2020_POW_Maintenance_Worklist.docx
DOCX document 16 KB Posted
- Attached to
- Prince of Wales Island Road Maintenance
- Solicitation number
- 12010920Q0033
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Relevant Experience Evaluation Form.pdf | ||
| 12010920Q0033 Solicitation.pdf | ||
| 156_Public Traffic.docx | DOCX document | |
| POW RD MTCE vicinity map.pdf | ||
| Construction Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2020 POW Road Maintenance and Culvert Replacement Worklist
| Road Number |
| Milepost |
| Description of Work |
3018 000
| 8.65 |
| Slide removal - sidecast approximately 200CY of debris from road |
3023 500
| 0.93 |
| Remove slide debris (approximately 100 CY)from road surface, haul to helicopter landing 150ft before slide, reconstruct catch basin and lead-in ditch to 36" CPP, excavate channel and re-establish ditchline |
| 1.96 |
| Remove slide debris (approximately 300 CY) from road surface, end haul debris to turnout at MP 0.94, re-establish upslope ditch(approx. 300FT), repair road surface |
3000 000
| 18.36 |
| Install new 24"x40' CPP |
| 20.92 |
| Install new 18"x30' CPP/ 200ft of ditching |
| 21.17 |
| Remove 18" CMP and replace with 24"x40' CPP/ 500ft of ditching as staked |
| 23.23 |
| Remove earthen berms from underneath approach rails so water may drain off of the road prism. Install 4 object markers with posts |
| 23.3 |
| Install new 36"x40' CPP |
| 23.52 |
| 200ft of ditching as staked- remove woody debris from ditch as well as reconstruct short section of ditch |
| 23.56 |
| Remove 18" CMP and replace with 24"x40' CPP |
| 23.61 |
| Remove 18" CMP and replace with 24"x35' CPP |
| 23.95 |
| Remove earthen berms from underneath approach rails so water may drain off of the road prism. Install 4 object markers with posts |
| 24.29 |
| Remove 18" CMP and replace with 24"x40' CPP |
| 24.34 |
| Remove 18" CMP and replace with 24"x30' CPP |
| 24.46 |
| Remove 24"CMP and replace with 24"x30' CPP |
| 24.52 |
| Remove 18" CMP and replace with 24"x30' CPP |
| 24.67 |
| Remove 24"CMP and replace with 24"x30' CPP |
| 24.77 |
| Remove 24" CMP and replace with 24"x40' CPP |
| 24.821 |
| Remove earthen berms from underneath approach rails so water may drain off of the road prism. |
| 33.49 |
| Remove earthen berms from underneath approach rails so water may drain off of the road prism. Install 4 object markers with posts |
| 37.75 |
| Remove earthen berms from underneath approach rails so water may drain off of the road prism. Install 4 object markers with posts |
| 37.88 |
| Remove earthen berms from underneath approach rails so water may drain off of the road prism. |
| 38.37 |
| Remove 18" CMP and replace with 24"x30' CPP |
| 38.37-38.41 |
| Ditch |
| 38.37-38.41 |
| Haul and place 20CY crushed rock to repair road surface |
| 38.41 |
| Remove 18" CMP and replace with 24"x30' CPP |
| 38.41-38.455 |
| Ditching |
| 38.455 |
| Install new 24"x30' CPP with ditchblock- ditch 50ft to 38.47 |
| 40.35 |
| Remove 18" CMP and replace with 18"x30' CPP - 150ft of ditching |
| 40.4 |
| Remove 18" CMP and replace with 18"x35' CPP - 150ft ditching |
| 40.47 |
| Remove 24" CMP replace with 24"x30' CPP |
| 40.5 |
| Remove 18" CMP replace with24"x35' CPP |
| 40.56 |
| Remove 18" CMP replace with 18"x35' CPP |
| 40.64 |
| Remove 18" CMP replace with 24"x30' CPP |
| 40.74 |
| Remove 18" CMP replace with 24"x35' CPP |
| 40.82 |
| Remove 18" CMP replace with 24"x30' CPP |
| 41.11 |
| Remove 18" CMP replace with 24"x35' CPP with ditchblock |
| 41.15 |
| Remove 18" CMP replace with 24"x35' CPP |
| 41.2 |
| Remove 18" CMP replace with 24" x30' CPP |
| 41.3 |
| Remove 18" CMP replace with 18"x30' CPP |
| 41.51 |
| Remove 18" CMP replace with 18"x30' CPP |
| 41.62 |
| Remove 18" CMP replace with 18"x30' CPP |
| 41.84 |
| Haul and place 80CY of riprap (class 3-5)to repair slump below road |