This document is a project manual and specifications for the McKinley Park Trail Restoration project, issued by the City of Pittsburgh Department of Public Works in Pittsburgh, Pennsylvania. The project involves comprehensive trail renovation work at McKinley Park, located at 900 Delmont Avenue, with a bid set dated April 4, 2023. The scope of work includes site general construction encompassing project coordination, permits, surveying, temporary fencing, removals, erosion and sedimentation controls, unclassified excavation, earthwork, grading, stormwater infrastructure installation, subgrade preparation, concrete and asphalt pavement restoration, compacted aggregate trail construction, stairs, curbs, dry stacked stone wall, site amenities, landscaping, and seeding. The project includes three alternate bid options: concrete stairs instead of timber box stairs, concrete paving in lieu of compacted aggregate trail, and an ornamental fence around an existing rain garden.
The project will be awarded by the City of Pittsburgh to the responsible bidder offering the lowest combined price of selected bids, with the owner reserving the right to accept or reject any or all bids. The contract allows for flexible site access, with the City providing electricity and water for construction purposes at no cost to the contractor. Contractors will be responsible for their own parking, temporary facilities, and adhering to City of Pittsburgh work hour ordinances. The project emphasizes safety, environmental protection, and maintaining public access to the park during construction. While specific funding sources are not detailed in the document, the project appears to be a municipal infrastructure improvement initiative focused on trail restoration and park amenity enhancement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| McKinley_Park_Trail_Renovations_(Addendum_#2_Revision).pdf | ||
| 2023-04-04_McKinleyTrail_Bid_Set_-_DWGs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
MANUAL
SPECIFICATIONS
McKinley Park Trail Restoration
Prepared By:
Pashek + MTR, Ltd.
619 East Ohio Street
Pittsburgh, PA 15212
City of Pittsburgh
Department of Public Works
Pittsburgh, PA
April 4, 2023
BID SET
CITY OF PITTSBURGH DEPARTMENT OF PUBLIC WORKS
MCKINLEY PARK TRAIL RESTORATION
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
Project Manual Cover Page Table of Contents 01 10 00 Summary of Work ................................................................................... 01 10 00-1 to 7 01 10 10 Safety, Health, and Emergency Response ............................................... 01 10 10-1 to 8 01 20 00 Price and Payment Procedures ................................................................ 01 20 00-1 to 7 01 22 00 Unit Prices ............................................................................................... 01 22 00-1 to 3 01 31 13 Project Coordination ................................................................................ 01 31 13-1 to 4 01 31 19 Project Meetings ...................................................................................... 01 31 19-1 to 4 01 32 00 Construction Progress Documentation .................................................... 01 32 00-1 to 6 01 32 19 Submittals ................................................................................................ 01 32 19-1 to 9 01 35 00 Change Order Procedures ........................................................................ 01 35 00-1 to 6 01 36 00 Application for Payment .......................................................................... 01 36 00-1 to 3 01 37 00 Schedule of Values .................................................................................. 01 37 00-1 to 2 01 40 00 Quality Requirements .............................................................................. 01 40 00-1 to 7 01 43 00 Reference Standards ................................................................................ 01 43 00-1 to 4 01 50 00 Temporary Facilities and Controls .......................................................... 01 50 00-1 to 3 01 55 00 Maintenance and Protection of Traffic During Construction .................. 01 55 00-1 to 2 01 56 00 Temporary Barriers and Enclosures ........................................................ 01 56 00-1 to 3 01 56 39 Temporary Tree and Plant Protection ...................................................... 01 56 39-1 to 6 01 60 00 Delivery, Storage and Handling .............................................................. 01 60 00-1 to 2 01 63 00 Substitutions and Product Options ......................................................... 01 63-00-1 to 4 01 71 23 Field Engineering .................................................................................... 01 71 23-1 to 3 01 77 00 Closeout Procedures ................................................................................ 01 77 00-1 to 8 01 78 36 Warranties................................................................................................ 01 78 36-1 to 2
DIVISION 2 – EXISTING CONDTIONS
02 41 13 Selective Site Demolition ....................................................................... 02 41 13-1 to 8
DIVISION 4 – MASONRY
04 40 00 Stone Assemblies ................................................................................. 04 40 00-1 to 11
DIVISION 5 – METALS
05 52 00 Metal Railings ........................................................................................ 05 52 00-1 to 9
DIVISION 6 – WOOD, PLASTICS AND COMPOSITES
06 20 13 Exterior Carpentry .................................................................................. 06 20 13-1 to 5
DIVISION 12 – FURNISHINGS
12 93 00 Site Furnishings ...................................................................................... 12 93 00-1 to 3
DIVISION 31 – EARTHWORK
31 11 00 Clearing and Grubbing ........................................................................... 31 11 00-1 to 5 31 23 19 Dewatering ............................................................................................. 31 23 19-1 to 3 31 25 00 Soil Erosion and Sedimentation Control ................................................ 31 25 00-1 to 7 31 29 99 Earth Moving ........................................................................................ 31 29 99-1 to 16 31 32 19 Geosynthetic Soil Stabilization and Layer Separation ........................... 31 32 19-1 to 3
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 16 Asphalt Pavement ................................................................................... 32 12 16-1 to 5 32 13 13 Concrete Paving ..................................................................................... 32 13 13-1 to 8 32 14 00 Unit Paving ............................................................................................. 32 14 00-1 to 7 32 15 40 Compacted Aggregate Surface ............................................................... 32 15 40-1 to 4 32 92 00 Turf and Grasses ................................................................................... 32 92 00-1 to 17
LIST OF DRAWINGS
COVER
ECR1 Conservation, Reuse, and Removals Plan ECR2 Conservation, Reuse, and Removals Plan ESC1 Erosion & Sedimentation Control Plan ESC2 Erosion & Sedimentation Control Plan ESC3 Erosion & Sedimentation Control Notes ESC4 Erosion & Sedimentation Control Details SP1 Site Plan SP2 Site Plan GP1 Grading Plan GP2 Grading Plan CD1 Construction Details CD2 Construction Details CD3 Construction Details
DIVISION 01: GENERAL REQUIREMENTS
SECTION 01 10 00 – SUMMARY OF WORK
McKinley Park Trail Remediation Summary of Work 01 10 00-1
PART 1 - GENERAL
1.01 SUMMARY
A. This Section includes provisions for the following:
1. Summary of work
2. Contractor’s use of premises
3. Occupancy requirements
1.02 PROJECT INFORMATION
A. Project Location: McKinley Park 900 Delmont Avenue Pittsburgh, PA 15210 40.415302, -80.002296
B. Owner: Department of Public Works City of Pittsburgh 301 City-County Building 414 Grant Street, Room 301 Pittsburgh, PA 15219
C. Contract Bid Documents: Dated April 4, 2023, prepared by Pashek + MTR, Ltd; Pittsburgh, Pennsylvania
1.03 TYPE OF CONTRACT
A. Project will be constructed under one prime contract: Site General Contract.
1.04 SITE GENERAL CONTRACT
A. Work of the Site General Contract includes, but is not limited to, the following:
1. Site General Construction - Base Bid Including: project coordination, permits, bonds, surveying, layout, staking, temporary fencing, removals, erosion and sedimentation controls, stake out of improvements, unclassified excavation, earthwork, grading, installation of stormwater infrastructure, subgrade preparation & compaction, concrete paving, asphalt pavement restoration, compacted aggregate trail, stairs, curbs, dry stacked stone wall, benches and other site amenities, landscaping, and seeding. All work on the drawings shall be included in the Base Bid unless noted on the drawings as an Alternate.
2. Add Alternate #1 Construct Concrete Stairs in lieu of Timber Box Stairs specified in the base bid, within the limits indicated on the Drawings.
3. Add Alternate #2 Construct Concrete Paving in lieu of Compacted Aggregate Trail specified in the base bid, within the limits indicated on the Drawings.
Summary of Work 01 10 00-2
4. Add Alternate #3 Construct Ornamental Fence around existing rain garden as indicated on the Drawings.
B. Contract Awards: If Contract(s) is/are awarded, it will be awarded by the Owner to a responsible Bidder on the basis of the lowest combined price of selected bids, if any. The Owner reserves the right to accept or reject any or all Bids, or any part of a Bid, and to waive informalities, and to award the Bid in the best interest of Owner.
1.05 CONTRACTOR’S USE OF PREMISES
A. Contractor shall have limited use of premises for construction operations and shall coordinate with the City of Pittsburgh for establishing an area within the site that may be feasible for conducting their operations, including the following:
1. The Contractor shall be responsible for coordinating with the City of Pittsburgh to determine the route that construction traffic shall use to the work areas and ensure that adjacent areas are protected against damage, dust and noise.
2. Limit use of the premises to perform the Work. Confine operations to areas within the
Contract Limits. Do not disturb portions of the site beyond areas in which the Work will be constructed.
B. The City, within its facilities, will furnish electricity for construction purposes free of charge to the Contractors.
C. The City will provide water for construction purposes at no cost to the Contractor.
D. The Contractor's working hours shall be in accordance with City of Pittsburgh Ordinances, and a schedule agreed upon by the Contractor and the City. Should evening hours or weekend work be required, this work must be fully coordinated with the City in advance of scheduling the off-hours work.
E. Contractors will be required to use pay phones or cell phones at their own cost and expense. The Contractors shall refrain from soliciting the use of City telephones.
F. Contractors shall not use other than approved designated work areas for storage of materials.
G. The City will not provide parking for Contractors. Workers shall park at their own expense; there is available street parking areas close to the site. No parking of Contractor vehicles is permitted on sidewalks, pedestrian plazas or lawn and green areas.
1. Driveway and Entrances: Keep driveway and entrances serving the premises clear and available for public access to the Park and for emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize traffic, space and the time requirements for storage of materials and equipment on-site.
H. The Contractor shall be responsible for keeping public and private roads clean of mud, dirt, or debris originated by the construction operations. These roads shall be cleaned daily by the Contractor to the satisfaction of the City.
Summary of Work 01 10 00-3
I. The Contractor shall provide temporary toilet facilities for their work force, and those of their subcontractors. The location for temporary toilet facilities shall be coordinated and approved with the City. These facilities shall be maintained in a sanitary condition and shall be removed from the site upon completion of the project.
J. Use of City dumpsters for disposal of materials is prohibited.
1.06 OCCUPANCY REQUIREMENTS
A. Owner Occupancy: City of Pittsburgh, Department of Public Works (Owner and the Public) will occupy the adjacent open park premises during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the work so as not to interfere with Owner’s operations. Maintain existing entry and exits, unless otherwise indicated.
B. The contractor shall prepare a schedule for approval by the owner within (10) ten days of “Notice to Proceed” that outlines specific phasing of the project work that provides the City continued access to the open portions of the park throughout construction.
C. Maintain access to existing active walkways, corridors, and other adjacent occupied or used areas within the facilities, without written permission from Owner and authorities having jurisdiction.
D. Provide not less than 72 hours’ notice to Owner of activities that will affect Owner’s operations.
1.07 SHUTDOWN OF UTILITIES
A. Contractor shall obtain approval from the City, at least ten (10) working days in advance, for the shutdown of utilities. Utility shut downs must be scheduled so they do not interfere with the daily park functions, as applicable.
1.08 NOISE AND VIBRATION CONTROL
A. In most instances, noise control will be implemented in accordance with City Ordinances.
Therefore, it is mandatory that equipment such as compressors, generating equipment, etc. be fitted with mufflers or other noise abatement attachments to meet the City’s ordinance requirements.
B. Coordinate use of vibration-producing equipment, such as jackhammers, with the City of Pittsburgh, Department of Public Works.
C. It may become necessary to schedule some operations during periods of low occupancy.
1.09 JOB SITE SECURITY
A. Job site security will not be provided by the City. The City assumes no responsibility for damage or loss to Contractor's property.
1.10 CITY OF PITTSBURGH OWNED EQUIPMENT
Summary of Work 01 10 00-4
A. The use of City-owned equipment is prohibited. It shall be the responsibility of the Contractor to provide all tools, equipment and materials necessary to perform the work.
1.11 NO-SMOKING POLICY
A. The City’s "No-Smoking" policy applies to City owned and leased facilities including construction sites. Construction workers must refrain from smoking in these areas.
1.12 DELIVERIES AND STORAGE
A. Equipment and materials delivered to the work site will be stored at locations approved by the City.
B. The Contractor will coordinate with the City for delivery of construction materials. The Contractor will keep access to the building site unobstructed at all times.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
END OF SECTION
DIVISION 1: GENERAL REQUIREMENTS
SECTION 01 10 10 – SAFETY, HEALTH AND EMERGENCY REPSONSE
Safety, Health, and Emergency Response 01 10 10-1
1.01 REQUIREMENTS INCLUDED
A. Pursuant to Section 107 of the Contract Work Hours and Safety Standards Act and DOL
Regulations set forth in 29 C.F.R. Part 1926, the Contractor agrees that such provisions are a condition of, and incorporated into, the Contract, and shall be made a condition of each subcontract entered into pursuant to the Contract, that the Contractor and any Subcontractor shall not require any laborer or mechanic employed in performance of the Contract to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous to his or her health and safety, as determined under the applicable construction health and safety standards promulgated by the Secretary of Labor or the State.
B. The Contractor shall promptly and fully comply with, execute and enforce, without separate charge therefore to City, the safety and health requirements stated herein and those that may be prescribed by any official or representative charged with the enforcement thereof, and shall take such other measures as may be necessary to assure that the Work shall be done in a safe manner and the safety and health of the employees and the general public are safe-guarded. The Contractor shall be responsible for its Subcontractors' compliance with these provisions.
C. Copies of all reports submitted to OSHA by the Contractor or any Subcontractor, and also copies of OSHA citations and recommendations, shall be submitted to the Owner’s
Representative within five (5) days of submission or receipt.
D. The Contractor shall:
1. The Contractor shall submit one (1) electronic copy of a Safety Program in writing to the Owner’s Representative, for review and approval for conformance with the requirements of the Contract Documents, within ten (10) days after receipt of the
Notice of Award.
2. The Contractor’s Safety Program shall incorporate such programs and activities as may be necessary to comply with OSHA and other applicable federal, state, county and municipal laws and regulations in the performance of the Work. The Program shall address site-, project-, and COVID-19-specific safety and health requirements and procedures based upon site-, project-, and COVID-19-specific conditions. The level of detail provided in the Program shall be tailored to the type of work, complexity of operations to be accomplished, and anticipated hazards, including COVID-19. As part of this item, the Contractor shall develop and institute, for the duration of the Contract, procedures in the event of fire, injury, accident or other emergency conditions. This portion of the Safety Program is to be maintained on public display at the Contractor's field office;
3. Designate, at the Pre-Construction Conference, a Safety Supervisor whose duties shall be to implement and enforce the Safety Program; and
4. Conduct weekly Worksite safety meetings. Included at these meetings will be instructions for each employee on the recognition and avoidance of unsafe
Safety, Health, and Emergency Response 01 10 10-2 conditions and the regulations applicable to his or her work environment to control or eliminate any hazards or other exposures to illness or injury. Such meetings shall be administered by the Contractor's Safety Supervisor. Notice of the time and place of such safety meetings shall be given to the Owner’s Representative at least three (3) days in advance of each such meeting. A copy of the safety meeting minutes shall be provided to the Owner’s Representative within three (3) days after each safety meeting. The Owner’s Representative or City shall be invited to, and at their discretion, may attend these meetings.
E. As an integral part of the Contractor’s Safety Program, the Contractor shall prepare and maintain a directory, listing the company name and contact person, business telephone number and emergency telephone number, including a mobile number (i.e. cellular, pager, etc.) as available, for the following, which shall be maintained and updated as required for the duration of the Contract, and shall be provided to City and the Owner’s Representative and posted at each of the Contractor’s telephones and at a prominent place at the Worksite:
1. Contractor's Main Office, including a 24-hour contact for non-business hours;
2. Contractor's Project Manager;
3. Contractor's Field Superintendent, Safety Supervisor and any other Contractor’s personnel as required by the Owner;
4. Each Subcontractor;
5. Each City contractor working adjacent to or on the Worksite;
6. Owner’s Representative’s Field Office, including a 24-hour contact for non-business hours;
7. Owner’s Representative’s Main Office;
8. Testing laboratories and batch plants;
9. Emergency telephone numbers including, but not limited to, physicians, emergency hospitals, ambulance, police and fire department;
10. Emergency telephone numbers for utility owners who have facilities on or adjacent to the Worksite;
11. City's 24 hour emergency numbers to be provided.
12. Railroads and other affected agencies and/or authorities;
13. Pennsylvania Department of Environmental Protection.
F. Failure of the Contractor to comply with any of the requirements of this Article may be cause for City to disqualify the Contractor from bidding on any other City contracts.
G. Should a Responsible Authority, determine that the Contractor’s failure to comply with
Safety, Health, and Emergency Response 01 10 10-3 this Article creates a hazard to life, limb or property, the Responsible Authority may stop any operation of the Contractor affected by the failure until such failure is remedied. Any time lost due to any such stoppage of the Work shall not be made the subject of any claim for money or time by the Contractor. The Contractor shall not make any claim for extension of time or for additional compensation or for damages by reason of or in connection with work stoppages directed by any Responsible Authority, by reason of or involving operations which create an imminent danger (as defined by OSHA) to employees, to the public or to property.
H. The Contractor shall submit to the Owner’s Representative and City a copy of all accident occurrence reports within 24 hours of occurrence.
I. The Contractor shall submit one copy of the OSHA Form 300A to the Owner’s
Representative, no later than the third day of each month. The Contractor shall indicate the total man-hours worked by the Contractor and its Subcontractors during the previous month.
J. The Contractor shall be solely responsible for initiating, maintaining and supervising safety precautions and programs in connection with the Work.
1. The Contractor shall take reasonable precautions for the safety of, and provide reasonable protection to prevent damage, injury or loss to:
a. The materials and equipment for incorporation in the Work whether in storage on or off the site under the care, custody or control of the Contractor or others;
b. Other property at the site or adjacent to it, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not for removal, relocation or replacement in the course of construction.
c. Vehicle, pedestrian, and bicycle traffic traveling through, under, or around the construction area and construction access areas.
2. The Contractor shall erect and maintain, as required by existing conditions and progress of the Work, reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent utilities.
3. The Contractor shall ensure employees, visitors, Subcontractor's employees, and
Suppliers' employees, while on the Worksite, comply with the provisions of the
Williams Steiger Occupational Safety and Health Act of 1970 and any changes thereto.
4. In the event of a conflict and/or ambiguity between various safety statutes or requirements, the interpretation by the Owner as to which provision(s) applies or what a given provision(s) implies will be final.
K. Contractor shall employ and assign to the Work a Safety Supervisor whose responsibility shall include in part job safety for this Contract, and whose primary duties shall be assisting in the supervision for the safety of persons on and about the work and affected property.
1. The Contractor shall, within fifteen (15) days after Notice of Award, submit to the
Owner’s Representative for approval, the qualifications of its proposed Safety
Safety, Health, and Emergency Response 01 10 10-4
Supervisor. Qualifications shall include building construction experience of not less than ten (10) years and five (5) years devoted to, and with responsibility for, job safety. No
Work shall commence until the Owner’s Representative has approved the Safety
Supervisor.
2. The Contractor’s Safety Supervisor shall:
a. Make daily safety inspections of job sites and take necessary immediate corrective action to eliminate unsafe acts and conditions;
b. Assure that the OSHA 300A Form Accident Report is properly completed and submitted to the Owner;
c. Review accident and incident reports and initiate immediate corrective action;
d. Provide job foremen with appropriate material for use in conducting weekly “tool box” safety meetings;
e. Attend foremen “tool box” safety meetings and evaluate their effectiveness;
f. Assist in the preparation of the accident investigation and reporting procedures;
g. Implement training programs for supervisors and employees as they apply to their specific responsibilities;
h. Encourage programs for recognition of individual employee’s safety efforts and their contribution toward improved work methods;
i. Be responsible for the control and availability of the necessary safety equipment, including employee’s personal protective equipment;
j. Coordinate activities with those of the other contractors and the Engineer;
k. Submit a written weekly report summarizing:
1) Daily inspection results;
2) Tool box meetings;
3) Accident investigations; and
4) Planning activities for upcoming operation.
l. Maintain a current copy of OSHA 29 CFR 1926/1910 Standards on site; and
m. Maintain a record of the installation and maintenance of the traffic control and highway closure signs, signals, barricades, and devices. The record shall include a written log of daily maintenance and photographs of installations.
L. If the Owner’s Representative determines that the Safety Supervisor is not effective in executing his or her duties, the Owner’s Representative may direct the Contractor, in
Safety, Health, and Emergency Response 01 10 10-5 writing, to replace the current Safety Supervisor with a new Safety Supervisor.
M. If or when it should be necessary to replace the Safety Supervisor, the Contractor shall notify the Owner’s Representative, within 72 hours in writing, and submit to the Owner’s
Representative the name, experience and qualifications of the proposed replacement Safety
Supervisor for approval. The replacement Safety Supervisor shall be approved and on site prior to replacing the current Safety Supervisor.
N. Imminent Danger - The Contractor shall not make any claim for extension of time or for additional compensation, or for damages by reason of or in connection with Work stoppages that City, the Owner’s Representative or their authorized representative directs by reason of or involving operations creating an imminent danger (as defined by OSHA) to employees, to the public or to property. Imminent danger, according to OSHA, “is any condition where there is reasonable certainty that a danger exists that can be expected to cause death or serious physical harm immediately or before the danger can be eliminated through normal enforcement procedures".
O. Safety Program - The Safety Program shall provide guidelines to implement an accident prevention program on the Project, and fully describe the Contractor's commitments for meeting its obligations to provide safe and healthful working conditions for its employees.
After Notice of Award, and prior to the start of Work, the Owner’s Representative will schedule a meeting with the Contractor to review the Safety Program. The Contractor shall conduct a similar meeting with each Subcontractor at any tier prior to start of the
Subcontractor’s work and shall ensure that each Subcontractor complies with the Safety
Program. Both meetings will require the attendance of the Contractor’s Project Manager and approved Safety Supervisor. Other attendees at the meeting may include representatives from the Owner’s Representative and City. The intent of the review is to: clarify any issues regarding regulatory compliance or contract requirements; enhance planning for both safety and productivity; and reduce the potential for accidents. The Owner’s Representative will review the Safety Program to verify that it complies with the Contract Documents. The
Contractor shall not begin the Work until the Owner’s Representative approves the
Contractor's Safety Program as compliant with the requirements of the Contract Documents.
1. Safety Program Content
a. Accident Investigation and Procedures – The Contractor shall describe the accident/incident reporting procedures for the Project. The Contractor shall submit to the Owner a copy of accident/incident reports within 24 hours of occurrence of the following:
1) Personal injury to a member of a crew, subcontractor, general public traveling in vehicles or pedestrians, and City personnel;
2) Equipment or property damage;
3) Near misses having a potential for serious injury, death or property damage; and
4) Requests of the Owner.
b. Employee Sanctions – Explain disciplinary action for any employee who jeopardizes his or her health or safety, or the health or safety of others.
Safety, Health, and Emergency Response 01 10 10-6
c. Emergency Procedures – Describe the procedures to familiarize employees with
Emergency Procedures for the Project. As a minimum, the procedure shall cover injuries, fires, evacuations, and similar situations, Worksite medical facilities including number and location of stretchers and first aid kits and the location of the
First Aid Station.
d. Fire Protection and Prevention – Explain the Project fire protection and prevention program in detail and how the Contractor shall implement it.
e. First Aid – Explain the role of supervision and employees in reporting accidents and injuries, however minor. Provide at least two (2) persons at the Worksite with a valid certificate in First Aid/CPR Training. The Contractor shall provide documentation of this training to the Owner’s Representative.
f. Hazard Communications – The Contractor shall provide a written hazard communication program which describes how the Contractor will comply with the requirements of 29 CFR 1926.59 "Hazard Communication".
g. Medical Surveillance – Explain how it will meet the requirements of 29 CFR
1926.33 "Access to Employee Exposure and Medical Records."
h. Occupational Health Programs – Provide required, specific occupational health programs to protect employees working on the Project, i.e., air monitoring, sampling, special protective clothing or equipment, particular hazards monitoring including, but not limited to, silica, asbestos and lead, and a Project - wide noise survey.
i. Personal Protective Equipment – Describe personal protective equipment to be utilized on this Project, including for COVID-19. Include parameters for its use.
Parameters shall include orange or yellow-green (or fluorescent versions of these colors) vest, shirt or jacket in work zones adjacent to traffic.
j. Safe Work Practices – Explain requirements placed on supervision when making
Work assignments. List site specific requirements here and give responsibility for enforcement. Provide competent designated signalmen for crane work. Submit annual crane inspection certificate prior to use of any crane.
k. Safety Orientation of New Hires – Describe how each new hire or transferee shall receive a thorough safety and hazard communication orientation which imparts basic information about the Project safety and health program, federal and local regulations, and other safety rules and regulations necessary to perform tasks safely.
The Contractor shall verify its new hire orientation for each employee. It shall do so in writing with the employee’s signature on the letter to attest to its validity within 24 hours of the employee’s orientation. The Contractor shall submit verification of employees’ rights and duties as required by Section 306 (f.1) of PA Workers
Compensation Act. Future safety instructions may be necessary if the Contractor performs hazardous work and/or unfamiliar tasks. Based upon the nature of the work, orientation may include, but not be limited to, the following:
1) Confined spaces;
Safety, Health, and Emergency Response 01 10 10-7
2) Cranes, rigging and material handling;
3) Electrical safety;
4) Emergency procedures;
5) Evacuation;
6) Eye protection;
7) Fall protection;
8) Fire protection;
9) First aid facilities and emergency procedures;
10) Foot protection;
11) Hazard communications;
12) Head protection;
13) Hearing protection;
14) Housekeeping;
15) Medical surveillance;
16) Perimeter guarding;
17) Respiratory protection;
18) Safe work practices on City property;
19) Safety harnesses and lifelines;
20) Safety meetings;
21) Scaffolding and ladders;
22) Special Project requirements and procedures;
23) Temporary shoring; and
24) Trenching and excavations.
l. Safety Orientation For Supervisors – The Contractor shall describe supervisor safety orientation upon hire or promotion. List safety duties and responsibilities in daily work activities.
m. Tool Box Safety Meetings – The Contractor shall describe its weekly Toolbox
Safety Meetings for its employees and an equivalent requirement that its
Subcontractors conduct similar meetings. The meetings shall address material relevant to employees’ activities e.g. hazard communications, pre-job orientation and changing jobs or conditions.
n. Task Safety Analysis and Training – The Contractor shall describe its pre-task planning and safety analysis of different phases of the Project. The Contractor shall describe the procedures to train employees in the exposures they will face and the job they are to perform. This is to be done during the pre-job and hazardous communications orientation. Other situations may arise during the course of the
Project requiring additional training. The Contractor shall describe how it shall
Safety, Health, and Emergency Response 01 10 10-8 accomplish this.
o. Worksite Safety Inspection – The Contractor shall document to the
Owner’s Representative its daily Worksite safety inspections.
p. Confined Spaces – Identify potential areas constituting confined spaces. Describe plans for ventilation, atmosphere monitoring, access and egress, and personal protective equipment requirements. Describe in detail emergency procedures and equipment. Describe the specific training programs to conduct prior to confined space entry.
q. Jobsite Security – Identify proactive measures for security of the Worksite.
2. 100% Fall Protection.
a. The Contractor shall develop and submit to Owner’s Representative a plan detailing specific actions it shall take to ensure that no employees are exposed to an elevated fall hazard in excess of six (6) feet. The Contractor shall utilize full body harnesses for personal fall protection. At no time shall the Contractor and its Subcontractors use body belts as part of a personal fall arrest system.
b. The Contractor shall train personnel in proper fall protection methods and requirements, and give additional training concerning full body harnesses, lanyards, and lifelines. Training shall cover proper use of such equipment, including wearing, securing, and inspection procedures. The Contractor shall maintain documentation of such training on the Project. The Contractor shall institute measures to verify the effectiveness of the training.
SECTION 01 20 00 – PRICE AND PAYMENT PROCEDURES
McKinley Park Trail Remediation
Price and Payment Procedures 01 20 00-1
PART 1 - GENERAL
1.01 SUMMARY
A. This Section includes provisions for the following:
1. Administrative and procedural requirements governing price and payment procedures.
1.02 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation with Contractor’s CPM Construction Schedule.
1. Submit typed schedule within time frame stipulated.
a. Application for Payments will not be processed without an approved Schedule of
Values or until post bid items are submitted and reviewed.
B. Format and Content: Use the Project Manual table of contents as a guide to establish format.
Provide at least one line item for each Specification Section.
1. Identification: Include the following Project Identification:
a. Project name, number, and location.
b. Name of Owner and Owner’s Representatives
c. Contractor’s name, address and telephone number.
d. Date of submittal.
2. Arrange in tabular form with separate columns to indicate the following for each item indicated:
a. Related Specification Section.
b. Description of Work.
c. Name of Subcontractor.
d. Name of manufacturer, fabricator, or supplier.
e. Change Orders (numbers) that affect value.
f. Dollar Value.
1) Percentage of Contract Sum to the nearest one-hundredth percent, adjust to total 100%.
2) List both material and labor for each item.
3. Provide a breakdown of the Cost of Work in accord with the Provisions of Article 9 of the Agreement between Owner and Contractor, in detail to substantiate the stipulations and requirements of Article 9.3, et sequentia of the Agreement Between Owner and
Contractor for the Owner’s Representative to process the Applications for Payment and the progress reports.
4. Round to the nearest whole dollar for total to equal cost of Work.
5. Provide separate line item for each Work part where Applications for Payment may include materials or equipment, purchased or fabricated and stored but not yet installed.
McKinley Park Trail Remediation
Price and Payment Procedures 01 20 00-2
a. Differentiate between items stored on-site and items stored off-site. Include requirements for insurance and bonded warehousing, if required.
6. Provide separate line items for initial cost of the materials, for each subsequent stage of completion, and for total installed value of that part of the Work.
7. Margins of Cost: Show line items for indirect costs and margins on actual costs only when such items are listed individually in the Applications for Payment and are allocable to the completed Work. Complete each item in the Schedule of Values and Applications for Payment.
8. Include a separate line item for the Contractor’s fee separate from the items required to perform the Work.
9. Separately identify site mobilization; bonds and insurance; field supervision; general conditions, construction facilities and temporary controls.
a. For items that are not direct cost of actual work-in-place and require monthly invoicing, show as a separate line item, including, but not limited to the following:
1) Temporary facilities
2) Phone service
3) Trailer rental
4) Other rentals necessary for the Project
5) Superintendence
6) Project Management
7) Overhead and Profit
8) Submittals
b. Indicate a detailed breakout for the above listed items scheduled for the duration of the Contract.
10. Site Cleaning: Provide a line item for clean-up of the Project.
11. Schedule Updating: Update and resubmit Schedule of Values prior to the next
Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract sum.
C. Include, and specifically itemize in each line item, the amount of labor costs, quantity and other costs as applicable in sufficient detail to serve as a basis for computing progress payment values.
1. Schedule of Values not containing breakdown of these items will be rejected.
D. For items on which progress payments will be requested for stored materials, breakdown the value into:
1. The cost of the materials, delivered and unloaded, with taxes paid.
2. The total installed value.
1.03 APPLICATIONS FOR PAYMENT
A. Prior to submittal of each Application for Payment, at the time determined by the Owner’s
Representative and agreed to by the Owner, submit a “pencil copy” for review by Owner’s
McKinley Park Trail Remediation
Price and Payment Procedures 01 20 00-3
Representative. After review with the Owner, revise and resubmit Application for Payment in the same manner.
B. Submit three copies of each application on AIA Form G702-Application and Certificate of
Payment and Continuation Sheets (AIA Form G703 and all other attachments) to the Owner’s
Representative for review and transmittal to the Owner with recommendation. Submit updated
Construction Schedule with the Application for Payment.
C. Content and Format: Utilize approved Schedule of Values for exact listing of the items in the
Application for Payment:
1. For each item, provide a column for listing: item number, description of work, scheduled value, previous applications, work in place (and stored materials) under this application, authorized change orders, total completed (and stored) to date of applications, percent complete, balance to finish and retainage.
D. List Change Order amounts only when fully executed by the Owner, Owner’s Representative and the Contractor.
E. For each Application for Payment, include a sworn statement, certified to the Owner and the
Lender, indicating the actual contract amounts, payment information and retainage for each first tier subcontractor and supplier and separately scheduling General Conditions and Fee.
F. Payment Period: Monthly as per the requirements of the Construction Agreement.
G. Preparations of Applications:
1. Execute certifications by signature of authorized officer.
2. Use data from approved Schedule of Values. Provide dollar value in each column for each line item for portion of work performed and stored.
3. List each authorized Change Order as an extension on the Continuation Sheet, listing
Change Order Number and dollar amount as for an original item of work.
4. Prepare Application for Final Payment.
H. Substantiating Data:
1. When the Owner’s Representative or Owner requires substantiating information per 12.4 of the Standard Form of Agreement Between Owner and the Contractor, submit data justifying items submitted for the Application for Payment.
2. Provide one copy of the data with cover letter for each copy of submittal. Show application number and date, and line item by number and description.
3. Provide Certificate of Insurance for each item stored off-site, stating specific items stored, the exact location and the replacement value of stored materials or products.
4. Provide Contractor’s Affidavit stating ownership of the materials and acknowledging
Contractor’s continued responsibility for the stored items.
I. Waivers of Mechanics Liens: When requested, submit waivers of mechanics liens from subcontractors, sub-subcontractors and suppliers for the construction period covered by the previous application with each application for payment.
1. When an application shows completion of an item, submit final or full waivers.
McKinley Park Trail Remediation
Price and Payment Procedures 01 20 00-4
2. The Owner reserves the right to designate which entities involved in the Work must submit Waivers.
3. Submit final Applications for Payment with or preceded by final waivers from every entity involved with the performance of Work covered by the application who is lawfully entitled to a lien.
4. Waiver Forms: Submit waivers of lien forms, and executed in a manner, acceptable to the
Owner.
J. Initial Application for Payment: Administrative actions and submittals, in forms acceptable to the Owner and the Owner’s Representative, that must be completed prior to the first Application of Payment include the following:
1. List of subcontractors.
2. List of principal suppliers and fabricators.
3. Schedule of Values.
4. Contractor’s Preliminary CPM Construction Schedule.
5. Schedule of principal products.
6. Submittal Schedule.
7. Submission of coordination drawings.
8. List of Contractor’s staff assignments.
9. List of Contractor’s principal consultants.
10. Copies of building permits.
11. Copies of authorizations and licenses from governing authorities for performance of the
Work.
12. Certificates of Insurance and other insurance policies required.
13. Performance and payment bonds.
14. Data needed to acquire the Owner’s insurance.
15. Settlement surveys and damage report, if required.
K. Application for Payment at Substantial Completion: Following issuance of the Certificate of
Substantial Completion, submit an Application for Payment.
1. Reflect Certificates of Partial Substantial Completion issued previously for the Owner occupancy of designated portions of the Work.
2. Precede or coincide with this application, administrative actions and submittals, in forms acceptable to the Owner and the Owner’s Representative, to include:
a. Occupancy permits and similar approvals.
b. Warranties and maintenance agreements.
c. Test / adjust / balance records.
d. Maintenance instructions.
e. Meter readings.
f. Start-up performance reports.
g. Changeover information related to the Owner’s occupancy, use, operation and maintenance.
h. Final cleaning.
i. Application for reduction of retainage and consent of surety.
j. Advice on shifting insurance coverages.
k. List of incomplete Work, recognized exceptions to the Owner’s Representative’s
Certificate of Substantial Completion.
McKinley Park Trail Remediation
Price and Payment Procedures 01 20 00-5
L. Final Payment Application: Administrative actions and submittals, in forms acceptable to the
Owner and the Owner’s Representative, that must precede or coincide with submittal of the final Application for Payment include the following:
1. Completion of project close-out requirements.
2. Completion of items specified for completion after Substantial Completion.
3. Ensure unsettled claims will be settled.
4. Ensure incomplete Work is not accepted and will be completed without undue delay.
5. Transmittal of required Project construction records to the Owner.
6. Proof that taxes, fees and similar obligations have been paid.
7. Removal of temporary facilities and services.
8. Removal of surplus materials, rubbish and similar elements.
1.04 CHANGE PROCEDURES
A. The Owner/Owner’s Representative will advise the Contractor of minor changes in the Work not involving and adjusting the cost to the Work and of the Contract Time as authorized by AIA
A201 Articles 7 and 8 by issuing supplemental instructions on AIA Form G710 Architect’s
Supplemental instructions. The Owner’s Representative will advise the Contractor of the minor change.
B. The Owner may issue a Notice of Change that includes a detailed description of a proposed change in the Contract Time for executing the change with a stipulation of any overtime work required and the period of time during the requested price will be considered valid. Contractor will prepare and submit a written estimate within seven days.
C. The Contractor may propose a change by submitting request for change describing the proposed change and its full effect on the Work. Include a statement describing the reason for the change, and the effect on the Contract Sum / Price and Contract Time with full documentation and a statement describing the effect on the Work by separate or other contractors.
1. Include the proposed costs with categories for labor and material and a breakdown of the allowed Contractor’s fee.
2. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
3. Comply with requirements in Section “Substitutions” if proposed change in Work requires substitution of one product or system for a product or system specified.
4. Include a statement indicating the effect proposed change in Work will have on Contract
Time.
D. Stipulated Sum Change Order: Based on Notice of Change and Contractor’s price quotation or
Contractor’s request for Change Order as approved.
E. Unit Price Change Order: For unit prices and quantities pre-determined by the Schedule of
Values, the Change Order will be executed on a fixed unit price basis. For unit costs or quantities of units of work that are not pre-determined, execute Work under a Construction
Change Authorization or Work Directive Change. Changes in Contract Sum / Price or Contract
Time will be computed as specified for Time and Material Change Order.
1. Survey at the Completion of Change: The Owner/Owner’s Representative will determine cost of such Work based on the unit prices and quantities used.
McKinley Park Trail Remediation
Price and Payment Procedures 01 20 00-6
a. Submit documentation to establish the number of units of each item and any claims for change in Contract Time.
b. Sign and date Change Order and indicate their agreement with the terms therein.
c. Owner will sign and date the Change Order to indicate their agreement with the terms therein.
d. Owner will sign and date the Change Order to establish the change in Contract
Sum, and Contract Time has been reviewed and all administrative requirements have been met.
F. Construction Change Authorization: Owner may issue a directive, on AIA Form G713
Construction Change Authorization signed by the Owner, instructing the Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.
G. Time and Materials Change Order: Submit itemized account and support data after completion of change, within the time limits indicated in the Conditions of the Contract. Owner will determine the change allowable in the Cost for the Work or Contract Time as provided in the
Contract Documents. The Owner’s Representative / Owner will verify time and materials in the field.
H. Maintain detailed records for Work done on a time and materials basis. Provide full information required for evaluation of proposed changes, and to substantiate costs for changes in the Work.
I. Document each quotation for a change in cost or time with sufficient data to allow evaluation of the Quotation.
J. On request, provide additional data to support computations:
1. Quantities of product, labor and equipment.
2. Taxes, insurances and bonds.
3. Overhead and profit.
4. Justification for any change in Contract Time.
5. Credit for deletions from Contract similarly documented.
K. Support each claim for additional costs, and for Work done on a time and materials basis, with addition information:
1. Origin and date of the claim.
2. Dates and times Work was performed and by whom.
3. Time records and wages rates paid.
4. Invoices and receipts for products, equipment and subcontracts, similarly documented.
L. Change Order and Construction Change Directive Forms: Owner’s Construction Change Order and Construction Change Directive Forms.
M. Execution of Change Orders: Owner’s Representative will issue Change Orders for signatures of parties as provided in the Conditions of the Contract.
1. Designate in writing the member of the Contractor’s organization:
a. Who is authorized to accept changes in the Work.
McKinley Park Trail Remediation
Price and Payment Procedures 01 20 00-7
b. Who is responsible for informing others in the Contractor’s employ of the authorization of the changes in the Work.
2. Owner will designate in writing the person who is authorized to execute Change Orders.
N. Correlation of the Contractor Submittals:
1. Promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Cost for the Work.
2. Promptly revise progress schedules to reflect any change in Contract Time, revise sub-schedules to adjust time for other items or work affected by the change, and resubmit.
3. Promptly enter changes in Project Record Documents.
1.05 CONSTRUCTION CHANGE DIRECTIVE
A. Construction Change Directive: When Owner and Contractor are not in total agreement on terms of a Change Order Proposal Request, the Owner’s Representative, with the concurrence and review of the Owner, may issue a Construction Change Directive on AIA Form G714, instructing Contractor to proceed with a change in the Work, for subsequent inclusion in
Change Order.
B. Construction Change Directive will contain a complete description of Change in Work and designate method to be followed to determine change in Cost for the Work or Contract Time.
C. Documentation: Maintain detailed records on a time and material basis or work required by the
Construction Change Directive.
1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.
SECTION 01 22 00 – UNIT PRICES
Unit Prices 01 22 00-1
PART 1 - GENERAL
1.01 SUMMARY
A. This Section includes provisions for the following:
1. Administrative and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .