2022 Crane Repair Vendor Price Sheet.xls
XLS spreadsheet 58 KB Posted
- Attached to
- TS Freedom Star FY 22 Crane Repairs
- Solicitation number
- 6933A222Q000003
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Availabilty Summary
| Freedom Star Vendor Price Sheet | Date: | |||||
| AVAILABILITY SUMMARY SHEET | (See individual estimate sheets tab for detailed breakdown of estimate) | |||||
| Item No. | Title / Description | Material, Misc & Other Costs | ||||
| Total Labor Cost | Total Cost estimate | |||||
| SECTION 200: WORK ITEMS | ||||||
| 1 | Overhaul Crane Cylinders | $ - 0 | ||||
| 2 | Supplemental Labor | $ 5,000.00 | $ 5,000.00 | |||
| 3 | Supplemental Materials | $ 5,000.00 | $ 5,000.00 | |||
| $ - 0 | ||||||
| $ - 0 | ||||||
| Total | $ 10,000.00 |
Individual Item Estimates
| Job Title: | Item 1 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | 0.0 | $0.00 | ||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | $0.00 | ||||
| Electrician | Material | ||||
| Engineering Services | Tech Rep | $0.00 | |||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 0.0 | ||||
| Job Title: | Item 2 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | 0.0 | $0.00 | ||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | Tech Rep | ||||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 0.0 | ||||
| Job Title: | Item 3 | ||||
| Labor Costs | Summary of Costs | ||||
| Trade | Manhours | Labor Hours | Labor Rate/Hour | Total | |
| Blacksmith | Straight Time | 0.0 | $0.00 | ||
| Boiler maker | Premium Time (1-1/2) | $0.00 | |||
| Burner | Premium Time (2) | $0.00 | |||
| Carpenter | Travel Time | $0.00 | |||
| Chipper | Total Labor Costs | $0.00 | |||
| Electrician | Material | ||||
| Engineering Services | Tech Rep | ||||
| Fire watch | Equipment | ||||
| General Labor | Other (Specify) | ||||
| Joiner | Total Costs Other Than Labor | $0.00 | |||
| Lagger | Grand Total | $0.00 | |||
| Machinist Inside | Remarks: | ||||
| Machinist Outside | |||||
| NDT | |||||
| Painter | |||||
| Pipefitter | |||||
| QA | |||||
| Rigger | |||||
| Sheet Metal | |||||
| Shipfitter | |||||
| Welder | |||||
| Total | 0.0 |
File details come from the government source that posted it. Updated .