20200519 CDRLS A001-A003-A004.pdf
PDF 500 KB Posted
- Attached to
- Can, Hermetic Sealing
- Solicitation number
- N0025320Q0159
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0025320Q0159 A0001.pdf | ||
| N0025320Q0159 Conformed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing, and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information
Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Harrisonget, Paperwork Reduction
Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting
Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER MISC
D. SYSTEM/ITEM
HERMETIC SEALING CAN
E. CONTRACT/PR NO.
N00253-20-X-XXXX
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
CERTIFICATE OF COMPLIANCE
3. SUBTITLE
CERTIFICATE OF CONFORMANCE
17.PRICE GROUP
4. AUTHORITY (Data Acquisition Doc. No.)
DI-MISC-81356A
5. CONTRACT REFERENCE
SOW PARAGRAPH 2
6. REQUIRING OFFICE
NUWCDIVKPT
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMSSN
SEE BLOCK 16
14. DISTRIBUTION
SEE BLOCK 16
18. ESTIMATED
TOTAL PRICE
8. APP CODE SEE BLK 16 11. AS OF DATE 13.DATE OF SUBSEQ SUBMSSN b. COPIES
N/A N/A SEE BLOCK 16 a. ADDRESSEE Final
16. REMARKS Draft Reg Repro
TPOC 1
PCO 1
CS 1
15. TOTAL 3
G. PREPARED BY
Jose Cardoza
H. DATE
20 May 2020
I. APPROVED BY
Donald Joel Mapes, Certified Data Manager
J. DATE
21 May 2020
DD Form 1423-1, FEB 2001 Previous editions are obsolete. Page 1 of 1 Page
BLOCK 4: Contractor format is acceptable.
BLOCK 9: DISTRIBUTION STATEMENT D - Distribution authorized to the U.S. Department of Defense and U.S. DoD contractors only. Administrative (insert date). Other requests shall be referred to NUWC, Division Keyport, Attn: Contracting, 610 Dowell Street, Keyport, WA 98345-7610.
BLOCKS 10, 12 and 13: A certificate of conformance shall be delivered with each production delivery lot.
BLOCK 14: Distribution and submittal shall be by electronic media whenever possible to addressees specified in the CDRL Distribution List. Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government. The deliverables shall be in accordance with the latest Federal Government Microsoft Office approved version.
Text Document: Adobe PDF (.pdf, searchable) or Microsoft Word (.doc) Presentation: Adobe PDF (.pdf, searchable) or Microsoft PowerPoint (.ppt) Spreadsheet: Microsoft Excel (.xls)
If this CDRL deliverable contains classified information, distribution and submittal shall be in accordance with the contract DD Form 254.
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing, and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information
Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Harrisonget, Paperwork Reduction
Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting
B. EXHIBIT
A
E. CONTRACT/PR NO.
N00253-20-X-XXXX
A004
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
FIRST ARTICLE AND PRODUCTION
TEST REPORTS
17.PRICE GROUP
4. AUTHORITY (Data Acquisition Doc. No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
SOW PARAGRAPH 10
12. DATE OF FIRST SUBMSSN
SEE BLOCK 16
14. DISTRIBUTION
SEE BLOCK 16
18. ESTIMATED
TOTAL PRICE
8. APP CODE SEE BLK 16 11. AS OF DATE 13.DATE OF SUBSEQ SUBMSSN b. COPIES
N/A N/A SEE BLOCK 16 a. ADDRESSEE Final
16. REMARKS Draft Reg Repro
TPOC 1
Donald Joel Mapes, Certified Data manager
DD Form 1423-1, FEB 2001 Previous editions are obsolete. Page 1 of 1 Pages
BLOCK 4: Contractor format acceptable.
BLOCK 9: DISTRIBUTION STATEMENT D - Distribution authorized to the U.S. Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests shall be referred to NUWC, Division Keyport, Attn: Contracting, 610 Dowell Street, Keyport, WA 98345-7610.
BLOCKS 10, 12 and 13: Test data shall be delivered with each shipment of material (first article and production units). See contract for delivery schedule.
BLOCK 14: Distribution and submittal shall be by electronic media whenever possible to addressees specified in the CDRL Distribution List. Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government. The deliverables shall be in accordance with the latest Federal Government Microsoft Office approved version.
Text Document: Adobe PDF (.pdf, searchable) or Microsoft Word (.doc) Presentation: Adobe PDF (.pdf, searchable) or Microsoft PowerPoint (.ppt) Spreadsheet: Microsoft Excel (.xls)
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing, and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information
Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Harrisonget, Paperwork Reduction
Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting
B. EXHIBIT
A
E. CONTRACT/PR NO.
N00253-20-X-XXXX
A003
2. TITLE OF DATA ITEM
SCIENTIFIC AND TECHNICAL REPORTS
3. SUBTITLE
MANUFACTURING MATERIALS
LIST
17.PRICE GROUP
4. AUTHORITY (Data Acquisition Doc. No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
SOW PARAGRAPH 10
12. DATE OF FIRST SUBMSSN
SEE BLOCK 16
14. DISTRIBUTION
SEE BLOCK 16
18. ESTIMATED
TOTAL PRICE
8. APP CODE SEE BLK 16 11. AS OF DATE 13.DATE OF SUBSEQ SUBMSSN b. COPIES
N/A N/A SEE BLOCK 16 a. ADDRESSEE Final
16. REMARKS Draft Reg Repro
TPOC 1
Donald Joel Mapes, Certified Data Manager
BLOCK 4: Contractor format acceptable.
BLOCK 9: DISTRIBUTION STATEMENT D - Distribution authorized to the U.S. Department of Defense and U.S. DoD contractors only. Critical Technology: (insert date). Other requests shall be referred to NUWC, Division Keyport, Attn: Contracting, 610 Dowell Street, Keyport, WA 98345-7610.
BLOCKS 10, 12 and 13: A manufacturing materials list shall be delivered with each shipment of material (first article and production units). See contract for delivery schedule.
BLOCK 14: Distribution and submittal shall be by electronic media whenever possible to addressees specified in the CDRL Distribution List. Electronic deliverables shall be delivered in the following formats unless otherwise approved by the Government. The deliverables shall be in accordance with the latest Federal Government Microsoft Office approved version.
Text Document: Adobe PDF (.pdf, searchable) or Microsoft Word (.doc) Presentation: Adobe PDF (.pdf, searchable) or Microsoft PowerPoint (.ppt) Spreadsheet: Microsoft Excel (.xls)
5/21/2020
X Joel Mapes
Donald Joel Mapes
Certified Data Manager
Signed by: MAPES.DONALD.J.1392160201
DD Form 1423-1, FEB 2001 Previous editions are obsolete. Page 1 of 1 Pages
CDRL Distribution List. Provide documentation in accordance with Block 14 of the appropriate CDRL. The e-mail subject block shall contain the contract number, CDRL title and date.
Distribution mailing addressees and electronic mailing addresses are provided below.
Block 14 Entry Mailing Address Attention E-mail Address
TPOC Commander Naval Undersea Warfare Center Division Keyport 610 Dowell Street Keyport, WA 98345-7610
FirstName LastName, Title, Code
Jose Cardoza Jose.l.cardoza@navy.mil 360-315-0754
PCO Commander Naval Undersea Warfare Center Division Keyport 610 Dowell Street Keyport, WA 98345-7610
FirstName LastName, Contracting Officer, Code
Jason Gavinski jason.gavinski@navy.mil 360-615-0947
CS Commander Naval Undersea Warfare Center Division Keyport 610 Dowell Street Keyport, WA 98345-7610
FirstName LastName, Contract Specialist, Code
Elizabeth Ferguson elizabeth.ferguson@navy.mil 360-396-5024 mailto:Jose.l.cardoza@navy.mil mailto:jason.gavinski@navy.mil mailto:elizabeth.ferguson@navy.mil
File details come from the government source that posted it. Updated .