2020-MOC_P-Stair tower Statment of need.docx

DOCX document 18 KB Posted

Attached to
Platform Stands - MOC-P Federal contract opportunity
Solicitation number
NMAN7100-20-00526
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

View the file

Other files for this federal contract opportunity

Other files attached to Platform Stands - MOC-P, newest first.
File Type Posted
2019-Rampmaster Stairtower diagram.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Late Update: 12/3/2019

STATEMENT OF NEED FOR SUPPLIES < $150K

NMAN7100-20-00526

PURPOSE:

Purchase of several fabricated platform stands that match up to Rampmaster 0408005-GW gangways. Our need is for one 48” platform height, and two 72” platform height towers that meet the specifications of the Rampmaster Model #0408005-PS platform stand. These platforms will be used to assist visiting NOAA ship’s Rampmaster gangways and the Newport Oregon tidal ranges.

TECHNICAL SPECIFICATIONS:

1 Pier stand meeting the following specification:

· Aluminum construction w/ SS hardware

· Minimum capacity of 100 lb/sq.ft. plus lower end of fully loaded Rampmaster 0408005-GW gangway

· 48” Usable width x 10’ nominal length

· 48” Top platform height

· 48” x 36” Top platform with open bar grating, slip resistant surface

· 35º Incline with slip resistant treads

· Pipe handrails with midrail

· Four (4) swivel casters

· Connecting pads for Rampmaster 0408005-GW gangway

· Connecting axle for Rampmaster 0408005-GW gangway 2 Pier stand meeting the following specification:

· Aluminum construction w/ SS hardware

· Minimum capacity of 100 lb/sq.ft. plus lower end of fully loaded Rampmaster 0408005-GW gangway

· Up to 72” Usable width x 12 nominal length (or safest for 72” height top platform height)

· 72” Top platform height

· 48” x 36” Top platform with open bar grating, slip resistant surface

· 35º Incline with slip resistant treads

· Pipe handrails with midrail

· Four (4) swivel casters

· Connecting pads for Rampmaster 0408005-GW gangway

· Connecting axle for Rampmaster 0408005-GW gangway

DELIVERABLE SCHEDULE:

48” stand should be delivered prior to June 1st 2020. The other two 72” stands, no later than August 1st 2020.

REFERENCES:

ISO 5488:1979 - Shipbuilding - Accommodation Ladders ISO 7061:1993 - Shipbuilding - Shore Gangways ISO 7364:1983 - Shipbuilding - Ladder Winches IMO MSC.1/Circ.1331

PLACE OF PERFORMANCE or DELIVERY ADDRESS:

2002 SE Marine Science Drive, Newport Oregon. 97365

SPECIAL CONSIDERATIONS: None

TECHNICAL POINT OF CONTACT (TOC): LCDR Tim Sinquefield or LCDR Colin Kliewer 541-867-8703

File details come from the government source that posted it. Updated .