2019803 Structures Plans_Part 1 of 2.pdf

PDF 18 MB Posted

Attached to
CR-880 and Sam Senter Rd over SFWMD Ocean Canal
Solicitation number
IFB 360 2019803 10
Issued by
Palm Beach County, Florida

About this file

This file contains structural plans for the CR-880 and Sam Senter Road bridge project over the SFWMD Ocean Canal in Florida, prepared by design and engineering professionals for the state transportation authority. The document presents Part 1 of 2 of comprehensive structural design plans that detail the bridge construction specifications, engineering drawings, and technical requirements necessary for the replacement or rehabilitation of the existing structures crossing the canal. The plans include architectural and structural details required for contractors to bid on and execute the construction project, establishing the technical baseline for project implementation and contractor performance standards.

The structural plans serve as the primary technical reference document for solicitation of construction bids and represent the engineering design phase deliverable that precedes the formal bidding process. These plans form the basis for cost estimation, scheduling, and construction methodology that bidders will use to prepare their proposals. As Part 1 of a two-part document set, these plans work in conjunction with additional detailed drawings and specifications to provide complete project documentation necessary for qualified contractors to submit competitive bids for the bridge construction work.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .