2021.12.16 (ISSUE FOR BID - UPDATED PER ICRA).pdf
PDF 18 MB Posted
- Attached to
- Y1DZ--620-20-205 Renovate Building 3 Audiology
- Solicitation number
- 36C24222B0022
About this file
This solicitation is for renovation work at a Department of Veterans Affairs facility. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 is seeking bids to relocate its audiology department at the Hudson Valley Campus in Montrose, New York under solicitation number 36C24222B0022. The solicitation requires renovation and construction services to relocate the audiology department by December 2022. Bids are due by January 5, 2023 and the contract is expected to be awarded by February 2023. The solicitation does not specify any set-asides but requests pricing for the renovation work broken out by line item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| b3 walkthru attendance.pdf | ||
| 2022.03.30 B3 Audiology RFIs - VA Response.pdf | ||
| 36C24222B0022 0004.docx | DOCX document | |
| 2022.03.30 (AMENDMENT 1 - ARCH).pdf | ||
| 36C24222B0022 0003.docx | DOCX document | |
| 36C24222B0022 0002.docx | DOCX document | |
| 36C24222B0022 0001.docx | DOCX document | |
| 620-20-205 Specs.zip | ZIP file | |
| P07 - Wage Determination Westchester 1.7.2022.pdf | ||
| 620-20-205 Specifications Package.zip | ZIP file | |
| 36C24222B0022.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT TO SCALE
SITE MAP1
G-001
BLDG. 3
32 11
4 13
55.2
55.1
FIRE ZO
N
E
FIRE ZO
N E
N
S
W
E
G
G
GS
AREA OF WORK
PARKING AREA
G-001 COVER SHEET
A-506
SP-001
FA-101
FA-301
AUDIOLOGY BOOTH - EXAM ROOM VIEWS A-D (FOR REFERENCE ONLY)
SPRINKLER SPECIFICATIONS
FIRE ALARM DEMOLITION & CONSTRUCTION PLANS
FIRE ALARM DETAILS I
A-001 ARCHITECTURAL NOTES AND LEGENDS
A-505 AUDIOLOGY BOOTH - EXTERIOR ELEVATION (FOR REFERENCE ONLY)
SP-101 SPRINKLER DEMOLITION & CONSTRUCTION PLANS
AD-100 ARCHITECTURAL DEMOLITION PLANS
GI-101 LIFE SAFETY CODE NOTES AND PLANS
A-504 AUDIOLOGY BOOTH - ROOF LAYOUTS (FOR REFERENCE ONLY)
GI-100 GENERAL REQUIREMENTS NOTES
A-507 AUDIOLOGY BOOTH - CONTROL ROOM VIEWS A-D (FOR REFERENCE ONLY)
FA-001 FIRE ALARM SPECIFICATIONS
AS-101 FACILITY TRUCK ROUTE
AS-102 ARCHITECTURAL SITE PLAN
AC-100 ARCHITECTURAL FLOOR PLAN AND REFLECTED CEILING PLAN
A-301 ARCHITECTURAL DETAILS I
AC-101 ARCHITECTURAL CONSTRUCTION PLANS
AC-200 NEW INTERIOR CASEWORK ELEVATIONS AND INTERIOR ELEVATIONS
A-302 ARCHITECTURAL DETAILS II
A-401 ARCHITECTURAL DOOR SCHEDULE, HARDWARE & DETAILS
A-503 AUDIOLOGY BOOTH - ROOM LAYOUTS (FOR REFERENCE ONLY)
A-502 AUDIOLOGY BOOTH - WALL LAYOUT (FOR REFERENCE ONLY)
A-501 AUDIOLOGY BOOTH -GENERAL NOTES AND SCOPE (FOR REFERENCE ONLY)18
SP-301 SPRINKLER DETAILS I
SP-302 SPRINKLER DETAILS II
GI-201 INFECTION CONTROL PLAN - GROUND FLOOR
SHUTTLE ROUTE TO/FROM PARKING AREA TO CONSTRUCTION SITE
32 P-001 PLUMBING NOTES, SYMBOLS & LEGEND
M-001
P-301
P-302
MECHANICAL NOTES, SYMBOLS & LEGEND
PLUMBING DETAILS I & SCHEDULE
PLUMBING DETAILS II
P-303 ANTISCALD VALVE DETAILS
MD-101 MECHANICAL STEAM DISTRIBUTION - OVERALL
42 MC-101 MECHANICAL STEAM DEMOLITION AND CONSTRUCTION DRAWINGS
MC-102 MECHANICAL HVAC DEMOLITION AND CONSTRUCTION DRAWINGS
M-301 MECHANICAL DETAILS I
M-302 MECHANICAL DETAILS II
PD-101 PLUMBING SANITARY, VENT, HOT WATER & COLD WATER DEMOLITION PLANS
M-401 MECHANICAL SCHEDULES
E-001 ELECTRICAL NOTES AND ABBREVIATIONS
E-100 ELECTRICAL SYSTEMS OVERVIEW
49 ED-101 ELECTRICAL POWER AND LIGHTING DEMOLITION PLANS
EC-101 ELECTRICAL POWER AND LIGHTING CONSTRUCTION PLANS
EY-101 ELECTRICAL SPECIAL SYSTEMS PLANS
E-301 ELECTRICAL DETAILS I
E-302 ELECTRICAL DETAILS II
PC-101 PLUMBING AIR, GAS & VACUUM DEMOLITION & CONSTRUCTION PLANS
PC-102 PLUMBING SANITARY, VENT, HOT WATER & COLD WATER CONSTRUCTION PLANS
P-401 PLUMBING DEMOLITION & CONSTRUCTION RISER DIAGRAMS (ALL TRADES)
E-401 ELECTRICAL SYMBOLS AND SCHEDULES
SI-100 EXISTING STRUCTURAL PLAN (FOR REFERENCE ONLY)
SI-600 EXISTING STRUCTURAL BEAM, FOOTING, COLUMN & SLAB SCHEDULES
AC-102 INTERIOR DESIGN PLAN, SCHEDULES, LOCATIONS & SIGN DETAILS
A-303 ARCHITECTURAL DETAILS III - WALL PARTITIONS
HC-101 ASBESTOS AND LEAD PLANS
ENTRY TO MONTROSE VAMC FROM ALBANY POST ROAD
321 4 5 6 7
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs of
LocationPhase
Project Number
Building Number
Drawing Number
Project Title
STAMPARCHITECT/ENGINEER OF RECORD
Date:Revisions:
Issue Date
Approved By: Approved By:
Approved By:Approved By:
Approved By:
Approved By: Approved By:
Approved By:
Drawing Title
Checked Drawn
CONSULTANT
620-20-205620-20-205 Renovate Building 3 Audiology
FDR VA HOSPITAL MONTROSE, NY
2021.11.18 N/A MA&MM
BID DOCUMENTSRevisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyyAPPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
Rev.
COVER SHEET
SCALE: NOT TO SCALE1
G-001 1 0
FD
R
-0
COVER SHEET
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
NO PARKING
AutoCAD SHX Text
NO PARKING
AutoCAD SHX Text
NO PARKING
AutoCAD SHX Text
POND
AutoCAD SHX Text
POND
AutoCAD SHX Text
FUEL TANK
AutoCAD SHX Text
VA HUDSON VALLEY HEALTH CARE SYSTEM
AutoCAD SHX Text
RENOVATE BUILDING 3 AUDIOLOGY
AutoCAD SHX Text
2094 ALBANY POST ROAD, MONTROSE, NEW YORK 10548
AutoCAD SHX Text
NOVEMBER 18, 2021
AutoCAD SHX Text
AT
AutoCAD SHX Text
FRANKLIN DELANO ROOSEVELT HOSPITAL
AutoCAD SHX Text
PROJECT 620-20-205
AutoCAD SHX Text
%%UDRAWING LIST:
AutoCAD SHX Text
%%UDRAWING LIST:
GENERAL REQUIREMENTS:
1. ALL WORK SHALL CONFORM TO FEDERAL, STATE LOCAL RULES, LAWS, REGULATIONS,
VETERANS AFFAIRS (VA) SPECIFICATION. ALL PLUMBING WORK SHALL CONFORM TO
NATIONAL PLUMBING CODE, ALL ELECTRICAL WORK SHALL CONFORM TO NATIONAL
ELECTRICAL CODE, AND ALL HEATING AND VENTILATING WORK SHALL COMPLY WITH
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS
(ASHRAE) STANDARDS.
2. BEFORE BEGINNING ANY CUTTING OR DEMOLITION WORK, THE CONTRACTOR SHALL
CAREFULLY SURVEY THE EXISTING CONDITIONS AND DETERMINE THE EXTENT OF THE
WORK TO BE DONE. THE CONTRACTOR SHALL ENSURE THAT STRUCTURAL ITEMS ARE
NOT WEAKENED AND SHALL BE RESPONSIBLE FOR INCREASING OR ADDING
STRUCTURAL SUPPORTS AS MAY BE REQUIRED AS A RESULT OF ANY CUTTING,
REMOVAL OR DEMOLITION WORK.
3. CONTRACTOR SHALL TERMINATE AND REMOVE COMPLETELY BACK TO THE SOURCE, ALL
MECHANICAL, ELECTRICAL OR PLUMBING ITEMS AND ASSOCIATED WIRING, DUCT WORK,
AND PIPING THAT MAY NOT BE FULLY INDICATED OR NECESSARY FOR THE
FUNCTIONALITY OF THE NEW DESIGN.
4. CONTRACTOR SHALL PROVIDE AND COORDINATE THE LOCATION OF ALL NEW OPENINGS
IN ANY EXISTING WALLS OR FLOORS AS INDICATED ON THESE DRAWINGS OR AS
NECESSARY FOR THE COMPLETION OF NEW WORK SHOWN OR IMPLIED.
5. FOR SHUT-DOWN AND TIE-INS, CONTRACTOR SHALL AT MINIMUM, SUBMITA 72 HOUR
NOTICE TO THE CONTRACTING OFFICER IN WRITING FOR ALL SHUT-DOWNS OR TIE-INS
AND SHALL BE DONE AT SUCH TIMES AND HOURS AS NOTED AND SHALL NOT INTERFERE
WITH THE VETERANS AFFAIRS OPERATION. ALL OVERTIME EXPENSES REQUIRED FOR
SHUT-DOWNS AND TIE-INS SHALL BE BORNE BY THE CONTRACTOR.
6. ALL QUANTITIES SHOWN ON THE DRAWING ARE ESTIMATED QUANTITIES ONLY. IT SHALL
BE THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY AND ASCERTAIN ALL
EXISTING CONDITIONS, DIMENSIONS AND QUANTITIES THAT MAY NOT BE SHOWN. ANY
AND ALL DISCREPANCIES BETWEEN ACTUAL CONDITIONS AND DRAWINGS AND
SPECIFICATIONS SHALL BE REPORTED TO THE CONTRACTING OFFICER OR
CONSTRUCTION OFFICER REPRESENTATIVE IN WRITING FOR CLARIFICATION. WORK
SHALL NOT PROCEED UNTIL SUCH CLARIFICATION HAS BEEN RECEIVED.
7. SHOULD UNFORESEEN CONDITIONS OR OTHER CAUSES NECESSITATE CONSTRUCTION
DETAILS NOT IN ACCORDANCE WITH THESE PLANS, THE CONTRACTOR SHALL NOTIFY
THE CONTRACTING OFFICER AND SUBMIT THEIR DETAILS SHOWING THE PROPOSED
METHODS TO ACCOMPLISH THE REQUIRED RESULTS.
6. REMOVALS SHALL BE PERFORMED WITHOUT DAMAGE TO ADJACENT RETAINED WORK,
HOWEVER WHERE SUCH WORK IS DAMAGED, THE CONTRACTOR SHALL PATCH, REPAIR
OR OTHERWISE RESTORE DAMAGED ITEMS TO THE SATISFACTION OF THE
CONTRACTING OFFICER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
PATCHING, REPAIRING AND FINISHING OF ALL DISTURBED AREAS. PATCHING OF
SURROUNDING AREAS SHALL BE WITH MATERIALS TO MATCH EXISTING.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY BRACING AND
PROTECTING ALL WORK DURING CONSTRUCTION AGAINST STRUCTURAL DAMAGE,
BREAKAGE, COLLAPSE, DISTORTIONS AND MISALIGNMENT ACCORDING TO APPLICABLE
CODES, STANDARDS AND PRACTICE.
8. THE CONTRACTOR SHALL CARRY NEW WALL FINISHING WORK (PAINTING, ETC.) TO AN
APPROPRIATE STOPPING POINT (CHANGE IN WALL DIRECTION).
9. PROTECTION OF PERSONNEL: WHERE THE SAFETY OF PEDESTRIANS AND DRIVERS ARE
ENDANGERED IN THE AREA OF REMOVAL WORK, BARRICADES FOR TRAFFIC SHALL BE
USED AND ADVANCE NOTICE SHALL BE GIVEN TO THE CONTRACTING OFFICER PRIOR TO
BEGINNING ANY SUCH WORK.
10. THE CONTRACTOR SHALL MAINTAIN ACCESS TO EXISTING EXITS OR CREATE NEW EXITS
AS REQUIRED BY THE CONTRACTING OFFICER FOR THE SAFETY OF BUILDING
OCCUPANTS.
11. CONTRACTOR RESTRICTIONS: THE CONTRACTOR SHALL CHECK WITH AND RECEIVE
APPROVAL FROM THE CONTRACTING OFFICER FOR ROUTES OF ACCESS AND SUPPLY
STORAGE AREAS REGARDING THE GENERAL WORK AREA WITHIN THIS CONTRACT. V.A.
DOES NOT PROVIDE STORAGE AREAS FOR CONTRACTORS TO STORE MATERIAL ON SITE.
12. SUBSTITUTION OF MATERIALS: WHERE EXISTING MATERIALS OF ANY KIND MUST BE
REPLACED FOR ANY REASON AS A RESULT OF THE WORK HERE UNDER AND EXACT
DUPLICATES ARE NOT AVAILABLE, THEIR FUNCTIONAL EQUIVALENTS MAY BE
SUBSTITUTED UPON RECEIPT OF PRIOR WRITTEN APPROVAL FROM THE CONTRACTING
OFFICER.
13. ALL BIDDERS ARE HIGHLY RECOMMENDED TO VISIT THE SITE BEFORE SUBMITTING BIDS,
TO INSPECT THE PREMISES AND VIEW THE EXISTING CONDITIONS TO VERIFY ALL
CONDITIONS, SIZES AND QUANTITIES. PLANS ARE FURNISHED TO INDICATE THE SCOPE
OF THE INTENDED CONTRACT WORK. EXISTING CONDITIONS WHICH MIGHT PRECLUDE
OR INTERFERE WITH THE PROPOSED WORK AS DRAWN OR SPECIFIED SHALL BE
BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER FOR RESOLVING.
RELOCATIONS MUST BE CHECKED TO VERIFY THEIR FEASIBILITY IN ACCORDANCE WITH
THE NEW REQUIREMENTS.
14. ALL NEW PENETRATIONS THRU EXISTING CONSTRUCTION SHALL BE SEALED AND/OR
FILLED WITH APPROVED FIRESTOPPING MATERIALS.
15. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS WHERE WORK MUST BE
ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY ALSO BE NECESSARY
IN AREAS NOT SHOWN ON THE ARCHITECTURAL DRAWINGS DUE TO CHANGES
AFFECTING EXISTING MECHANICAL, ELECTRICAL, PLUMBING, OR OTHER SYSTEMS. SUCH
INCIDENTAL WORK IS ALSO A PART OF THIS CONTRACT. INSPECT THOSE AREAS, AND
ASCERTAIN WORK NEEDED, AND DO THAT WORK IN ACCORDANCE WITH THE CONTRACT
REQUIREMENTS, AT NO ADDITIONAL COST.
16. TRADE, PRODUCT, OR MANUFACTURER'S NAMES OR CATALOG NUMBERS SHOWN ON THE
DRAWINGS FOR NEW PRODUCTS ARE TO ESTABLISH QUALITY REQUIRED. IN EACH CASE
ADD, BY INFERENCE, AFTER TRADE, PRODUCT, OR MANUFACTURER'S NAME, THE
PHRASE "OR APPROVED EQUAL".
17. EXCEPT IN SPACES WHERE NO WORK UNDER THIS CONTRACT IS REQUIRED, ENCLOSE
EXISTING AND NEW CONDUITS, DUCTS, PIPES, AND SIMILAR ITEMS IN FURRING WHERE
SUCH ITEMS PASS THROUGH FINISHED SPACES WHETHER OR NOT FURRING IS
INDICATED.
18. WHERE CONDUITS, DUCTS, PIPES AND SIMILAR ITEMS ARE SHOWN TO BE INSTALLED IN
EXISTING WALLS OR PARTITIONS, NEATLY CHASE THE WALLS OR PARTITIONS, INSTALL
THE ITEMS, AND PATCH THE WALLS OR PARTITIONS TO MAKE THE INSTALLATION NOT
DISCERNIBLE IN THE FINISHED WORK.
19. SEAL TIGHT AND PROTECT WITH FIRE SHAFTS EXISTING AND NEW SLEEVES AND
OPENINGS THROUGH FLOORS. FIRE SHAFTS SHALL BE A MINIMUM 2 HOUR RATED FOR
ALL APPLICATIONS AND LOCATIONS.
20. WHERE A NEW CEILING IS NOT SCHEDULED, INSTALL NEW CONDUITS AND PIPES IN NEW
CHASE, AND NEW DUCTS WHERE POSSIBLE, ABOVE THE EXISTING CEILING. REMOVE
EXISTING CEILING AS NECESSARY. AFTER INSTALLATION OF CONCEALED WORK,
REINSTALL REMOVED CEILING AND PATCH AND REFINISH TO MATCH ADJACENT
UNREMOVED CEILINGS.
21. FUR TO CONCEAL HORIZONTAL DUCTS PASSING THROUGH EXISTING OR NEW SPACES
WHERE IT IS NOT POSSIBLE TO INSTALL THE DUCTS ABOVE THE CEILING. USE GYPSUM
BOARD FOR SUCH FURRING.
22. WHERE PERMANENT REMOVAL OF EXISTING MILLWORK, CASEWORK,CABINETWORK,
ACCESSORIES, EQUIPMENT OR FURNISHINGS IS REQUIRED, AND PREVIOUSLY
CONCEALED SURFACES ARE TO REMAIN EXPOSED, PATCH PREVIOUSLY CONCEALED
SURFACES TO MATCH ADJACENT EXPOSED SURFACES. WHERE SUCH SURFACES ARE
SCHEDULED TO RECEIVE NEW FINISHES, PREPARE THE SURFACES TO RECEIVE THE NEW
FINISHES.
23. WHERE CUTTING OF EXISTING SURFACES OR REMOVAL OF EXISTING FINISHES IS
REQUIRED TO PERFORM THE WORK UNDER THIS CONTRACT, AND A NEW FINISH IS NOT
INDICATED, FILL RESULTING OPENINGS AND PATCH THE SURFACE AFTER DOING THE
WORK, AND FINISH TO MATCH ADJACENT EXISTING SURFACES.
24. ALL WORK SHALL BE PERFORMED, MONDAY THRU FRIDAY, DURING NORMAL BUSINESS
HOURS OF 8:00AM - 4:30PM. SATURDAY, SUNDAY AND HOLIDAYS, ARE TO BE REQUESTED
TO AND APPROVED BY THE CONTRACTING OFFICER. SEE SPECIFICATIONS FOR W.H.E.N.
REQUESTS. THE CONTRACTOR SHALL BE REQUIRED TO WORK PRIME TIME AND
OVERTIME TO COMPLETE OR CONSTRUCT PORTIONS OF THIS WORK OUTSIDE NORMAL
BULSINESS HOURS. THIS SHALL BE AS DIRECTED BY THE CONTRACTING OFFICER AT NO
ADDITIONAL COST TO THE GOVERNMENT.
25. CONTRACTOR SHALL ABIDE AT THEIR OWN EXPENSE TO THE LATEST EDITIONS OF ALL
OSHA REGULATIONS AND REQUIREMENTS.
26. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND ASCERTAIN IN THE FIELD, ALL
EXISTING UTILITIES, EXISTING CONDITIONS, FIELD MEASUREMENTS, DIMENSIONS,
QUANTITIES, RELATED TO THE PROJECT.
27. CONTRACTOR SHALL SUBMIT FOR APPROVAL ALL MATERIALS USED FOR CONSTRUCTION
AND ALL EQUIPMENT INTENDED FOR INSTALLATION IN THIS PROJECT.
28. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY AND ASCERTAIN THE LOCATION,
DIRECTION, SIZE, OF ANY AND ALL UTILITIES EXISTING IN THE GENERAL VICINITY OF THE
WORK AREA.
29. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR ANY UTILITY DISRUPTED,
BROKEN, OR OTHERWISE RENDERED NON-FUNCTIONABLE DUE TO THE WORK
PERFORMED AT NO ADDITIONAL COST TO THE GOVERNMENT DURING THIS COURSE OF
WORK.
30. THE CONTRACTOR SHALL IDENTIFY ANY NON-FUNCTIONING UTILITY/SYSTEM, PRIOR TO
THE START OF WORK TO THE CONTRACTING OFFICER. IDENTIFICATION OF SUCH AFTER
THE START OF WORK SHALL BE DEEMED AS DISTURBED/DAMAGED BY THE CONTRACTOR
AND SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR.
31. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROPERLY SUPPORT ANY UTILITY
ENCOUNTERED IN THE COURSE OF THIS WORK.
32. THE CONTRACTOR SHALL LEAVE THE WORK SITE CLEAN AND SECURED AT THE END OF
EACH WORKING DAY. THE WORK SITE SHALL NOT BE LEFT UNATTENDED AT ANY TIME BY
THE CONTRACTOR, UNLESS THE WORK AREA IS PROPERLY SECURED BY THE
CONTRACTOR.
33. THE CONTRACTOR IS ADVISED THAT THEY ARE SOLELY RESPONSIBLE FOR THE SAFETY
OF THE WORK SITE AND TAKE ALL ACTIONS TO ELIMINATE ANY SAFETY HAZARDS THAT
SHALL EXIST AND POSE A THREAT OF HARM TO PATIENTS, EMPLOYEES OF THE
GOVERNMENT, EMPLOYEES OF THE CONTRACTOR OR OTHER(S). IT SHALL BE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR TO TAKE IMMEDIATE ACTION TO ALLEVIATE ANY
SAFETY HAZARD THAT MAY EXIST WITHOUT DIRECTION FROM THE CONTRACTING
OFFICER OR HIS DESIGNEE. THE CONTRACTOR SHALL TAKE IMMEDIATE CORRECTIVE
ACTION TO ALLEVIATE ANY SAFETY HAZARD, CONDITION, ETC., AS INDICATED BY THE
CONTRACTING OFFICER.
34. THERE SHALL BE NO CLAIMS AGAINST THE DEPARTMENT OF VETERANS AFFAIRS FOR
WORK STOPPAGES DUE TO ACTS OF GOD, WEATHER CONDITIONS, STOP WORK ORDERS
(VERBAL AND/OR WRITTEN), UNDERESTIMATION OF WORK, ESTIMATED QUANTITIES,
MATERIALS, SUPPLIES, TOOLS, CORRECTION OF SAFETY PROBLEMS, OR ANY OTHER
REASON.
35. AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL PROVIDE TO THE
VETERANS AFFAIRS A "AS BUILT" FOR THE WORK. THIS DRAWING SHALL BE SUBMITTED
ON 30" BY 42", COMPLETE WITH 2 COPIES. THIS DRAWING SHALL BE TECHNICALLY
CORRECT AND DRAWN ACCORDING TO SOUND ENGINEERING PRINCIPLES. THIS SHALL
SHOW ALL ELEVATIONS, DISTANCES, DIAMETERS, SCHEDULES, MATERIALS INSTALLED,
SEQUENCE OF OPERATIONS OF ANY AND ALL ITEMS TO THE DEPARTMENT OF VETERANS
AFFAIRS. CONTRACTOR IS ADVISED THAT THEY ARE RESPONSIBLE TO MAINTAIN ALL
MEASUREMENTS DURING THE COURSE OF THIS PROJECT AND DIMENSIONS MISSING ON
THE AS-BUILT DRAWINGS SHALL NOT BE ACCEPTABLE. FINAL PAYMENT SHALL NOT BE
PROVIDED UNTIL THIS DRAWING IS SUBMITTED AND APPROVED. A COMPLETE,
ACCEPTABLE, SEPARATE, ENGINEERING "AS BUILT" IS REQUIRED FOR EACH UTILITY.
36. CONTRACTOR SHALL SAW CUT WITH PROPER BLADE ANY CONCRETE ENCOUNTERED IN
THE COURSE OF THIS WORK. ALL HOLES SHALL BE CORED DRILLED WITH DIAMOND
CORE BITS. THE USE OF JACK HAMMERS IS PROHIBITED.
37. CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ANY AND ALL DEBRIS FROM THE
MEDICAL CENTER DAILY AND DISPOSE OF IN ACCORDANCE TO VA SPECIFICATIONS.
38. CONTRACTOR SHALL PROVIDE FOR OWN STORAGE SPACE AND SECURITY FOR SAME.
CONTRACTOR SHALL BE PROHIBITED FROM USING VA SPACE FOR STORAGE. LOCATION
TO BE COORDINATED WITH COR AFTER NOTICE TO PROCEED HAS BEEN ISSUED.
39. ALL WORK SHALL BE PERFORMED BY THOSE WHO ARE SKILLED AND LICENSED IN THEIR
TRADES. THE CONTRACTOR IS ADVISED THAT WORK DEEMED UNSUITABLE,
UNACCEPTABLE BY THE VETERANS AFFAIRS SHALL BE DEEMED NON-ACCEPTABLE AND
THE CONTRACTOR SHALL REMOVE, REPLACE, AND RE-DO TO THE SATISFACTION OF THE
DEPARTMENT OF VETERANS AFFAIRS, THE UNACCEPTABLE WORK IS AT NO ADDITIONAL
COST TO THE GOVERNMENT. THERE SHALL BE NO ADDITIONAL CLAIMS AGAINST THE
DEPARTMENT OF VETERANS AFFAIRS FOR THE ABOVE.
40. THE CONTRACTOR SHALL BE RESPONSIBLE TO REROUTE ANY UTILITY ENCOUNTERED IN
THE COURSE OF THIS PROJECT. THE CONTRACTOR IS ADVISED THAT THE VETERANS
AFFAIRS HAS MADE THE ATTEMPT TO IDENTIFY MAJOR UTILITIES TO BE REROUTED. THE
CONTRACTOR SHALL SUBMIT "SHOP DRAWINGS" IN ACCORDANCE TO SPECIFICATIONS
PROVIDING THE VA ON ANY REROUTING OF UTILITIES AND HOW THE WORK WILL BE
COORDINATED FOR PRIOR APPROVAL BY THE VA.
41. THE GOVERNMENT SHALL NOT BE LIABLE FOR EXTRA PAYMENT SHOULD THE
CONTRACTOR UNDERESTIMATE QUANTITIES OF MATERIALS OF CONSTRUCTION.
42. THE CONTRACTOR SHALL BE ADVISED THAT ALL UTILITIES ARE TO BE VERIFIED AND
ASCERTAINED IN THE FIELD BY THE CONTRACTOR PRIOR TO ANY WORK.
43. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING
PHONE SYSTEM, CAUSED BY CONSTRUCTION AND SHALL REPAIR ANY DAMAGE AT THE
CONTRACTOR'S EXPENSE. ANY AND ALL TELEPHONE WORK SHALL BE COORDINATED
WITH THE VA IRM TELECOMMUNICATION SERVICE AT THE MEDICAL CENTER.
44. CONTRACTOR SHALL INSTALL AND MAINTAIN DUST BARRIERS OR TEMPORARY
CONSTRUCTION WALLS AS DIRECTED BY THE CONTRACTING OFFICER. REFER TO
DEMOLITION PLAN FOR LOCATION, SEE SHEET "AD 100". SEE PARTITION DETAIL 4 ON
SHEET "AI 100" FOR DUST BARRIER OR TEMPORARY CONSTRUCTION WALL DETAILS AND
LOCATIONS.
45. THE GOVERNMENT SHALL NOT BE LIABLE TO THE CONTRACTOR FOR DELAYS DUE TO
NON-DELIVERY OF MATERIALS, WEATHER DELAYS, MANPOWER SHORTAGE, SUBMITTAL
DELAYS, SUBMITTAL RETURNS, WORK STOPPAGES BY REPRESENTATIVES OF THE
GOVERNMENT, FOR ANY REASON, SAFETY DELAYS, WORK DEEMED NON-ACCEPTABLE
BY THE GOVERNMENT.
46. PRIOR TO ANY WELDING, CUTTING, BRAZING, SOLDERING, THE CONTRACTOR SHALL
OBTAIN A "HOT WORK PERMIT" FROM THE DEPARTMENT OF VETERANS AFFAIRS FIRE
DEPARTMENT. WITHOUT THIS PERMIT, HOT WORK SHALL NOT BE PERMITTED BY THE
GOVERNMENT.
47. THE CONTRACTOR SHALL MAINTAIN SECURITY FOR THE WORK AREA AND PROVIDE KEYS
TO THE CONTRACTING OFFICER FOR ACCESS.
48. THE CONTRACTOR SHALL NOT LEAVE THE WORK AREA UNATTENDED FOR ANY REASON,
UNLESS SAFETY PARTITIONS, SAFETY FENCING ARE INSTALLED AND SECURED.
49. THE CONTRACTOR SHALL PARK IN APPROVED PARKING SPACES ONLY.
50. THE CONTRACTOR SHALL BE ADVISED THAT THERE MAY BE ASBESTOS ENCOUNTERED
AT ANY TIME ON THE SITE. THE CONTRACTOR SHALL BE ADVISED THAT IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ANY ASBESTOS ENCOUNTERED AND
DISPOSE OF IT PROPERLY OFF THE SITE AND IN ACCORDANCE WITH ALL LOCAL, CITY,
STATE, FEDERAL, VA RULES REGULATIONS, LAWS, STATUTES AND OTHERS.
51. THE CONTRACTOR SHALL TURN OVER, TO THE GOVERNMENT, A WASTE DISPOSAL
MANIFEST FOR EACH DUMPSTER REMOVED FROM THE CONSTRUCTION SITE. MANIFESTS
SHALL BE DELIVERED ON A MONTHLY BASIS.
52. GC IS RESPONSIBLE FOR FOLLOWING ALL MONTROSE VAMC ENGINEERING DIRECTIVES
AND POLICIES TITLED BELOW AND PROVIDED IN FULL WITH THE PROJECT
SPECIFICATIONS:
52.1. SOP 138-12HV
52.2. SOP 138-13HV
52.3. SOP 13A-01HV
52.4. SOP 138-15HV
52.5. SOP 138-22HV
52.6. SOP 138-58HV
52.7. SOP 138-60HV
52.8. SOP 138-62HV
52.9. SOP 138-69HV
52.10. VA FORM 2237 KEY REQUEST
52.11. VA SF 85 ID BADGE FORMS
52.12. VA HVHCS 11IC-05HV INFECTION CONTROL
52.13. VA HVHCS CONTRACTOR ORIENTATION MANUAL
52.14. VA HVHCS SAFETY MANUAL
52.15. VA HVHCS ASBESTOS PERMIT
52.16. VA HVHCS REQUEST TO WORK W.H.E.N. HOURS
52.17. VA WASTE MANIFEST REPORT
321 4 5 6 7
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs of
LocationPhase
Project Number
Building Number
Drawing Number
Project Title
STAMPARCHITECT/ENGINEER OF RECORD
Date:Revisions:
Issue Date
Approved By: Approved By:
Approved By:Approved By:
Approved By:
Approved By: Approved By:
Approved By:
Drawing Title
Checked Drawn
CONSULTANT
620-20-205620-20-205 Renovate Building 3 Audiology
FDR VA HOSPITAL MONTROSE, NY
2021.11.18 N/A MA&MM
BID DOCUMENTSRevisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyyAPPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
Rev.
GENERAL REQUIREMENTS NOTES
SCALE: NOT TO SCALE1
FD
R
-0
GI-100
GENERAL REQUIREMENTS NOTES
N
S
W
E
N
S
W
E
321 4 5 6 7
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs of
LocationPhase
Project Number
Building Number
Drawing Number
Project Title
STAMPARCHITECT/ENGINEER OF RECORD
Date:Revisions:
Issue Date
Approved By: Approved By:
Approved By:Approved By:
Approved By:
Approved By: Approved By:
Approved By:
Drawing Title
Checked Drawn
CONSULTANT
620-20-205620-20-205 Renovate Building 3 Audiology
FDR VA HOSPITAL MONTROSE, NY
2021.11.18 N/A MA&MM
BID DOCUMENTSRevisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyyAPPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
Rev.
LIFE SAFETY PLAN AND NOTES GROUND FLOOR- EXISTING
SCALE: 1/8" = 1'-0"1
LIFE SAFETY PLAN AND NOTES
GROUND FLOOR- NEW AND
EXISTING
FD
R
-0
GI-101
LIFE SAFETY PLAN AND NOTES GROUND FLOOR - NEW
SCALE: 1/8" = 1'-0"2
KEY PLAN KEY PLAN
AutoCAD SHX Text
UP
AutoCAD SHX Text
CORRIDOR 19Z
AutoCAD SHX Text LIFE SAFETY CODE REQUIREMENTS: 1. BUILDING 03 OCCUPANCY CLASSIFICATION: BUILDING 03 OCCUPANCY CLASSIFICATION: BUSINESS (B) 2. BUILDING IS FULLY SPRINKLED. BUILDING IS FULLY SPRINKLED. 3. EXISTING GROUND FLOOR IS BUSINESS OCCUPANCY IN ACCORDANCE TO NFPA 101, CHAPTERS 39 & EXISTING GROUND FLOOR IS BUSINESS OCCUPANCY IN ACCORDANCE TO NFPA 101, CHAPTERS 39 & 40. 4. GROUND FLOOR HAZARDS: LOW RISK. GROUND FLOOR HAZARDS: LOW RISK. 5. REFER TO TABLE 7.3.1.2 OF THE N.F.P.A 101 LIFE SAFETY CODE. REFER TO TABLE 7.3.1.2 OF THE N.F.P.A 101 LIFE SAFETY CODE. OCCUPANCY LOAD: BUSINESS: 100 GROSS SQ. FT. PER PERSON 100 GROSS SQ. FT. PER PERSON 6. TRAVEL DISTANCE TO EXITS, CHAPTERS 39.2.6.1; COMMON TRAVEL PATH, CHAPTERS 39.2.5.3; TRAVEL DISTANCE TO EXITS, CHAPTERS 39.2.6.1; COMMON TRAVEL PATH, CHAPTERS 39.2.5.3; DEAD-END CORRIDORS, CHAPTERS 39.2.5.2 ; REQUIRES CRITICAL PATHS SHALL NOT EXCEED AS NOTED BELOW: BUSINESS (B): 300 FT. TRAVEL DISTANCE TO EXITS. 300 FT. TRAVEL DISTANCE TO EXITS. 100 FT. COMMON PATH OF TRAVEL. 50 FT. DEAD-END CORRIDORS. EXISTING ACTUAL 99'-8" TRAVEL DISTANCE "A" 99'-8" TRAVEL DISTANCE "A" 110'-5" TRAVEL DISTANCE "B" 72'-6" COMMON PATH 0'-0" DEAD END TRAVEL NEW DISTANCES 97'-2" TRAVEL DISTANCE "A" 97'-2" TRAVEL DISTANCE "A" 91'-8" TRAVEL DISTANCE "B" 67'-10" COMMON PATH 0'-0" DEAD END TRAVEL GENERAL INFECTION CONTROL NOTES: 1. PROVIDE ACTIVE MEANS TO PREVENT AIR-BORNE DUST FROM DISPENSING INTO THE ATMOSPHERE, PROVIDE ACTIVE MEANS TO PREVENT AIR-BORNE DUST FROM DISPENSING INTO THE ATMOSPHERE, WHICH MAY INCLUDE A USE OF A CONTROL CUBE. 2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. 3. SEAL ANY UNUSED DOORS WITH MASKING TAPE. SEAL ANY UNUSED DOORS WITH MASKING TAPE. 4. BLOCK OFF AND SEAL ANY AIR VENTS TO PREVENT SPREAD OF CONSTRUCTION DEBRIS FROM THE BLOCK OFF AND SEAL ANY AIR VENTS TO PREVENT SPREAD OF CONSTRUCTION DEBRIS FROM THE WORK AREA. 5. ALL DOORS AND WINDOWS WITHIN THE WORK AREA ARE TO REMAIN CLOSED AT ALL TIMES EXCEPT ALL DOORS AND WINDOWS WITHIN THE WORK AREA ARE TO REMAIN CLOSED AT ALL TIMES EXCEPT DURING INGRESS OR EGRESS. 6. PLACE ADHESIVE MATS AT ENTRANCES AND EXITS OF WORK AREA AS NECESSARY. PLACE ADHESIVE MATS AT ENTRANCES AND EXITS OF WORK AREA AS NECESSARY. 7. COVER TRANSPORT RECEPTACLES OR CARTS. COVER TRANSPORT RECEPTACLES OR CARTS. 8. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. 9. USE DESIGNATED ROUTES / ELEVATORS FOR REMOVAL OF DEBRIS. USE DESIGNATED ROUTES / ELEVATORS FOR REMOVAL OF DEBRIS. 10. WET MOP AND VACUUM WITH HEPA FILTERED VACUUM AT END OF THE JOB OR END OF WORK SHIFT. WET MOP AND VACUUM WITH HEPA FILTERED VACUUM AT END OF THE JOB OR END OF WORK SHIFT. AREA SHALL BE FREE OF DUST AND CONSTRUCTION DEBRIS. CONSTRUCTION BARRIER NOTES: 1. ALL CONSTRUCTION BARRIERS MUST BE BUILT, INSPECTED AND APPROVED BY COR AND VA FIRE ALL CONSTRUCTION BARRIERS MUST BE BUILT, INSPECTED AND APPROVED BY COR AND VA FIRE DEPARTMENT BEFORE START OF DEMOLITION WORK. BEFORE START OF DEMOLITION WORK. START OF DEMOLITION WORK. 2. FOR GENERAL REQUIREMENTS, SEE SHEET "GI 100". FOR GENERAL REQUIREMENTS, SEE SHEET "GI 100". 3. FIREPROOF AND FIRESTOP ALL EXISTING WALLS ADJACENT TO OCCUPIED ROOMS TO CREATE A ONE FIREPROOF AND FIRESTOP ALL EXISTING WALLS ADJACENT TO OCCUPIED ROOMS TO CREATE A ONE (1) HOUR SEPERATION DURING CONSTRUCTION AT ALL TIMES. ALL CONSTRUCTION BARRIERS MUST EXTEND TO UNDERSIDE OF EXISTING STRUCTURE ABOVE.
AutoCAD SHX Text
TRAVEL DISTANCE "A" 99'-8"
AutoCAD SHX Text
TRAVEL DISTANCE "B" 110'-5"
AutoCAD SHX Text
COMMON PATH 72'-6"
AutoCAD SHX Text SPEECH PATHOLOGY 155 Sq. Ft. 037B
AutoCAD SHX Text SWING OFFICE 124 Sq. Ft. 037G
AutoCAD SHX Text AUDIOMETRIX LAB 01 255 Sq. Ft. 037C
AutoCAD SHX Text OFFICE 127 Sq. Ft. 037F
AutoCAD SHX Text AUDIO AID LAB. 147 Sq. Ft. 037D
AutoCAD SHX Text AUDIO LAB. 399 Sq. Ft. 037E
AutoCAD SHX Text AUDIO DEVICE STORAGE 92 Sq. Ft. 037D1
AutoCAD SHX Text WAITING AREA 182 Sq. Ft. 037
AutoCAD SHX Text AUDIOLOGY SERVICE 215 Sq. Ft. 037Z
AutoCAD SHX Text ELEC. CL. 17.5 Sq. Ft. 037A
AutoCAD SHX Text
CORRIDOR 19Z
AutoCAD SHX Text
TRAVEL DISTANCE "A" 97'-2"
AutoCAD SHX Text
TRAVEL DISTANCE "B" 91'-8"
AutoCAD SHX Text
COMMON PATH 67'-10"
AutoCAD SHX Text
ELEC. CLOSET 4
AutoCAD SHX Text
RECORDS 5C
AutoCAD SHX Text
RECEP. AREA 5A
AutoCAD SHX Text
FILM PROC. 5E1
AutoCAD SHX Text
TOILET 5B
AutoCAD SHX Text
TOILET 5U
AutoCAD SHX Text
WAITING AREA 5V
AutoCAD SHX Text
SOILED LINEN 6
AutoCAD SHX Text
CONN. CORR. TO BLDG. 4
AutoCAD SHX Text
STAIR HALL A 8 (N.I.C)
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text F
AutoCAD SHX Text
FLOOR TO DECK PARTITION
AutoCAD SHX Text
2HR RATED (EXISTING)
AutoCAD SHX Text V
AutoCAD SHX Text V
AutoCAD SHX Text
FEC
AutoCAD SHX Text
EXTEND WALL 8" FOR ACCEPTANCE OF NEW SEMI-RECESSED FEC.
AutoCAD SHX Text V
F
W
E
UP
321 4 5 6 7
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs of
LocationPhase
Project Number
Building Number
Drawing Number
Project Title
STAMPARCHITECT/ENGINEER OF RECORD
Date:Revisions:
Issue Date
Approved By: Approved By:
Approved By:Approved By:
Approved By:
Approved By: Approved By:
Approved By:
Drawing Title
Checked Drawn
CONSULTANT
620-20-205620-20-205 Renovate Building 3 Audiology
FDR VA HOSPITAL MONTROSE, NY
2021.11.18 N/A MA&MM
BID DOCUMENTSRevisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyyAPPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
Rev.
INFECTION CONTROL PLAN - GROUND FLOOR
SCALE: 1/8" = 1'-0"1
FD
R
-0
GI-201
INFECTION CONTROL PLAN -
GROUND FLOOR
AutoCAD SHX Text
ELEV. 1
AutoCAD SHX Text
ELEV. 2
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
692 SF
AutoCAD SHX Text
PRIMARY CARE WAITING
AutoCAD SHX Text
AutoCAD SHX Text
355 SF
AutoCAD SHX Text
H.A.S. CHECK-IN
AutoCAD SHX Text
AutoCAD SHX Text
50 SF
AutoCAD SHX Text
PAT. TLT
AutoCAD SHX Text
AutoCAD SHX Text
145 SF
AutoCAD SHX Text
SHARED WOMEN'S HEALTH EXAM RM
AutoCAD SHX Text
AutoCAD SHX Text
48 SF
AutoCAD SHX Text
PRIVATE PAT. TLT
AutoCAD SHX Text 018A
AutoCAD SHX Text
159 SF
AutoCAD SHX Text
SHARED WOMEN'S HEALTH EXAM RM
AutoCAD SHX Text
AutoCAD SHX Text
175 SF
AutoCAD SHX Text H.A.S.
AutoCAD SHX Text 051L
AutoCAD SHX Text
484 SF
AutoCAD SHX Text H.A.S.
AutoCAD SHX Text
AutoCAD SHX Text
122 SF
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text 057A
AutoCAD SHX Text
123 SF
AutoCAD SHX Text
TRAVEL
AutoCAD SHX Text 051L1
AutoCAD SHX Text
130 SF
AutoCAD SHX Text
CVT/EXAM
AutoCAD SHX Text
AutoCAD SHX Text
39 SF
AutoCAD SHX Text
CLEAN STOR.
AutoCAD SHX Text
AutoCAD SHX Text
125 SF
AutoCAD SHX Text
PACT TEAM #3 EXAM RM
AutoCAD SHX Text
AutoCAD SHX Text
81 SF
AutoCAD SHX Text
PYXIS ROOM
AutoCAD SHX Text
AutoCAD SHX Text
130 SF
AutoCAD SHX Text
PACT TEAM #1 EXAM RM
AutoCAD SHX Text
AutoCAD SHX Text
125 SF
AutoCAD SHX Text
PSYCHOLOGIST/ PRIMARY CARE/ MENTAL HEALTH EXAM RM
AutoCAD SHX Text
AutoCAD SHX Text
126 SF
AutoCAD SHX Text
SPRINKLER RM
AutoCAD SHX Text
AutoCAD SHX Text
125 SF
AutoCAD SHX Text
MEN'S STAFF LOCKER RM
AutoCAD SHX Text 037D
AutoCAD SHX Text
50 SF
AutoCAD SHX Text
STAFF TLT
AutoCAD SHX Text
AutoCAD SHX Text
161 SF
AutoCAD SHX Text
NEW ELEC RM
AutoCAD SHX Text
AutoCAD SHX Text
23 SF
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
AutoCAD SHX Text
23 SF
AutoCAD SHX Text
JAN.
AutoCAD SHX Text
AutoCAD SHX Text
74 SF
AutoCAD SHX Text
CLEAN STOR./ FORMER AMBULATORY
AutoCAD SHX Text 051H
AutoCAD SHX Text
88 SF
AutoCAD SHX Text
SOILED UTILITY RM
AutoCAD SHX Text 051F
AutoCAD SHX Text
437 SF
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
165 SF
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text 051C
AutoCAD SHX Text
149 SF
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text 051D
AutoCAD SHX Text
97 SF
AutoCAD SHX Text
STAFF/ OFFICE/ FORMER AMBULATORY
AutoCAD SHX Text 051E
AutoCAD SHX Text
122 SF
AutoCAD SHX Text
EXAM RM/ FORMER AMBULATORY
AutoCAD SHX Text 051I
AutoCAD SHX Text
65 SF
AutoCAD SHX Text
TLT
AutoCAD SHX Text 051A
AutoCAD SHX Text
186 SF
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
90 SF
AutoCAD SHX Text
EMS CL
AutoCAD SHX Text
AutoCAD SHX Text
151 SF
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
157 SF
AutoCAD SHX Text
RESIDENT BEDROOM
AutoCAD SHX Text
AutoCAD SHX Text
125 SF
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
83 SF
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 051M4
AutoCAD SHX Text
104 SF
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 051M3
AutoCAD SHX Text
54 SF
AutoCAD SHX Text
TLT
AutoCAD SHX Text 051M2
AutoCAD SHX Text
136 SF
AutoCAD SHX Text
EXIST ELEC RM
AutoCAD SHX Text
AutoCAD SHX Text
507 SF
AutoCAD SHX Text
MECH RM
AutoCAD SHX Text
AutoCAD SHX Text
127 SF
AutoCAD SHX Text
PSYCHOLOGIST/ PRIMARY CARE/ MENTAL HEALTH EXAM RM
AutoCAD SHX Text
AutoCAD SHX Text
280 SF
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
102 SF
AutoCAD SHX Text
TLT
AutoCAD SHX Text
AutoCAD SHX Text
59 SF
AutoCAD SHX Text
TLT
AutoCAD SHX Text 048B
AutoCAD SHX Text
279 SF
AutoCAD SHX Text
ELEV LOBBY
AutoCAD SHX Text
740 SF
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
335 SF
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
25 SF
AutoCAD SHX Text
MED STOR.
AutoCAD SHX Text 019A
AutoCAD SHX Text
64 SF
AutoCAD SHX Text
SHOWER/ SEARCH RM
AutoCAD SHX Text 051M1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
127 SF
AutoCAD SHX Text
STAIR HALL #1
AutoCAD SHX Text
179 SF
AutoCAD SHX Text
MECH
AutoCAD SHX Text
AutoCAD SHX Text
230 SF
AutoCAD SHX Text
STARBUCKS
AutoCAD SHX Text
AutoCAD SHX Text
61 SF
AutoCAD SHX Text
PAT. TLT
AutoCAD SHX Text
AutoCAD SHX Text
193 SF
AutoCAD SHX Text
SHARED TREATMENT
AutoCAD SHX Text
AutoCAD SHX Text
49 SF
AutoCAD SHX Text
PRIVATE PAT. TLT
AutoCAD SHX Text 020A
AutoCAD SHX Text
51 SF
AutoCAD SHX Text
PUBLIC TLT
AutoCAD SHX Text
AutoCAD SHX Text
56 SF
AutoCAD SHX Text
PUBLIC TLT
AutoCAD SHX Text
AutoCAD SHX Text
46 SF
AutoCAD SHX Text
STAFF TLT
AutoCAD SHX Text 027A
AutoCAD SHX Text
167 SF
AutoCAD SHX Text
PACT TEAM #1 COMMON RM
AutoCAD SHX Text
AutoCAD SHX Text
19 SF
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 014A
AutoCAD SHX Text
190 SF
AutoCAD SHX Text
PACT TEAM #2 COMMON RM
AutoCAD SHX Text
AutoCAD SHX Text
33 SF
AutoCAD SHX Text
SOILED HOLDING
AutoCAD SHX Text
AutoCAD SHX Text
454 SF
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
139 SF
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text 051J
AutoCAD SHX Text
116 SF
AutoCAD SHX Text
MED 3 NEW
AutoCAD SHX Text 051K
AutoCAD SHX Text
336 SF
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
177 SF
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text 051M
AutoCAD SHX Text
840 SF
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text
AutoCAD SHX Text
1332 SF
AutoCAD SHX Text
LOBBY AND WAITING
AutoCAD SHX Text
47 SF
AutoCAD SHX Text
AMBASSADOR
AutoCAD SHX Text
88 SF
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text
364 SF
AutoCAD SHX Text
ATRIUM
AutoCAD SHX Text
150 SF
AutoCAD SHX Text
STAIR HALL #5
AutoCAD SHX Text 15H
AutoCAD SHX Text
146 SF
AutoCAD SHX Text
STAIR HALL #4
AutoCAD SHX Text
18 SF
AutoCAD SHX Text
TELE CL
AutoCAD SHX Text
AutoCAD SHX Text
30 SF
AutoCAD SHX Text
TLT
AutoCAD SHX Text 044A
AutoCAD SHX Text
20 SF
AutoCAD SHX Text
CL
AutoCAD SHX Text 043A
AutoCAD SHX Text
124 SF
AutoCAD SHX Text
PACT TEAM #2 EXAM RM
AutoCAD SHX Text
AutoCAD SHX Text
124 SF
AutoCAD SHX Text
CONF RM
AutoCAD SHX Text
AutoCAD SHX Text
601 SF
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
94 SF
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
AutoCAD SHX Text
210 SF
AutoCAD SHX Text
STAIR HALL #2
AutoCAD SHX Text
206 SF
AutoCAD SHX Text
STAIR HALL #3
AutoCAD SHX Text
141 SF
AutoCAD SHX Text
PACT TEAM #3 EXAM RM
AutoCAD SHX Text
AutoCAD SHX Text
122 SF
AutoCAD SHX Text
PACT TEAM #2 EXAM RM
AutoCAD SHX Text
AutoCAD SHX Text
186 SF
AutoCAD SHX Text
PACT TEAM #3 COMMON RM
AutoCAD SHX Text
AutoCAD SHX Text
105 SF
AutoCAD SHX Text
SOCIAL WORKER
AutoCAD SHX Text
AutoCAD SHX Text
124 SF
AutoCAD SHX Text
PHARMACIST
AutoCAD SHX Text
AutoCAD SHX Text
CONN. CORR. TO BLDG 4
AutoCAD SHX Text 05L8
AutoCAD SHX Text
CONN. CORR. TO BLDG 2, 15
AutoCAD SHX Text 05L9
AutoCAD SHX Text
122 SF
AutoCAD SHX Text
PACT TEAM #1 EXAM RM
AutoCAD SHX Text
AutoCAD SHX Text
68 SF
AutoCAD SHX Text
ELEV 1
AutoCAD SHX Text
AutoCAD SHX Text
99 SF
AutoCAD SHX Text
ELEV 2
AutoCAD SHX Text
AutoCAD SHX Text
62 SF
AutoCAD SHX Text
EXIST ELEC
AutoCAD SHX Text
AutoCAD SHX Text
10 SF
AutoCAD SHX Text
CRASH CART
AutoCAD SHX Text
TRIAGE 1
AutoCAD SHX Text 051B
AutoCAD SHX Text
127 SF
AutoCAD SHX Text
WOMEN'S STAFF LOCKER RM
AutoCAD SHX Text 037C
AutoCAD SHX Text
207 SF
AutoCAD SHX Text
STAFF LOUNGE
AutoCAD SHX Text 037B
AutoCAD SHX Text
78 SF
AutoCAD SHX Text
IT CLOSET.
AutoCAD SHX Text
AutoCAD SHX Text
8 SF
AutoCAD SHX Text
ELEC. CL.
AutoCAD SHX Text
AutoCAD SHX Text
AUDIOLOGY
AutoCAD SHX Text
AutoCAD SHX Text
207 SF
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text 037A
AutoCAD SHX Text
4 SF
AutoCAD SHX Text
ELEC. CL.
AutoCAD SHX Text
AutoCAD SHX Text
36 SF
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
4 SF
AutoCAD SHX Text
CLOSET.
AutoCAD SHX Text
AutoCAD SHX Text
SUITE
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBG CL
AutoCAD SHX Text
AutoCAD SHX Text 051G
AutoCAD SHX Text 048A
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DEMOLITION DEBRIS AND INFECTION CONTROL NOTES:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text DEMOLITION TO BE COORDINATED AMONG ALL TRADES. ISSUES TO BE BROUGHT TO THE ATTENTION OF THE COR PRIOR TO START OF WORK.
AutoCAD SHX Text COORDINATE PATH OF DEBRIS REMOVAL WITH THE COR AND BUILDING STAFF. PROTECT ELEVATOR, FLOORS, WALLS AND CEILING AS NEEDED TO PREVENT DAMAGE DURING REMOVAL OF DEBRIS AND CONSTRUCTION THROUGHOUT PROJECT.
AutoCAD SHX Text
AutoCAD SHX Text CONSTRUCTION BARRIER MUST BE APPROVED BY COR AND VA FIRE DEPARTMENT PRIOR TO START OF DEMOLITION WORK. 6 MIL. FIRE RETARDANT POLY EXTENDED TO UNDERSIDE OF STRUCTURE ABOVE TAPED AND SEALED AT ALL EDGES AND AROUND ALL PENETRATIONS. PROVIDE STICKY MATS ON BOTH SIDES OF NEW POLY ZIP DOORS.
AutoCAD SHX Text
AutoCAD SHX Text PATH OF DEMOLITION DEBRIS REMOVAL AND GENERAL CONSTRUCTION ACCESS. ALL MATERIALS ARE TO BE LOADED ONTO CART AND COVERED PRIOR TO EXITING CONSTRUCTION AREA. DO NOT BLOCK PATH OF EGRESS OR EXISTING SIDEWALK. IF NEEDED, POUR ASPHALT PATH TO TAKE DEBRIS TO/FROM DUMPSTER AREA. REPAIR ANY DAMAGE TO EXISTING SIDEWALK AND BREAKUP AND REMOVE ASPHALT AFTER CONSTRUCTION.
AutoCAD SHX Text
AutoCAD SHX Text DUMPSTER TO BE COVERED WITH TARP FASTENED DOWN AT ALL TIMES TO PREVENT DEBRIS, DUST, ETC. FROM BEING BLOWN ONTO THE GROUNDS OF THE FACILITY. DEMOLITION MATERIALS SUCH AS LIGHT BULBS AND METALS AND OTHER HAZARDOUS MATERIALS ARE TO BE SORTED AND DISCARDED OR RECYCLED PER VA HAZARDOUS WASTE MANAGEMENT SPECIFICATIONS. ALL DUMPSTER MANIFESTS SHALL BE SUBMITTED TO THE VA RESIDENT ENGINEER FOR RECORD.
AutoCAD SHX Text
AutoCAD SHX Text FIREPROOF/FIRESTOP THROUGHOUT EXISTING FLOOR TO MAINTAIN INTEGRITY OF 2HR FIRE RATING FOR FLOOR AND 1 HOUR FIRE RATING FOR WALLS WHERE ANY PENETRATIONS EXIST OR WHERE ANY ITEMS HAVE BEEN REMOVED. PRIME CONTRACTOR TO INSPECT WORK DAILY FOR NEW PENETRATIONS AND PERFORM THIS WORK.
AutoCAD SHX Text
AutoCAD SHX Text PROTECT FLOORS AND WALLS THAT ARE EXISTING TO REMAIN IN AREA OF WORK WITH PARTICLE HARDBOARD TAPED AT SEAMS.
AutoCAD SHX Text
AutoCAD SHX Text CLASS IV ICRA CLASSIFICATION PRECAUTIONS TO BE TAKEN DURING CONSTRUCTION: 1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. MAINTAIN ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. MAINTAIN UNTIL BARRIER IS REMOVED AT COMPLETION OF PROJECT. 2. DESIGNATE ENTRY AND EXIT TRAFFIC PATTERN, UNAUTHORIZED PERSONNEL ARE NOT PERMITTED TO ENTER WORK DESIGNATE ENTRY AND EXIT TRAFFIC PATTERN, UNAUTHORIZED PERSONNEL ARE NOT PERMITTED TO ENTER WORK ZONE, TRAFFIC CONTROL SIGNS PLACED. 3. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) TO SEAL AREA FROM NON-WORK AREA AND COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) TO SEAL AREA FROM NON-WORK AREA AND IMPLEMENT CONTROL CUB CART (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. 4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE AND UTILIZE HEPA EQUIPPED NEGATIVE AIR FILTRATION UNITS. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE AND UTILIZE HEPA EQUIPPED NEGATIVE AIR FILTRATION UNITS. BOTH WILL BE MAINTAINED UNTIL PROJECT AND TERMINAL CLEANING ARE COMPLETED AND INFECTION CONTROL AUTHORIZES REMOVAL. 5. AIR PRESSURE TO BE MONITORED AND DOCUMENTED AT LEAST DAILY. AIR PRESSURE TO BE MONITORED AND DOCUMENTED AT LEAST DAILY. 6. ADHESIVE MATS PLACED AT ALL ENTRANCES AND EXITS OF WORK AREA. ADHESIVE MATS PLACED AT ALL ENTRANCES AND EXITS OF WORK AREA. 7. THE CONTRACTOR WILL MAINTAIN THE CONSTRUCTION ZONE IN A CLEAN MANNER. THE CONTRACTOR WILL MAINTAIN THE CONSTRUCTION ZONE IN A CLEAN MANNER. 7.1. THE AREA WILL BE HEPA-VACUUMED, OR DAMP MOPPED DAILY OR MORE OFTEN AS NECESSARY TO MINIMIZE THE AREA WILL BE HEPA-VACUUMED, OR DAMP MOPPED DAILY OR MORE OFTEN AS NECESSARY TO MINIMIZE DUST. 7.2. DAILY CLEANUP OF DEBRIS, MATERIAL AND WASTE SHALL BE COMPLETED. DAILY CLEANUP OF DEBRIS, MATERIAL AND WASTE SHALL BE COMPLETED. 7.3. ADHESIVE MATS MONITORED AND CHANGED ON A REGULAR BASIS SO THAT THEY REMAIN EFFECTIVE. ADHESIVE MATS MONITORED AND CHANGED ON A REGULAR BASIS SO THAT THEY REMAIN EFFECTIVE. 7.4. ANY DUST OR CONSTRUCTION DEBRIS TRACKED OUTSIDE OF WORK AREA WILL BE PROMPTLY CLEANED. ANY DUST OR CONSTRUCTION DEBRIS TRACKED OUTSIDE OF WORK AREA WILL BE PROMPTLY CLEANED. 8. THE TERMINAL CLEANING WILL BE INSPECTED BY THE OWNER PRIOR TO AUTHORIZATION FOR THE BARRIER REMOVAL. THE TERMINAL CLEANING WILL BE INSPECTED BY THE OWNER PRIOR TO AUTHORIZATION FOR THE BARRIER REMOVAL. 9. AIR SAMPLED MAY BE PERFORMED FOLLOWING IC/SAFETY PROTOCOL. AIR SAMPLED MAY BE PERFORMED FOLLOWING IC/SAFETY PROTOCOL. 10. BARRIERS WILL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF CONSTRUCTION DUST AND DEBRIS. BARRIERS WILL BE REMOVED CAREFULLY TO MINIMIZE SPREADING OF CONSTRUCTION DUST AND DEBRIS. 11. SEAL ALL HOLES, PIPES AND CONDUIT PENETRATION IN WORK AREA. SEAL ALL HOLES, PIPES AND CONDUIT PENETRATION IN WORK AREA. 12. CONSTRUCT ANTEROOM FOR STAGING OF EQUIPMENT AND DONNING OF COVERALLS. CONSTRUCT ANTEROOM FOR STAGING OF EQUIPMENT AND DONNING OF COVERALLS. 13. WORKED WILL WEAR COVERALLS IN WORK AREA. UPON COMPLETION OF MAJOR DUST GENERATING ACTIVITIES, COVERALL WORKED WILL WEAR COVERALLS IN WORK AREA. UPON COMPLETION OF MAJOR DUST GENERATING ACTIVITIES, COVERALL REQUIREMENT IS REMOVED. 14. COVERALLS ARE REMOVED IN WORK ZONE BEFORE ENTERING ANTEROOM. COVERALLS ARE REMOVED IN WORK ZONE BEFORE ENTERING ANTEROOM. 15. ANY RESIDUAL DUST LEFT ON WORKED SHALL BE REMOVED BY VACUUM. ANY RESIDUAL DUST LEFT ON WORKED SHALL BE REMOVED BY VACUUM. 16. SHOE COVERS WILL BE WORN BY WORKED AND REMOVED IN THE ANTEROOM WHEN EXITING AREA. SHOE COVERS WILL BE WORN BY WORKED AND REMOVED IN THE ANTEROOM WHEN EXITING AREA. 17. ALL RENOVATION, CONSTRUCTION, MAINTENANCE AND TOOL CARTS LEAVING AREA MUST BE COVERED AND THE WHEELS ALL RENOVATION, CONSTRUCTION, MAINTENANCE AND TOOL CARTS LEAVING AREA MUST BE COVERED AND THE WHEELS WIPED DOWN WITH A DISINFECTANT SOLUTION. 18. CONTRACTOR WILL VACUUM OR DAMP MOP THE AREA OUTSIDE AND ADJACENT TO THE WORK ZONE AS FREQUENTLY CONTRACTOR WILL VACUUM OR DAMP MOP THE AREA OUTSIDE AND ADJACENT TO THE WORK ZONE AS FREQUENTLY AS NEEDED TO MAINTAIN CLEAN AREA. 19. PRIOR TO PROJECT COMPLETION: VACUUM AND WET MOP WORK AREA WITH DISINFECTANT, REMOVE ISOLATION OF HVAC PRIOR TO PROJECT COMPLETION: VACUUM AND WET MOP WORK AREA WITH DISINFECTANT, REMOVE ISOLATION OF HVAC SYSTEM, AND ALLOW INFECTION CONTROL AND SAFETY OFFICE TO INSPECT AREA BEFORE TAKING DOWN BARRIERS.
AutoCAD SHX Text
1. OBTAIN VA HUDSON VALLEY HCS POLICY 11IC-05HV ATTACHMENT A "INFECTION CONTROL RISK ASSESSMENT WORK OBTAIN VA HUDSON VALLEY HCS POLICY 11IC-05HV ATTACHMENT A "INFECTION CONTROL RISK ASSESSMENT WORK PERMIT" PRIOR TO START OF ANY WORK ON THIS PROJECT. 2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. 3. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION. 4. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE. 5. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR ANY REASON. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING DRY WALL FOR ANY REASON. 6. SEAL UNUSED DOORS WITH MASKING TAPE. SEAL UNUSED DOORS WITH MASKING TAPE. 7. BLOCK OFF AND SEAL AIR VENTS PRIOR TO START OF WORK. BLOCK OFF AND SEAL AIR VENTS PRIOR TO START OF WORK. 8. PLACE DUST MAT AT EVERY ENTRANCE AND EXIT OF WORK AREA. DOORS WITHIN WORK AREAS ARE TO REMAIN CLOSED PLACE DUST MAT AT EVERY ENTRANCE AND EXIT OF WORK AREA. DOORS WITHIN WORK AREAS ARE TO REMAIN CLOSED AT ALL TIMES EXCEPT DURING INGRESS/EGRESS. 9. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. MAINTAIN UNTIL BARRIER IS REMOVED AT COMPLETION OF PROJECT. 10. DESIGNATE ENTRY AND EXIT TRAFFIC PATTERN. UNAUTHORIZED PERSONNEL ARE NOT PERMITTED TO ENTER WORK ZONE, DESIGNATE ENTRY AND EXIT TRAFFIC PATTERN. UNAUTHORIZED PERSONNEL ARE NOT PERMITTED TO ENTER WORK ZONE, PLACE TRAFFIC CONTROL SIGNS. 11. REMOVE CONSTRUCTION WASTE AND CLEANUP DEBRIS, MATERIAL AND WASTE DAILY. INSPECT ICRA COMPLIANCE DAILY. REMOVE CONSTRUCTION WASTE AND CLEANUP DEBRIS, MATERIAL AND WASTE DAILY. INSPECT ICRA COMPLIANCE DAILY. KEEP A DAILY LOG OF VA HUDSON VALLEY HCS POLICY 11IC-05HV ATTACHMENT D "DAILY CONSTRUCTION - INFECTION CONTROL INTERVENTIONS COMPLIANCE MONITOR" AND SUBMIT LOG WEEKLY TO VA RESIDENT ENGINEER FOR RECORD. 12. PROVIDE TEMPORARY CONSTRUCTION PARTITIONS FOR ANY PERIMETER DOORS BEING REMOVED (DRYWALL/SHEETROCK) PROVIDE TEMPORARY CONSTRUCTION PARTITIONS FOR ANY PERIMETER DOORS BEING REMOVED (DRYWALL/SHEETROCK) AND SEAL UNUSED DOORS AND WINDOWS AT PERIMETER OF THE WORK AREA WITH DUCT TAPE TO SEAL AREA FROM NON-WORK AREA BEFORE CONSTRUCTION BEGINS. 13. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING WINDOW EXHAUST FANS STRATEGICALLY LOCATED WITH MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING WINDOW EXHAUST FANS STRATEGICALLY LOCATED WITH HEPA FILTER EQUIPPED AIR FILTRATION UNITS. 14. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY COVERING IN PLASTIC AND CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS OR BY COVERING IN PLASTIC AND SEALING WITH DUCT TAPE. REFER TO GENERAL REQUIREMENTS FOR REMOVAL OF WASTE. 15. USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF DEBRIS, CONSTRUCTION WASTE, USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF DEBRIS, CONSTRUCTION WASTE, CONSTRUCTION EQUIPMENT, CONTAINERS, ETC... THROUGH THE FACILITY. 16. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT. 17. ALL NEW AND DEMO MATERIALS THAT MUST BE TRANSPORTED THROUGH OCCUPIED AREAS INCLUDING COMMON CORRIDORS ALL NEW AND DEMO MATERIALS THAT MUST BE TRANSPORTED THROUGH OCCUPIED AREAS INCLUDING COMMON CORRIDORS AND ANY OTHER AREA, ARE TO BE TRANSPORTED INSIDE COVERED CARTS DURING W.H.E.N. (WEEKEND, HOLIDAY, EVENING, NIGHT) HOURS. 18. ANY WORK TO OCCUR IN OCCUPIED AREAS INCLUDING COMMON CORRIDORS AND ANY OTHER AREA NOT SPECIFICALLY ANY WORK TO OCCUR IN OCCUPIED AREAS INCLUDING COMMON CORRIDORS AND ANY OTHER AREA NOT SPECIFICALLY SHOWN, IS TO RECEIVE TEMPORARY PARTITIONS AND BE PERFORMED DURING W.H.E.N. HOURS INSIDE TEMPORARY NON-RATED PARTITIONS MEETING THE REQUIREMENTS OF DETAIL 2 ICRA TEMPORARY BARRIER ON SHEET A-501. 19. SEE NOTE 9 ON THIS SHEET FOR PROJECT CLOSEOUT PROCEDURE.SEE NOTE 9 ON THIS SHEET FOR PROJECT CLOSEOUT PROCEDURE.
AutoCAD SHX Text PATIENT RISK GROUP: HIGH RISK HIGH RISK CONSTRUCTION PROJECT TYPE: D D CLASS: IVIV
AutoCAD SHX Text
INFECTION CONTROL POLICY
AutoCAD SHX Text
(PRECAUTIONS DURING CONSTRUCTION)
AutoCAD SHX Text
AutoCAD SHX Text
19. PRIOR TO PROJECT COMPLETION: VACUUM AND WET MOP WORK AREA WITH DISINFECTANT, REMOVE ISOLATION OF HVAC PRIOR TO PROJECT COMPLETION: VACUUM AND WET MOP WORK AREA WITH DISINFECTANT, REMOVE ISOLATION OF HVAC SYSTEM, AND ALLOW INFECTION CONTROL AND SAFETY OFFICE TO INSPECT AREA BEFORE TAKING DOWN BARRIERS.
AutoCAD SHX Text
AutoCAD SHX Text EXAMPLES OF PRODUCTS AND MATERIALS FOR ICRA CONTAINMENT: 1. BARRIER TYPES: FIRE RETARDANT POLYETHYLENE, 6-MIL THICKNESS MINIMUM, GYPSUM WALL BOARD, FIRE RATED BARRIER TYPES: FIRE RETARDANT POLYETHYLENE, 6-MIL THICKNESS MINIMUM, GYPSUM WALL BOARD, FIRE RATED FIBERGLASS REINFORCED PLASTIC (SIMILAR TO FIRE-X GLASSBOARD), PLYWOOD AND MASONITE PAINTED W/ FIRE RESISTANT PAINT (FLAM CONTROL COATINGS #320A OR SIMILAR) 2. CARPET VACUUM: NOBLE ULTRA-GLIDE 18" W/ DUAL MOTORS & HEPA FILTERS OR EQUIVALENT CARPET VACUUM: NOBLE ULTRA-GLIDE 18" W/ DUAL MOTORS & HEPA FILTERS OR EQUIVALENT 3. DOOR TYPES: ZIPPER DOOR IN POLYETHYLENE, OR AN OVERLAPPED POLYETHYLENE ENTRANCE AS SPECIFIED IN ICRA DOOR TYPES: ZIPPER DOOR IN POLYETHYLENE, OR AN OVERLAPPED POLYETHYLENE ENTRANCE AS SPECIFIED IN ICRA WORK PERMIT 4. EXHAUST HOSES: HEAVY DUTY FLEXIBLE STEEL-REINFORCED; VENTILATION BLOWER HOSE QPG AS MANUFACTURED BY EXHAUST HOSES: HEAVY DUTY FLEXIBLE STEEL-REINFORCED; VENTILATION BLOWER HOSE QPG AS MANUFACTURED BY FEDERAL HOSE MTG. OR SIMILAR 5. NEGATIVE AIR MACHINE: HEPA FILTER EQUIPPED AND PROVIDE ROUGHING FILTERS, PRIMARY FILTERS, AND HEPA FINAL NEGATIVE AIR MACHINE: HEPA FILTER EQUIPPED AND PROVIDE ROUGHING FILTERS, PRIMARY FILTERS, AND HEPA FINAL FILTERS WITH A RATING OF 200 TO 2000 CFM. HEPA FILTERS MINIMUM 99.97% EFFICIENT. HEPA FILTER FACTORY SCAN TESTED & ACCEPTED AFTER MANUFACTURE. NO LEAKS GREAT THAN 0.01 OF UPSTREAM CONCERNTRATION AT RATED CAPACITY OF 2000 CFM. INITIAL CLEAN RESISTANCE SHALL BE NO MORE THAN 1.35" W.C. @ 2000 CFM. SUPPLIER: AIRBORNE CONTAMINATION IDENTIFICATION ASSOCIATES, OR SIMILAR 6. WALK-OFF MATS: PROVIDE MINIMUM SIZE ADHESIVE MATS OF 18"x24" AS MANFUCATURED BY 3M, ST. PAUL, MN OR WALK-OFF MATS: PROVIDE MINIMUM SIZE ADHESIVE MATS OF 18"x24" AS MANFUCATURED BY 3M, ST. PAUL, MN OR SIMILAR.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AREA OF NEW WORK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text GC RESPONSIBLE FOR EXISTING AUDIOLOGY BOOTH TO BE BROKEN DOWN FROM CURRENT TEMPORARY LOCATION AND INSTALLED IN NEW LOCATION AS SHOWN ON PLANS AND PER MANUFACTURER GUIDELINES.
AutoCAD SHX Text EXISTING LOCATION OF TEMPORARY AUDIOLOGY SUITE. TO MINIMIZE FACILITY DOWNTIME, TEMPORARY SUITE WILL REMAIN ACTIVE UNTIL NEW SITE LOCATION IS PREPARED FOR ACCEPTANCE OF EXISTING AUDIOLOGY BOOTH. COORDINATE PHASING WITH PROJECT ENGINEER / COR.
AutoCAD SHX Text
AutoCAD SHX Text MAINTAIN EXISTING 1-HOUR RATED FIRE BARRIER WALL. ALLOW FOR (20) PENETRATIONS TO BE FIRESTOPPED PRIOR TO START OF WORK. PROVIDE AND INSTALL NEW 3/4-HOUR, SELF-CLOSING, SELF-LATCHING TEMPORARY DOOR.
AutoCAD SHX Text
W
E
QUANTITIES - ACM MATERIALS
AREAS ANTICIPATED TO BE IN-SCOPE OF REQUIRED MODIFICATION, COORDINATE
WITH DEMOLITION AND NEW WORK TO DETERMINE SPECIFIC EXTENTS.
30LF ± OF PIPE TO BE ABATED
LEGEND
PIPES, STEAM
HISTORICALLY RECORDED ACM
N
S
W
E
321 4 5 6 7
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs of
LocationPhase
Project Number
Building Number
Drawing Number
Project Title
STAMPARCHITECT/ENGINEER OF RECORD
Date:Revisions:
Issue Date
Approved By: Approved By:
Approved By:Approved By:
Approved By:
Approved By: Approved By:
Approved By:
Drawing Title
Checked Drawn
CONSULTANT
620-20-205620-20-205 Renovate Building 3 Audiology
FDR VA HOSPITAL MONTROSE, NY
2021.11.18 N/A MA&MM
BID DOCUMENTSRevisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyy
Revisions: mm/dd/yyyyAPPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
APPROVED_BY
Rev.
ASBESTOS ABATEMENT PLAN - PIPING
SCALE: 1/8" = 1'-0"1
ASBESTOS AND LEAD PLANS
FD
R
-0
HC-101
KEY PLAN
LEAD-CONTAINING PAINT FINISH PLAN
SCALE: 1/8" = 1'-0"2
KEY PLAN
AutoCAD SHX Text
UP
AutoCAD SHX Text ASBESTOS ABATEMENT GENERAL NOTES 1.