20210916 DWH Dwgs.pdf

PDF 5 MB Posted

Attached to
Z1DA--693-22-1-594-0005 | Replace Building 1 Domestic Water Heaters
Solicitation number
36C24422B0001
Issued by

About this file

This federal contract opportunity synopsis describes a solicitation for replacing domestic water heaters at a VA Medical Center. The Department of Veterans Affairs is seeking proposals for removing existing steam water heaters and installing new steam water heaters. Offerors must provide all labor, materials, tools and equipment to complete the project. Work will include starting up domestic water house tank pumps and a domestic hot water booster pump package. The project magnitude is estimated between $1 million to $5 million, with a performance period of approximately 180 calendar days. This is a 100% SDVOSB set-aside requiring registration in SAM.gov and VetBiz. A pre-proposal conference will be held within two weeks of issuance, with the solicitation to be posted on beta.sam.gov around November 1st. Questions should be directed to the specified contracting officer via email.

View the file

Other files

File Type Posted
S04 Site Visit 36C42222B0001.pdf PDF
36C24422B0001 0001.docx DOCX document
S02 SafetyHealthDuringConstruction 18S-15-346.pdf PDF
17-194 DWH Specifications.pdf PDF
36C24422B0001_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEDICAL CENTER ASSOC. DIRECTOR

CHIEF OF STAFF

ASSOC. DIRECTOR OF PATIENT CARE

CHIEF ENGINEER

MEDICAL CENTER DIRECTOR

VA APPROVAL

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

1, 11

/1

/2

:2

:1

P

M

G-001

COVER

1 2SM

REPLACE BUILDING 1

DOMESTIC HOT WATER

HEATERS

1111 EAST END BLVD, WILKES-BARRE,

PA 18411

SEPTEMBER 17, 2021

100% CONSTRUCTION DOCUMENTS

693-22-11117-194-MOD1

REPLACE BUILDING 1 DOMESTIC HOT

WATER HEATERS

1111 EAST END BLVD, WILKES-BARRE, PA 18411

VA PROJECT #: 693-22-111

PLH

DRAWING LIST

No. Description Dwg of Dwg

GENERAL

G-001 COVER 1 2

G-002 ICRA NOTES, DETAILS AND CONSTRUCTION ROUTE PLAN 2 2

PLUMBING

P-001 PLUMBING GENERAL INFORMATION AND SCHEDULES 1 6

P-401 ENLARGED PLUMBING PLANS 2 6

P-402 ENLARGED PLUMBING PLANS 3 6

P-403 ENLARGED PLUMBING PLANS AND CONTROLS 4 6

P-501 PLUMBING DETAILS 5 6

P-502 PLUMBING CONTROLS 6 6

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 3

M-401 ENLARGED MECHANICAL PLANS 2 3

M-501 MECHANICAL DETAILS 3 3

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS 1 4

E-401 ELECTRICAL MECHANICAL ENLARGEMENTS 2 4

E-501 ELECTRICAL DETAILS 3 4

E-601 ELECTRICAL SCHEDULES 4 4

AREA OF WORK

PROJECT LOCATION

DocuSign Envelope ID: 064377DA-BF06-4E98-ADD6-BC95A4CEEA47

9/20/2021

SH

UT

TE

R

O

VE

R H

EA

D

DO

OR

RO

LL

IN

G

O

VE

R H

EA

D

DO

OR

O

VE

R H

EA

D

DO

OR

RA

M P U P

DN

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR

REPLACE BUILDING 1 DOMESTIC HOT WATER HEATERS

• THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

• PLEASE USE ALTERNATE EXITS AS MARKED

1'-5"

ICRA, ILSM, FIRE WATCH AND

MISC. FORMS

PAPER

CADDY

ILSM SIGNAGE

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

6. Remove or isolation of HVAC system in areas where work was being performed.

1. Includes all activities required by Class III.

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each ime the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers work area until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II.

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers i.e. sheetrock, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units if indicated.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class I.

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Place adhesive walk-off mats at entrance and exit of work area. Replaced used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet

- painting (but not sanding)

- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete cabling system

- new construction

• Cardiology

• Echocardiography

• Endoscopy

• Nuclear Medicine

• Physical Therapy

• Radiology / MRI

• Respitory Therapy

• CCU

• Emergency Room

• Labor & Delivery

• Laboratories (specimen)

• Newborn Nursery

• Outpatient Surgery

• Pediatrics

• Pharmacy

• Post Anesthesia Care Unit

• Surgical Units

• Any area caring for immunocompromised patients

• Burn Unit

• Cardiac Cath Lab

• Central Sterile Supply

• Intensive Care Units

• Medical Unit

• Negative pressure isolation rooms

• Oncology

• Operation rooms including C-section rooms

• Office Spaces

• Hallways

• FES/EMS areas

(Note: Mechanical Space)

C L

A S

S I V

C L

A S

S I

II

C L

A S

S I I

C L

A S

I

PATIENT RISK GROUPS

LOW Risk Group 1

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4

TYPE A TYPE B TYPE C TYPE D

I II II III/IV

I II III IV

I II III/IV IV

II III/IV I/IV IV

During Construction Project: Upon Completion of Project:

TYPE D

TYPE C

TYPE B

TYPE A

Group 1 Low Risk

Group 2 Medium Risk

Group 3 High Risk

Group 4 Highest Risk

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

Construction Project Type

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicated that Class III or Class IV Control procedures are necessary.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

Type of Construction Project activity (Type A-D)

INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR

CONSTRUCTION AND RENOVATION

1. Wipe work surfaces to remove dust.

AA BB CC DD EE FF GG HH JJ

1'

2'

3'

4'

5'

6'

7'

8' U

V

12 13

OFFICE

EG-38B

OFFICE

EG-39A

LOADING DOCK

LD-1

OFFICE

EB-04

CART WASH

EB-43

MECHANICAL RM

GG-51A

WASTE MANAGEMENT

STORAGE

CB-29

CORRIDOR

CG-54

WASTE MANAGEMENT

STORAGE

CB-30

CORRIDOR

GG-49

CORRIDOR

EG-48

BREAK RM

GG-28

CANTEEN STORAGE

GG-29

EMS BRK/CONF RM

EB-02 NEW EMS EQUIP 1

EB-05

BIO MED

EG-33

CORRIDOR

EG-30

BIO MED

EG-34

CORRIDOR

EG-48A

OFFICE

EG-39C

OFFICE

EG-39D

OFFICE

EG-39E

OFFICE

EG-39F

EMS LAUNDRY

EB-38

CORRIDOR

EG-39

MECH RM

EG-63

BREAK RM

EG-36

BIOMED

EG-35

MORGUE

EG-57

STEAM

DRYER

LAUNDRY

EG-38A

LOADING DOCK

EG-38C

MECHANICAL RM

EG-61A

ANTE RM

EG-57

REFR

EG-59

TOILET

EG-60

STORAGE

EG-61

HAC

EG-60A

CORRIDOR

EG-58

STORAGE

GG-5F

OFFICE

G3-2

BOILER PLANT

GG-5A

PUMP ROOM

GG-4

BIO-MED SHOP

GG-2

CONSTRUCTION

ACCESS

'-0

17'-2

59'-0"

13'-10"

AREA OF WORK

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

1, 11

/1

/2

:2

:3

P

M

G-002

ICRA NOTES, DETAILS AND

CONSTRUCTION ROUTE PLAN

2 2SM

REPLACE BUILDING 1

DOMESTIC HOT WATER

HEATERS

1111 EAST END BLVD, WILKES-BARRE,

PA 18411

SEPTEMBER 17, 2021

100% CONSTRUCTION DOCUMENTS

693-22-11117-194-MOD1

PLH

ICRA GENERAL NOTES:

1. NO MAJOR EQUIPMENT ACCESS THROUGH THE

BUILDING BETWEEN 7AM TO 5PM. CONTRACTOR

TOCOORDINATE WITH VA COR.

Scale: No Scale

ILSM SIGNAGE

Scale: No Scale

ICRA BARRIER TAG DETAIL

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

NORTH

0 84 16

Scale: 3/32" = 1'-0"

GROUND FLOOR CONSTRUCTION ACCESS PLAN

1 TEMPORARY PLASTIC BARRIER TO UNDERSIDE

OF CEILING WITH ZIPPER ENTRY.

2 PROVIDE STICKY MAT AT ZIPPER ENTRY

CONSTRUCTION ACCESS POINT.

3 CONSTRUCTION ROUTE.

PIPING SYSTEM

DCW DOMESTIC COLD WATER

PLUMBING SYMBOLS

ANNOTATION SYMBOLS

EXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

NEW PLUMBING EQUIPMENT MARK

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

P-###

EXISTING PLUMBING EQUIPMENT MARKP-###

PLUMBING SYMBOLS & ABBREVIATIONS

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CONTROL VALVE

GATE VALVE

GLOBE VALVE

SAFETY RELIEF VALVE

TWO POSITION CONTROL VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

PLUG VALVE

PLUMBING SYMBOLS

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT - ROUND OR SQUARE

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

OR

CO

PIPE SLOPE ARROW

AV

F

P

T

M

CIRCUIT SETTER

ANNOTATION ABBREVIATIONS

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PASCAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DA DENTAL COMPRESSED AIR

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DV DENTAL VACUUM

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

DHW DOMESTIC HOT WATER

DCWR DOMESTIC CW RECIRCULATION

DHWR DOMESTIC HW RECIRCULATION

1. THIS FACILITY OPERATES 24 HOURS PER DAY, 7 DAYS PER WEEK. CONSTRUCTION WORK SHALL BE PHASED TO MINIMIZE BOTH QUANTITY AND DURATION OF SHUTDOWNS. SCHEDULE ALL SHUTDOWNS WITH THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) A MINIMUM OF TWO (2)

WEEKS IN ADVANCE.

2. SUBMIT A DETAILED PHASING PLAN FOR REVIEW BY THE COR, ARCHITECT AND ENGINEER. PHASING PLAN SHALL INCLUDE, BUT NOT BE LIMITED TO, START AND END DATES OF ALL TASKS THROUGHOUT THE ENTIRE PROJECT, AND DATE AND DURATION OF SUGGESTED SHUTDOWNS.

3. ALL MEANS OF EGRESS SHALL BE MAINTAINED DURING CONSTRUCTION. ACCESSIBLE ICRA BARRIERS SHALL BE ERECTED AND TAKEN DOWN

AS REQUIRED TO MEET THE VA SCHEDULING REQUIREMENTS.

4. JOINTS AND FITTINGS ON COPPER PIPING 2" AND UNDER SHALL BE SOLDERED. JOINTS AND FITTINGS ON COPPER PIPING OVER 2" SHALL BE

BRAZED. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

GENERAL WORK AND PHASING NOTES

THERE IS EXISTING EQUIPMENT THAT WAS INSTALLED AS PART OF PREVIOUS PROJECTS THAT WILL SERVE THE PLUMBING SYSTEM INSTALLED AS PART OF THIS PROJECT. START-UP HAS NOT BEEN PERFORMED ON THIS EQUIPMNT. THIS EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO:

- DDC CONTROLS

- DOMESTIC COLD WATER HOUSE TANK PUMPS

- DOMESTIC COLD WATER BOOSTER PUMP PACKAGE FOR MAIN BUILDING 1 WATER HEATERS

- EXISTING DOMESTIC HOT WATER RECIRCULATING PUMPS

- EXISTING 13TH FLOOR DOMESTIC WATER HOUSE TANK LEVEL CONTROLS

CONFIRM LOCATION OF ALL EXISTING SYSTEMS AND EQUIPMENT. START-UP SHALL BE PERFORMED ON ALL NEW AND EXISTING SYSTEMS AND EQUIPMENT. START-UP OF NEW AND EXISTING SYSTEMS AND EQUIPMENT SHALL BE PERFORMED BY THE EQUIPMENT MANUFACTURER, OR BY AN AUTHORIZED AND CERTIFIED REPRESENTATIVE OF THE EQUIPMENT MANUFACTURER. PROVIDE THIRD-PARTY TESTING FOR ALL NEW AND

EXISTING SYSTEMS AND EQUIPMENT.

PROGRAM THE DDC CONTROLS FOR NEW AND EXISTING SYSTEMS AND EQUIPMENT, IN ACCORDANCE WITH THE SEQUENCES OF OPERATION INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS. LOCATIONS AND QUANTITIES OF EXISTING DDC CONTROL PANELS ARE SHOWN ON THE DRAWINGS, BASED ON INFORMATION TAKEN DURING FIELD SURVEY. CONFIRM QUANTITIES AND LOCATIONS OF ALL EXISTING DDC CONTROL PANELS. VERIFY THE CAPACITY OF THE EXISTING DDC CONTROLLERS AND PROVIDE ADDITIONAL CONTROLLERS, OR EXPANSION MODULES ON EXISTING CONTROLLERS, AS REQUIRED TO ACCOMPLISH SEQUENCES OF CONTROL, INCLUDING NEW CONTROLLER CABINETS IF NEEDED.

ADDITIONALLY, PROVIDE CONTROL WIRING FOR ANY EXISTING SENSORS OR EQUIPMENT NOT WIRED TO THEIR RESPECTIVE CONTROLLER.

PROVIDE THIRD-PARTY COMMISSIONING SERVICES ON ALL NEW AND EXISTING SYSTEMS AND EQUIPMENT USING PROCEDURES OUTLINED IN THE

SPECIFICATIONS.

EQUIPMENT START-UP, COMMISSIONING AND DDC CONTROLS NOTES

1. PREPARE DRAWINGS SHOWING MECHANICAL, PLUMBING AND FIRE PROTECTIONS SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK

OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.

A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING

CONDITIONS.

B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY. BOTH NEW AND EXISTING SYSTEMS SHALL BE SHOWN IN THE COORDINATION DRAWINGS

C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN

ACCORDANCE WITH DIRECTIONS GIVEN.

D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.

2. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR

RECONFIGURE WORK LACKING COORDINATION AT NO ADDITIONAL COST.

COORDINATION DRAWINGS

PLUMBING GENERAL NOTES

PLUMBING DEMOLITION GENERAL NOTES

1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE

PROCEEDING WITH WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF

THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION. IF ITEMS TO REMAIN ARE DAMAGED, REMOVED OR RELOCATED DURING THE COURSE OF WORK, REINSTALL AND REPAIR ITEMS BACK TO ORIGINAL CONDITION. IF

IT IS NOT POSSIBLE TO REPAIR THE ITEM, FULLY REPLACE THE ITEM IN KIND.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK. COORDINATE

THIS WORK WITH DIVISION 23 AND DIVISION 26 CONTRACTORS.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUDTOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND

APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES

DAMAGED AT NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING AND WORK OF OTHER TRADES. FOR FLOORS THAT ARE EXISTING TO REMAIN, PROVIDE NEW

FINISHES TO MATCH EXISTING.

10. REMOVE ALL OBSOLETE PLUMBING EQUIPMENT, PIPING, INSULATION, HANGERS, CONTROLS, PADS, AND SUPPORTS UNLESS OTHERWISE INDICATED TO REMAIN. DISCONNECT PLUMBING FROM EQUIPMENT WHICH IS TO BE REMOVED BY OTHERS. PIPING MADE OBSOLETE BY NEW CONSTRUCTION SHALL BE FULLY REMOVED. IF A PIPING RUNOUT IS TO BE REMOVED, BUT THE PIPE MAIN IS TO REMAIN, REMOVE PIPE AS CLOSE AS POSSIBLE TO MAIN AND CAP TO ELIMINATE DEAD LEGS. PIPING REMOVED FROM THE EXISTING PLUMBING SYSTEM SHALL NOT BE USED IN THE INSTALLATION OF NEW SYSTEMS. REMOVE ALL DEAD LEGS IN PIPING, EVEN IF NOT

SHOWN ON THE DRAWINGS TO BE REMOVED. LEGALLY DISPOSE OF ALL REMOVED ITEMS.

11. DEMOLITION WORK INDICATED ON THE DRAWINGS DOES NOT NECESSARILY INDICATE ALL PIPING OR EQUIPMENT TO BE REMOVED. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON MULTIPLE WEEKS OF SITE SURVEY PERFORMED BY THE ENGINEERS, AS WELL AS EXISTING DRAWINGS. PRIOR TO SUBMITTING BID, THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND REVIEW EXISTING CONDITIONS.

DETERMINE THE FULL EXTENT OF DEMOLITION AND INCLUDE ALL REQUIRED DEMOLITION WORK IN THE BID. NO ADDITIONAL COST WILL BE GRANTED FOR DEMOLITION. FOR ANY ITEMS SPECIFICALLY DESIGNATED BY THE VA TO BE SALVAGED, REMOVE THE ITEMS AND PLACE IN A LOCATION DIRECTED BY THE VA. IF THE CONTRACTOR REMOVES AN ITEM THAT IS REQUIRED FOR AN EXISTING SYSTEM TO REMAIN, THE CONTRACTOR SHALL REPLACE THAT ITEM AT NO ADDITIONAL COST TO THE GOVERNMENT. PROVIDE ALL TEMPORARY SUPPORTS REQUIRED FOR EXISTING SYSTEMS TO REMAIN. IF A SUPPORT FOR AN EXISTING ITEM OF ANOTHER TRADE MUST BE REMOVED TO PERFORM PLUMBING WORK, COORDINATE SUCH WORK WITH THE APPROPRIATE

CONTRACTOR

12. COORDINATE ALL DEMOLITION AND NEW WORK WITH THE PHASING PLANS. PROVIDE ALL LABOR AND MATERIALS REQUIRED TO MAINTAIN CONTINUED OPERATION OF THE SYSTEM THROUGHOUT THE PHASES OF WORK. GENERALLY, NEW WORK (EQUIPMENT, PIPING, ETC.) SHALL BE INSTALLED AND MADE OPERATIONAL

PRIOR TO DEMOLITION OF EXISTING SYSTEMS.

13. COORDINATE WITH THE COR PRIOR TO BRINGING NEW EQUIPMENT AND MATERIALS INTO THE WORK AREA, AND REMOVING DEMOLISHED EQUIPMENT AND MATERIALS FROM THE WORK AREA.

1. WORK SHALL CONFORM TO LOCAL, STATE, AND NATIONAL CODES AND VA STANDARDS.

2. PROVIDE ALL MATERIALS AND EQUIPMENT, AND PERFORM ALL LABOR REQUIRED TO INSTALL A COMPLETE AND

OPERABLE PLUMBING SYSTEM.

3. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND THEREFORE DO NOT SHOW EVERY PIPE, FITTING, VALVE OR APPURTENANCE THAT IS REQUIRED FOR A COMPLETE INSTALLATION. PROVIDE THESE PIPES, FITTINGS, VALVES AND APPURTENANCES EVEN IF NOT SHOWN ON THE DRAWINGS. DO NOT SCALE LOCATION DIMENSIONS FROM THESE DRAWINGS. DO NOT SCALE THESE DRAWINGS FOR THE ACCURATE CUTTING OF PIPE OR ITS EXACT LOCATION. BEFORE ANY PIPING IS FABRICATED OR INSTALLED, CONFER WITH ALL OTHER CONTRACTORS IN ORDER TO ESTABLISH THE LOCATION OF THEIR PIPING, CONDUIT, DUCTWORK, CEILING DEVICES, FOUNDATIONS, STRUCTURAL STEEL, LIGHTING FIXTURES AND OTHER EQUIPMENT SO AS TO AVOID INTERFERENCE. NO ADDITIONAL COST TO THE GOVERNMENT WILL BE PERMITTED FOR FAILURE OF THE DIVISION 22 CONTRACTOR TO COORDINATE WITH OTHER CONTRACTORS. COORDINATE WITH EXISTING SYSTEMS INCLUDING, BUT NOT LIMITED TO, DUCTWORK, PIPING, CONDUIT, CABLE TRAY, AND STRUCTURE.

4. DO NOT STRESS OR STRAIN PIPING.

5. WHERE PIPES PENETRATE FIRE-RATED OR SMOKE-RATED BARRIERS OR PARTITIONS (WALLS, FLOOR AND CEILINGS), SEAL PENTRATIONS IN ACCORDANCE WITH NFPA 90A WITH UL-LISTED FIRESTOPPING SYSTEM(S) AND

SMOKE SEALING TO MATCH THE FIRE/SMOKE RATING OF THE BARRIER OR PARTITION.

6. DO NOT INSTALL PIPING IN DEDICATED ELECTRICAL PANEL SPACE.

7. ALL MATERIALS, EQUIPMENT AND DEVICES SHALL, AT A MINIMUM, MEET THE REQUIREMENTS OF UL WHERE UL

REQUIREMENTS ARE ESTABLISHED FOR THOSE ITEMS.

8. ALL FACTORY-APPLIED COATINGS AND FINISHES SHALL BE PROVIDED WITHOUT RUST, SCRATCHES OR DENTS.

9. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

10. OBTAIN AND PAY FOR PERMITS, FEES, AND THIRD PARTY TESTS, INSPECTIONS AND COMMISSIONING REQUIRED FOR THIS WORK. ALL INSPECTIONS, TESTS AND COMMISSIONING SHALL BE PERFORMED BY A THIRD PARTY.

THE VA WILL PROVIDE INFORMATION TO THE CONTRACTOR REGARDING THE REQUIRED TESTS AND

INSPECTIONS.

11. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE

FOR THE PURPOSES INTENDED.

12. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND

CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

13. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR

EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

14. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

15. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

16. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

17. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES

AND APPLICABLE VA STANDARDS.

18. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

19. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF

PIPING WITH EXISTING CONDITIONS.

20. CONTRACTOR SHALL COORDINATE ANY SYSTEM REQUIRED SHUTDOWN WITH THE COR A MINIMUM OF TWO (2)

WEEKS IN ADVANCE.

21. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS

CONTRACT, UNLESS NOTED OTHERWISE.

22. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF

PROJECT.

23. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

24. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

25. PROVIDE COPPER TUBING THAT IS CERTIFIED BY ASTM B88. TUBING THAT IS NOT CERTIFIED (SOMETIMES

REFERRED TO AS "STANDARD TUBE"), WILL NOT BE ACCEPTED.

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

1, 11

/1

/2

:2

:4

P

M

P-001

PLUMBING GENERAL INFORMATION

AND SCHEDULES

1 6SM

REPLACE BUILDING 1

DOMESTIC HOT WATER

HEATERS

1111 EAST END BLVD, WILKES-BARRE,

PA 18411

SEPTEMBER 17, 2021

100% CONSTRUCTION DOCUMENTS

693-22-11117-194-MOD1

PLH

1-DWH3 PUMP ROOM GG-4 BUILDING 1 DOMESTIC HOT WATER

DOUBLE WALL, SEMI INSTANTANEOUS, SHELL & TUBE,

PACKAGED

115 50 150 60 50 6,020 1-ST3 12,040 THERMAFLO TH-750V 1248 1, 2, 3

1-DWH2 PUMP ROOM GG-4 BUILDING 1 DOMESTIC HOT WATER

DOUBLE WALL, SEMI INSTANTANEOUS, SHELL & TUBE,

PACKAGED

115 50 150 60 50 6,020 1-ST2 12,040 THERMAFLO TH-750V 1248 1, 2, 3

1-DWH1 PUMP ROOM GG-4 BUILDING 1 DOMESTIC HOT WATER

DOUBLE WALL, SEMI INSTANTANEOUS, SHELL & TUBE,

PACKAGED

115 50 150 60 50 6,020 1-ST1 12,040 THERMAFLO TH-750V 1248 1, 2, 3

GPM °F °F FT PSIG PSIG LB/HR LB/HR

FLOW EWT LWT WPD ENT CONTROL VALVE ENT HEAT EXCHANGER

TRAP NO

CAPACITY

MANUF. MODEL NO.

MARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE

WATER CONDITIONS STEAM PRESSURE

CONTROL VALVE

TRAP BASIS OF DESIGN

REMARKS

STEAM TO DOMESTIC WATER HEAT EXCHANGER SCHEDULE

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. PACKAGED, STEAM-TO-WATER DOMESTIC WATER HEATER, COMPLETE WITH SHELL-AND-TUBE HEAT EXCHANGER (WATER IN SHELL, STEAM IN TUBES), ELECTRONIC CONTROLLER, MODULATING STEAM CONTROL VALVE (100:1 TURNDOWN), FLOAT & THERMOSTATIC STEAM TRAP, TEMPERATURE AND PRESSURE GAUGES, RELIEF VALVES, SOLENOID DUMP VALVE, RECIRCULATION PUMP, VACUUM BREAKER, AND CARBON STEEL STAND. FULLY FACTORY ASSEMBLED AND TESTED.

3. MOUNT AND SECURE UNIT TO NEW 4" CONCRETE PAD.

N/A PUMP ROOM GG-4 DOMESTIC HOT WATER

CENTRIFUGAL IN-LINE CLOSE

COUPLED

DOMESTIC COLD WATER 250 225 50 70 30 3 230/460 3500 VARIABLE

GOULDS WATER

TECHNOLOGY

46SV31GN4C10 1

N/A PUMP ROOM GG-4 DOMESTIC COLD WATER

CENTRIFUGAL IN-LINE CLOSE

COUPLED

DOMESTIC COLD WATER 250 225 50 70 25 3 230/460 3600 VARIABLE

GOULDS WATER

TECHNOLOGY

46SV32NM4C50N 1

GPM FT °F HP

FLUID

FLOW HEAD TEMPERATURE

MIN. % EFF

NOMINAL POWER

PHASE VOLT

MAX

RPM

SPEED

CONTROL

MANUFACTURER MODEL NO.

MARK LOCATION

SYSTEM AND/OR

SERVICE

TYPE

CIRCULATING FLUID ELECTRICAL MOTOR BASIS OF DESIGN

REMARKS

PLUMBING PUMP SCHEDULE

REMARKS:

1. FURNISH ONE (1) PUMP & MOTOR COMBINATION IDENTICAL TO EXISTING PUMP. FURNISH TWO (2) REPAIR KITS.

PLUMBING BACKFLOW PREVENTER SCHEDULE

MARK LOCATION AREA AND/OR ROOM SERVED SYSTEM TYPE FLOW

INLET

PRESSURE SIZE REMARKS

1-BFP-1 BLDG 11, GG-5F STORAGE BLDG 1 DOMESTIC COLD

WATER

REDUCED PRESSURE

PRINCIPLE

650.0 GPM 59.00 psi 6" 1, 2, 3

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. PROVIDE (1) SPARE BACKFLOW PREVENTER. BACKFLOW PREVENTERS SHALL BE INSTALLED IN PARALLEL.

3. BASIS OF DESIGN: ZURN WILKINS MODEL 375

1-WQMS-1 GG-5F STORAGE DOMESTIC COLD WATER BLDG 1 1 120 60 1 WALL MOUNTED

PHASE VOLT HZ AMP

MARK LOCATION

SYSTEM AND/OR

SERVICE

AREA AND/OR BUILDING

SERVED

ELECTRICAL REQUIREMENTS

REMARKS

WATER DISTRIBUTION QUALITY MONITOR EQUIPMENT SCHEDULE

DNDN

EE FF GG HH JJ

3'

4'

5'

6'

EX. 8'' SERVICE WATER

FROM UNDERGROUND

WITH 8'' VALVE IN

VERTICAL

EX. WATER

FILTRATION SYSTEM

EX. PUMP

EX. AIR COMPRESSOR

EX. AIR RECEIVER

EX. HOT WATER

RECIRCULATING

PUMP

EX. EXPANSION TANKS

EX. 6'' SERVICE WATER

EX. CW

SUPPLY TO

1ST FLR

(COOLING

TOWER)

EX. CW

FROM 1ST

FLR

EX. DOMESTIC WATER

BOOSTER PACKAGE (TO

SERVE WATER HEATERS)

EX. WATER HEATERS TO REMAIN

EX. DDC CONTROLS

EX. MIXING VALVE

STATION (NOT IN

SERVICE)

EX. HOUSE TANK PUMP

EX. HOUSE TANK

PUMPS TO REMAIN

EX. DCW TO BOILER PLANT

EX. 5'' DCW TO

HOUSE TANK

EX. 6'' DCW TO HOUSE

TANK (NOT IN

SERVICE)

EX. 2'' DHWR (NOT

IN SERVICE)

EX. 6'' DHW

(NOT IN

SERVICE)

2" DHWR

6" DHW

6" DCW

EX. 6'' DCW FROM

HOUSE TANK TO

WATER HEATERS

EX. 6'' DHW FROM

WATER HEATERS

2'' DHWR TO HOT

WATER RECIRCULATING

PUMPS

EX. DHW TO BOILER PLANT

3" DCW

3" DCW

6"

6"5" DCW

4" DCW

EX. 4'' DCW FROM

MORGUE (BACKUP)

6" DCW

4" DCW

5" DCW

4" DCW

3/4" DHWR

3" DCW

3/4" DHWR

2" DHWR

3" DHW

PUMP ROOM

GG-4

BIO-MED SHOP

GG-2

6"

6"

6"

EE FF GG HH JJ

3'

4'

5'

6'

6" DCW

6" DCW

6" DCW4" DCW

6" DCW

6" DCW

3" DCW

EX. 8'' SERVICE WATER

FROM UNDERGROUND

WITH 8'' VALVE IN

VERTICAL

EX. WATER

FILTRATION SYSTEM

EX. PUMP

EX. AIR COMPRESSOR

EX. AIR RECEIVER

EX. HOT WATER

RECIRCULATING

PUMP

EX. EXPANSION TANKS

EX. 6'' SERVICE WATER

EX. CW

SUPPLY TO

1ST FLR

(COOLING

TOWER)

EX. CW

FROM 1ST

FLR

EX. DOMESTIC WATER

BOOSTER PACKAGE (TO

SERVE WATER HEATERS)

EX. WATER HEATERS

EX. DDC CONTROLS

EX. MIXING VALVE

STATION (NOT IN

SERVICE)

EX. HOUSE TANK PUMP

EX. HOUSE TANK PUMPS

EX. DCW TO BOILER PLANT

EX. 5'' DCW TO

HOUSE TANK

EX. 6'' DCW TO HOUSE

TANK (NOT IN

SERVICE)

EX. 2'' DHWR (NOT

IN SERVICE)

EX. 6'' DHW

(NOT IN

SERVICE)

EX. 6'' DCW FROM

HOUSE TANK TO

WATER HEATERS

EX. 6'' DHW FROM

WATER HEATERS

2'' DHWR TO HOT

WATER RECIRCULATING

PUMPS

EX. DHW TO BOILER PLANT

EX. 4'' DCW FROM

MORGUE (BACKUP)

1 3" DHWR

3" DHWR

2" DHWR

6" DCW

3" DHW

2" DHWR

3" DCW

3/4" DHWR

5" DCW

4" DCW

6" DCW

4" DCW

3" DCW

3" DCW

PUMP ROOM

GG-4

BIO-MED SHOP

GG-2

BALL VALVE IN

VERTICAL

BALL VALVE IN

VERTICAL

NC

NC

3" DHWR

3" DHWR

2" DHWR

3" DHWR

2" DHWR

2" DHWR

A. COORDINATE EXACT ROUTE OF PIPING WITH

OTHER NEW AND EXISTING DUCTWORK AND

PIPING, STRUCTURE, LIGHTS, CONDUITS AND

ALL OTHER SERVICES.

B. VERIFY SIZES OF EXISTING PIPING AND TIE-IN

POINTS PRIOR TO WORK.

C. DEMOLITION WORK SHALL BE PERFORMED

SUCH THAT ALL PIPES, HANGERS, SUPPORTS

AND VALVES ARE REMOVED COMPLETELY TO

LIMITS OF DEMOLITION. REMOVE ALL ITEMS TO

ENSURE NOTHING IS ABANDONED IN PLACE.

D. NO DEAD ENDS SHALL REMAIN. DEMOLISH

PIPING TO WITHIN TWO PIPE DIAMETERS FROM

MAIN OR BRANCH.

E. DOMESTIC WATER HOUSE TANK PUMPS

INSTALLED AS A PART OF PREVIOUS PROJECT

SHALL BE MADE OPERATIONAL PRIOR TO THE

DEMOLITION OF OLD HOUSE TANK PUMPS.

F. NEW DOMESTIC HOT WATER HEATERS SHALL

BE MADE OPERATIONAL PRIOR TO THE

DEMOLITION OF EXISTING DOMESTIC HOT

WATER HEATERS.

G. COORDINATE SHUTDOWNS IN ANY SERVICE

WITH THE COR A MINIMUM OF TWO (2) WEEKS IN

ADVANCE.

H. MAINTAIN DETAILED AS-BUILT DRAWINGS ON

SITE DURING CONSTRUCTION. ENGAGE IN

WEEKLY MEETINGS WITH THE COR TO PROVIDE

PROJECT STATUS AND TO SHOW LATEST AS-

BUILT DRAWINGS.

I. PROVIDE SHUT-OFF VALVE AT EACH BRANCH

TAKE OFF IN COLD AND HOT WATER SUPPLY,

AND COLD AND HOT WATER RETURN. SHUT-OFF

VALVES SHALL BE INSTALLED WITHIN TWO PIPE

DIAMETERS OF MAIN.

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

1, 11

/1

/2

:2

:5

P

M

P-401

ENLARGED PLUMBING PLANS

2 6SM

REPLACE BUILDING 1

DOMESTIC HOT WATER

HEATERS

1111 EAST END BLVD, WILKES-BARRE,

PA 18411

SEPTEMBER 17, 2021

100% CONSTRUCTION DOCUMENTS

693-22-11117-194-MOD1

PLH

Scale: 1/4" = 1'-0"

ENLARGED GG-4 PUMP ROOM PLUMBING DEMOLITION PLAN - PHASE I

Scale: 1/4" = 1'-0"

ENLARGED GG-4 PUMP ROOM PLUMBING PLAN - PHASE I

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

1 PROVIDE NEW 3'' DOMESTIC HOT WATER

RETURN PIPING IN PARALLEL TO EXISTING.

PROVIDE VALVED CONNECTIONS FOR FUTURE

CONNECTION TO NEW AND EXISTING WATER

SYSTEMS.

2 CONNECT PUMPS INSTALLED AS A PART OF

PREVIOUS PROJECT TO NEW PIPING.

3 HOUSE TANK PUMPS FULL SIZE BYPASS LOOP.

PROVIDE LOCKABLE TYPE ISOLATION VALVES.

INSTALL ISOLATION VALVES WITHIN TWO PIPE

DIAMETERS OF MAINS. BYPASS VALVES

NORMALLY CLOSED. PROVIDE A DRAIN AND A

CHECK VALVE IN THE PORTION OF THE PIPE

BETWEEN VALVES.

4 PROVIDE 6'' VALVED CONNECTION TO

DOMESTIC HOT WATER BOOSTER PUMP

PACKAGE.

5 PROVIDE 6'' VALVED CONNECTION TO HOUSE

TANK.

6 PROVIDE 3'' VALVED CONNECTION.

7 RECIRCULATION PUMPS FULL SIZE BYPASS

LOOP. PROVIDE LOCKABLE TYPE ISOLATION

VALVES. INSTALL ISOLATION VALVES WITHIN

TWO PIPE DIAMETERS OF MAINS. BYPASS

VALVES NORMALLY CLOSED. PROVIDE A DRAIN

AND A CHECK VALVE IN THE PORTION OF THE

PIPE BETWEEN VALVES.

8 FURNISH ONE (1) SPARE HOUSE TANK PUMP

AND ONE (2) REPAIR KIT. REFER TO SCHEDULE.

1 DEMOLISH EXISTING DOMESTIC COLD AND HOT

WATER PIPING TO POINT INDICATED. STRAIGHT

LENGTHS OF UNSOLDERED PIPE MAY BE

REUSED IF IN A CONDITION DEEMED BY THE

COR AS SUITABLE.

2 DEMOLISH DOMESTIC COLD WATER PIPING TO

POINT INDICATED AND PREPARE TO

RECONNECT. VERTICAL LENGTHS OF PIPING

TO/FROM HOUSE TANK PUMPS SHALL REMAIN.

3 CAP EXISTING DOMESTIC COLD AND HOT

WATER SUPPLIES.

NORTH

0 2 4 8

NORTH

0 2 4 8

OV

ER

H

EA

D

DO

OR

OV

ER

H

EA

D

DO

OR

DN

OV

ER

H

EA

D

DO

OR

OV

ER

H

EA

D

DO

OR

DN

EE FF GG HH JJ

1'

2'

3'

4'

5'

6'

EX. 6'' SERVICE WATER

EX. 8'' SERVICE WATER

FROM UNDERGROUND

WITH 8'' VALVE IN

VERTICAL

EX. WATER

FILTRATION SYSTEM

EX. PUMP

EX. AIR COMPRESSOR

EX. AIR RECEIVER

EX. HOT WATER

RECIRCULATING

PUMP

EX. EXPANSION TANKS

EX. 6'' SERVICE WATER

EX. CW

SUPPLY TO

1ST FLR

(COOLING

TOWER)

EX. CW

FROM 1ST

FLR

EX. DOMESTIC WATER

BOOSTER PACKAGE (TO

SERVE WATER HEATERS)

EX. WATER HEATERS TO REMAIN

EX. DDC CONTROLS

EX. MIXING VALVE

STATION (NOT IN

SERVICE)

EX. HOUSE TANK PUMP

EX. HOUSE TANK

PUMPS

EX. DCW TO BOILER PLANT

EX. 5'' DCW TO

HOUSE TANK

EX. 6'' DCW TO HOUSE

TANK (NOT IN

SERVICE)

EX. 2'' DHWR (NOT

IN SERVICE)

EX. 6'' DHW

(NOT IN

SERVICE)

EX. 6'' DCW FROM

HOUSE TANK TO

WATER HEATERS

EX. 6'' DHW FROM

WATER HEATERS

2'' DHWR TO HOT

WATER RECIRCULATING

PUMPS

EX. DHW TO BOILER PLANT

EX. 4'' DCW FROM

MORGUE (BACKUP)

3" DCW

4" DCW

3" DCW

6" DCW

3" DCW

4" DCW

6" DCW

5" DCW

4" DCW

3" DCW

3/4" DHWR

2" DHWR

3" DHW

6" DCW

3" DHWR

2" DHWR

PUMP RM

GG-4

BIO-MED SHOP

GG-2

2" DHWR

2" DHWR

1" DHWR

2" DHWR

2" DHWR

EX. 6'' INCOMING STAINLESS STEEL

SERVICE WATER LINE

STORAGE

GG-5F

6" DCW

EE FF GG HH JJ

1'

2'

3'

4'

5'

6'

1-DWH1

1-DWH2

1-DWH3

NC

NC

NEW DDC CONTROLS

NC

EX. 8'' SERVICE WATER

FROM UNDERGROUND

WITH 8'' VALVE IN

VERTICAL

EX. WATER

FILTRATION SYSTEM

EX. PUMP

EX. AIR COMPRESSOR

EX. AIR RECEIVER

EX. HOT WATER

RECIRCULATING

PUMP

EX. EXPANSION TANKS

EX. 6'' SERVICE WATER

EX. CW

SUPPLY TO

1ST FLR

(COOLING

TOWER)

EX. CW

FROM 1ST

FLR

EX. DOMESTIC WATER

BOOSTER PACKAGE (TO

SERVE WATER HEATERS)

EX. WATER HEATERS TO REMAIN

EX. DDC CONTROLS

EX. MIXING VALVE

STATION (NOT IN

SERVICE)

EX. HOUSE TANK PUMP

EX. DCW TO BOILER PLANT

EX. 5'' DCW TO

HOUSE TANK

EX. 6'' DCW TO HOUSE

TANK (NOT IN

SERVICE)

EX. 2'' DHWR (NOT

IN SERVICE)

EX. 6'' DHW

(NOT IN

SERVICE)

EX. 6'' DCW FROM

HOUSE TANK TO

WATER HEATERS

EX. 6'' DHW FROM

WATER HEATERS

2'' DHWR TO HOT

WATER RECIRCULATING

PUMPS

EX. DHW TO BOILER PLANT

EX. 4'' DCW FROM

MORGUE (BACKUP)

3" DCW

6" DCW

6" DCW

6" DCW 4

3" DHWR

6" DCW

6" DHW

6" DCW

6" DHW

4" DCW

3" DCW

3" DCW

6" DCW

5" DCW

4" DCW

BIO-MED SHOP

GG-2

PUMP RM

GG-4

NC

NC

NC

3" DHWR

3" DHWR

3" DHWR

6" DHW

6" DCW

1-WQMS-1 8

STORAGE

GG-5F

EX. 6'' INCOMING STAINLESS STEEL

SERVICE WATER LINE

1-BFP-1

8" DRAIN

TO SPLASH

BLOCK

6" DCW

A. COORDINATE EXACT ROUTE OF PIPING WITH

OTHER NEW AND EXISTING DUCTWORK AND

PIPING, STRUCTURE, LIGHTS, CONDUITS AND

ALL OTHER SERVICES.

B. VERIFY SIZES OF EXISTING PIPING AND TIE-IN

POINTS PRIOR TO WORK.

C. DEMOLITION WORK SHALL BE PERFORMED

SUCH THAT ALL PIPES, HANGERS, SUPPORTS

AND VALVES ARE REMOVED COMPLETELY TO

LIMITS OF DEMOLITION. REMOVE ALL ITEMS TO

ENSURE NOTHING IS ABANDONED IN PLACE.

D. NO DEAD ENDS SHALL REMAIN. DEMOLISH

PIPING TO WITHIN TWO PIPE DIAMETERS FROM

MAIN OR BRANCH.

E. DOMESTIC WATER HOUSE TANK PUMPS

INSTALLED AS A PART OF PREVIOUS PROJECT

SHALL BE MADE OPERATIONAL PRIOR TO THE

DEMOLITION OF OLD HOUSE TANK PUMPS.

F. NEW DOMESTIC HOT WATER HEATERS SHALL

BE MADE OPERATIONAL PRIOR TO THE

DEMOLITION OF EXISTING DOMESTIC HOT

WATER HEATERS.

G. COORDINATE SHUTDOWNS IN ANY SERVICE

WITH THE COR A MINIMUM OF TWO (2) WEEKS IN

ADVANCE.

H. MAINTAIN DETAILED AS-BUILT DRAWINGS ON

SITE DURING CONSTRUCTION. ENGAGE IN

WEEKLY MEETINGS WITH THE COR TO PROVIDE

PROJECT STATUS AND TO SHOW LATEST AS-

BUILT DRAWINGS.

I. PROVIDE SHUT-OFF VALVE AT EACH BRANCH

TAKE OFF IN COLD AND HOT WATER SUPPLY,

AND COLD AND HOT WATER RETURN. SHUT-OFF

VALVES SHALL BE INSTALLED WITHIN TWO PIPE

DIAMETERS OF MAIN.

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

1, 11

/1

/2

:2

:0

P

M

P-402

ENLARGED PLUMBING PLANS

3 6SM

REPLACE BUILDING 1

DOMESTIC HOT WATER

HEATERS

1111 EAST END BLVD, WILKES-BARRE,

PA 18411

SEPTEMBER 17, 2021

100% CONSTRUCTION DOCUMENTS

693-22-11117-194-MOD1

PLH

N

AREA OF WORK

SCOPE OUTLINE

KEY PLAN

SCALE: NO SCALE

Scale: 1/4" = 1'-0"

ENLARGED GG-4 PUMP ROOM PLUMBING DEMOLITION PLAN - PHASE II

Scale: 1/4" = 1'-0"

ENLARGED GG-4 PUMP ROOM PLUMBING PLAN - PHASE II

1 DEMOLISH EXISTING DOMESTIC COLD WATER

PUMPS AFTER NEW DOMESTIC COLD WATER

PUMPS ARE MADE OPERATIONAL. DEMOLISH

ASSOCIATED PIPING TO POINT INDICATED AND

CAP. DEMOLISH AND LEVEL EXISTING

CONCRETE PADS (APPROXIMATELY 14'' TALL).

2 DEMOLISH DOMESTIC HOT WATER RETURN

PIPING TO POINTS INDICATED AND CAP.

PREPARE TO RECONNECT DOMESTIC HOT

WATER RECIRCULATING PUMPS TO PIPING

INSTALLED IN PHASE I.

3 DEMOLISH DCW AS INDICATED. PREPARE TO

INSTALL BACKFLOW PREVENTERS.

NORTH

0 2 4 8

NORTH

0 2 4 8

1 PROVIDE DOMESTIC WATER HEATERS PER

DETAIL 7, SHEET P-501. PROVIDE COMMON 4''

CONCRETE PAD FOR THE WATER HEATERS.

2 PROVIDE 2'' DOMESTIC HOT WATER VALVED

CONNECTION FOR MIXING STATION.

3 PROVIDE 2'' DOMESTIC HOT WATER VALVED

CONNECTION FOR BOILER PLANT FEED.

4 DOMESTIC WATER BOOSTER PACKAGE FULL

SIZE BYPASS. PROVIDE LOCKABLE ISOLATION

VALVES. INSTALL ISOLATION VALVES WITHIN

TWO PIPE DIAMETERS OF MAINS.BYPASS

VALVES NORMALLY CLOSED. PROVIDE A DRAIN

AND A CHECK VALVE IN THE PORTION OF THE

PIPE BETWEEN VALVES.

5 PROVIDE PORTS FOR HYPERCHLORINATION

PER DETAIL 4, SHEET P-501. COORDINATE PORT

LOCATIONS WITH THE COR.

6 DOMESTIC COLD WATER PIPING TO BE USED IN

FUTURE PROJECT.

7 RECONNECT EXISTING HOT WATER

RECIRCULATING PUMPS TO PIPING INSTALLED

IN PHASE I. PROVIDE NEW VALVES AND

SENSORS.

8 PROVIDE WATER QUALITY MONITORING

EQUIPMENT PER DETAIL 2/P-403.

9 PROVIDE TWO (2) REDUCED PRESSURE

BACKFLOW PREVENTER WITH DRAIN

DISCHARGE TO EXTERIOR OF BUILDING.

DN

EE FF GG HH JJ

3'

4'

5'

6'

PUMP ROOM

GG-4

BIO-MED SHOP

GG-2

EX. 8'' SERVICE WATER

FROM UNDERGROUND

WITH 8'' VALVE IN

VERTICAL

EX. WATER

FILTRATION SYSTEM

EX. PUMP

EX. AIR COMPRESSOR

EX. AIR RECEIVER

EX. HOT WATER

RECIRCULATING

PUMP

EX. EXPANSION TANKS

EX. 6'' SERVICE WATER

EX. CW

SUPPLY TO

1ST FLR

(COOLING

TOWER)

EX. CW

FROM 1ST

FLR

EX. DOMESTIC WATER

BOOSTER PACKAGE (TO

SERVE WATER HEATERS)

EX. WATER HEATERS

EX. DDC CONTROLS

EX. MIXING VALVE

STATION (NOT IN

SERVICE)

EX. HOUSE TANK PUMP

EX. DOMESTIC HOT

WATER HEATERS

EX. DCW TO BOILER PLANT

EX. 5'' DCW TO

HOUSE TANK

EX. 6'' DCW TO HOUSE

TANK (NOT IN

SERVICE)

EX. 2'' DHWR (NOT

IN SERVICE)

EX. 6'' DHW

(NOT IN

SERVICE)

EX. 6'' DCW FROM

HOUSE TANK TO

WATER HEATERS

EX. 6'' DHW FROM

WATER HEATERS

2'' DHWR TO HOT

WATER RECIRCULATING

PUMPS

EX. DHW TO BOILER PLANT

EX. 4'' DCW FROM

MORGUE (BACKUP)

6" DCW

2" DHWR

3" DHW

3" DCW

3/4" DHWR

6" DCW

5" DCW

3" DHWR

6" DCW

6" DHW

3" DCW

6" DCW

3" DCW

6" DCW

6" DCW

3" DHWR

2" DHWR

6" DHW

6" DCW

A. COORDINATE EXACT ROUTE OF PIPING WITH

OTHER NEW AND EXISTING DUCTWORK AND

PIPING, STRUCTURE, LIGHTS, CONDUITS AND

ALL OTHER SERVICES.

B. VERIFY SIZES OF EXISTING PIPING AND TIE-IN

POINTS PRIOR TO WORK.

C. DEMOLITION WORK SHALL BE PERFORMED

SUCH THAT ALL PIPES, HANGERS, SUPPORTS

AND VALVES ARE REMOVED COMPLETELY TO

LIMITS OF DEMOLITION. REMOVE ALL ITEMS TO

ENSURE NOTHING IS ABANDONED IN PLACE.

D. NO DEAD ENDS SHALL REMAIN. DEMOLISH

PIPING TO WITHIN TWO PIPE DIAMETERS FROM

MAIN OR BRANCH.

E. DOMESTIC WATER HOUSE TANK PUMPS

INSTALLED AS A PART OF PREVIOUS PROJECT

SHALL BE MADE OPERATIONAL PRIOR TO THE

DEMOLITION OF OLD HOUSE TANK PUMPS.

F. NEW DOMESTIC HOT WATER HEATERS SHALL

BE MADE OPERATIONAL PRIOR TO THE

DEMOLITION OF EXISTING DOMESTIC HOT

WATER HEATERS.

G. COORDINATE SHUTDOWNS IN ANY SERVICE

WITH THE COR A MINIMUM OF TWO (2) WEEKS IN

ADVANCE.

H. MAINTAIN DETAILED AS-BUILT DRAWINGS ON

SITE DURING CONSTRUCTION. ENGAGE IN

WEEKLY MEETINGS WITH THE COR TO PROVIDE

PROJECT STATUS AND TO SHOW LATEST AS-

BUILT DRAWINGS.

I. PROVIDE SHUT-OFF VALVE AT EACH BRANCH

TAKE OFF IN COLD AND HOT WATER SUPPLY,

AND COLD AND HOT WATER RETURN. SHUT-OFF

VALVES SHALL BE INSTALLED WITHIN TWO PIPE

DIAMETERS OF MAIN.

SCHEDULE OF ITEMS FOR WATER QUALITY MONITORING SYSTEMS:

1. CONTROLLER, EQUAL TO ADVANTAGE CONTROLS, AS APPROVED BY COR

2. MONOCHLORAMINE MONITOR, EQUAL TO ATI, AS APPROVED BY COR

3. FLOWCELL FOR MONOCHLORAMINE MONITOR

4. MONOCHLORAMINE SENSOR

5. OUTLET TO DRAIN

6. SAMPLE PORT

7. FLOW SWITCH

8. CONDUCTIVITY PROBE

9. RECIRCULATION PUMP, EQUAL TO GRUNDFOS MODEL UPS15-58FC, AS

APPROVED BY COR

10. PH PROBE

11. PRESSURE-REDUCING VALVE (PRV) FOR FLOWCELL SUPPLY

12. FLOW METER

13. BASKET STRAINER

14. ISOLATION VALVE - PANEL INLET

15. ISOLATION VALVE - PANEL OUTLET

NOTES:

1. PIPING AND TUBING SHALL BE COPPER, 3/4" AND 1/4", RESPECTIVELY.

2. PIPE TO MAINS:

A. BLDG. 11, GG-5F STORAGE: PROVIDE CUT AND NEW TEES INTO TWO ADJACENT LOCATIONS ON 6" STAINLESS STEEL MAIN. PROVIDE DIELECTRIC FITTINGS AT THE POINT OF CONNECTION TO

COPPER PIPING.

B. OUTAGES: REQUEST TWO WEEKS IN ADVANCE.

3. VALVES SHALL BE GLOBE VALVES:

A. SALIENT FEATURES:

a. PLUMBING REQUIREMENTS:

• CLASS: CLASS 125

• PIPE SIZE: 3/4"

• CONNECTION TYPE: FNPT

b. MECHANICAL REQUIREMENTS:

• BODY MATERIAL: BRONZE

• TOP OF HANDLE TO INLET CENTER: 3-15/16"

• INLET TO OUTLET LENGTH: 2-9/16"

c. OPERATING CONSTRAINTS:

• MAX. WATER PRESSURE 200 PSI

• MAX. STEAM PRESSURE 125 PSI

• MAX. FLUID TEMP. 406°F

4. PRESSURE REDUCING VALVE:

A. LEAD-FREE WATER PRESSURE REDUCING VALVE.

B. SALIENT FEATURES:

a. PLUMBING REQUIREMENTS:

• PIPE SIZE: 3/4"

• CONNECTION TYPE: FNPT

b. MECHANICAL REQUIREMENTS:

• BODY MATERIAL: BRONZE

• HEIGHT: 6-1/16"

• INLET TO OUTLET LENGTH: 4"

c. OPERATING CONSTRAINTS:

• MAX. WATER PRESSURE 400 PSI

• MAX. FLUID TEMP. 180 DEGREES F

• PRESET PRESSURE SETTINGS: 50 PSIG

• PRESSURE ADJUSTMENT RANGE: 25 TO 75 PSIG

WQS INSTALLATION NOTES:

1. PROVIDE WATER QUALITY MONITORING SYSTEM (QMS).

2. EACH SYSTEM SHALL PROVIDE DIGITAL MONITORING FOR PARAMETERS: MONOCHLORAMINE, PH, TEMPERATURE, CONDUCTIVITY, PRESSURE, AND FLOW (FOR FLOW, SWITCH ONLY, NOT FLOW RATE).

PROVIDE STATIC MONITORING OF FLOW RATE.

3. MONITOR SHALL PROVIDE CONTINUOUS DATA LOGGING VIA EXISTING JCI METASYS SYSTEM.

4. PROVIDE POWER PER PLANS.

5. CONTROLS WORK:

A. PROVIDE SHOP DRAWINGS AND RELATED ENGINEERING TO ENSURE PROPOSED NEW JCI EQUIPMENT IS

PROPERLY SELECTED AND FURNISHED WITH HARDWARE (PORTS, CARDS, BOARDS) REQUIRED.

B. NEW EQUIPMENT.

C. PROVIDE NEW DDC CONTROLLER(S) AND ENCLOSURE(S), SELECTED APPROPRIATELY FOR THE

EQUIPMENT BEING CONTROLLED.

D. SIGNAL FROM NEW SYSTEMS TO NEW JCI EQUIPMENT.

E. SIGNAL FROM NEW JCI EQUIPMENT TO COMMUNICATIONS PORT OR EXISTING JCI PANEL, AS EACH

SITUATION REQUIRES.

F. CONTRACTOR TO FURNISH:

a. PROGRAMMING AND SET UP OF SCREEN AT GRAPHICS.

b. TIE INTO METASYS.

c. SIGNAL TESTING AND REPORTING AT GRAPHICS.

6. ARCHITECTURAL:

A. PANEL AND FASTENERS

a. 3/8” POLYETHYLENE PANEL, MOUNTED TO WALL.

b. FASTENERS: ¼”X3” STAINLESS STEEL COUNTERSUNK SCREWS SET IN EXPANSION ANCHORS, 15

TOTAL, EVENLY SPACED IN 3 ROWS OF 5 SCREWS.

B. PATCHING: WITH LIKE MATERIALS AND COLORS WHERE DAMAGE IS CAUSED BY CONTRACTOR WORK.

7. PLUMBING:

A. SEE PLUMBING DETAILS AND NOTES ON PLANS.

B. PROVIDE NEW DIGITAL PRESSURE GAGE, DRILLED AND TAPPED INTO EACH WATER MAIN, TIED INTO AND

POWERED BY PLUG FROM WQS CONTROLLER. TYPE: EQUAL TO OMEGA DPG1000L-200G, AS APPROVED

BY THE COR.

8. ELECTRICAL:

A. PROVIDE NEW CONDUIT, CABLING, AND POWER SUPPLY TO NEW DEVICES AND EQUIPMENT

B. PROVIDE 4-20MA SIGNAL CONDUCTORS INTO NEW JCI PANELS.

T

1-DWH1

CT

BI - HOT WATER RETURN PUMP STATUS

M

BI – WATER HEATER STATUS

BO - HOT WATER RETURN PUMP START/STOP

MOTOR STARTER1-DWH2 1-DWH3

T T T

AI – DOMESTIC HOT WATER SUPPLY TEMP

AI – DOMESTIC HOT WATER SUPPLY TEMP

AI – DOMESTIC HOT WATER SUPPLY TEMP

T

AI – DOMESTIC HOT WATER SUPPLY TEMP

AI – DOMESTIC HOT WATER RETURN TEMP

T

AI – DOMESTIC COLD WATER SUPPLY TEMP

DHW

D C

W

H W

R

BI – WATER HEATER STATUS

BI – WATER HEATER STATUS

LOCAL DDC

CONTROL PANEL

CTBI - HOT WATER RETURN PUMP STATUS

M

BO - HOT WATER RETURN PUMP START/STOP

MOTOR STARTER

SEQUENCE OF OPERATION

OVERALL HOT WATER SUPPLY TEMPERATURE SENSOR SHALL

PROVIDE A FEEDBACK SIGNAL TO THE WATER HEATER

CONTROLLER TO MODULATE THE STEAM CONTROL VALVE TO

MAINTAIN HOT WATER SUPPLY TEMPERATURE SETPOINT OF 140

DEGREES (ADJUSTABLE). SETPOINT FOR EACH INDIVIDUAL

WATER HEATER SHALL BE 140 DEGREES F (ADJUSTABLE).

AN ALARM SHALL ANNUNCIATE AT THE DDC ENGINEERING

CONTROL CENTER (ECC) UPON THE OCCURRENCE OF ANY OF

THE FOLLOWING:

• HOT WATER SUPPLY TEMPERATURE (FROM ANY WATER

HEATER AND OVERALL SUPPLY TEMPERATURE) DROPS

BELOW 135 DEGREES F (ADJUSTABLE) FOR MORE THAN 5

MINUTES (ADJUSTABLE).

• HOT WATER SUPPLY TEMPERATURE RISES ABOVE 145

DEGREES F (ADJUSTABLE) FOR MORE THAN 5 MINUTES

(ADJUSTABLE).

• HOT WATER RETURN TEMPERATURE DROPS BELOW 124

DEGREES F (ADJUSTABLE) FOR MORE THAN 5 MINUTES

(ADJUSTABLE).

• THE CURRENT SENSOR ON ANY WATER HEATER

CIRCULATION PUMP DOES NOT PROVE OPERATION AFTER A

COMMAND TO START.

• THE CURRENT SENSOR ON THE MAIN HOT WATER RETURN

PUMP DOES NOT PROVE OPERATION AFTER A COMMAND TO

START.

POINT NAME:

DOMESTIC HOT WATER RETURN TEMPERATURE

DOMESTIC HOT WATER SUPPLY TEMPERATURE (1-DWH-1)

DOMESTIC HOT WATER SUPPLY TEMPERATURE (1-DWH-2)

OVERALL DOMESTIC HOT WATER SUPPLY TEMPERATURE

DOMESTIC HW RETURN PUMP ONE START/STOP

DOMESTIC HOT WATER RETURN PUMP ONE STATUS

DOMESTIC HW SUPPLY TEMP SETPOINT

DOMESTIC HW RETURN PUMP ONE FAILURE

DOMESTIC HW RET PUMP ONE RUNNING IN HAND

HIGH DOM HW SUPPLY TEMPERATURE

HARDWARE POINTS

AI AO

X

X

X

X

BI BO

SOFTWARE POINTS

AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC

X

X

X

X

X

X

X

X

X

X

X

X

X

X

TOTAL HARDWARE (11) TOTAL SOFTWARE (21)

6 5 2 1

X

X

12 8 22

X

X

X

X

X

X

X

DOMESTIC HW RET PUMP ONE RUN TIME EXCEEDED

0 0 0

X

X

X

LOW DOM HW SUPPLY TEMPERATURE

X

X

X

DOMESTIC HOT WATER SUPPLY TEMPERATURE (1-DWH-3)

X XXDOMESTIC COLD WATER SUPPLY TEMPERATURE

WATER HEATER…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .