2019803 Roadway Plans_Part 2 of 3.pdf

PDF 19 MB Posted

Attached to
CR-880 and Sam Senter Rd over SFWMD Ocean Canal
Solicitation number
IFB 360 2019803 5
Issued by
Palm Beach County, Florida

About this file

This is a roadway plans document (Part 2 of 3) prepared for the Florida Department of Transportation or relevant county jurisdiction for the CR-880 and Sam Senter Road improvement project over the SFWMD Ocean Canal. The document contains detailed engineering and design plans for the proposed roadway improvements, including alignments, cross-sections, and structural specifications for bridge or culvert construction over the canal. The plans establish the technical requirements and design standards that will govern the construction and bidding process for this infrastructure project.

The roadway plans document serves as a critical component of the procurement package, providing contractors with the engineering specifications, site conditions, and design parameters necessary to prepare accurate bids for the project. As Part 2 of a three-part set, this document works in conjunction with other plan sheets to present a comprehensive design solution for improving traffic flow and safety at the CR-880 and Sam Senter Road intersection while accommodating the SFWMD Ocean Canal crossing. Contractors and engineers should review all three parts of the plans concurrently to ensure full understanding of the project scope, and this technical documentation will be referenced throughout the bidding, award, and construction phases of the contract.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .