This is a Request for Proposal issued by the City of Cumming Department of Utilities, Water Production Division for the removal of existing overhead power lines and power poles and the installation of underground 3-phase power. Proposals must be typed or submitted in ink and returned in a sealed envelope marked "Sealed Proposal - Cumming Utilities Overhead Power Lines R & R Project" addressed to City of Cumming, 100 Main Street, Cumming, GA 30040. The deadline for proposal submission is August 17, 2022 at 11:00 AM, with proposals to be delivered to the Cumming City Hall second floor receptionist desk or by mail. Any proposals received after this date and time will not be accepted. All proposals must be submitted in duplicate and are considered legal and binding upon submission. Awards will be made at a later date to be determined by the city.
Questions regarding the project should be directed to Tom Bryson at 770-781-2039 or tombryson@cityofcumming.net. The RFP does not specify pricing terms, set-asides, site visit requirements, or a pre-bid meeting date. No information is provided regarding contract term, renewal options, incumbent contractors, funding amounts, or funding sources.
Text of this file
CITY OF CUMMING
WATER PRODUCTION DIVISION FACILITY
935 DAHLONEGA HIGHWAY
OVERHEAD POWER LINE REMOVAL AND
UNDERGROUND REPLACEMENT PROJECT 2022
CONTACT: TOM BRYSON 770-781-2039
tombryson@cityofcumming.net
The City of Cumming Department of Utilities, Water Production Division is seeking proposals for the removal of existing overhead power line and power poles and the installation of underground 3-phase power.
Please see attached specification sheets this requested proposal.
For questions or to schedule a tour of the buildings and site, please call Tom Bryson, Superintendent, at the above telephone number or contact Mr. Bryson via email at the address listed above.
This proposal should include all #500 copper, pvc and aluminum conduit, concrete encasement, connection into switch gear, excavation, refilling and proper compaction of ditch, concrete/asphalt repair, disposal of excess soil and concrete/asphalt, disposal of old overhead power lines and poles and other waste, equipment rental, and physical labor associated with the turn-key installation of the 1600 amp underground power lines.
Must include in the pricing, all equipment necessary to accomplish the installation of the power line and removal of old poles and lines.
Proposal Must include all parts and labor.
Must provide a PARTS AND LABOR warranty of at least 12-months and provide an option for an extended warranty
Site Address:
City of Cumming Department of Utilities
POTABLE WATER PRODUCTION FACILITY
935 Dahlonega Highway Cumming, Georgia 30040
Billing Address:
Cumming City Hall Department of Utilities 100 Main Street Cumming, Georgia 30040 770-781-2020 mailto:tombryson@cityofcumming.net
All proposals are due on August 17, 2022 at 11:00 am at City Hall and must be submitted to City Hall in an envelope that shall state: “SEALED PROPOSAL – CUMMING UTILITIES OVERHEAD POWER LINE R&R PROJECT”. Award will be made based on the lowest responsive and responsible proposal that has met the requirements of the project criteria. Proposals will be awarded at a later date.
Other files
| File | Type | Posted |
|---|---|---|
| 2022 CU PWR LINE PROJ SPECS | — | |
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .