2021-043135-R3 IFQ Package No Plans.pdf

PDF 5 MB Posted

Attached to
Morikami - Tile Replacement and Concrete Repair (RE-BID)
Solicitation number
IFB 410 2021-043135-R3 1
Issued by
Palm Beach County, Florida

About this file

This is an Invitation for Quote/Bid document issued by Palm Beach County's Capital Improvements Division for tile replacement and concrete repair work at the Morikami Museum in Delray Beach, Florida. The project involves removing existing floor tile from museum terraces (front, rear, and cafe areas) and replacing it with new slate tiles (Ardoise, 10mm, 40mm x 80mm with grip finish), along with concrete repair and grinding to create a flat, smooth surface. The contractor must also provide separate bid amounts for applying micro topping in the rear and cafe areas. A mandatory pre-bid conference is scheduled for May 3, 2023, at 10:00 a.m. at the Morikami Museum main entrance. Bids are due May 18, 2023, by 2:00 p.m. and will be opened at a public meeting. The work must be substantially completed within 360 calendar days from the Notice to Proceed, conducted between 8:00 a.m. and 5:00 p.m., Tuesday through Friday, with liquidated damages of $120 per day for failure to achieve substantial completion on schedule.

Bidders must be qualified contractors under Palm Beach County's Annual Contract – Flooring and must submit qualification applications at least 10 days before the bid due date. Bid security and public construction bonds are required for bids of $200,000 or more, with the bid security set at 5% of the bid price and the public construction bond at 100% of the contract value. The project is subject to Palm Beach County's Equal Business Opportunity (EBO) Program requirements, including Small Business Enterprise (SBE) sheltered market provisions for work orders of $100,000 or below and a 10% SBE price preference for single-trade construction. Contractors must submit EBO Schedules 1 and 2 documenting all subcontractors and S/M/WBE participation. All materials must meet or exceed Florida Building Code requirements, and the contractor is responsible for obtaining all measurements during site inspection and securing any required permits within five days of Notice to Proceed. The contractor must provide a 12-month warranty on all equipment, materials, and labor from the date of substantial completion.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR QUOTE/BID

ANNUAL CONTRACT

DATE: 04/19/2023

SENT TO: Qualified Contractors

On the Annual Contract - Flooring

SENT FROM: Capital Improvements Division

CONTACT: Ben Carroll, Facilities Systems Project Manager

PHONE: (561)233-2059

PROJECT NAME: Morikami - Tile Replacement and Concrete Repair

(RE-BID)

PROJECT NUMBER: 2021-043135-R3

Mandatory Pre-Bid Conference. There will be a Mandatory Pre-Bid Meeting at Morikami Museum (meeting at main entrance to museum), located at 4000 Morikami Park Road, Delray Beach, FL at 10:00 a.m. on May 3, 2023. The purpose of this pre-bid meeting will be to review the requirements for the project described in this Invitation for Quote/Bid. The work is to be done under the terms and conditions of Palm Beach County’s Annual Contract – Flooring as supplemented by this Invitation for Quote/Bid. You must attend this meeting if you intend to bid this work, unless your firm attended one of the previously held pre-bid.

Questions must be e-mailed to FDO-CID-Bids@pbcgov.org at least seven (7) calendar days prior to the bid due date. Only questions received in writing will be responded to regarding this Invitation for Quote/Bid.

Form Rev. 11/30/22 Invitation for Quote/Bid - NonFederal

Gregg K. Weiss, Mayor

Maria Sachs, Vice Mayor

Maria G. Marino

Michael A. Barnett

Marci Woodward

Sara Baxter

Mack Bernard

Verdenia C. Baker

Submitting the Quote/Bid Package

The Quote/Bid Package must be enclosed in a sealed opaque envelope. The envelope must be addressed as follows:

Morikami - Tile Replacement and Concrete Repair (RE-BID)

Project Number: 2021-043135-R3

Capital Improvements Division

2633 Vista Parkway

West Palm Beach, Florida 33411

Attention: Bid Submissions

No responsibility will be attached to the Owner for premature opening of or failure to open a quote/bid not properly identified. If the quote/bid is sent by mail, the sealed envelope must be enclosed in a separate mailing with the notation "SEALED QUOTE/BID ENCLOSED" on the face thereof.

PROJECT NAME: Morikami - Tile Replacement and Concrete Repair (RE-BID)

PROJECT NO.: 2021-043135-R3

*DUE: May 18, 2023 by 2:00 p.m.

* The Quotes/Bids received by this time will be opened at a public meeting at the below address.

RETURN TO: Capital Improvements Division

2633 Vista Parkway

West Palm Beach, FL 33411

Qualification of Contractors. In order to submit a quote/bid in response to this IFQ/B, a contractor must be qualified under the Annual Contract - Flooring. A contractor may obtain a Qualification Application for this Annual Contract by sending an email with the Project #, Prequalification: Annual Contract - Flooring in the subject line to: FDO-CID-

Bids@pbcgov.org or call (561) 233-0261. Qualification applications may also be downloaded from the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService. The contractor must submit the Qualification

Application at least 10 days before the Quote/Bid Due Date in order for its quote/bid to be considered.

mailto:FDO-CID-Bids@pbcgov.org https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService

1. SCOPE OF WORK: This Quote/Bid is to furnish all material, labor, supervision, permits and supplies necessary and reasonably incidental to repair concrete and replace tiles per the project requirements provided by Capital Improvements Division in this Invitation for Quote/Bid on Attachment “C” and all exhibits and addenda thereto. Work is to be done under the terms and conditions of Palm Beach

County’s Annual Contract - Flooring, and pursuant to the conditions of the Work Order, both of which are incorporated into the Contract Documents by reference.

2. SCHEDULE OF TIME FOR COMPLETION. The time of completion for this Project will be as follows: The Contractor must substantially complete the work within three hundred sixty (360) calendar days from notice to proceed.

3. LIQUIDATED DAMAGES. Liquidated Damages are $120/day for failure to achieve certification of

Substantial Completion within the Work Order time or approved extension thereof.

4. BID SECURITY AND PUBLIC CONSTRUCTION BOND. Bid Security and Public Construction

Bond are required for this Project in accordance with Section 5.2 of the Instructions to Bidders of the Annual

Contract as follows:

Bid Security. If Bid is $200,000 or over, this Bid must be accompanied by a Bid Security (in the form of, at Bidder's option, cashier's check, certified check, money order or Bid Bond in favor of the County) in the amount of at least five percent (5%) of the bid price, see Section 5.2.2 of the

Instructions to Bidders of the Annual Contract for detailed requirements regarding Bid Security.

Public Construction Bond. If Bid is $200,000 or over (or if cumulative open work orders are

$200,000 or over), then prior to execution of a Work Order, and not later than fourteen (14) calendar days after notification from Owner, the successful Bidder must furnish a Public

Construction Bond in the amount of 100% of the Work Order and Guarantee, see Section 5.2.3 of the Instructions to Bidders of the Annual Contract for detailed requirements regarding the Public

Construction Bond and Guarantee.

5. Equal Business Opportunity Program. Section 5.3 of the Instruction to Bidders of the Annual Contract sets out the requirements of the County’s Equal Business Opportunity Program. All Bidders are required to submit with their bid the appropriate EBO Program schedules. EBO Schedules to be submitted with the quote/bid are as follows:

a) Schedule 1 - List of All Proposed Subcontractors, including S/M/WBE Participation. A completed Schedule 1 shall list the prime and names of all subcontractors, including S/M/WBE subcontractors, intended to be used in performance of the Work Order, if awarded. This schedule shall also be used if an S/M/WBE prime bidder is performing any work and/or using any subcontractors.

b) Schedule(s) 2 - Letter(s) of Intent to Perform as a Subcontractor, including S/M/WBE Subcontractors. A Schedule 2 for each subcontractor, including each S/M/WBE subcontractor, listed on Schedule 1, shall be completed and executed by the proposed subcontractor. The type of Work to be performed by each subcontractor and the dollar value or percentage shall also be specified. Additional copies may be made as needed. A completed Schedule 2 is a binding agreement between the prime contractor and the subcontractor and should be treated as such.

Attachment “A” identifies the affirmative procurement initiatives (APIs) applicable to this Invitation for Quote/Bid.

If Bidder is unable to comply with the API requirements (Attachment “A” hereto), such Bidder shall submit a request for a waiver or partial waiver at least (7) days prior to the quote/bid due date If

Bidder requests a waiver from an API from the Office of EBO at least 7 days prior to the quote/bid due date, then the quote/bid due date will be extended pending the outcome of a waiver request.

Additionally, if the waiver is granted, the solicitation will be amended accordingly and the due date extended again.

6. Addendum. Any interpretation, clarification, correction, or change of the Bidding Documents will be made only by Addendum. The Department will send written instructions regarding discrepancies, omissions or unclear intents to all Bidders who are Qualified Contractors with an

Annual Contract. For projects $100,000 and over all Addendum to a solicitation will also be posted under the applicable solicitation on the County’s on-line Vendor Self-Service (VSS) system at https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService. Interpretations, corrections or changes to the Bidding Documents made in any other manner will not be binding, and Bidders shall not rely upon such interpretations, corrections and changes. Prior to submission of its

Bid/Quote, each Bidder must ascertain that it has received all Addenda issued. The Bidder must acknowledge receipt of each individual Addendum at the time of issuance and final receipt of all

Addenda by completing the acknowledgment space provided on the Addendum Form. Failure to acknowledge receipt may result in rejection of a bid/quote.

7. Failure to Provide the Required Documents after Notification of Award. If after Notification of award from the County, the successful Bidder does not provide within 14 Days of Notification the signed

Work Order, the Public Construction Bond and Guarantee (when required), and the required certificates of insurance, the County may: 1. Call in the bid security when provided; 2. Cancel the notification of recommended award and award the project to the next responsive, responsible low bidder; 3. Terminate this Annual Contract for cause; 4. Suspend or debar the Bidder from bidding on future projects for a period of two (2) years, in accordance with the Palm Beach County Purchasing Ordinance; and/or 5. Pursue any and all remedies available against the Bidder for damages resulting from its failure to enter into a Work

Order and provide all required documents within 14 Days after notification.

8. CONTRACT AMENDMENTS. The Annual Contract is amended as follows:

The Insurance Coverage & Limit Table of General Condition 31.15 to the Contract is amended and modified as follows:

Worker’s Compensation and Employer’s Liability

Coverage not less than statutory

Employer’s Liability Limits $500,000/$500,000/$500,000

The following General Condition is added to the General Conditions:

GC 83 E-VERIFY - EMPLOYMENT ELIGIBILITY

83.1 Contractor warrants and represents that it is in compliance with section 448.095, Florida Statutes, as may be amended, and that it: (1) is registered with the E-Verify System

(E-Verify.gov), and beginning January 1, 2021, uses the E-Verify System to electronically verify the employment eligibility of all newly hired workers; and (2) has verified that all of the Contractor’s subcontractors performing any duties and obligations under this Contract https://pbcvssp.co.palm-beach.fl.us/webapp/vssp/AltSelfService are registered with the E-Verify System and beginning January 1, 2021, use the E-Verify

System to electronically verify the employment eligibility of all newly hired workers.

83.2 Contractor shall obtain from each of its subcontractors an affidavit stating that the subcontractor does not employ, contract with, or subcontract with an Unauthorized Alien, as that term is defined in section 448.095(1)(k), Florida Statutes, as may be amended.

Contractor shall maintain a copy of any such affidavit from a subcontractor for, at a minimum, the duration of the subcontract and any extension thereof. This provision shall not supersede any provision of this Contract which requires a longer retention period.

83.3 Owner shall terminate this Contract if it has a good faith belief that Contractor has knowingly violated Section 448.09(1), Florida Statutes as may be amended.

83.3.1 If Owner has a good faith belief that Contractor’s subcontractor has knowingly violated Section 448.09(1), Florida Statutes, as may be amended, Owner shall notify Contractor to terminate its contract with the subcontractor and

Contractor shall immediately terminate its contract with the subcontractor.

83.4 If Owner terminates this Contract pursuant to the above, Contractor shall be barred from being awarded a future contract by Owner for a period of one (1) year from the date on which this Contract was terminated. In the event of such contract termination, Contractor shall also be liable for any additional costs incurred by Owner as a result of the termination.

Form Rev. 10/18/21 Bid Form - NonFederal

BID FORM

PROJECT NAME: Morikami - Tile Replacement and Concrete Repair (RE-BID)

IN ORDER TO BE DEEMED RESPONSIVE TO THIS INVITATION FOR QUOTE/BID,

THE QUOTE/BID PACKAGE MUST CONTAIN:

a) This Quote/Bid Form completed and executed.

b) EBO Schedules 1 and 2 completed and executed.

c) Bid Security. (If the bid is $200,000 or more).

d) Signed Addenda, if any issued

THE FOLLOWING MUST BE COMPLETED AND SIGNED BY CONTRACTOR

1. TOTAL QUOTE/BID AMOUNT $

Written amount

2. Bidder commits to achieving the APIs applicable to this solicitation as designated on Attachment

A and as submitted on its EBO Schedules 1 and 2.

3. Is the Bidder a Palm Beach County certified S/M/WBE? Yes No

4. Commercial Non-Discrimination Certification. The undersigned Bidder hereby certifies and agrees that the following information is correct: In preparing its response to this Solicitation, the

Bidder has considered all proposals submitted from qualified, potential Subcontractors and suppliers, and has not engaged in "discrimination" as defined in the County’s Commercial

Nondiscrimination Policy as set forth in Resolution 2017-1770 as amended, to wit: discrimination in the solicitation, selection or commercial treatment of any Subcontractor, vendor, supplier or commercial customer on the basis of race, color, national origin, religion, ancestry, sex, age, marital status, familial status, sexual orientation, gender identity or expression, disability, or genetic information, or on the basis of any otherwise unlawful use of characteristics regarding the vendor's, supplier's or commercial customer's employees or owners; provided that nothing in this policy shall be construed to prohibit or limit otherwise lawful efforts to remedy the effects of discrimination that have occurred or are occurring in the County’s relevant marketplace of Palm

Beach County. Without limiting the foregoing, "discrimination" also includes retaliating against any person or other entity for reporting any incident of "discrimination." Without limiting any other provision of the solicitation, it is understood and agreed that, if this certification is false, such false certification will constitute grounds for the County to reject the bid submitted by the Bidder for this Solicitation, and to terminate any contract awarded based on the response. As part of its bid, the Bidder shall provide to the County a list of all instances within the immediate past four (4) years where there has been a final adjudicated determination in a legal or administrative proceeding in the State of Florida that the Bidder discriminated against its Subcontractors, vendors, suppliers or commercial customers, and a description of the status or resolution of that complaint, including any remedial action taken. As a condition of submitting a bid to the County, the Bidder agrees to comply with the County’s Commercial Nondiscrimination Policy as described in Resolution 2017-

1770 as amended.

5. The Bidder shall be bound by the terms of its Bid for a period of one hundred twenty (120) calendar days from the date of the bid opening and may not withdraw its Bid within that time period.

If the County issues a Notification from Owner within the above 120-Day period, then the Bidder will be bound by the Bid as submitted. If the County fails to issue a Notification from Owner to the successful Bidder within the above identified 120-Day period, the successful bidder will not be required to honor its bid unless otherwise agreed to by both parties. County anticipates, but does not guarantee, the award of a Work Order and written notice to proceed within ninety (90) calendar days of Notification from Owner, absent the filing of a timely bid protest.

6. It is agreed that the undersigned has received all addenda complete as issued by the County and that related costs are included in the bid submitted. The undersigned acknowledges receipt of said addenda as follows:

Addendum # dated Addendum # dated

Addendum # dated Addendum # dated

The undersigned has included the signed addenda, if issued, in its bid package.

7. The undersigned does hereby declare that the Bid covers all expenses of every kind incidental to the completion of said Work in accordance with the Contract Documents, including all claims that may arise through damages or other causes whatsoever. The undersigned does hereby declare that it shall make no claim on account of any variation from any estimate in the quantities of Work to be done, nor on account of any misunderstanding or misconception of the nature of the Work to be done or the grounds, subsurface conditions, or place where the Work is to be done.

QUOTE/BID PROVIDED BY:

Contractor Firm Name

Date Signature

Print Name and Title

Quote/Bid Must Contain Original Signatures. No Copies or Emailed/Faxed Quotes/Bids Will

Be Accepted

OEBO SCHEDULE 1

REVISED 05/23/2022

SOLICITATION/PROJECT/BID NAME: _________________________________________ SOLICITATION/PROJECT/BID NO.: ______________________________________

SOLICITATION OPENING/SUBMITTAL DATE: ___________________________________ COUNTY DEPARTMENT: ______________________________________________

Section A PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY THE PRIME CONTRACTOR/CONSULTANT* ON THE PROJECT:

NAME OF PRIME RESPONDENT/BIDDER: _______________________________________________ ADDRESS: ___________________________________________________

CONTACT PERSON: _______________________________________________________ PHONE NO.: ________________________ E-MAIL:_________________________________

PRIME’S DOLLAR AMOUNT OR PERCENTAGE OF WORK: __________________________________ Non-SBE MBE WBE SBE *SMWBE Prime’s must include their percentage or dollar amount in the Total Participation line under section B.

Section B PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY ALL SUBCONTRACTORS/SUBCONSULTANTS ON THE PROJECT BELOW:

(Check all Applicable Categories) Subcontractor/Sub consultant Name MBE WBE SBE Non-SBE Minority Women Small Business Business Business

DOLLAR AMOUNT OR PERCENTAGE OF WORK

Black Hispanic Women Caucasian Asian Other

1.

2.

3.

4.

5.

(Please use additional sheets if necessary) Total ___________ ___________ ____________ ____________ ___________ ___________

Total Bid/Offer Price $______________________________________ Total Certified S/M/WBE Participation $ _____________

I hereby certify that the above information is accurate to the best of my knowledge: ______________________________ Name & Authorized Signature Title

Note: 1. The amount listed on this form for a Subcontractor/sub consultant must be supported by price or percentage listed on the properly executed Schedule 2 or attached signed proposal.

2. Only those firms certified by Palm Beach County at the time of solicitation opening or due date are eligible to meet the established OEBO Affirmative Procurement Initiative (API). Please check the applicable box and list the dollar amount or percentage under the appropriate demographic category.

3. Modification of this form is not permitted and will be rejected upon submittal.

OEBO LETTER OF INTENT – SCHEDULE 2

Revised 09/17/2019

A completed Schedule 2 is a binding document between the Prime Contractor/consultant and a Subcontractor/subconsultant (for any tier) and should be treated as such. The Schedule 2 shall contain bolded language indicating that by signing the Schedule 2, both parties recognize this Schedule as a binding document. All Subcontractors/subconsultants, including any tiered Subcontractors/subconsultants, must properly execute this document. Each properly executed Schedule 2 must be submitted with the bid/proposal.

SOLICITATION/PROJECT NUMBER: ________________________________________________________________________________

SOLICITATION/PROJECT NAME: __________________________________________________________________________________

Prime Contractor: ___________________________________________Subcontractor:______________________________________ (Check box(s) that apply) � SBE � WBE � MBE � M/WBE � Non-S/M/WBE Date of Palm Beach County Certification (if applicable):_______________.

The undersigned affirms they are the following (select one from each column if applicable):

Column 1 Column 2 Column 3

� Male � Female � African-American/Black � Asian American � Caucasian American � Supplier � Hispanic American � Native American

S/M/WBE PARTICIPATION – S/M/WBE Primes must document all work to be performed by their own work force on this form. Failure to submit a properly executed Schedule 2 for any S/M/WBE participation may result in that participation not being counted. Specify in detail, the scope of work to be performed or items supplied with the dollar amount and/or percentage for each work item. S/M/WBE credit will only be given for the areas in which the S/M/WBE is certified. A detailed proposal may be attached to a properly executed Schedule 2.

Line Item

Item Description Unit Price Quantity/ Units

Contingencies/ Allowances

Total Price/Percentage

The undersigned Subcontractor/subconsultant is prepared to self-perform the above-described work in conjunction with the aforementioned project at the following total price or percentage:

Print Name of Prime Print Name of Subcontractor/subconsultant

By: _____________________________________________ By: ________________________________________________

Authorized Signature Authorized Signature

Print Name Print Name

Title Title

Date: ___________________________________________ Date: ______________________________________________

If the undersigned intends to subcontract any portion of this work to another Subcontractor/subconsultant, please list the business name and the amount below accompanied by a separate properly executed Schedule 2.

Price or Percentage:

Name of 2nd/3rd tier Subcontractor/subconsultant

THearn Highlight

SAMPLE OEBO SCHEDULE 1

Carlin Park, Maintenance Bldg - Roof Replacement 19600SOLICITATION/PROJECT/BID NO.:

FDO/CID

SOLICITATION/PROJECT/BID NAME:

SOLICITATION OPENING/SUBMITTAL DATE: COUNTY DEPARTMENT:

Section A PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE COMPLETED BY THE PRIME CONTRACTOR/CONSULTANT* ON THE PROJECT:

123 Somewhere St. WPB, FL 33415Roofers Are Us, Inc.

NAME OF PRIME RESPONDENT/BIDDER:

John Doe

ADDRESS:

123-456JB90 janedow@email.comPHONE NO.: E-MAIL:CONTACT PERSON:

$95,000

SBENon-SBEPRIME'S DOLLAR AMOUNT OR PERCENTAGE OF WORK:

*SMWBE Primes must include their percentage or dollar amount in the Total Participation line under section B. 0i

Section B iCTORS/SUBCONSULTANTS ON THE PROJECT BELOW:PLEASE LIST THE DOLLAR AMOUNT OR PERCENTAGE OF WORK TO BE IPLI

MUST List ALL Subcontractors/Subconsuitants (Check all Applicable Categorii

MBE

Non-SBE Minority

Business iQLLAR AMOUNT OR PERCENTAGE OF WORK Subcontractor/Sub consultant Name DIRECTION: List Firm Name, Address, & Provide PBC Vendor ID#, (https://www.pbcgov.org/pbcvendors)

HispanicBl Women Asian OtherCaucasian

Subcontractor 1 1 1222 Easy St. WPB,FL 33401 7

561-123-456 VC178229

$50,385.80

1 r Subcontractor 2

~ 5600 Carefree Lane, WPB, FL 33411

Z - 954-345-6789 VC123459

$35,995.05

3.

4.

Add AH Certified SBE Amounts, including Prime SBEf~~~l15.

(Please use additional sheets if necessary) $95,000$50,385.80 $35,995.05 Total

$145,385.80Total Bid/Offer Price $181 380.85 Total Cwtified S/M/WBE Participation $

PresidentI hereby certify that the above information is accurate to the best of my knowledge:

Name & Authorized Signature Title

1. The amount listed on this form for a Subcontractor/Sub consultant must be supported by price or percentage listed on the properly executed Schedule 2 or attached signed proposal.

2. Only those firms certified by Palm Beach Count£l»t-thetime of solicitation opening or due date are eligible to meet the established OEBO Affirmative Procurement Initiative (API). Please check the applicable box and list the dollar amount or percentage under the appropriate demographic category.

3. Modification of this form is not permitted and will be rejected upon submittal.

Note:

REVISED 06/30/2022

SAMPLE

Form Rev. 10/18/21 Attachment A for Asphalt, Demolition, Electrical, Flooring, HVAC, Low Voltage, Painting and Weatherproofing, Roofing

ATTACHMENT “A”

(for Asphalt, Demolition, Electrical, Flooring, HVAC, Low Voltage, Painting and Weatherproofing, Roofing)

AFFIRMATIVE PROCUREMENT INITIATIVES (APIs) FOR CONSTRUCTION

PROCUREMENT

The API(s) approved for this project are selected below by ☒. Fillable pdfs of all EBO forms can be found on the OEBO website at http://discover.pbcgov.org/oebo/Pages/Compliance- Programs.aspx. Also, see the EBO Ordinance and Countywide PPM CW-O-043 for further information on APIs.

__X__ SBE Sheltered Market for Small Construction Contracts

Under this contract, Work Orders $100,000 and below are reserved for competition among only certified SBEs. Small prime construction contracts (single trade or multi-trade) valued at or below $100,000 may be reserved for sheltered market competition where only certified SBEs are eligible to submit bids or quotes.

__X__ SBE Price Preference For Single Trade Construction

The work orders under this contract shall be awarded to the lowest, responsive, responsible bidder unless a certified SBE’s bid is within ten percent (10%) of the lowest non-SBE bid, in which case the award shall be made to the certified SBE bidder. Construction contracts where there are no opportunities for subcontracting (i.e.

single trade), may include a provision requiring awards of the contract to be made to the lowest responsive, responsible respondent or bidder unless a certified SBE’s bid is within ten (10) percent of the lowest non-small business bid, in which case the award shall be made to the certified small business bidder submitting the lowest responsive, responsible bid at the price that it bid.

http://discover.pbcgov.org/oebo/Pages/Compliance-Programs.aspx

IFQ/B ATTACHMENT B

Include Attachment B if bid is $200,000 or more

DATE:

BID BOND

STATE OF FLORIDA

COUNTY OF PALM BEACH

KNOW ALL MEN BY THESE PRESENTS: That we, (hereinafter called "Principal"), and

(hereinafter called "Surety") are held and firmly bound unto Palm Beach

County, a Political Subdivision in the State of Florida, by and through its Board of County Commissioners, (hereinafter called "County") in the sum of

Dollars,($ ), (which sum is at least 5% of the bid price), lawful money of the United States of America, for the payment of which sum will and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly be these presents;

WHEREAS, the "Principal" contemplates submitting or has submitted a bid to the Board of County Commissioners, Palm Beach County, Florida, for furnishing and paying for all necessary labor materials, equipment, machinery, tools, apparatus, services, all state workmen's compensation and unemployment compensation taxes incurred in the performance of the Contract, means of transportation for and complete Construction of: Morikami - Tile

Replacement and Concrete Repair (RE-BID), Project Number 2021-043135-R3, in the County of Palm Beach, State of Florida; and

WHEREAS, it was a condition precedent to the submission of said bid that a certified check cashier's check, money order or bid bond in the amount of five percent (5%) of the base bid be submitted with said bid as a guarantee that the bidder would, if given a Notification from Owner, enter into a written contract with the County, and furnish a public construction bond in an amount equal to one hundred (100%) of the total Contract, within fourteen (14) consecutive calendar days after the County issues the Notification from Owner.

NOW THEREFORE, THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, if the bid of the

"Principal" herein is accepted and said "Principal", within fourteen (14) consecutive calendar days after written notice being given of such acceptance, (i) enter into a written contract with the County and (ii) furnishes a public construction contract bond in the amount equal to one hundred percent (100%) of the total contract amount and in a form satisfactory to the County, then this obligation shall be void. If the Principal fails to complete (i) and (ii) above, the sum herein stated shall be due and payable to the "County", and the "Surety" herein agrees to pay said sum immediately upon demand of the "County", in good and lawful money of the United States of America, as liquidated damages for failure of said "Principal".

Bid Bond Must Contain Original Signatures. No Copies Will Be Accepted.

DATE:

IN WITNESS WHEREOF, the said as

"Principal" herein, has caused these presents to be signed in its name, by its

, and attested by its under the corporate seal, and the said as "Surety" herein, has caused these presents to be signed in its name, by its , and attested by its corporate Seal, this day of , A.D., 20 .

ATTEST:

(Signature)

Print Name

TITLE: ______

(SEAL)

(Contractor Firm Name)

By:

Print Name and Title:

ATTEST:

Print Name

TITLE: ______

(SEAL)

(Surety Name)

By:

Print Name and Title:

Bid Bond Must Contain Original Signatures. No Copies Will Be Accepted.

CAPITAL IMPROVEMENT DIVISION

IFQ/B ATTACHMENT C

PROJECT REQUIREMENTS

Annual Contract – Flooring

Contact: Ben Carroll, Capital Improvements Division Phone: (561) 233-2059 Project Title: Morikami Museum – Concrete Repair and Tile Replacement (RE-BID) Project #: 2021-043135-R3 Project Location: 4000 Morikami Park Road, Delray Beach, FL

1. GENERAL

a. The work covered by this Request for Quote consists of furnishing of all labor, equipment, devices, tools, materials, transportation, professional services, supervision, drawings, permitting and all miscellaneous requirements to perform all operations necessary to accomplish the work set forth below and shall be considered part of the Scope of Work.

b. Please reference the Annual Contract – Flooring for additional requirements.

c. Work to be completed during the hours of 8:00 a.m. to 5:00 p.m., Tuesday through

Friday.

d. Contractor shall contact the Project Manager, within seventy-two (72) hours of

“Notice to Proceed” to establish scheduling etc. required for project implementation.

e. Work to be completed within three hundred sixty (360) calendar days from notice to proceed. Permit application, if required, is to be submitted by Contractor within five

(5) days of “Notice to Proceed” and due diligence exercised to address all Building Department comments.

f. Liquidated damages will accrue in the amount of $120 per day.

g. The Contractor will provide a Certificate of Occupancy or Certificate of Completion, as appropriate, obtained from the proper Building official, prior to processing of final payment.

h. Contractor is responsible for obtaining all measurements during the site inspection.

2. SCOPE OF WORK

To repair concrete and replace tiles per the project requirements provided below:

a. Contractor to remove and properly dispose of all floor tile in the museum terraces (front, rear, and café) as shown on Exhibit “1”.

b. Contractor shall work in sections to allow museum visitors and staff to enter and exit museum and grounds during construction.

c. Contractor to properly remove existing tiles and replace them with new slate tiles.

Tiles are to be Ardoise, 10mm, 40mm x 80mm with grip finish, rectified tile size (if available), or Palm Beach County (PBC) approved equal, as referenced in Exhibit “2” and Exhibit “6”. The thin-set material shall be for exterior tile installation and approved by the county.

d. Thin-set material shall comply with tile manufacturer’s recommendation and tile installation location.

e. Grout lines to be a maximum of 1/16 inches. Grout color is to be selected from manufacturer’s standard color line. County and Morikami Museum Architect to approve final grout color.

f. All flooring materials shall be installed in compliance with ADA standards, especially in slope and floor transitions.

g. Contractor to repair all cracked concrete and grind concrete to a flat smooth-level surface. Contractor shall repair concrete as outlined in Exhibit “3” as attached.

h. Contractor to provide separate bid amounts to apply micro topping on concrete in the rear and café areas as outlined in Exhibits “4” and “5”, or PBC approved equal. Install micro topping in compliance with ADA floor-level transitions

i. Contractor to provide bids for individual line items for each location (front, rear, and café) to determine if funding is available.

j. Contractor shall generate a “construction schedule” based on floor-tile delivery date and labor time frame to prepare and install new tiles.

3. SUBMITTALS

All submittals shall be sent to the Project Manager for approval. This includes, but is not limited to, products to be used, methods of installation and requests for information and/or clarification. All submittals must be made by the Contractor and must include all details necessary for the Project Manager and Palm Beach County to make any necessary determinations. A transmittal form must be included which clearly requests data or information and deviations from the contract requirements for which approval is being requested. Failure to provide sufficient information will result in the rejection of the submittal. Where the specifications do not specify a brand name product or where a substitution of a product is not specifically prohibited, the Contractor shall submit their selected products for approval by the Project Manager. Such submittals shall include as much detail, and in a format, as required by the Project Manager, so as to allow the Project Manager to evaluate the proposed substitution.

4. MATERIALS

a. All material shall meet or exceed Florida Building Code and product submittals shall be reviewed and approved by the Owner’s Representative prior to ordering.

b. Materials shall be delivered in their original, unopened packages, and protected from exposure to the elements. Damaged or deteriorated materials shall not be used.

5. TEMPORARY PROTECTION

The Contractor shall protect all workers, staff and the general public from injury. The Contractor shall coordinate and schedule all work with the Project Manager.

6. PROJECT CONDITIONS

Contractor is to coordinate all space and security requirements with the Project Manager.

A construction schedule shall be submitted for review and approval prior to pre-construction meeting, including a start date, substantial completion date, and work plan defining which openings will be scheduled on what day. The Contractor shall conduct all work so as to cause the least interference possible with the normal activities of the operations of the facility and surrounding areas. Any damage caused by Contractor (including landscaping and irrigation) shall be the responsibility of the Contractor to repair and return to its original state.

7. PREPARATION

It shall be the responsibility of the Contractor to prep the site at the construction locations.

8. EXAMINATION

Report to the Project Manager, in writing, any imperfections, unacceptable conditions and/or corrections required to be made before commencing work. Any items not identified, documented and reported to PBC in writing, will become part of the contractors’ scope. All other items identified in writing, if approved, shall result in a change order.

9. INSTALLATION

All materials shall be installed in strict accordance with Manufacturer’s written instructions and recommendations. All work shall be done in conformance with applicable Federal, State and Local codes, and established standards.

10. WARRANTY

Contractor warrants all equipment, materials and labor furnished or performed against defects in design, materials and workmanship for a period of twelve (12) months from substantial completion.

11. CLEAN UP

Remove all waste materials, tools and equipment from job site daily. Thoroughly clean the entire job area prior to requesting final inspection.

12. SECURITY

All bidders must have badged employees as identified below prior to commencement of work.

This project is subject to: [ ] Critical Facilities Background Check

[ ] CJI Facilities Background Check [X] No Background Check

EXHIBIT “1”

This exhibit contains exempt and confidential information.

Firms must submit a Nondisclosure Agreement prior to exhibit distribution, as the bid documents contain exempt and/or confidential information under Florida

Public Records Law.

To request this exhibit, please send an email with the following subject line

“Project # & Non-Disclosure” to FDO-CID-Bids@pbcgov.org or by calling (561)

233-0292.

EXHIBIT "2"

Technical Data Bulletin | www.SuperStone.com | 305.681.3561 REV 1.17

CRACK REPAIR KIT

Super Stone® Crack Repair Kit is an easy to apply and complete system that provides flawless, long-lasting crack repairs. Crack repair material can be feather-edged to zero, resulting in seamless, durable repairs that are invisible after applying decorative top coat.

RECOMMENDED USAGE

For use with or without fabric as a concrete patch or may also be used as a flexible waterproof coating for above or below grade cementitious surfaces such as concrete, masonry, stucco foundations, block, cement ponds, or CBS walls.

• Interior and Exterior

• Spalled and Cracked Concrete

• Pedestrian and Vehicular Traffic Surfaces

• Horizontal and Vertical Applications

• Concrete and Masonry Resurfacing Projects

COVERAGE DRY TIME

100 Linear Feet Per 4 Gallons

3 ft2 per bag at 1/2" thick

6 ft2 per bag at 1/4" thick

12 ft2 per bag at 1/8" thick

25 ft2 per bag at 1/16" thick

Approximately 4-24 hours depending upon location, temperature and humidity.

SURFACE PREPARATION

Remove any spalling, loose, or deteriorated cementitious surfaces. Use a high-pressure water cleaner or sandblast. (2500 PSI) Surface must be firm, free of dust, dirt, oil, debris or moisture.

APPLICATION

Mixing Instructions

Smooth or textured finish: Mix thoroughly with 16 oz of water and 4 lbs of mix.

Knock down finish: Use less water. Start with 12 oz and add an ounce at a time until the desired consistency is obtained.

Mix no more than 16 oz of water per kit. Dry times vary dependent upon temperature, humidity, and mixing water temperature. After application protect from freezing and moisture water for at least 24 hours. Air and surface temperature of the substrate will affect the working time and method of curing needed.

EXHIBIT "3"

Technical Data Bulletin | www.SuperStone.com | 305.681.3561 REV 1.17

Once Mixed

Only mix material needed and apply mixture to cleaned patch area with a margin trowel or spackle knife at 1/16” thickness. Let the material set for approximately 5 minutes depending upon the temperature. Cooler temperatures will take longer to set. Warm or hot temperatures will set quicker.

Dip the tile sponge into the bucket of cool water and wring out so that the sponge is moist but not soaked. Use the sponge to blend the edges and smooth the first coat. Mix the remainder of the patch kit. Dip a long-bristled paint brush into the patch kit and flick the material onto the patch area. Wait about 5 minutes’ and use a pool trowel to knock down the drops of material flicked from the brush.

One pass is all that is needed. The area should be completely dried within a few hours. Use the edge of the trowel to scrape any nips or burs from the patched area. A grinding stone may also be used.

The deck is now ready to be resealed once it is fully cleaned and dried.

SAFETY PRECAUTIONS

Use with adequate ventilation. A (NIOSH) approved respirator is recommended. Avoid breathing vapor for prolonged periods of time and use gloves to avoid repeated contact with the skin. In case of fire, use foam, dry chemical or Carbon Dioxide.

Avoid contact with eyes, skin, and clothing. First Aid: Eyes-- In case of eye contact flush right away with large amounts of water for at least 15 minutes and seek immediate medical attention. Skin-- Wash the affected area thoroughly with soap and water. Inhalation-- If you experience difficulty breathing, remove yourself from the area to obtain fresh air. If symptoms persist or develop, seek medical attention. Ingestion-- Do not induce vomiting. Call a physician or poison control center immediately for further instructions. Never give anything by mouth to an unconscious or convulsing person. Rinse out the mouth with water.

Limited Warranty: Since no control is exercised over product use, Super Stone® only warrants that this product is of consistent quality within manufacturing tolerances. Seller’s and manufacturer’s obligation under this warranty shall be limited to refunding the purchase price of the portion of the material proved to be defective. NO OTHER ORAL OR WRITTEN

REPRESENTATION OR STATEMENT OF ANY KIND, EXPRESSED OR IMPLIED, NOW OR

HEREAFTER MADE IS AUTHORIZED OR WARRANTED BY SUPER STONE, INCLUDING

THOSE OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Super Stone will not be liable for special, incidental or consequential damages, including for delays or lost profits.

FOR PROFESSIONAL USE

WARNING! HARMFUL OR FATAL IF SWALLOWED. KEEP OUT OF THE REACH OF CHILDREN.

OVEREXPOSURE MAY CAUSE SKIN IRRITATION, SERIOUS EYE IRRITATION, RESPIRATORY

IRRITATION, ALLERGY OR ASTHMA SYMPTOMS OR BREATHING DIFFICULTIES IF INHALED.

MAY CAUSE DAMAGE TO ORGANS THROUGH PROLONGED OR REPEATED USE,

SUSPECTED OF CAUSING CANCER.

SOLICITATIONPROJECT NUMBER: 2021-043135-R3
SOLICITATIONPROJECT NAME: Morikami Museum - Concrete Repair and Tile Replacement (RE-BID)
Prime Contractor:
Subcontractor:
Date of Palm Beach County Certification if applicable:
Line ItemRow1:
Item DescriptionRow1:
Unit PriceRow1:
Quantity UnitsRow1:
Contingencies AllowancesRow1:
Total PricePercentageRow1:
Line ItemRow2:
Item DescriptionRow2:
Unit PriceRow2:
Quantity UnitsRow2:
Contingencies AllowancesRow2:
Total PricePercentageRow2:
Line ItemRow3:
Item DescriptionRow3:
Unit PriceRow3:
Quantity UnitsRow3:
Contingencies AllowancesRow3:
Total PricePercentageRow3:
Line ItemRow4:
Item DescriptionRow4:
Unit PriceRow4:
Quantity UnitsRow4:
Contingencies AllowancesRow4:
Total PricePercentageRow4:
Line ItemRow5:
Item DescriptionRow5:
Unit PriceRow5:
Quantity UnitsRow5:
Contingencies AllowancesRow5:
Total PricePercentageRow5:
Line ItemRow6:
Item DescriptionRow6:
Unit PriceRow6:
Quantity UnitsRow6:
Contingencies AllowancesRow6:
Total PricePercentageRow6:
at the following total price or percentage:
Name of 2nd3rd tier Subcontractorsubconsultant:
Print Name of Prime:
By:
Print Name:
Title:
Date:
Price or Percentage:
Print Name of Subcontractorsubconsultant:
By_2:
Print Name_2:
Title_2:
Date_2:
Check Box1: Off
NAME OF PRIME RESPONDENTBIDDER:
ADDRESS:
PRIMES DOLLAR AMOUNT OR PERCENTAGE OF WORK:
Total:
undefined:
undefined_2:
undefined_3:
undefined_4:
undefined_5:
Total BidOffer Price:
Title0:
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
PARTICIPATION:
Text31:
Text32:
Text33:
Text34:
Text35: Morikami Museum - Concrete Repair and Tile Replacement (RE-BID)
Text36: 2021-043135-R3
Text37:
Text38:
Text39:
Text40:
Text41:
Text42:
Text43:
Text44:
Text45:
Text46:
Text47:
Text48:
Text49:
Text50:
Text51:
Text52:
Text53:
Text54:
Text55:
Text56:
Text57:
Text58:
Text59:
Text60:
Text61:
Text62:
Text63:
Text64:
Text65:
Text66:
Text67:
Text68:
Text69:
Text70:
Text71:
Text72: