This federal contract opportunity synopsis describes a solicitation for replacing domestic water heaters at a VA Medical Center. The Department of Veterans Affairs is seeking proposals for removing existing steam water heaters and installing new steam water heaters. Offerors must provide all labor, materials, tools and equipment to complete the project. Work will include starting up domestic water house tank pumps and a domestic hot water booster pump package. The project magnitude is estimated between $1 million to $5 million, with a performance period of approximately 180 calendar days. This is a 100% SDVOSB set-aside requiring registration in SAM.gov and VetBiz. A pre-proposal conference will be held within two weeks of issuance, with the solicitation to be posted on beta.sam.gov around November 1st. Questions should be directed to the specified contracting officer via email.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04 Site Visit 36C42222B0001.pdf | ||
| 36C24422B0001 0001.docx | DOCX document | |
| S02 SafetyHealthDuringConstruction 18S-15-346.pdf | ||
| 17-194 DWH Specifications.pdf | ||
| 36C24422B0001_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEDICAL CENTER ASSOC. DIRECTOR
CHIEF OF STAFF
ASSOC. DIRECTOR OF PATIENT CARE
CHIEF ENGINEER
MEDICAL CENTER DIRECTOR
VA APPROVAL
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
1, 11
/1
/2
:2
:1
P
M
G-001
COVER
1 2SM
REPLACE BUILDING 1
DOMESTIC HOT WATER
HEATERS
1111 EAST END BLVD, WILKES-BARRE,
PA 18411
SEPTEMBER 17, 2021
100% CONSTRUCTION DOCUMENTS
693-22-11117-194-MOD1
REPLACE BUILDING 1 DOMESTIC HOT
WATER HEATERS
1111 EAST END BLVD, WILKES-BARRE, PA 18411
VA PROJECT #: 693-22-111
PLH
DRAWING LIST
No. Description Dwg of Dwg
GENERAL
G-001 COVER 1 2
G-002 ICRA NOTES, DETAILS AND CONSTRUCTION ROUTE PLAN 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION AND SCHEDULES 1 6
P-401 ENLARGED PLUMBING PLANS 2 6
P-402 ENLARGED PLUMBING PLANS 3 6
P-403 ENLARGED PLUMBING PLANS AND CONTROLS 4 6
P-501 PLUMBING DETAILS 5 6
P-502 PLUMBING CONTROLS 6 6
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 3
M-401 ENLARGED MECHANICAL PLANS 2 3
M-501 MECHANICAL DETAILS 3 3
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES AND SYMBOL LEGENDS 1 4
E-401 ELECTRICAL MECHANICAL ENLARGEMENTS 2 4
E-501 ELECTRICAL DETAILS 3 4
E-601 ELECTRICAL SCHEDULES 4 4
AREA OF WORK
PROJECT LOCATION
DocuSign Envelope ID: 064377DA-BF06-4E98-ADD6-BC95A4CEEA47
9/20/2021
SH
UT
TE
R
O
VE
R H
EA
D
DO
OR
RO
LL
IN
G
O
VE
R H
EA
D
DO
OR
O
VE
R H
EA
D
DO
OR
RA
M P U P
DN
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR
REPLACE BUILDING 1 DOMESTIC HOT WATER HEATERS
• THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
• PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
ILSM SIGNAGE
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove or isolation of HVAC system in areas where work was being performed.
1. Includes all activities required by Class III.
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each ime the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers work area until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II.
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers i.e. sheetrock, plywood, plastic to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units if indicated.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class I.
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Place adhesive walk-off mats at entrance and exit of work area. Replaced used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet
- painting (but not sanding)
- wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete cabling system
- new construction
• Cardiology
• Echocardiography
• Endoscopy
• Nuclear Medicine
• Physical Therapy
• Radiology / MRI
• Respitory Therapy
• CCU
• Emergency Room
• Labor & Delivery
• Laboratories (specimen)
• Newborn Nursery
• Outpatient Surgery
• Pediatrics
• Pharmacy
• Post Anesthesia Care Unit
• Surgical Units
• Any area caring for immunocompromised patients
• Burn Unit
• Cardiac Cath Lab
• Central Sterile Supply
• Intensive Care Units
• Medical Unit
• Negative pressure isolation rooms
• Oncology
• Operation rooms including C-section rooms
• Office Spaces
• Hallways
• FES/EMS areas
(Note: Mechanical Space)
C L
A S
S I V
C L
A S
S I
II
C L
A S
S I I
C L
A S
I
PATIENT RISK GROUPS
LOW Risk Group 1
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4
TYPE A TYPE B TYPE C TYPE D
I II II III/IV
I II III IV
I II III/IV IV
II III/IV I/IV IV
During Construction Project: Upon Completion of Project:
TYPE D
TYPE C
TYPE B
TYPE A
Group 1 Low Risk
Group 2 Medium Risk
Group 3 High Risk
Group 4 Highest Risk
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
Construction Project Type
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicated that Class III or Class IV Control procedures are necessary.
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
Type of Construction Project activity (Type A-D)
INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR
CONSTRUCTION AND RENOVATION
1. Wipe work surfaces to remove dust.
AA BB CC DD EE FF GG HH JJ
1'
2'
3'
4'
5'
6'
7'
8' U
V
12 13
OFFICE
EG-38B
OFFICE
EG-39A
LOADING DOCK
LD-1
OFFICE
EB-04
CART WASH
EB-43
MECHANICAL RM
GG-51A
WASTE MANAGEMENT
STORAGE
CB-29
CORRIDOR
CG-54
WASTE MANAGEMENT
STORAGE
CB-30
CORRIDOR
GG-49
CORRIDOR
EG-48
BREAK RM
GG-28
CANTEEN STORAGE
GG-29
EMS BRK/CONF RM
EB-02 NEW EMS EQUIP 1
EB-05
BIO MED
EG-33
CORRIDOR
EG-30
BIO MED
EG-34
CORRIDOR
EG-48A
OFFICE
EG-39C
OFFICE
EG-39D
OFFICE
EG-39E
OFFICE
EG-39F
EMS LAUNDRY
EB-38
CORRIDOR
EG-39
MECH RM
EG-63
BREAK RM
EG-36
BIOMED
EG-35
MORGUE
EG-57
STEAM
DRYER
LAUNDRY
EG-38A
LOADING DOCK
EG-38C
MECHANICAL RM
EG-61A
ANTE RM
EG-57
REFR
EG-59
TOILET
EG-60
STORAGE
EG-61
HAC
EG-60A
CORRIDOR
EG-58
STORAGE
GG-5F
OFFICE
G3-2
BOILER PLANT
GG-5A
PUMP ROOM
GG-4
BIO-MED SHOP
GG-2
CONSTRUCTION
ACCESS
'-0
17'-2
59'-0"
13'-10"
AREA OF WORK
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 11
/1
/2
:2
:3
P
M
G-002
ICRA NOTES, DETAILS AND
CONSTRUCTION ROUTE PLAN
2 2SM
REPLACE BUILDING 1
DOMESTIC HOT WATER
HEATERS
1111 EAST END BLVD, WILKES-BARRE,
PA 18411
SEPTEMBER 17, 2021
100% CONSTRUCTION DOCUMENTS
693-22-11117-194-MOD1
PLH
ICRA GENERAL NOTES:
1. NO MAJOR EQUIPMENT ACCESS THROUGH THE
BUILDING BETWEEN 7AM TO 5PM. CONTRACTOR
TOCOORDINATE WITH VA COR.
Scale: No Scale
ILSM SIGNAGE
Scale: No Scale
ICRA BARRIER TAG DETAIL
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
NORTH
0 84 16
Scale: 3/32" = 1'-0"
GROUND FLOOR CONSTRUCTION ACCESS PLAN
1 TEMPORARY PLASTIC BARRIER TO UNDERSIDE
OF CEILING WITH ZIPPER ENTRY.
2 PROVIDE STICKY MAT AT ZIPPER ENTRY
CONSTRUCTION ACCESS POINT.
3 CONSTRUCTION ROUTE.
PIPING SYSTEM
DCW DOMESTIC COLD WATER
PLUMBING SYMBOLS
ANNOTATION SYMBOLS
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
NEW PLUMBING EQUIPMENT MARK
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
P-###
EXISTING PLUMBING EQUIPMENT MARKP-###
PLUMBING SYMBOLS & ABBREVIATIONS
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CONTROL VALVE
GATE VALVE
GLOBE VALVE
SAFETY RELIEF VALVE
TWO POSITION CONTROL VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
HOSE BIBB / SILLCOCK
PLUG VALVE
PLUMBING SYMBOLS
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER W/DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT - ROUND OR SQUARE
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
OR
CO
PIPE SLOPE ARROW
AV
F
P
T
M
CIRCUIT SETTER
ANNOTATION ABBREVIATIONS
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FU FIXTURE UNITS
G GALLON
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUTS
GD GARBAGE DISPOSAL
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB (INTERIOR)
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SINK BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PASCAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MIN
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TDL TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WHD WALL HYDRANT
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
A/E ARCHITECT/ENGINEER
AC ABOVE CEILING
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
AFG ABOVE FINISHED GRADE
ASD ADJUSTABLE SPEED DRIVE
ASHRAE AMERICAN SOCIETY HEATING,
REFRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BAS BUILDING AUTOMATION SYSTEM
BF BELOW FLOOR
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BH BOOSTER HEATER
BHP BREAK HORSEPOWER
BJ BETWEEN JOISTS
BOP BOTTOM OF PIPE
BSP BLACK STEEL PIPE
BT BATHTUB
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CF COMBINATION FIXTURE
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
COND CONDENSATE
CP CONDENSATE PUMP
CS CLINICAL SINK
CV CONTROL VALVE
DA DENTAL COMPRESSED AIR
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DF DRINKING FOUNTAIN
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DV DENTAL VACUUM
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYEWASH STATION
EX EXISTING
DHW DOMESTIC HOT WATER
DCWR DOMESTIC CW RECIRCULATION
DHWR DOMESTIC HW RECIRCULATION
1. THIS FACILITY OPERATES 24 HOURS PER DAY, 7 DAYS PER WEEK. CONSTRUCTION WORK SHALL BE PHASED TO MINIMIZE BOTH QUANTITY AND DURATION OF SHUTDOWNS. SCHEDULE ALL SHUTDOWNS WITH THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) A MINIMUM OF TWO (2)
WEEKS IN ADVANCE.
2. SUBMIT A DETAILED PHASING PLAN FOR REVIEW BY THE COR, ARCHITECT AND ENGINEER. PHASING PLAN SHALL INCLUDE, BUT NOT BE LIMITED TO, START AND END DATES OF ALL TASKS THROUGHOUT THE ENTIRE PROJECT, AND DATE AND DURATION OF SUGGESTED SHUTDOWNS.
3. ALL MEANS OF EGRESS SHALL BE MAINTAINED DURING CONSTRUCTION. ACCESSIBLE ICRA BARRIERS SHALL BE ERECTED AND TAKEN DOWN
AS REQUIRED TO MEET THE VA SCHEDULING REQUIREMENTS.
4. JOINTS AND FITTINGS ON COPPER PIPING 2" AND UNDER SHALL BE SOLDERED. JOINTS AND FITTINGS ON COPPER PIPING OVER 2" SHALL BE
BRAZED. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL WORK AND PHASING NOTES
THERE IS EXISTING EQUIPMENT THAT WAS INSTALLED AS PART OF PREVIOUS PROJECTS THAT WILL SERVE THE PLUMBING SYSTEM INSTALLED AS PART OF THIS PROJECT. START-UP HAS NOT BEEN PERFORMED ON THIS EQUIPMNT. THIS EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO:
- DDC CONTROLS
- DOMESTIC COLD WATER HOUSE TANK PUMPS
- DOMESTIC COLD WATER BOOSTER PUMP PACKAGE FOR MAIN BUILDING 1 WATER HEATERS
- EXISTING DOMESTIC HOT WATER RECIRCULATING PUMPS
- EXISTING 13TH FLOOR DOMESTIC WATER HOUSE TANK LEVEL CONTROLS
CONFIRM LOCATION OF ALL EXISTING SYSTEMS AND EQUIPMENT. START-UP SHALL BE PERFORMED ON ALL NEW AND EXISTING SYSTEMS AND EQUIPMENT. START-UP OF NEW AND EXISTING SYSTEMS AND EQUIPMENT SHALL BE PERFORMED BY THE EQUIPMENT MANUFACTURER, OR BY AN AUTHORIZED AND CERTIFIED REPRESENTATIVE OF THE EQUIPMENT MANUFACTURER. PROVIDE THIRD-PARTY TESTING FOR ALL NEW AND
EXISTING SYSTEMS AND EQUIPMENT.
PROGRAM THE DDC CONTROLS FOR NEW AND EXISTING SYSTEMS AND EQUIPMENT, IN ACCORDANCE WITH THE SEQUENCES OF OPERATION INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS. LOCATIONS AND QUANTITIES OF EXISTING DDC CONTROL PANELS ARE SHOWN ON THE DRAWINGS, BASED ON INFORMATION TAKEN DURING FIELD SURVEY. CONFIRM QUANTITIES AND LOCATIONS OF ALL EXISTING DDC CONTROL PANELS. VERIFY THE CAPACITY OF THE EXISTING DDC CONTROLLERS AND PROVIDE ADDITIONAL CONTROLLERS, OR EXPANSION MODULES ON EXISTING CONTROLLERS, AS REQUIRED TO ACCOMPLISH SEQUENCES OF CONTROL, INCLUDING NEW CONTROLLER CABINETS IF NEEDED.
ADDITIONALLY, PROVIDE CONTROL WIRING FOR ANY EXISTING SENSORS OR EQUIPMENT NOT WIRED TO THEIR RESPECTIVE CONTROLLER.
PROVIDE THIRD-PARTY COMMISSIONING SERVICES ON ALL NEW AND EXISTING SYSTEMS AND EQUIPMENT USING PROCEDURES OUTLINED IN THE
SPECIFICATIONS.
EQUIPMENT START-UP, COMMISSIONING AND DDC CONTROLS NOTES
1. PREPARE DRAWINGS SHOWING MECHANICAL, PLUMBING AND FIRE PROTECTIONS SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK
OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING
CONDITIONS.
B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY. BOTH NEW AND EXISTING SYSTEMS SHALL BE SHOWN IN THE COORDINATION DRAWINGS
C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN
ACCORDANCE WITH DIRECTIONS GIVEN.
D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
2. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR
RECONFIGURE WORK LACKING COORDINATION AT NO ADDITIONAL COST.
COORDINATION DRAWINGS
PLUMBING GENERAL NOTES
PLUMBING DEMOLITION GENERAL NOTES
1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE
PROCEEDING WITH WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF
THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION. IF ITEMS TO REMAIN ARE DAMAGED, REMOVED OR RELOCATED DURING THE COURSE OF WORK, REINSTALL AND REPAIR ITEMS BACK TO ORIGINAL CONDITION. IF
IT IS NOT POSSIBLE TO REPAIR THE ITEM, FULLY REPLACE THE ITEM IN KIND.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK. COORDINATE
THIS WORK WITH DIVISION 23 AND DIVISION 26 CONTRACTORS.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUDTOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND
APPROVAL.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES
DAMAGED AT NO ADDITIONAL COST.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING AND WORK OF OTHER TRADES. FOR FLOORS THAT ARE EXISTING TO REMAIN, PROVIDE NEW
FINISHES TO MATCH EXISTING.
10. REMOVE ALL OBSOLETE PLUMBING EQUIPMENT, PIPING, INSULATION, HANGERS, CONTROLS, PADS, AND SUPPORTS UNLESS OTHERWISE INDICATED TO REMAIN. DISCONNECT PLUMBING FROM EQUIPMENT WHICH IS TO BE REMOVED BY OTHERS. PIPING MADE OBSOLETE BY NEW CONSTRUCTION SHALL BE FULLY REMOVED. IF A PIPING RUNOUT IS TO BE REMOVED, BUT THE PIPE MAIN IS TO REMAIN, REMOVE PIPE AS CLOSE AS POSSIBLE TO MAIN AND CAP TO ELIMINATE DEAD LEGS. PIPING REMOVED FROM THE EXISTING PLUMBING SYSTEM SHALL NOT BE USED IN THE INSTALLATION OF NEW SYSTEMS. REMOVE ALL DEAD LEGS IN PIPING, EVEN IF NOT
SHOWN ON THE DRAWINGS TO BE REMOVED. LEGALLY DISPOSE OF ALL REMOVED ITEMS.
11. DEMOLITION WORK INDICATED ON THE DRAWINGS DOES NOT NECESSARILY INDICATE ALL PIPING OR EQUIPMENT TO BE REMOVED. EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON MULTIPLE WEEKS OF SITE SURVEY PERFORMED BY THE ENGINEERS, AS WELL AS EXISTING DRAWINGS. PRIOR TO SUBMITTING BID, THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND REVIEW EXISTING CONDITIONS.
DETERMINE THE FULL EXTENT OF DEMOLITION AND INCLUDE ALL REQUIRED DEMOLITION WORK IN THE BID. NO ADDITIONAL COST WILL BE GRANTED FOR DEMOLITION. FOR ANY ITEMS SPECIFICALLY DESIGNATED BY THE VA TO BE SALVAGED, REMOVE THE ITEMS AND PLACE IN A LOCATION DIRECTED BY THE VA. IF THE CONTRACTOR REMOVES AN ITEM THAT IS REQUIRED FOR AN EXISTING SYSTEM TO REMAIN, THE CONTRACTOR SHALL REPLACE THAT ITEM AT NO ADDITIONAL COST TO THE GOVERNMENT. PROVIDE ALL TEMPORARY SUPPORTS REQUIRED FOR EXISTING SYSTEMS TO REMAIN. IF A SUPPORT FOR AN EXISTING ITEM OF ANOTHER TRADE MUST BE REMOVED TO PERFORM PLUMBING WORK, COORDINATE SUCH WORK WITH THE APPROPRIATE
CONTRACTOR
12. COORDINATE ALL DEMOLITION AND NEW WORK WITH THE PHASING PLANS. PROVIDE ALL LABOR AND MATERIALS REQUIRED TO MAINTAIN CONTINUED OPERATION OF THE SYSTEM THROUGHOUT THE PHASES OF WORK. GENERALLY, NEW WORK (EQUIPMENT, PIPING, ETC.) SHALL BE INSTALLED AND MADE OPERATIONAL
PRIOR TO DEMOLITION OF EXISTING SYSTEMS.
13. COORDINATE WITH THE COR PRIOR TO BRINGING NEW EQUIPMENT AND MATERIALS INTO THE WORK AREA, AND REMOVING DEMOLISHED EQUIPMENT AND MATERIALS FROM THE WORK AREA.
1. WORK SHALL CONFORM TO LOCAL, STATE, AND NATIONAL CODES AND VA STANDARDS.
2. PROVIDE ALL MATERIALS AND EQUIPMENT, AND PERFORM ALL LABOR REQUIRED TO INSTALL A COMPLETE AND
OPERABLE PLUMBING SYSTEM.
3. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND THEREFORE DO NOT SHOW EVERY PIPE, FITTING, VALVE OR APPURTENANCE THAT IS REQUIRED FOR A COMPLETE INSTALLATION. PROVIDE THESE PIPES, FITTINGS, VALVES AND APPURTENANCES EVEN IF NOT SHOWN ON THE DRAWINGS. DO NOT SCALE LOCATION DIMENSIONS FROM THESE DRAWINGS. DO NOT SCALE THESE DRAWINGS FOR THE ACCURATE CUTTING OF PIPE OR ITS EXACT LOCATION. BEFORE ANY PIPING IS FABRICATED OR INSTALLED, CONFER WITH ALL OTHER CONTRACTORS IN ORDER TO ESTABLISH THE LOCATION OF THEIR PIPING, CONDUIT, DUCTWORK, CEILING DEVICES, FOUNDATIONS, STRUCTURAL STEEL, LIGHTING FIXTURES AND OTHER EQUIPMENT SO AS TO AVOID INTERFERENCE. NO ADDITIONAL COST TO THE GOVERNMENT WILL BE PERMITTED FOR FAILURE OF THE DIVISION 22 CONTRACTOR TO COORDINATE WITH OTHER CONTRACTORS. COORDINATE WITH EXISTING SYSTEMS INCLUDING, BUT NOT LIMITED TO, DUCTWORK, PIPING, CONDUIT, CABLE TRAY, AND STRUCTURE.
4. DO NOT STRESS OR STRAIN PIPING.
5. WHERE PIPES PENETRATE FIRE-RATED OR SMOKE-RATED BARRIERS OR PARTITIONS (WALLS, FLOOR AND CEILINGS), SEAL PENTRATIONS IN ACCORDANCE WITH NFPA 90A WITH UL-LISTED FIRESTOPPING SYSTEM(S) AND
SMOKE SEALING TO MATCH THE FIRE/SMOKE RATING OF THE BARRIER OR PARTITION.
6. DO NOT INSTALL PIPING IN DEDICATED ELECTRICAL PANEL SPACE.
7. ALL MATERIALS, EQUIPMENT AND DEVICES SHALL, AT A MINIMUM, MEET THE REQUIREMENTS OF UL WHERE UL
REQUIREMENTS ARE ESTABLISHED FOR THOSE ITEMS.
8. ALL FACTORY-APPLIED COATINGS AND FINISHES SHALL BE PROVIDED WITHOUT RUST, SCRATCHES OR DENTS.
9. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
10. OBTAIN AND PAY FOR PERMITS, FEES, AND THIRD PARTY TESTS, INSPECTIONS AND COMMISSIONING REQUIRED FOR THIS WORK. ALL INSPECTIONS, TESTS AND COMMISSIONING SHALL BE PERFORMED BY A THIRD PARTY.
THE VA WILL PROVIDE INFORMATION TO THE CONTRACTOR REGARDING THE REQUIRED TESTS AND
INSPECTIONS.
11. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE
FOR THE PURPOSES INTENDED.
12. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND
CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
13. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR
EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
14. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH
SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
15. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND
APPLICABLE VA STANDARDS.
16. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.
17. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES
AND APPLICABLE VA STANDARDS.
18. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
19. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF
PIPING WITH EXISTING CONDITIONS.
20. CONTRACTOR SHALL COORDINATE ANY SYSTEM REQUIRED SHUTDOWN WITH THE COR A MINIMUM OF TWO (2)
WEEKS IN ADVANCE.
21. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS
CONTRACT, UNLESS NOTED OTHERWISE.
22. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF
PROJECT.
23. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
24. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.
25. PROVIDE COPPER TUBING THAT IS CERTIFIED BY ASTM B88. TUBING THAT IS NOT CERTIFIED (SOMETIMES
REFERRED TO AS "STANDARD TUBE"), WILL NOT BE ACCEPTED.
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
1, 11
/1
/2
:2
:4
P
M
P-001
PLUMBING GENERAL INFORMATION
AND SCHEDULES
1 6SM
REPLACE BUILDING 1
DOMESTIC HOT WATER
HEATERS
1111 EAST END BLVD, WILKES-BARRE,
PA 18411
SEPTEMBER 17, 2021
100% CONSTRUCTION DOCUMENTS
693-22-11117-194-MOD1
PLH
1-DWH3 PUMP ROOM GG-4 BUILDING 1 DOMESTIC HOT WATER
DOUBLE WALL, SEMI INSTANTANEOUS, SHELL & TUBE,
PACKAGED
115 50 150 60 50 6,020 1-ST3 12,040 THERMAFLO TH-750V 1248 1, 2, 3
1-DWH2 PUMP ROOM GG-4 BUILDING 1 DOMESTIC HOT WATER
DOUBLE WALL, SEMI INSTANTANEOUS, SHELL & TUBE,
PACKAGED
115 50 150 60 50 6,020 1-ST2 12,040 THERMAFLO TH-750V 1248 1, 2, 3
1-DWH1 PUMP ROOM GG-4 BUILDING 1 DOMESTIC HOT WATER
DOUBLE WALL, SEMI INSTANTANEOUS, SHELL & TUBE,
PACKAGED
115 50 150 60 50 6,020 1-ST1 12,040 THERMAFLO TH-750V 1248 1, 2, 3
GPM °F °F FT PSIG PSIG LB/HR LB/HR
FLOW EWT LWT WPD ENT CONTROL VALVE ENT HEAT EXCHANGER
TRAP NO
CAPACITY
MANUF. MODEL NO.
MARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE
WATER CONDITIONS STEAM PRESSURE
CONTROL VALVE
TRAP BASIS OF DESIGN
REMARKS
STEAM TO DOMESTIC WATER HEAT EXCHANGER SCHEDULE
REMARKS:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PACKAGED, STEAM-TO-WATER DOMESTIC WATER HEATER, COMPLETE WITH SHELL-AND-TUBE HEAT EXCHANGER (WATER IN SHELL, STEAM IN TUBES), ELECTRONIC CONTROLLER, MODULATING STEAM CONTROL VALVE (100:1 TURNDOWN), FLOAT & THERMOSTATIC STEAM TRAP, TEMPERATURE AND PRESSURE GAUGES, RELIEF VALVES, SOLENOID DUMP VALVE, RECIRCULATION PUMP, VACUUM BREAKER, AND CARBON STEEL STAND. FULLY FACTORY ASSEMBLED AND TESTED.
3. MOUNT AND SECURE UNIT TO NEW 4" CONCRETE PAD.
N/A PUMP ROOM GG-4 DOMESTIC HOT WATER
CENTRIFUGAL IN-LINE CLOSE
COUPLED
DOMESTIC COLD WATER 250 225 50 70 30 3 230/460 3500 VARIABLE
GOULDS WATER
TECHNOLOGY
46SV31GN4C10 1
N/A PUMP ROOM GG-4 DOMESTIC COLD WATER
CENTRIFUGAL IN-LINE CLOSE
COUPLED
DOMESTIC COLD WATER 250 225 50 70 25 3 230/460 3600 VARIABLE
GOULDS WATER
TECHNOLOGY
46SV32NM4C50N 1
GPM FT °F HP
FLUID
FLOW HEAD TEMPERATURE
MIN. % EFF
NOMINAL POWER
PHASE VOLT
MAX
RPM
SPEED
CONTROL
MANUFACTURER MODEL NO.
MARK LOCATION
SYSTEM AND/OR
SERVICE
TYPE
CIRCULATING FLUID ELECTRICAL MOTOR BASIS OF DESIGN
REMARKS
PLUMBING PUMP SCHEDULE
REMARKS:
1. FURNISH ONE (1) PUMP & MOTOR COMBINATION IDENTICAL TO EXISTING PUMP. FURNISH TWO (2) REPAIR KITS.
PLUMBING BACKFLOW PREVENTER SCHEDULE
MARK LOCATION AREA AND/OR ROOM SERVED SYSTEM TYPE FLOW
INLET
PRESSURE SIZE REMARKS
1-BFP-1 BLDG 11, GG-5F STORAGE BLDG 1 DOMESTIC COLD
WATER
REDUCED PRESSURE
PRINCIPLE
650.0 GPM 59.00 psi 6" 1, 2, 3
REMARKS:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE (1) SPARE BACKFLOW PREVENTER. BACKFLOW PREVENTERS SHALL BE INSTALLED IN PARALLEL.
3. BASIS OF DESIGN: ZURN WILKINS MODEL 375
1-WQMS-1 GG-5F STORAGE DOMESTIC COLD WATER BLDG 1 1 120 60 1 WALL MOUNTED
PHASE VOLT HZ AMP
MARK LOCATION
SYSTEM AND/OR
SERVICE
AREA AND/OR BUILDING
SERVED
ELECTRICAL REQUIREMENTS
REMARKS
WATER DISTRIBUTION QUALITY MONITOR EQUIPMENT SCHEDULE
DNDN
EE FF GG HH JJ
3'
4'
5'
6'
EX. 8'' SERVICE WATER
FROM UNDERGROUND
WITH 8'' VALVE IN
VERTICAL
EX. WATER
FILTRATION SYSTEM
EX. PUMP
EX. AIR COMPRESSOR
EX. AIR RECEIVER
EX. HOT WATER
RECIRCULATING
PUMP
EX. EXPANSION TANKS
EX. 6'' SERVICE WATER
EX. CW
SUPPLY TO
1ST FLR
(COOLING
TOWER)
EX. CW
FROM 1ST
FLR
EX. DOMESTIC WATER
BOOSTER PACKAGE (TO
SERVE WATER HEATERS)
EX. WATER HEATERS TO REMAIN
EX. DDC CONTROLS
EX. MIXING VALVE
STATION (NOT IN
SERVICE)
EX. HOUSE TANK PUMP
EX. HOUSE TANK
PUMPS TO REMAIN
EX. DCW TO BOILER PLANT
EX. 5'' DCW TO
HOUSE TANK
EX. 6'' DCW TO HOUSE
TANK (NOT IN
SERVICE)
EX. 2'' DHWR (NOT
IN SERVICE)
EX. 6'' DHW
(NOT IN
SERVICE)
2" DHWR
6" DHW
6" DCW
EX. 6'' DCW FROM
HOUSE TANK TO
WATER HEATERS
EX. 6'' DHW FROM
WATER HEATERS
2'' DHWR TO HOT
WATER RECIRCULATING
PUMPS
EX. DHW TO BOILER PLANT
3" DCW
3" DCW
6"
6"5" DCW
4" DCW
EX. 4'' DCW FROM
MORGUE (BACKUP)
6" DCW
4" DCW
5" DCW
4" DCW
3/4" DHWR
3" DCW
3/4" DHWR
2" DHWR
3" DHW
PUMP ROOM
GG-4
BIO-MED SHOP
GG-2
6"
6"
6"
EE FF GG HH JJ
3'
4'
5'
6'
6" DCW
6" DCW
6" DCW4" DCW
6" DCW
6" DCW
3" DCW
EX. 8'' SERVICE WATER
FROM UNDERGROUND
WITH 8'' VALVE IN
VERTICAL
EX. WATER
FILTRATION SYSTEM
EX. PUMP
EX. AIR COMPRESSOR
EX. AIR RECEIVER
EX. HOT WATER
RECIRCULATING
PUMP
EX. EXPANSION TANKS
EX. 6'' SERVICE WATER
EX. CW
SUPPLY TO
1ST FLR
(COOLING
TOWER)
EX. CW
FROM 1ST
FLR
EX. DOMESTIC WATER
BOOSTER PACKAGE (TO
SERVE WATER HEATERS)
EX. WATER HEATERS
EX. DDC CONTROLS
EX. MIXING VALVE
STATION (NOT IN
SERVICE)
EX. HOUSE TANK PUMP
EX. HOUSE TANK PUMPS
EX. DCW TO BOILER PLANT
EX. 5'' DCW TO
HOUSE TANK
EX. 6'' DCW TO HOUSE
TANK (NOT IN
SERVICE)
EX. 2'' DHWR (NOT
IN SERVICE)
EX. 6'' DHW
(NOT IN
SERVICE)
EX. 6'' DCW FROM
HOUSE TANK TO
WATER HEATERS
EX. 6'' DHW FROM
WATER HEATERS
2'' DHWR TO HOT
WATER RECIRCULATING
PUMPS
EX. DHW TO BOILER PLANT
EX. 4'' DCW FROM
MORGUE (BACKUP)
1 3" DHWR
3" DHWR
2" DHWR
6" DCW
3" DHW
2" DHWR
3" DCW
3/4" DHWR
5" DCW
4" DCW
6" DCW
4" DCW
3" DCW
3" DCW
PUMP ROOM
GG-4
BIO-MED SHOP
GG-2
BALL VALVE IN
VERTICAL
BALL VALVE IN
VERTICAL
NC
NC
3" DHWR
3" DHWR
2" DHWR
3" DHWR
2" DHWR
2" DHWR
A. COORDINATE EXACT ROUTE OF PIPING WITH
OTHER NEW AND EXISTING DUCTWORK AND
PIPING, STRUCTURE, LIGHTS, CONDUITS AND
ALL OTHER SERVICES.
B. VERIFY SIZES OF EXISTING PIPING AND TIE-IN
POINTS PRIOR TO WORK.
C. DEMOLITION WORK SHALL BE PERFORMED
SUCH THAT ALL PIPES, HANGERS, SUPPORTS
AND VALVES ARE REMOVED COMPLETELY TO
LIMITS OF DEMOLITION. REMOVE ALL ITEMS TO
ENSURE NOTHING IS ABANDONED IN PLACE.
D. NO DEAD ENDS SHALL REMAIN. DEMOLISH
PIPING TO WITHIN TWO PIPE DIAMETERS FROM
MAIN OR BRANCH.
E. DOMESTIC WATER HOUSE TANK PUMPS
INSTALLED AS A PART OF PREVIOUS PROJECT
SHALL BE MADE OPERATIONAL PRIOR TO THE
DEMOLITION OF OLD HOUSE TANK PUMPS.
F. NEW DOMESTIC HOT WATER HEATERS SHALL
BE MADE OPERATIONAL PRIOR TO THE
DEMOLITION OF EXISTING DOMESTIC HOT
WATER HEATERS.
G. COORDINATE SHUTDOWNS IN ANY SERVICE
WITH THE COR A MINIMUM OF TWO (2) WEEKS IN
ADVANCE.
H. MAINTAIN DETAILED AS-BUILT DRAWINGS ON
SITE DURING CONSTRUCTION. ENGAGE IN
WEEKLY MEETINGS WITH THE COR TO PROVIDE
PROJECT STATUS AND TO SHOW LATEST AS-
BUILT DRAWINGS.
I. PROVIDE SHUT-OFF VALVE AT EACH BRANCH
TAKE OFF IN COLD AND HOT WATER SUPPLY,
AND COLD AND HOT WATER RETURN. SHUT-OFF
VALVES SHALL BE INSTALLED WITHIN TWO PIPE
DIAMETERS OF MAIN.
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 11
/1
/2
:2
:5
P
M
P-401
ENLARGED PLUMBING PLANS
2 6SM
REPLACE BUILDING 1
DOMESTIC HOT WATER
HEATERS
1111 EAST END BLVD, WILKES-BARRE,
PA 18411
SEPTEMBER 17, 2021
100% CONSTRUCTION DOCUMENTS
693-22-11117-194-MOD1
PLH
Scale: 1/4" = 1'-0"
ENLARGED GG-4 PUMP ROOM PLUMBING DEMOLITION PLAN - PHASE I
Scale: 1/4" = 1'-0"
ENLARGED GG-4 PUMP ROOM PLUMBING PLAN - PHASE I
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
1 PROVIDE NEW 3'' DOMESTIC HOT WATER
RETURN PIPING IN PARALLEL TO EXISTING.
PROVIDE VALVED CONNECTIONS FOR FUTURE
CONNECTION TO NEW AND EXISTING WATER
SYSTEMS.
2 CONNECT PUMPS INSTALLED AS A PART OF
PREVIOUS PROJECT TO NEW PIPING.
3 HOUSE TANK PUMPS FULL SIZE BYPASS LOOP.
PROVIDE LOCKABLE TYPE ISOLATION VALVES.
INSTALL ISOLATION VALVES WITHIN TWO PIPE
DIAMETERS OF MAINS. BYPASS VALVES
NORMALLY CLOSED. PROVIDE A DRAIN AND A
CHECK VALVE IN THE PORTION OF THE PIPE
BETWEEN VALVES.
4 PROVIDE 6'' VALVED CONNECTION TO
DOMESTIC HOT WATER BOOSTER PUMP
PACKAGE.
5 PROVIDE 6'' VALVED CONNECTION TO HOUSE
TANK.
6 PROVIDE 3'' VALVED CONNECTION.
7 RECIRCULATION PUMPS FULL SIZE BYPASS
LOOP. PROVIDE LOCKABLE TYPE ISOLATION
VALVES. INSTALL ISOLATION VALVES WITHIN
TWO PIPE DIAMETERS OF MAINS. BYPASS
VALVES NORMALLY CLOSED. PROVIDE A DRAIN
AND A CHECK VALVE IN THE PORTION OF THE
PIPE BETWEEN VALVES.
8 FURNISH ONE (1) SPARE HOUSE TANK PUMP
AND ONE (2) REPAIR KIT. REFER TO SCHEDULE.
1 DEMOLISH EXISTING DOMESTIC COLD AND HOT
WATER PIPING TO POINT INDICATED. STRAIGHT
LENGTHS OF UNSOLDERED PIPE MAY BE
REUSED IF IN A CONDITION DEEMED BY THE
COR AS SUITABLE.
2 DEMOLISH DOMESTIC COLD WATER PIPING TO
POINT INDICATED AND PREPARE TO
RECONNECT. VERTICAL LENGTHS OF PIPING
TO/FROM HOUSE TANK PUMPS SHALL REMAIN.
3 CAP EXISTING DOMESTIC COLD AND HOT
WATER SUPPLIES.
NORTH
0 2 4 8
NORTH
0 2 4 8
OV
ER
H
EA
D
DO
OR
OV
ER
H
EA
D
DO
OR
DN
OV
ER
H
EA
D
DO
OR
OV
ER
H
EA
D
DO
OR
DN
EE FF GG HH JJ
1'
2'
3'
4'
5'
6'
EX. 6'' SERVICE WATER
EX. 8'' SERVICE WATER
FROM UNDERGROUND
WITH 8'' VALVE IN
VERTICAL
EX. WATER
FILTRATION SYSTEM
EX. PUMP
EX. AIR COMPRESSOR
EX. AIR RECEIVER
EX. HOT WATER
RECIRCULATING
PUMP
EX. EXPANSION TANKS
EX. 6'' SERVICE WATER
EX. CW
SUPPLY TO
1ST FLR
(COOLING
TOWER)
EX. CW
FROM 1ST
FLR
EX. DOMESTIC WATER
BOOSTER PACKAGE (TO
SERVE WATER HEATERS)
EX. WATER HEATERS TO REMAIN
EX. DDC CONTROLS
EX. MIXING VALVE
STATION (NOT IN
SERVICE)
EX. HOUSE TANK PUMP
EX. HOUSE TANK
PUMPS
EX. DCW TO BOILER PLANT
EX. 5'' DCW TO
HOUSE TANK
EX. 6'' DCW TO HOUSE
TANK (NOT IN
SERVICE)
EX. 2'' DHWR (NOT
IN SERVICE)
EX. 6'' DHW
(NOT IN
SERVICE)
EX. 6'' DCW FROM
HOUSE TANK TO
WATER HEATERS
EX. 6'' DHW FROM
WATER HEATERS
2'' DHWR TO HOT
WATER RECIRCULATING
PUMPS
EX. DHW TO BOILER PLANT
EX. 4'' DCW FROM
MORGUE (BACKUP)
3" DCW
4" DCW
3" DCW
6" DCW
3" DCW
4" DCW
6" DCW
5" DCW
4" DCW
3" DCW
3/4" DHWR
2" DHWR
3" DHW
6" DCW
3" DHWR
2" DHWR
PUMP RM
GG-4
BIO-MED SHOP
GG-2
2" DHWR
2" DHWR
1" DHWR
2" DHWR
2" DHWR
EX. 6'' INCOMING STAINLESS STEEL
SERVICE WATER LINE
STORAGE
GG-5F
6" DCW
EE FF GG HH JJ
1'
2'
3'
4'
5'
6'
1-DWH1
1-DWH2
1-DWH3
NC
NC
NEW DDC CONTROLS
NC
EX. 8'' SERVICE WATER
FROM UNDERGROUND
WITH 8'' VALVE IN
VERTICAL
EX. WATER
FILTRATION SYSTEM
EX. PUMP
EX. AIR COMPRESSOR
EX. AIR RECEIVER
EX. HOT WATER
RECIRCULATING
PUMP
EX. EXPANSION TANKS
EX. 6'' SERVICE WATER
EX. CW
SUPPLY TO
1ST FLR
(COOLING
TOWER)
EX. CW
FROM 1ST
FLR
EX. DOMESTIC WATER
BOOSTER PACKAGE (TO
SERVE WATER HEATERS)
EX. WATER HEATERS TO REMAIN
EX. DDC CONTROLS
EX. MIXING VALVE
STATION (NOT IN
SERVICE)
EX. HOUSE TANK PUMP
EX. DCW TO BOILER PLANT
EX. 5'' DCW TO
HOUSE TANK
EX. 6'' DCW TO HOUSE
TANK (NOT IN
SERVICE)
EX. 2'' DHWR (NOT
IN SERVICE)
EX. 6'' DHW
(NOT IN
SERVICE)
EX. 6'' DCW FROM
HOUSE TANK TO
WATER HEATERS
EX. 6'' DHW FROM
WATER HEATERS
2'' DHWR TO HOT
WATER RECIRCULATING
PUMPS
EX. DHW TO BOILER PLANT
EX. 4'' DCW FROM
MORGUE (BACKUP)
3" DCW
6" DCW
6" DCW
6" DCW 4
3" DHWR
6" DCW
6" DHW
6" DCW
6" DHW
4" DCW
3" DCW
3" DCW
6" DCW
5" DCW
4" DCW
BIO-MED SHOP
GG-2
PUMP RM
GG-4
NC
NC
NC
3" DHWR
3" DHWR
3" DHWR
6" DHW
6" DCW
1-WQMS-1 8
STORAGE
GG-5F
EX. 6'' INCOMING STAINLESS STEEL
SERVICE WATER LINE
1-BFP-1
8" DRAIN
TO SPLASH
BLOCK
6" DCW
A. COORDINATE EXACT ROUTE OF PIPING WITH
OTHER NEW AND EXISTING DUCTWORK AND
PIPING, STRUCTURE, LIGHTS, CONDUITS AND
ALL OTHER SERVICES.
B. VERIFY SIZES OF EXISTING PIPING AND TIE-IN
POINTS PRIOR TO WORK.
C. DEMOLITION WORK SHALL BE PERFORMED
SUCH THAT ALL PIPES, HANGERS, SUPPORTS
AND VALVES ARE REMOVED COMPLETELY TO
LIMITS OF DEMOLITION. REMOVE ALL ITEMS TO
ENSURE NOTHING IS ABANDONED IN PLACE.
D. NO DEAD ENDS SHALL REMAIN. DEMOLISH
PIPING TO WITHIN TWO PIPE DIAMETERS FROM
MAIN OR BRANCH.
E. DOMESTIC WATER HOUSE TANK PUMPS
INSTALLED AS A PART OF PREVIOUS PROJECT
SHALL BE MADE OPERATIONAL PRIOR TO THE
DEMOLITION OF OLD HOUSE TANK PUMPS.
F. NEW DOMESTIC HOT WATER HEATERS SHALL
BE MADE OPERATIONAL PRIOR TO THE
DEMOLITION OF EXISTING DOMESTIC HOT
WATER HEATERS.
G. COORDINATE SHUTDOWNS IN ANY SERVICE
WITH THE COR A MINIMUM OF TWO (2) WEEKS IN
ADVANCE.
H. MAINTAIN DETAILED AS-BUILT DRAWINGS ON
SITE DURING CONSTRUCTION. ENGAGE IN
WEEKLY MEETINGS WITH THE COR TO PROVIDE
PROJECT STATUS AND TO SHOW LATEST AS-
BUILT DRAWINGS.
I. PROVIDE SHUT-OFF VALVE AT EACH BRANCH
TAKE OFF IN COLD AND HOT WATER SUPPLY,
AND COLD AND HOT WATER RETURN. SHUT-OFF
VALVES SHALL BE INSTALLED WITHIN TWO PIPE
DIAMETERS OF MAIN.
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1, 11
/1
/2
:2
:0
P
M
P-402
ENLARGED PLUMBING PLANS
3 6SM
REPLACE BUILDING 1
DOMESTIC HOT WATER
HEATERS
1111 EAST END BLVD, WILKES-BARRE,
PA 18411
SEPTEMBER 17, 2021
100% CONSTRUCTION DOCUMENTS
693-22-11117-194-MOD1
PLH
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
Scale: 1/4" = 1'-0"
ENLARGED GG-4 PUMP ROOM PLUMBING DEMOLITION PLAN - PHASE II
Scale: 1/4" = 1'-0"
ENLARGED GG-4 PUMP ROOM PLUMBING PLAN - PHASE II
1 DEMOLISH EXISTING DOMESTIC COLD WATER
PUMPS AFTER NEW DOMESTIC COLD WATER
PUMPS ARE MADE OPERATIONAL. DEMOLISH
ASSOCIATED PIPING TO POINT INDICATED AND
CAP. DEMOLISH AND LEVEL EXISTING
CONCRETE PADS (APPROXIMATELY 14'' TALL).
2 DEMOLISH DOMESTIC HOT WATER RETURN
PIPING TO POINTS INDICATED AND CAP.
PREPARE TO RECONNECT DOMESTIC HOT
WATER RECIRCULATING PUMPS TO PIPING
INSTALLED IN PHASE I.
3 DEMOLISH DCW AS INDICATED. PREPARE TO
INSTALL BACKFLOW PREVENTERS.
NORTH
0 2 4 8
NORTH
0 2 4 8
1 PROVIDE DOMESTIC WATER HEATERS PER
DETAIL 7, SHEET P-501. PROVIDE COMMON 4''
CONCRETE PAD FOR THE WATER HEATERS.
2 PROVIDE 2'' DOMESTIC HOT WATER VALVED
CONNECTION FOR MIXING STATION.
3 PROVIDE 2'' DOMESTIC HOT WATER VALVED
CONNECTION FOR BOILER PLANT FEED.
4 DOMESTIC WATER BOOSTER PACKAGE FULL
SIZE BYPASS. PROVIDE LOCKABLE ISOLATION
VALVES. INSTALL ISOLATION VALVES WITHIN
TWO PIPE DIAMETERS OF MAINS.BYPASS
VALVES NORMALLY CLOSED. PROVIDE A DRAIN
AND A CHECK VALVE IN THE PORTION OF THE
PIPE BETWEEN VALVES.
5 PROVIDE PORTS FOR HYPERCHLORINATION
PER DETAIL 4, SHEET P-501. COORDINATE PORT
LOCATIONS WITH THE COR.
6 DOMESTIC COLD WATER PIPING TO BE USED IN
FUTURE PROJECT.
7 RECONNECT EXISTING HOT WATER
RECIRCULATING PUMPS TO PIPING INSTALLED
IN PHASE I. PROVIDE NEW VALVES AND
SENSORS.
8 PROVIDE WATER QUALITY MONITORING
EQUIPMENT PER DETAIL 2/P-403.
9 PROVIDE TWO (2) REDUCED PRESSURE
BACKFLOW PREVENTER WITH DRAIN
DISCHARGE TO EXTERIOR OF BUILDING.
DN
EE FF GG HH JJ
3'
4'
5'
6'
PUMP ROOM
GG-4
BIO-MED SHOP
GG-2
EX. 8'' SERVICE WATER
FROM UNDERGROUND
WITH 8'' VALVE IN
VERTICAL
EX. WATER
FILTRATION SYSTEM
EX. PUMP
EX. AIR COMPRESSOR
EX. AIR RECEIVER
EX. HOT WATER
RECIRCULATING
PUMP
EX. EXPANSION TANKS
EX. 6'' SERVICE WATER
EX. CW
SUPPLY TO
1ST FLR
(COOLING
TOWER)
EX. CW
FROM 1ST
FLR
EX. DOMESTIC WATER
BOOSTER PACKAGE (TO
SERVE WATER HEATERS)
EX. WATER HEATERS
EX. DDC CONTROLS
EX. MIXING VALVE
STATION (NOT IN
SERVICE)
EX. HOUSE TANK PUMP
EX. DOMESTIC HOT
WATER HEATERS
EX. DCW TO BOILER PLANT
EX. 5'' DCW TO
HOUSE TANK
EX. 6'' DCW TO HOUSE
TANK (NOT IN
SERVICE)
EX. 2'' DHWR (NOT
IN SERVICE)
EX. 6'' DHW
(NOT IN
SERVICE)
EX. 6'' DCW FROM
HOUSE TANK TO
WATER HEATERS
EX. 6'' DHW FROM
WATER HEATERS
2'' DHWR TO HOT
WATER RECIRCULATING
PUMPS
EX. DHW TO BOILER PLANT
EX. 4'' DCW FROM
MORGUE (BACKUP)
6" DCW
2" DHWR
3" DHW
3" DCW
3/4" DHWR
6" DCW
5" DCW
3" DHWR
6" DCW
6" DHW
3" DCW
6" DCW
3" DCW
6" DCW
6" DCW
3" DHWR
2" DHWR
6" DHW
6" DCW
A. COORDINATE EXACT ROUTE OF PIPING WITH
OTHER NEW AND EXISTING DUCTWORK AND
PIPING, STRUCTURE, LIGHTS, CONDUITS AND
ALL OTHER SERVICES.
B. VERIFY SIZES OF EXISTING PIPING AND TIE-IN
POINTS PRIOR TO WORK.
C. DEMOLITION WORK SHALL BE PERFORMED
SUCH THAT ALL PIPES, HANGERS, SUPPORTS
AND VALVES ARE REMOVED COMPLETELY TO
LIMITS OF DEMOLITION. REMOVE ALL ITEMS TO
ENSURE NOTHING IS ABANDONED IN PLACE.
D. NO DEAD ENDS SHALL REMAIN. DEMOLISH
PIPING TO WITHIN TWO PIPE DIAMETERS FROM
MAIN OR BRANCH.
E. DOMESTIC WATER HOUSE TANK PUMPS
INSTALLED AS A PART OF PREVIOUS PROJECT
SHALL BE MADE OPERATIONAL PRIOR TO THE
DEMOLITION OF OLD HOUSE TANK PUMPS.
F. NEW DOMESTIC HOT WATER HEATERS SHALL
BE MADE OPERATIONAL PRIOR TO THE
DEMOLITION OF EXISTING DOMESTIC HOT
WATER HEATERS.
G. COORDINATE SHUTDOWNS IN ANY SERVICE
WITH THE COR A MINIMUM OF TWO (2) WEEKS IN
ADVANCE.
H. MAINTAIN DETAILED AS-BUILT DRAWINGS ON
SITE DURING CONSTRUCTION. ENGAGE IN
WEEKLY MEETINGS WITH THE COR TO PROVIDE
PROJECT STATUS AND TO SHOW LATEST AS-
BUILT DRAWINGS.
I. PROVIDE SHUT-OFF VALVE AT EACH BRANCH
TAKE OFF IN COLD AND HOT WATER SUPPLY,
AND COLD AND HOT WATER RETURN. SHUT-OFF
VALVES SHALL BE INSTALLED WITHIN TWO PIPE
DIAMETERS OF MAIN.
SCHEDULE OF ITEMS FOR WATER QUALITY MONITORING SYSTEMS:
1. CONTROLLER, EQUAL TO ADVANTAGE CONTROLS, AS APPROVED BY COR
2. MONOCHLORAMINE MONITOR, EQUAL TO ATI, AS APPROVED BY COR
3. FLOWCELL FOR MONOCHLORAMINE MONITOR
4. MONOCHLORAMINE SENSOR
5. OUTLET TO DRAIN
6. SAMPLE PORT
7. FLOW SWITCH
8. CONDUCTIVITY PROBE
9. RECIRCULATION PUMP, EQUAL TO GRUNDFOS MODEL UPS15-58FC, AS
APPROVED BY COR
10. PH PROBE
11. PRESSURE-REDUCING VALVE (PRV) FOR FLOWCELL SUPPLY
12. FLOW METER
13. BASKET STRAINER
14. ISOLATION VALVE - PANEL INLET
15. ISOLATION VALVE - PANEL OUTLET
NOTES:
1. PIPING AND TUBING SHALL BE COPPER, 3/4" AND 1/4", RESPECTIVELY.
2. PIPE TO MAINS:
A. BLDG. 11, GG-5F STORAGE: PROVIDE CUT AND NEW TEES INTO TWO ADJACENT LOCATIONS ON 6" STAINLESS STEEL MAIN. PROVIDE DIELECTRIC FITTINGS AT THE POINT OF CONNECTION TO
COPPER PIPING.
B. OUTAGES: REQUEST TWO WEEKS IN ADVANCE.
3. VALVES SHALL BE GLOBE VALVES:
A. SALIENT FEATURES:
a. PLUMBING REQUIREMENTS:
• CLASS: CLASS 125
• PIPE SIZE: 3/4"
• CONNECTION TYPE: FNPT
b. MECHANICAL REQUIREMENTS:
• BODY MATERIAL: BRONZE
• TOP OF HANDLE TO INLET CENTER: 3-15/16"
• INLET TO OUTLET LENGTH: 2-9/16"
c. OPERATING CONSTRAINTS:
• MAX. WATER PRESSURE 200 PSI
• MAX. STEAM PRESSURE 125 PSI
• MAX. FLUID TEMP. 406°F
4. PRESSURE REDUCING VALVE:
A. LEAD-FREE WATER PRESSURE REDUCING VALVE.
B. SALIENT FEATURES:
a. PLUMBING REQUIREMENTS:
• PIPE SIZE: 3/4"
• CONNECTION TYPE: FNPT
b. MECHANICAL REQUIREMENTS:
• BODY MATERIAL: BRONZE
• HEIGHT: 6-1/16"
• INLET TO OUTLET LENGTH: 4"
c. OPERATING CONSTRAINTS:
• MAX. WATER PRESSURE 400 PSI
• MAX. FLUID TEMP. 180 DEGREES F
• PRESET PRESSURE SETTINGS: 50 PSIG
• PRESSURE ADJUSTMENT RANGE: 25 TO 75 PSIG
WQS INSTALLATION NOTES:
1. PROVIDE WATER QUALITY MONITORING SYSTEM (QMS).
2. EACH SYSTEM SHALL PROVIDE DIGITAL MONITORING FOR PARAMETERS: MONOCHLORAMINE, PH, TEMPERATURE, CONDUCTIVITY, PRESSURE, AND FLOW (FOR FLOW, SWITCH ONLY, NOT FLOW RATE).
PROVIDE STATIC MONITORING OF FLOW RATE.
3. MONITOR SHALL PROVIDE CONTINUOUS DATA LOGGING VIA EXISTING JCI METASYS SYSTEM.
4. PROVIDE POWER PER PLANS.
5. CONTROLS WORK:
A. PROVIDE SHOP DRAWINGS AND RELATED ENGINEERING TO ENSURE PROPOSED NEW JCI EQUIPMENT IS
PROPERLY SELECTED AND FURNISHED WITH HARDWARE (PORTS, CARDS, BOARDS) REQUIRED.
B. NEW EQUIPMENT.
C. PROVIDE NEW DDC CONTROLLER(S) AND ENCLOSURE(S), SELECTED APPROPRIATELY FOR THE
EQUIPMENT BEING CONTROLLED.
D. SIGNAL FROM NEW SYSTEMS TO NEW JCI EQUIPMENT.
E. SIGNAL FROM NEW JCI EQUIPMENT TO COMMUNICATIONS PORT OR EXISTING JCI PANEL, AS EACH
SITUATION REQUIRES.
F. CONTRACTOR TO FURNISH:
a. PROGRAMMING AND SET UP OF SCREEN AT GRAPHICS.
b. TIE INTO METASYS.
c. SIGNAL TESTING AND REPORTING AT GRAPHICS.
6. ARCHITECTURAL:
A. PANEL AND FASTENERS
a. 3/8” POLYETHYLENE PANEL, MOUNTED TO WALL.
b. FASTENERS: ¼”X3” STAINLESS STEEL COUNTERSUNK SCREWS SET IN EXPANSION ANCHORS, 15
TOTAL, EVENLY SPACED IN 3 ROWS OF 5 SCREWS.
B. PATCHING: WITH LIKE MATERIALS AND COLORS WHERE DAMAGE IS CAUSED BY CONTRACTOR WORK.
7. PLUMBING:
A. SEE PLUMBING DETAILS AND NOTES ON PLANS.
B. PROVIDE NEW DIGITAL PRESSURE GAGE, DRILLED AND TAPPED INTO EACH WATER MAIN, TIED INTO AND
POWERED BY PLUG FROM WQS CONTROLLER. TYPE: EQUAL TO OMEGA DPG1000L-200G, AS APPROVED
BY THE COR.
8. ELECTRICAL:
A. PROVIDE NEW CONDUIT, CABLING, AND POWER SUPPLY TO NEW DEVICES AND EQUIPMENT
B. PROVIDE 4-20MA SIGNAL CONDUCTORS INTO NEW JCI PANELS.
T
1-DWH1
CT
BI - HOT WATER RETURN PUMP STATUS
M
BI – WATER HEATER STATUS
BO - HOT WATER RETURN PUMP START/STOP
MOTOR STARTER1-DWH2 1-DWH3
T T T
AI – DOMESTIC HOT WATER SUPPLY TEMP
AI – DOMESTIC HOT WATER SUPPLY TEMP
AI – DOMESTIC HOT WATER SUPPLY TEMP
T
AI – DOMESTIC HOT WATER SUPPLY TEMP
AI – DOMESTIC HOT WATER RETURN TEMP
T
AI – DOMESTIC COLD WATER SUPPLY TEMP
DHW
D C
W
H W
R
BI – WATER HEATER STATUS
BI – WATER HEATER STATUS
LOCAL DDC
CONTROL PANEL
CTBI - HOT WATER RETURN PUMP STATUS
M
BO - HOT WATER RETURN PUMP START/STOP
MOTOR STARTER
SEQUENCE OF OPERATION
OVERALL HOT WATER SUPPLY TEMPERATURE SENSOR SHALL
PROVIDE A FEEDBACK SIGNAL TO THE WATER HEATER
CONTROLLER TO MODULATE THE STEAM CONTROL VALVE TO
MAINTAIN HOT WATER SUPPLY TEMPERATURE SETPOINT OF 140
DEGREES (ADJUSTABLE). SETPOINT FOR EACH INDIVIDUAL
WATER HEATER SHALL BE 140 DEGREES F (ADJUSTABLE).
AN ALARM SHALL ANNUNCIATE AT THE DDC ENGINEERING
CONTROL CENTER (ECC) UPON THE OCCURRENCE OF ANY OF
THE FOLLOWING:
• HOT WATER SUPPLY TEMPERATURE (FROM ANY WATER
HEATER AND OVERALL SUPPLY TEMPERATURE) DROPS
BELOW 135 DEGREES F (ADJUSTABLE) FOR MORE THAN 5
MINUTES (ADJUSTABLE).
• HOT WATER SUPPLY TEMPERATURE RISES ABOVE 145
DEGREES F (ADJUSTABLE) FOR MORE THAN 5 MINUTES
(ADJUSTABLE).
• HOT WATER RETURN TEMPERATURE DROPS BELOW 124
DEGREES F (ADJUSTABLE) FOR MORE THAN 5 MINUTES
(ADJUSTABLE).
• THE CURRENT SENSOR ON ANY WATER HEATER
CIRCULATION PUMP DOES NOT PROVE OPERATION AFTER A
COMMAND TO START.
• THE CURRENT SENSOR ON THE MAIN HOT WATER RETURN
PUMP DOES NOT PROVE OPERATION AFTER A COMMAND TO
START.
POINT NAME:
DOMESTIC HOT WATER RETURN TEMPERATURE
DOMESTIC HOT WATER SUPPLY TEMPERATURE (1-DWH-1)
DOMESTIC HOT WATER SUPPLY TEMPERATURE (1-DWH-2)
OVERALL DOMESTIC HOT WATER SUPPLY TEMPERATURE
DOMESTIC HW RETURN PUMP ONE START/STOP
DOMESTIC HOT WATER RETURN PUMP ONE STATUS
DOMESTIC HW SUPPLY TEMP SETPOINT
DOMESTIC HW RETURN PUMP ONE FAILURE
DOMESTIC HW RET PUMP ONE RUNNING IN HAND
HIGH DOM HW SUPPLY TEMPERATURE
HARDWARE POINTS
AI AO
X
X
X
X
BI BO
SOFTWARE POINTS
AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC
X
X
X
X
X
X
X
X
X
X
X
X
X
X
TOTAL HARDWARE (11) TOTAL SOFTWARE (21)
6 5 2 1
X
X
12 8 22
X
X
X
X
X
X
X
DOMESTIC HW RET PUMP ONE RUN TIME EXCEEDED
0 0 0
X
X
X
LOW DOM HW SUPPLY TEMPERATURE
X
X
X
DOMESTIC HOT WATER SUPPLY TEMPERATURE (1-DWH-3)
X XXDOMESTIC COLD WATER SUPPLY TEMPERATURE
WATER HEATER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .