGNAL ENGINEER FOR APPROVAL.
ELECTRICAL / LINE HARDWARE MATERIALS TO THE CITY OF SANDY SPRINGS TRAFFIC
DIMENSIONS OF POLES AND CATALOG CUTS OF PROPOSED SIGNAL EQUIPMENT AND
4. CONTRACTOR SHALL SUBMIT LOAD CALCULATIONS, SHOP DRAWINGS AND FOUNDATION
SPRINGS, ATTN: TRAFFIC SIGNAL ENGINEER.
INSTALLATION WORK.THE CONTRACTOR SHALL SUBMIT DOCUMENTATION TO CITY OF SANDY
3. MATERIAL CERTIFICATION IS REQUIRED PRIOR TO BEGINNING ANY SIGNAL
AND ANSI NATIONAL ELECTRICAL SAFETY CODE.
SERVICES). INSTALLATIONS SHALL MEET CURRENT NFPA NATIONAL ELECTRICAL CODE
EXCEPTIONS AS DIRECTED BY THESE PLANS OR CITY OF SANDY SPRINGS TRAFFIC
SPECIFICATIONS AND STANDARD DETAILS FOR TRAFFIC SIGNAL INSTALLATION (WITH
DEPARTMENT OF TRANSPORTATION CURRENT STANDARD AND SUPPLEMENTAL
2. ALL MATERIALS AND WORK SHALL BE IN ACCORDANCE WITH THE GEORGIA
SUBSEQUENT PUBLISHED RULINGS.
OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION, INCLUDING
I. THE COMPLETE SIGNAL INSTALLATION SHALL CONFORM TO ALL APPROPRIATE PARTS
SHALL BE INSTALLED FOR EACH FLASHING YELLOW ARROW SIGNAL HEAD.
THE INSTALLATION. AN ADDITIONAL 7-CONDUCTOR, 14 AWG, STRANDED SIGNAL CABLE
PROPOSED AND FUTURE VEHICLE SIGNALS SHALL BE INSTALLED ON ALL FOUR SIDES OF
POLE. A MINIMUM OF ONE 7-CONDUCTOR, 14 AWG, STRANDED SIGNAL CABLE FOR
PROPOSED AND FUTURE PEDESTRIAN SIGNALS SHALL BE INSTALLED AT EACH STRAIN
20. ONE 7-CONDUCTOR, 14 AWG,STRANDED CABLE AND ONE 3-PAIR DETECTOR CABLE FOR
ITEMS OR TO SUBMIT ITEMS FOR TESTING AND APPROVAL.
SPRINGS SHALL BE USED. CONTACT CITY OF SANDY SPRINGS FOR A LIST OF APPROVED
AND PUSH BUTTONS THAT HAVE BEEN TESTED AND PRE-APPROVED BY CITY OF SANDY
19. ONLY THE MODELS OF VEHICLE SIGNAL MODULES, PEDESTRIAN SIGNAL MODULES,
FEEDBACK.
SHALL BE VANDAL RESISTANT WITH A PIEZO SWITCH, LED INDICATION AND AUDIBLE
WITH SIGN ARROW INDICATING THE CROSSING DIRECTION. PEDESTRIAN PUSHBUTTONS
ADAPTER". PEDESTRIAN PUSHBUTTONS SHALL BE INSTALLED WITHIN 10" OF SIDEWALK
PERPENDICULAR CROSSINGS SHALL BE MOUNTED ON A "DOUBLE PUSHBUTTON STATION
18. PUSHBUTTON STATIONS THAT ARE INSTALLED ON A PEDESTAL POLE FOR TWO
NUMERAL LED MODULES.
SHALL BE EQUIPPED WITH COUNTDOWN, UNIFORM APPEARANCE, FULL HAND/ MAN/
WITH ONE-WAY SIDE-OF-POLE POLYCARBONATE BRACKETS. PEDESTRIAN SIGNAL HEADS
PEDESTRIAN SIGNAL HEADS ATTACHED TO CONCRETE STRAIN POLES SHALL BE MOUNTED
POLES SHALL BE MOUNTED WITH "CLAMSHELL" TYPE BRACKET ASSEMBLIES. ALL
17. PEDESTRIAN SIGNAL HEADS ATTACHED TO PEDESTAL POLES AND STEEL STRAIN
LED MODULES.
MADE OF POLYCARBONATE MATERIAL. VEHICLE SIGNAL HEADS SHALL BE EQUIPPED WITH
BLACK IN COLOR. VEHICLE SIGNAL HEADS SHALL HAVE TUNNEL VISORS AND SHALL BE
16. VEHICLE AND PEDESTRIAN SIGNAL HEADS AND HARDWARE SHALL BE GREEN AND
15. SIGNAL HEADS ON MAST ARMS SHALL HAVE BACK PLATES AND BE RIGID MOUNTED.
SEPARATE FROM THE FIBER OPTIC INTERCONNECT CABLE.
TRACING WIRE GROUNDED ON ONE END SHALL BE INSTALLED INSIDE A CONDUIT
UNDERGROUND CONDUIT CONTAINING FIBER OPTIC INTERCONNECT CABLE. AN INSULATED
SANDY SPRINGS CALL (770) 730-5600" SHALL BE INSTALLED DIRECTLY ABOVE ALL
14. WHEN APPLICABLE TO THE PLANS, DETECTABLE MARKING TAPE LABELED "CITY OF
THE ENGINEER.
LENGTH SHALL BE BURIED TO A MINIMUM DEPTH OF 48 INCHES, UNLESS APPROVED BY
RIGID METAL OR ENCASED IN CONCRETE. ALL CONDUIT RUNS GREATER THAN 50 FEET IN
13. CONDUIT UNDER DRIVEWAYS AND ROADWAYS SHALL BE TYPE 3 (SDR II HDPE),
EQUIVALENT CABLE.
LOOP AND PEDESTRIAN DETECTOR CABLES SHALL BE 14 AWG IMSA 50-2 3-PAIR
SHEET. DETECTORS SHALL HAVE SEPARATE LEAD-INS TO THE CONTROLLER CABINET.
12. SHIELDED CABLE SHALL BE USED FOR DETECTOR RUNS, AS SHOWN ON THE DETAIL
SIGNAL PLAN
T2308
GENERAL NOTES
27-0001
CONSTRUCTION.
ARE IN PLACE TO ALLOW STANDARD OPERATION OF THE INTERSECTION THROUGHOUT
32. PRIOR TO INSTALLING THE MAST ARM AT THE NORTHEAST CORNER, ENSURE RECALLS
OF EQUIPMENT.
SHALL COORDINATE WITH SANDY SPRINGS TRAFFIC SERVICES STAFF PRIOR TO DELIVERY
SPRINGS WAREHOUSE: 7477 TROWBRIDGE ROAD, SANDY SPRINGS, GA 30328. CONTRACTOR
OLD CABINET, CABLES, ETC.) SHALL BE REMOVED AND RETURNED TO THE SANDY
31. ALL EXISTING SIGNAL EQUIPMENT (SIGNS, SIGNAL HEADS, ANCILLARY EQUIPMENT,
AT A MINIMUM OF TWO WEEKS PRIOR TO SIGNAL TURN-ON FOR PROGRAMMING.
SHALL PROVIDE NEW 2070LX CONTROLLER TO SANDY SPRINGS TRAFFIC SERVICES STAFF
PROGRAMMING OF SIGNAL TIMING AND TURN-ON OF NEW TRAFFIC SIGNAL. CONTRACTOR
30. SANDY SPRINGS PUBLIC WORKS, TRAFFIC SERVICES, WILL BE RESPONSIBLE FOR
SPRINGS OF ANY ACTIVITY.
CONTRACTOR TO PERFORM ANY WORK ON SAID INFRASTRUCTURE. NOTIFY CITY OF SANDY
CONSTRUCTION ACTIVITIES AND MUST USE A CITY OF SANDY SPRINGS APPROVED
INFRASTRUCTURE (LOOP, LEAD-IN, FIBER OPTICS, CONDUIT, PULL BOX, ETC.) DUE TO
RELOCATION OR DAMAGE TO CITY OF SANDY SPRINGS TRAFFIC SIGNAL OR ATMS
29. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ANY
TO THE CONTROLLER IF LOOP FAILURE OCCURS).
NONCONCURRENTLY. DETECTOR UNIT SHALL BE FAIL SAFE (PROVIDE A CONSTANT CALL
28. LOOP DETECTOR UNIT SHALL ENERGIZE ITS INDIVIDUAL LOOP CHANNELS
IN DELAY OF THE ACTIVATION OF THE NEW TRAFFIC SIGNAL INSTALLATION.
27. ENSURE ALL DETECTION IS INSTALLED PROMPTLY. FAILURE TO DO SO WILL RESULT
ANY PART OF THE SIGNAL OPERATION TO BE INOPERABLE.
INSTALLATION OF NEW SIGNAL EQUIPMENT. AT NO TIME SHALL THE CONTRACTOR CAUSE
LOCATION(S) REQUIRED BY THE PROJECT DURING THE INTERIM PERIOD THROUGH
AND/ OR CONTROL SYSTEM ADJUSTMENTS, INCLUDING TEMPORARY SUPPORT POLE
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC SIGNAL
26. THE CONTRACTOR SHALL MAINTAIN EXISTING TRAFFIC SIGNALS DURING
THE ENGINEER. NO IN-LINE SPLICES SHALL BE MADE IN ANY CABLE.
SPLICES. UNLESS OTHERWISE SPECIFICALLY NOTED IN EACH INSTANCE OR DIRECTED BY
25. ALL SPLICES OF FIBER OPTIC CABLE UNDER THIS CONTRACT SHALL BE FUSION
MAINTAINING ITS OPERATIONS.
24. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TESTING EXISTING FIBER AND
23. ALL FIBER JUMPERS ARE INCIDENTAL TO THE SWITCH.
DEVICE.
22. ALL CAT-5 CABLES SHALL BE PROVIDED BY THE CONTRACTOR FOR EACH ETHERNET
GUY ANCHORS SHALL BE GALVANIZED.
21. HOT DIP GALVANIZED WELDLESS RINGS SHALL BE USED FOR SPAN WIRE JUNCTIONS.
Image
GEORGIA
7:53:39 PM GPLOT-V8
00T0019_3_27-0002.dgn
10/23/2015 GPLN
Peachtree Corners, Georgia 30092
Suite 350, 3930 East Jones Bridge Road
CORRECTED:
VERIFIED:
DATE:
DATE:
10/18/2023
TRENCHED CONDUIT
BORED CONDUIT
VIDEO DETECTION CAMERA
6x40 PRESENCE LOOP (QUADRUPOLE)
4-SECTION HEAD W/BACKPLATE
EXISTING SIGNAL PROPOSED SIGNAL
CONTROLLER CABINET
STRAIN POLE
TIMBER POLE
MAST ARM
3-SECTION HEAD
OVERHEAD SIGN
PEDESTAL POLE
CURB CUT RAMP
PULLBOX, TP 2
6x40 PRESENCE LOOP (QUADRUPOLE)
CONDUIT
RAILROAD CONTROLLER
SIGN POST
WV
WM
FH
GV
GM
SD
E
G
W
S S
T
V
V
V
EXISTING UTILITIES
DOWN GUY
CONTROLLER CABINET
STRAIN POLE
TIMBER POLE
DOWN GUY
MAST ARM
OVERHEAD SIGN
PEDESTAL POLE
CURB CUT RAMP
PULLBOX, TP 2
PULLBOX, TP 3
RAILROAD CONTROLLER
SIGN POST
E
HEX ELECTRICAL HAND HOLE
EX COMMUNICATIONS MANHOLE
EX SD MANHOLE
EX DROP INLET
EX CATCH BASIN
EX STORM DRAIN
EX UG CABLE TV
EX OH CABLE TV
EX UG TELEPHONE
EX TELEPHONE POLE
EX OH TELEPHONE
EX TELEPHONE MH
EX SS MANHOLE
EX SANITARY SEWER
EX WATER VALVE
EX WATER METER
EX FIRE HYDRANT
EX WATER LINE
EX GAS VALVE
EX GAS METER
EX GAS LINE
EX. UG ELECTRIC
EX TRANSFORMER
EX POWER POLE
EX. OH ELECTRIC
EXISTING GUY WIRE
PULLBOX, TP 3
STREET LIGHT ON LUMINAIRE ARMSTREET LIGHT ON LUMINAIRE ARM
VIDEO DETECTION CAMERA
4-SECTION HEAD
3-SECTION HEAD W/BACKPLATE
PULLBOX, TP 4/4S
PULLBOX, TP 5/5S
PULLBOX, TP 4/4S
PULLBOX, TP 5/5S
PEDESTRIAN SIGNAL HEADPEDESTRIAN SIGNAL HEAD
SIGN POST SIGN POST
PULLBOX, TP 1 PULLBOX, TP 1
DETECTABLE WARNING SURFACE DETECTABLE WARNING SURFACE
6x6 PULSE LOOP
6x18 CALL LOOP
6x40 PRESENCE LOOP (DIPOLE)
6x6 PULSE LOOP
6x18 CALL LOOP
6x40 PRESENCE LOOP (DIPOLE)
TRAFFIC SIGNAL LEGEND
5-SECTION / 4-SECTION T-SHAPED HEAD
WIRELESS SENSOR
SPP RADIO
WIRELESS REPEATER
WIRELESS SENSOR
SPP RADIO
WIRELESS REPEATER
DIGITAL WAVE RADAR UNIT
DIGITAL WAVE RADAR UNIT
ELECTRICAL SERVICE POINT
ELECTRICAL SERVICE POINT
5-SECTION / 4-SECTION T-SHAPED HEAD W/BACKPLATE
T2308
27-0002
6x40 VIRTUAL DETECTION ZONE 6x40 VIRTUAL DETECTION ZONE
SIGNAL PLAN
LEGEND
YIELD
YIELD
285’ TO STOP BAR
270’ TO STOP BAR
L A
K E
P L
A C I
D
R
M P
H
EOI
E O I
EOI
EXISTING PHASING DIAGRAM
01/ 02/ 03/ 04/
05/ 06/ 07/ 08/
W W W
W
W
WW W
OMIT
OMIT R
G
12"
12"
12"
Y
2,4,6,8
18"
P2,P4,P6,P8
1/6,5/2
EXISTING LED SIGNAL HEADS
R
G G
12"
12"
12"
Y Y
DrLakePlacid
EXISTING REGULATORY SIGNS
PEDESTRIAN SIGNS
EXISTING
OVERHEAD STREET NAME SIGNS
EXISTING INTERNALLY ILLUMINATED
L A
K E
P L
A C I
M P
H
DON’T CROSS
DON’T START
START CROSSING
FLASHING
STEADY
If Started Finish Crossing
Vehicles Watch For
PUSH BUTTON
TO CROSS
DON’T CROSS
DON’T START
START CROSSING
FLASHING
STEADY
If Started Finish Crossing
Vehicles Watch For
PUSH BUTTON
TO CROSS
9"X12"
R10-3b(L)(MOD)
9"X12"
R10-3b(R)(MOD)
RoswellRd
R5L1
L B
L
A
L
1/6
5/2
8 6
2 4 4
L6B
L6A
- R10-15 (MOD)
EXISTING (TO BE REMOVED):
- STEEL STRAIN POLE
EXISTING (TO BE REMOVED):
EXISTING PULL BOX
GEORGIA
T2308
2:26:26 PM GPLOT-V8
00T0019_3_27-0003.dgn
10/23/2015 GPLN
Peachtree Corners, Georgia 30092
Suite 350, 3930 East Jones Bridge Road
CORRECTED:
VERIFIED:
DATE:
DATE:
10/19/2023
SIGNAL PLAN
27-0003 30 120
SCALE IN FEET
0 60
TROWBRIDGE ROAD, SANDY SPRINGS, GA 30328.
CABLES, ETC.) SHALL BE RETURNED TO THE SANDY SPRINGS WAREHOUSE: 7477
1. ALL OLD SIGNAL EQUIPMENT (SIGNS, SIGNAL HEADS, ANCILLARY EQUIPMENT,
NOTES:
EXIST. R/W
EXIST. R/W
E X I S
W E X I S
W
EXIST. R/W
EXIST. R/W
EXIST. R/W
EXIST. R/W
E X I S
W
E X I S
W
EXIST. R/W
EXIST. R/W
SIGNAL HEAD
PROPOSED 3-SEC
SIGNAL HEAD
EXISTING 3-SEC
SIGNAL HEAD
RELOCATED 3-SEC
SIGNAL HEAD
PROPOSED 4-SEC
SIGNAL HEAD
(CLUSTER)/T-SHAPED
PROPOSED 5-SEC
SIGNAL HEAD
PEDESTRIAN PROPOSED RADAR
PROPOSED VIRTUAL DETECTION ZONE
PROPOSED INDUCTIVE LOOP
PROPOSED VIDEO DETECTION CAMERA
PROPOSED MAGNETOMETER
DETECTION LEGENDSIGNAL LEGEND
72" X 18"
D3-1 (#1)
90" X 18"
D3-1 (#2)9"X15"
R10-3e(L)
9"X15"
R10-3e(R)
TO CROSS
PUSH BUTTON
START CROSSING
DON’T START
FLASHING
STEADY
Vehicles
Watch For
DON’T CROSS
TO CROSS
PUSH BUTTON
If Started
Finish Crossing
TIMER
TIME REMAINING
To Finish Crossing
START CROSSING
DON’T START
FLASHING
STEADY
Vehicles
Watch For
DON’T CROSS
If Started
Finish Crossing
TIMER
TIME REMAINING
To Finish Crossing
R10-15 (MOD)
24"X30"
R10-15L
30"X30"
R560-5
18"X24"
STATIONS, AND R10-3B SIGNS
PEDESTRIAN SIGNAL HEADS, PUSH BUTTON
- STEEL STRAIN POLE WITH LED COUNTDOWN
EXISTING (TO BE REMOVED):
STATIONS AND R10-3B SIGNS
PEDESTRIAN SIGNAL HEADS, PUSH BUTTON
- STEEL STRAIN POLE WITH LED COUNTDOWN
EXISTING (TO BE REMOVED):
- CABINET INTERFACE DEVICE
- EXTERNAL BATTERY BACKUP SYSTEM
- 2010ECL-IP CONFLICT MONITOR
- 2070 CONTROLLER
- 332 BASE MOUNTED CABINET
EXISTING (TO BE REMOVED):
- PULL BOX
EXISTING (TO BE REMOVED):
- PULL BOX
EXISTING (TO BE REMOVED):
- 6’X40’ QUADRUPOLE LOOP (TYP.)
EXISTING (TO BE ABANDONED):
- 6’X6’ LOOP (TYP.)
EXISTING (TO BE ABANDONED):
- PULL BOX
EXISTING (TO BE ABANDONED):
- 6’X40’ RADAR DETECTION ZONE
EXISTING (TO BE REMOVED):
SR 9/US 19/ROSWELL RD (35 MPH)
- R10-15L
EXISTING (TO BE REMOVED):
SR 9/US 19/ROSWELL RD (35 MPH)
- R10-15L
EXISTING (TO BE REMOVED):
- CCTV CAMERA
EXISTING (TO BE RELOCATED):
- R10-15L
EXISTING (TO BE REMOVED):
- R10-15L
EXISTING (TO BE REMOVED):
- PULL BOX
EXISTING (TO BE ABANDONED):
PUSH BUTTON STATIONS
- LED COUNTDOWN PEDESTRIAN SIGNAL HEADS AND PEDESTRIAN
EXISTING (TO BE REMOVED):
STATION ADAPTER AND R10-3E SIGNS
- PEDESTRIAN PEDESTAL POLE WITH DOUBLE PUSH BUTTON
EXISTING:
TURNING
VEHICLES
TO
TURNING
VEHICLES
TO
EXISTING PULL BOX
- STEEL WIRE STRAND CABLE (TYP.)
EXISTING (TO BE REMOVED):
- STEEL STRAIN POLE
EXISTING (TO BE REMOVED):
- RADAR UNIT FOR PHASE 5
SIGNAL HEADS, PUSH BUTTON STATIONS AND R10-3B SIGNS
- TIMBER SIGNAL POLE WITH LED COUNTDOWN PEDESTRIAN
EXISTING (TO BE REMOVED):
- D3-1 (#2)
EXISTING (TO BE REMOVED):
- D3-1 (#1)
EXISTING (TO BE REMOVED):
- D3-1 (#2)
EXISTING (TO BE REMOVED):- D3-1 (#1)
EXISTING (TO BE REMOVED):
- R560-5
EXISTING (TO BE REMOVED):
@ LAKE PLACID DR
SR 9/US 19/ROSWELL RD
FULTON COUNTY
EXISTING TYPE 3 PULL BOX
L2A
L2B
5R 4P
6P
8P
2P
6P
8P
4P
2P
3 4 5 6 7 8 9 10 11 13 14
C1 PIN
FUNCTION
FIELD TERM
56 39 63 47 58 41 65
FLASH
N/CTB8 4,6TB6 9,10TB6 5,6TB6 1,2TB4 9,10TB4 5,6TB4 1,2TB2 9,10TB2 5,6TB2 1,2
C1 PIN
FUNCTION
FIELD TERM N/C
C1 PIN
FUNCTION
FIELD TERM
C1 PIN
FUNCTION
FIELD TERM
1 2 12
TYPE
CARD
TYPE
CARD
TBA TBA DC DC DC
DC ISO
49 60 80 67 68 81
TB8 7,9
56 43 76 47 58 45 78 49 62 53 69 70 82
TBA TBA DC DC DC
55 40 64 48 57 42 66 50 59 54 71 72 51
TB3 1,2 TB3 5,6 TB5 1,2 TB5 5,6 TB5 9,10 TB7 1,2 TB7 5,6 TB7 9,10 TB9 4,6 TB9 10,12
55 44 77 48 57 46 79 50 61 75 73 74 52
TB3 3,4 TB3 7,8 TB3 11,12 TB5 3,4 TB5 7,8 TB5 11,12 TB7 3,4 TB7 7,8 TB7 11,12 TB9 5,6 TB9 8,9 TB9 11,12
STOP TIME
TB2 3,4 TB2 7,8 TB2 11,12 TB4 3,4 TB4 7,8 TB4 11,12 TB6 3,4 TB6 7,8 TB6 11,12 TB8 5,6 TB8 8,9
TB9 7,9
3 4 5 6 7 8 9 10 11 13 14SLOT 1 2 12
SLOT
DC ISODC ISO
Ph 1 Ph 2 Ph 2 Ph 2 PED Ph 6 PEDPh 3 Ph 4 Ph 1 INT ADV
Ph 1 Ph 2 Ph 2 Ph 4 Ph 3 MCE
NC
Ph 4 PED
DC ISOTBA TBA
Ph 5 Ph 6 Ph 6 Ph 7 Ph 8 Ph 5
Ph 7Ph 5 Ph 6 Ph 6 Ph 7 Ph 8 Ph 8
EVA EVB R/R
EVC EVD
CHANNEL
CHANNEL
(I)
FILE
INPUT
UPPER
(J)
FILE
INPUT
LOWER 1
CHANNEL
CHANNEL
LN. ASSIGN.
DET. NUMBER
DET. NUMBER
LN. ASSIGN.
DET. NUMBER
LN. ASSIGN.
DET. NUMBER
LN. ASSIGN.
1 3 5 7 9 11 13 15 17
1 4 6 7 9 12 14 15 18
19 21 23 25 29 31 33 35 37
19 22 24 25 29 32 34 35 38
Ph 2 Ph 4
Ph 4 Ph 2
TB3 9,10
Ph 6 Ph 8
Ph 8 Ph 6
Ph 3
SDLC SDLC
SDLC
PHASE 2 PHASE 6
PHASE 4 PHASE 3
SDLC
SDLC
V2A
V2B
V6A
V6B
Ph 3
Ph 3
27-0005
1. VIDEO INPUT USING GS2 PROCESSOR FOR INTERFACE TO 2070LX CONTROLLER WITH SDLC CABLE. DETECTOR INPUTS TO BE SOFTWARE ASSIGNED.
NOTE:
IVDS
V1
IVDS
V5
IVDS
IVDS IVDS
CL-4D CABINET INPUT FILES ASSIGNMENT
SIGNAL PLAN
INTERNALLY ILLUMINATED
2 REQUIRED
78"X18"
D3-1 (#1)
INTERNALLY ILLUMINATED
2 REQUIRED
96"X18"
D3-1 (#2)
4. CITY OF SANDY SPRINGS LOGO SHALL BE IN FULL COLOR.
3. LETTERS SHALL BE HIGHWAY FONT C, AT 8" IN HEIGHT.
FILM SERIES 1177 AND 1178.
2. MATERIAL SHALL BE 3M DIAMOND GRADE REFLECTIVE SHEETING USED WITH COLORED 3M ELECTROCUT FILM. COLOR SHALL BE EC
1. SIGN SHALL BE WHITE TEXT ON A GREEN BACKGROUND WITH WHITE BORDERS AND A MULTI-COLOR CITY OF SANDY SPRINGS LOGO.
NOTES:
V4A
V4B
Ph 3 PED
Ph 8
IVDS
SDLC
V4C
Peachtree Corners, Georgia 30092
Suite 350, 3930 East Jones Bridge Road
Engineering, Planning, and Environmental Consultants
REVISION DATES
10/19/2023 winnie.gobbel
GPLOT-V8
00T0019_3_27-0005.dgn
3:16:49 PM
GPLN4/28/2016
DRAWING No.
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
CHECKED:
PROJECT NUMBER
T2308
SANDY SPRINGS
GEORGIA
@ LAKE PLACID DR
SR 9/US 19/ROSWELL RD
QUANTITIES
27-0006
SIGNAL PLAN
Peachtree Corners, Georgia 30092
Suite 350, 3930 East Jones Bridge Road
Engineering, Planning, and Environmental Consultants
REVISION DATES
10/18/2023 winnie.gobbel
GPLOT-V8
00T0019_3_27-0006.dgn
7:57:52 PM
GPLN4/28/2016
DRAWING No.
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
CHECKED:
PROJECT NUMBER
T2308
SANDY SPRINGS
GEORGIA
POWER METER SERVICE AND DISCONNECT
DETAIL
| 00T0019_3_27-0002 |
| 00T0019_3_27-0003 |
| 00T0019_3_27-0004 |
| 00T0019_3_27-0005 |
| 00T0019_3_27-0006 |
| 00T0019_3_27-0003 |
| 00T0019_3_27-0004 |
| 00T0019_3_27-0005 |
| 00T0019_3_27-0004 |
| 00T0019_3_27-0005 |
| 00T0019_3_27-0003 |
| 00T0019_3_27-0004 |
| 00T0019_3_27-0005 |
| 00T0019_3_27-0003 |
| 00T0019_3_27-0004 |
| 00T0019_3_27-0005 |
| 00T0019_3_27-0004 |
| 00T0019_3_27-0005 |
| 00T0019_3_27-0004 |
| 00T0019_3_27-0004 |
File details come from the government source that posted it. Updated .