2022-051 Bid Documents revised 10.27.22.pdf

PDF 67 KB Posted

Attached to
DMH GRO35 2022-051 Freezer & Refrigeration Kitchen Repairs at Allen Hall
Solicitation number
BD-22-1022-DMH08-8210C-67837
Issued by
Worcester County, Massachusetts

About this file

This document is a bid package cover page for a project titled "Freezer & Refrigeration Kitchen Repairs at Allen Hall" issued by the Department of Mental Health Office of Engineering & Facilities Management in Westborough, Massachusetts. The project scope involves reclaiming and disposing of existing equipment, furnishing and installing a new refrigerator with indoor condensing unit and evaporator coil, and furnishing and installing new freezer equipment with a low-temperature indoor condensing unit and evaporator coil. The work includes necessary electrical wiring, power upgrades, permits, refrigerant reclaim, ceiling repairs, and a minimum 1-year warranty on parts and labor.

The document provides details on the required work but does not specify any information regarding pricing, set asides, incumbents, funding, or contract term and renewal options.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID PACKAGE

COVER PAGE

REVISED

October 27, 2021

DEPARTMENT OF MENTAL HEALTH

OFFICE OF ENGINEERING & FACILITIES MANAGEMENT

167 LYMAN STREET

WESTBOROUGH, MA 01581

Project #2022-051 Freezer & Refrigeration Kitchen Repairs at Allen Hall 288 Lyman Street

Westborough, Massachusetts 01581

Project #2022-051 Freezer & Refrigeration Kitchen Repairs

SCOPE OF WORK

FOR KITCHEN WALK-IN COOLER & WALK-IN FREEZER COMPONENT REPAIRS

1. Provide labor to reclaim, disconnect and dispose of existing equipment in both units.

2. Furnish and install a new equivalent in refrigerator with temp indoor condensing unit and a matching evaporator coil.

3. Furnish and install new equipment in freezer with approximately 2 hp “low” (assume low due to age of equipment) temp indoor condensing unit and a matching pre‐assembled low temp evaporator coil.

4. Work to include any necessary electrical wiring, power upgrades / changes, panel circuits as needed, permits and / or fees, refrigerant reclaim, ceiling repairs (if damaged), 1 year warranty min on parts and labor, and all other necessary tasks for full operation.

File details come from the government source that posted it. Updated .