2020-01-13_MCP 138-15_Electrical Safety Program.pdf

PDF 2 MB Posted

Attached to
J061--FY25 Service (Base +4) | Buffalo VAMC Generator Maintenance Services | 528
Solicitation number
36C24225Q0834
Issued by

About this file

This document is a Medical Center Policy (MCP) for the VA Western New York Healthcare System's Electrical Safety Program, numbered 138-15, effective January 13, 2020. The policy comprehensively outlines electrical safety procedures and responsibilities for all employees and contractors working with electrical systems, designed to protect personnel from injury and comply with OSHA and NFPA regulations. Key requirements include:

The policy establishes detailed responsibilities for various organizational levels, including the Engineering Manager's duties to compile qualified personnel lists, conduct arc and flash hazard assessments, ensure proper personal protective equipment (PPE) is used, and maintain electrical safety policies. Employees are required to adhere to electrical safety guidelines, observe warning signs, report equipment defects, and follow specific work practices such as de-energizing parts, using appropriate PPE, and maintaining minimum approach distances from electrical hazards. The document includes extensive definitions, work practices, training requirements, and references to national safety standards like NFPA 70E and OSHA regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .