53810 Federal Register / Vol. 84, No. 195 / Tuesday, October 8, 2019 / Notices
d. Enhancing aviation training, mentorship, education, and outreach programs that are exclusive to women.
No later than 2 years after the date of the enactment of the Reauthorization Act of 2018, the Board shall submit a report outlining the comprehensive plan for strategies to the Administrator and the appropriate committees of Congress.
Membership: The membership will be fairly balanced in terms of points of view represented and the functions performed. The stakeholder groups to be represented on the Board will include:
a. Major airlines and aerospace companies.
b. Nonprofit organizations within the aviation industry.
c. Aviation business associations.
d. Engineering business associations.
e. United States Air Force Auxiliary, Civil Air Patrol.
f. Institutions of higher education and aviation trade schools.
All Board members serve at the pleasure of the Secretary of Transportation. Other membership criteria include:
a. Members shall be appointed for the duration of the existence of the Board.
b. Members will serve without government compensation or reimbursement.
c. Representative members must represent a particular interest in employment, education, experience, or affiliation with a specific aviation-related organization.
d. Members must attend at least three-quarters of all Board meetings (estimated two meetings annually).
Qualifications: Representative member candidates must be in good public standing and currently serve as a member of their organization’s core senior leadership team. In some circumstances, membership will be granted to uniquely qualified individuals who do not meet this latter requirement.
Materials to Submit: Candidates are required to submit, in full, the following materials to be considered for Board membership. Failure to submit the required information may disqualify a candidate from the review process.
a. A short biography of the nominee, including professional and academic credentials.
b. A résumé or curriculum vitae, which must include relevant job experience, qualifications, as well as contact information.
c. Up to three letters of recommendation may be submitted, but are not required. Each letter may be no longer than one page.
d. A one-page statement describing how the candidate will benefit the
Board, taking into account the candidate’s unique perspective that will advance the conversation. This statement must also identify a primary and secondary stakeholder group to which the candidate’s expertise best aligns. Finally, candidates should state their previous experience on a Federal Advisory Committee, their level of knowledge in the above stakeholder groups, and the size of the constituency they represent or are able to reach.
Evaluations will be based on the materials submitted by the prospective candidates and will include consideration for membership balancing to ensure each of the above stakeholder groups has adequate representation.
Issued in Washington, DC, on September 30, 2019.
Angela Anderson, Senior Advisor, Office of the Assistant Administrator for Human Resource Management, Federal Aviation Administration.
[FR Doc. 2019–21962 Filed 10–7–19; 8:45 am]
BILLING CODE P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
Notice of Funding Opportunity for the Federal-State Partnership for State of Good Repair Program
AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT).
ACTION: Notice of funding opportunity (NOFO or notice).
SUMMARY: This notice details the application requirements and procedures to obtain grant funding for eligible projects under the Federal-State Partnership for State of Good Repair Program (Partnership Program). This notice solicits applications for Partnership Program funds made available by the Consolidated Appropriations Act, 2019. The opportunity described in this notice is made available under Catalog of Federal Domestic Assistance (CFDA) number 20.326, ‘‘Federal-State Partnership for State of Good Repair.’’ DATES: Applications for funding under this solicitation are due no later than 5:00 p.m. EDT, December 9, 2019. FRA will not consider applications for funding or supplemental material in support of an application received after 5:00 p.m. EDT, on December 9, 2019 or incomplete applications for funding.
See Section D of this notice for additional information on the application process.
ADDRESSES: Applications must be submitted via www.Grants.gov. Only applicants who comply with all submission requirements described in this notice and submit applications through www.Grants.gov will be eligible for award. For any supporting application materials that an applicant is unable to submit via www.Grants.gov (such as oversized engineering drawings), an applicant may submit an original and two (2) copies to Amy Houser, Office of Program Delivery, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W36–412, Washington, DC 20590. However, due to delays caused by enhanced screening of mail delivered via the U.S. Postal Service, applicants are advised to use other means of conveyance (such as courier service) to assure timely receipt of materials before the application deadline.
FOR FURTHER INFORMATION CONTACT: For further project- or program-related information in this notice, please contact Mr. Bryan Rodda, Office of Policy and Planning, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W38–203, Washington, DC 20590; email:
Bryan.Rodda@dot.gov; phone: 202–493– 0443. Grant application submission and processing questions should be addressed to Ms. Amy Houser, Office of Program Delivery, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W36–412, Washington, DC 20590; email:
amy.houser@dot.gov; phone: 202–493– 0303.
SUPPLEMENTARY INFORMATION:
Notice to applicants: FRA recommends that applicants read this notice in its entirety prior to preparing application materials. The term ‘‘grant’’ is used throughout this document and is intended to reference funding awarded through a grant agreement, as well as funding awarded to recipients through a cooperative agreement. Definitions of key terms used throughout the NOFO are provided in Section A(2). These key terms are capitalized throughout the NOFO. There are several administrative and eligibility requirements described herein with which applicants must comply. Additionally, applicants should note that the required Project Narrative component of the application package may not exceed 25 pages in length.
Table of Contents
A. Program Description B. Federal Award Information C. Eligibility Information D. Application and Submission Information E. Application Review Information
VerDate Sep<11>2014 21:50 Oct 07, 2019 Jkt 250001 PO 00000 Frm 00139 Fmt 4703 Sfmt 4703 E:\FR\FM\08OCN1.SGM 08OCN1jb el l o n
D S
K 3G
LQ
2P R
O D w ith
N O
T
IC
E S mailto:Bryan.Rodda@dot.gov mailto:amy.houser@dot.gov http://www.Grants.gov http://www.Grants.gov
53811 Federal Register / Vol. 84, No. 195 / Tuesday, October 8, 2019 / Notices
1 For any project that includes purchasing intercity passenger rail equipment, applicants are encouraged to use a standardized approach to the procurement, such as the specifications developed by the Next Generation Corridor Equipment Pool Committee or a similarly uniform process.
F. Federal Award Administration Information
G. Federal Awarding Agency Contacts H. Other Information
A. Program Description
1. Overview
The purpose of this notice is to solicit applications for grants for Capital Projects within the United States to repair, replace, or rehabilitate Qualified Railroad Assets to reduce the state of good repair backlog and improve Intercity Passenger Rail performance under the Partnership Program. The Partnership Program provides a Federal funding opportunity to leverage private, state, and local investments to significantly improve American rail infrastructure. The Partnership Program is authorized in Sections 11103 and 11302 of the Passenger Rail Reform and Investment Act of 2015 (Title XI of the Fixing America’s Surface Transportation (FAST) Act, Pub. L. 114–94 (2015));
codified at 49 U.S.C. 24911 and this NOFO is funded by the 2019 Appropriation.
The Department recognizes the importance of applying life cycle asset management principles throughout America’s infrastructure. It is important for rail infrastructure owners and operators, as well as those who may apply on their behalf, to plan for the maintenance and replacement of assets and the associated costs. In light of recent fatal passenger rail accidents, the Department particularly recognizes the opportunity to enhance safety in both track and equipment through this grant program, and encourages the submission of proposed projects to grade-separate or otherwise improve safety at highway-rail grade crossings.
The Partnership Program is intended to benefit both the Northeast Corridor (‘‘NEC’’) and the large number of public or Amtrak-owned or controlled infrastructure, equipment, and facilities located in other areas of the country, including strengthening transportation options for rural American communities. Applicants should note that the Partnership Program has distinct eligibility requirements based on project location. In addition to the generally applicable requirements, applicants proposing NEC Projects should specifically review the NEC-specific requirements provided in Section C(3)(b), and the Qualified Railroad Asset information provided in Section D(2)(a)(vi) while applicants proposing Non-NEC Projects should review the Qualified Railroad Asset information provided in Section D(2)(a)(v).
2. Definitions of Key Terms
a. ‘‘Benefit-Cost Analysis’’ (or ‘‘Cost- Benefit Analysis’’) is a systematic, data-driven, and transparent analysis comparing monetized project benefits and costs, using a no-build baseline and properly discounted present values, including concise documentation of the assumptions and methodology used to produce the analysis, a description of the baseline, data sources used to project outcomes, values of key input parameters, basis of modeling (including spreadsheets, technical memos, etc.), and presentation of the calculations in sufficient detail and transparency to allow the analysis to be reproduced and sensitivity of results evaluated by FRA. Please refer to the Benefit-Cost Analysis (BCA) Guidance for Discretionary Grant Programs prior to preparing a BCA at https:// www.transportation.gov/office-policy/ transportation-policy/benefit-cost-analysis-guidance. In addition, please also refer to the BCA FAQs on FRA’s website for rail-specific examples of how to apply the BCA Guidance for Discretionary Grant Programs to Partnership Program applications.
b. ‘‘Capital Project’’ means a project primarily intended to replace, rehabilitate, or repair major infrastructure assets utilized for providing Intercity Passenger Rail service, including tunnels, bridges, and stations; or a project primarily intended to improve Intercity Passenger Rail performance, including reduced trip times, increased train frequencies, and higher operating speeds, consistent with 49 U.S.C. 24911(a)(2).
c. ‘‘Commuter Rail Passenger Transportation’’ means short-haul rail passenger transportation in metropolitan and suburban areas usually having reduced fare, multiple ride, and commuter tickets and morning and evening peak period operations, consistent with 49 U.S.C. 24102(3).
d. ‘‘Intercity Rail Passenger Transportation’’ means rail passenger transportation, except Commuter Rail Passenger Transportation, consistent with 49 U.S.C. 24911(a)(3). In this notice, ‘‘Intercity Passenger Rail’’ is an equivalent term to ‘‘Intercity Rail Passenger Transportation.’’
e. ‘‘Major Capital Project’’ means a Capital Project with an estimated total project cost of $300 million or more.
f. ‘‘NEC Project’’ means a Capital Project where the Qualified Railroad Assets involved in the project are part of, or in primary use for, the Northeast Corridor (‘‘NEC’’).
g. ‘‘Non-NEC Project’’ means a Capital Project where the Qualified Railroad
Assets involved in the project are not part of, or are not in primary use for, the Northeast Corridor (‘‘NEC’’).
h. ‘‘Northeast Corridor’’ (‘‘NEC’’) means the main rail line between Boston, Massachusetts, and the District of Columbia; the branch rail lines connecting to Harrisburg, Pennsylvania, Springfield, Massachusetts, and Spuyten Duyvil, New York; and facilities and services used to operate and maintain these lines, consistent with 49 U.S.C. 24911(a)(4).
i. A ‘‘Qualified Railroad Asset,’’ consistent with 49 U.S.C. 24911(a)(5), means infrastructure, equipment, or a facility that:
i. is owned or controlled by an eligible applicant;
ii. is contained in the planning document developed under 49 U.S.C.
24904 and for which a cost-allocation policy has been developed under 49 U.S.C. 24905(c), or is contained in an equivalent planning document and for which a similar cost-allocation policy has been developed; and
iii. was not in a State of Good Repair on the date of enactment of the Passenger Rail Reform and Investment Act of 2015 (December 4, 2015).
See Section D(2)(a), Project Narrative, for further details about the Qualified Railroad Asset requirements and application submission instructions related to Qualified Railroad Assets.1
j. ‘‘State of Good Repair’’ means a condition in which physical assets, both individually and as a system, are (A) performing at a level at least equal to that called for in their as-built or as-modified design specification during any period when the life cycle cost of maintaining the assets is lower than the cost of replacing them; and (B) sustained through regular maintenance and replacement programs, consistent with 49 U.S.C. 24102(12).
B. Federal Award Information
1. Available Award Amount
The total funding available for awards under this NOFO is $396,000,000 after $4,000,000 is set aside for FRA award and project management oversight as provided in the 2019 Appropriation.
Should additional Partnership Program funds become available after the release of this NOFO, FRA may elect to award such additional funds to applications received under this NOFO.
VerDate Sep<11>2014 21:50 Oct 07, 2019 Jkt 250001 PO 00000 Frm 00140 Fmt 4703 Sfmt 4703 E:\FR\FM\08OCN1.SGM 08OCN1jb el l o n
D S
K 3G
LQ
2P R
O D w ith
N O
T
IC
E S https://www.transportation.gov/office-policy/transportation-policy/benefit-cost-analysis-guidance https://www.transportation.gov/office-policy/transportation-policy/benefit-cost-analysis-guidance https://www.transportation.gov/office-policy/transportation-policy/benefit-cost-analysis-guidance
53812 Federal Register / Vol. 84, No. 195 / Tuesday, October 8, 2019 / Notices
2 See Section D(2)(a)(iv) for supporting documentation required to demonstrate eligibility under this eligibility category.
2. Award Size
There are no predetermined minimum or maximum dollar thresholds for awards. FRA anticipates making multiple awards with the available funding. Given the limited amount of funding currently available, FRA may not be able to award grants to all eligible applications, nor even to all applications that meet or exceed the stated evaluation criteria (see Section E, Application Review Information).
Applicants are encouraged to identify scalable elements such as project components that have operational independence. (See Section C(3)(c) for more information.)
FRA strongly encourages applicants to identify and include other state, local, public, or private funding or financing to support the proposed project in order to maximize competitiveness.
Applicants proposing a Major Capital Project are encouraged to identify and describe project phases or elements that could be candidates for subsequent Partnership Program funding, if such funding becomes available.
Applications for a Major Capital Project that would seek future funds beyond fiscal year 2019 funding made available in this notice should indicate anticipated annual Federal funding requests from this program for the expected duration of the project. FRA may issue Letters of Intent to Partnership Program grantees proposing Major Capital Projects under 49 U.S.C.
24911(g); such Letters of Intent would serve to announce the FRA’s intention to obligate an amount from future available budget authority toward a grantee’s future project phases or elements. A Letter of Intent is not an obligation of the Federal government and is subject to the availability of appropriations for Partnership Program grants and subject to Federal laws in force or enacted after the date of the Letter of Intent.
3. Award Type
FRA will make awards for projects selected under this notice through grant agreements and/or cooperative agreements. Grant agreements are used when FRA does not expect to have substantial Federal involvement in carrying out the funded activity.
Cooperative agreements allow for substantial Federal involvement in carrying out the agreed upon investment, including technical assistance, review of interim work products, and increased program oversight under 2 CFR 200.24. The funding provided under this NOFO will be made available to grantees on a reimbursable basis. Applicants must certify that their expenditures are allowable, allocable, reasonable, and necessary to the approved project before seeking reimbursement from FRA.
Additionally, the grantee is expected to expend matching funds at the required percentage concurrent with Federal funds throughout the life of the project.
See an example of standard terms and conditions for FRA grant awards at:
https://www.fra.dot.gov/eLib/Details/ L19057.
4. Concurrent Applications DOT and FRA may be concurrently soliciting applications for transportation infrastructure projects for several financial assistance programs.
Applicants may submit applications requesting funding for a particular project to one or more of these programs. In the application for Partnership Program funding under this NOFO, applicants must indicate the other program(s) to which they submitted or plan to submit an application for funding the entire project or certain project components, as well as highlight new or revised information in the Partnership Program application that differs from the application(s) submitted for other Federal financial assistance programs.
C. Eligibility Information This section of the notice explains applicant eligibility, cost sharing and matching requirements, project eligibility, and project component operational independence. Applications that do not meet the requirements in this section will be ineligible for funding. Instructions for submitting eligibility information to FRA are detailed in Section D of this NOFO.
1. Eligible Applicants The following entities are eligible applicants for all projects permitted under this notice:
(1) A state (including the District of Columbia);
(2) a group of states;
(3) an Interstate Compact;
(4) a public agency or publicly chartered authority established by one or more states; 2
(5) a political subdivision of a state;
(6) Amtrak, acting on its own behalf or under a cooperative agreement with one or more states; or
(7) any combination of the entities described in (1) through (6).
Applications must identify a lead applicant. The lead applicant serves as the primary point of contact for the application, and if selected, as the recipient of the Partnership Program grant award. To submit a joint application, the lead applicant must identify the joint applicant(s) and include a signed statement from an authorized representative of each joint applicant entity that affirms the entity joins the application. See Section D(2) for further instructions about submitting a joint application.
An application submitted by Amtrak and one or more states must identify the lead applicant and include a signed cooperative agreement between Amtrak and the state(s) consistent with 49 U.S.C. 24911(a)(1)(F). Selection preference will be provided for joint applications, as further discussed in Section E(1)(c). Applications may reference entities that are not eligible applicants (e.g., private sector firms) in an application as a project partner.
However, FRA will provide selection preference to joint applications submitted by multiple eligible applicants.
2. Cost Sharing or Matching The Federal share of total costs for a project funded under the Partnership Program shall not exceed 80 percent, though FRA will provide selection preference to applications where the proposed Federal share of total project costs is 50 percent or less. The estimated total cost of a project must be based on the best available information, including engineering studies, studies of economic feasibility, environmental analyses, and information on the expected use of equipment and facilities. The minimum 20 percent non- Federal share may be comprised of public sector (e.g., state or local) or private sector funding. However, FRA will not consider any other Federal grants, nor any non-Federal funds already expended (or otherwise encumbered), that do not comply with 2 CFR 200.458, as applicable, toward the matching requirement.
FRA is limiting the first 20 percent of the non-Federal match to cash contributions only. Contributions of specified items or activities may be accepted for any non-Federal matching beyond the first 20 percent. Such contributions including the donation of services, materials, and equipment, may be credited as a project cost, in a uniform manner consistent with 2 CFR
200.306. Moreover, FRA encourages
applicants to broaden their funding table in applications. FRA will give preference to non-Federal shares consisting of funding from multiple sources that demonstrate broad
VerDate Sep<11>2014 21:50 Oct 07, 2019 Jkt 250001 PO 00000 Frm 00141 Fmt 4703 Sfmt 4703 E:\FR\FM\08OCN1.SGM 08OCN1jb el l o n
D S
K 3G
LQ
2P R
O D w ith
N O
T
IC
E S https://www.fra.dot.gov/eLib/Details/L19057 https://www.fra.dot.gov/eLib/Details/L19057
53813 Federal Register / Vol. 84, No. 195 / Tuesday, October 8, 2019 / Notices participation and cost sharing from affected stakeholders. If Amtrak is an applicant, Amtrak may use its ticket and other non-Federal revenues generated from its operations and other sources to satisfy the non-Federal share requirements. Applicants must identify the source(s) of their matching and other funds, and must clearly and distinctly reflect these funds as part of the total project cost.
Before applying, applicants should carefully review the principles for cost sharing or matching in 2 CFR 200.306.
FRA will approve pre-award costs consistent with 2 CFR 200.458. See Section D(6). Additionally, in preparing estimates of total project costs, applicants should refer to FRA’s cost estimate guidance, ‘‘Capital Cost Estimating: Guidance for Project Sponsors,’’ which is available at:
https://www.fra.dot.gov/Page/P0926.
3. Other
a. Project Eligibility
Projects eligible for Partnership Program funds include Capital Projects within the United States to replace or rehabilitate Qualified Railroad Assets and improve Intercity Passenger Rail performance, including:
(1) Capital Projects to replace existing assets in-kind;
(2) Capital Projects to replace existing assets with assets that increase capacity or provide a higher level of service;
(3) Capital Projects to ensure that service can be maintained while existing assets are brought into a State of Good Repair; and
(4) Capital Projects to bring existing assets into a State of Good Repair.
Qualified Railroad Assets, as further defined in Section A(2), are owned or controlled by an eligible applicant and may include: Infrastructure, including track, ballast, switches and interlockings, bridges, communication and signal systems, power systems, highway-rail grade crossings, and other railroad infrastructure and support systems used in intercity passenger rail service; stations, including station buildings, support systems, signage, and track and platform areas; equipment, including passenger cars, locomotives, and maintenance-of-way equipment;
and facilities, including yards and terminal areas and maintenance shops.
Capital Projects, as further defined in Section A(2), may include final design;
however, final design costs will only be eligible in conjunction with an award for project construction. Environmental and related clearances, including all work necessary for FRA to approve the project under the National
Environmental Policy Act (NEPA) and related statutes and regulations are not eligible for funding under this notice.
(See Section D(2)(a)(ix) for additional information.) Eligible projects with completed environmental and engineering documents indicate strong project readiness.
b. Additional Eligibility Requirements for NEC Projects
This section provides additional eligibility requirements for NEC Projects. Applicants proposing Non- NEC Projects are not subject to the requirements in this section, and may proceed to Section C(3)(c).
In the Partnership Program, grant funds may not be provided to an eligible recipient for an eligible NEC Project unless Amtrak and the public authorities providing commuter rail passenger transportation at the eligible project location on the NEC are in compliance with 49 U.S.C. 24905(c)(2).
Applicants must demonstrate compliance with 49 U.S.C. 24905(c)(2) by describing the status of compliance with such cost-allocation policy between Amtrak and the public authorities providing commuter rail passenger transportation at the eligible project location, which may include demonstrating that such authorities are excepted from allocating costs for the proposed NEC Project, consistent with 49 U.S.C. 24905(c)(1)(A)(ii). Such providers must maintain compliance with 49 U.S.C. 24905(c)(2) for the duration of the project.
c. Project Component Operational Independence
If an applicant requests funding for a project that is a component or set of components of a larger project, the project component(s) must be attainable with the award amount and comply with all eligibility requirements described in Section C.
In addition, the component(s) must enable independent analysis and decision making, as determined by FRA under NEPA (i.e., have independent utility, connect logical termini, and not restrict the consideration of alternatives for other reasonably foreseeable rail projects.) Components must have independent utility for use in the BCA.
D. Application and Submission Information
Required documents for the application are outlined in the following paragraphs. Applicants must complete and submit all components of the application. See Section D(2) for the application checklist. FRA welcomes the submission of additional relevant supporting documentation, such as planning, engineering and design documentation, and letters of support from partnering organizations that will not count against the Project Narrative page limit.
1. Address To Request Application Package
Applicants must submit all application materials in their entirety through www.Grants.gov no later than 5:00 p.m. EDT, on December 9, 2019.
FRA reserves the right to modify this deadline. General information for submitting applications through Grants.gov can be found at: https:// www.fra.dot.gov/Page/P0270.
For any supporting application materials that an applicant cannot submit via Grants.gov, such as oversized engineering drawings, an applicant may submit an original and two (2) copies to Amy Houser, Office of Program Delivery, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W36–412, Washington, DC 20590. However, due to delays caused by enhanced screening of mail delivered via the U.S. Postal Service, FRA advises applicants to use other means of conveyance (such as courier service) to assure timely receipt of materials before the application deadline. Additionally, if documents can be obtained online, explaining to FRA how to access files on a referenced website may also be sufficient.
2. Content and Form of Application Submission
FRA strongly advises applicants to read this section carefully. Applicants must submit all required information and components of the application package to be considered for funding.
Additionally, applicants selected to receive funding must satisfy the requirements in 49 U.S.C. 22905 explained in part at https:// www.fra.dot.gov/page/P0185.
Required documents for an application package are outlined in the checklist below.
• Project Narrative (see D.2.a).
• Statement of Work (see D.2.b.i).
• Benefit-Cost Analysis (see D.2.b.ii).
• Environmental Compliance
Documentation (see D.2.b.iii).
• SF424—Application for Federal
Assistance.
• SF 424C—Budget Information for
Construction, or, for an equipment procurement project without any construction costs, or SF 424A—Budget Information for Non-Construction.
• SF 424D—Assurances for Construction, or, for an equipment procurement project without any
VerDate Sep<11>2014 21:50 Oct 07, 2019 Jkt 250001 PO 00000 Frm 00142 Fmt 4703 Sfmt 4703 E:\FR\FM\08OCN1.SGM 08OCN1jb el l o n
D S
K 3G
LQ
2P R
O D w ith
N O
T
IC
E S https://www.fra.dot.gov/Page/P0270 https://www.fra.dot.gov/Page/P0270 https://www.fra.dot.gov/page/P0185 https://www.fra.dot.gov/page/P0185 https://www.fra.dot.gov/Page/P0926
53814 Federal Register / Vol. 84, No. 195 / Tuesday, October 8, 2019 / Notices construction costs, or SF 424B— Assurances for Non-Construction.
• FRA’s Additional Assurances and Certifications.
• SF LLL—Disclosure of Lobbying Activities.
a. Project Narrative This section describes the minimum content required in the Project Narrative of grant applications. The Project Narrative must follow the basic outline below to address the program requirements and assist evaluators in locating relevant information.
I. Cover Page—See D.2.a.i II. Project Summary—See D.2.a.ii III. Project Funding—See D.2.a.iii IV. Applicant Eligibility Criteria—See
D.2.a.iv
V. Non-NEC Project Eligibility Criteria— See D.2.a.v
VI. NEC Project Eligibility Criteria—See D.2.a.vi
VII. Detailed Project Description—See D.2.a.vii
VIII. Project Location—See D.2.a.viii IX. Grade Crossing Information, if applicable—See D.2.a.ix X. Evaluation and Selection Criteria—
See D.2.a.x XI. Project Implementation and
Management—See D.2.a.xi XII. Environmental Readiness—See
D.2.a.xii
The above content must be provided in a narrative statement submitted by the applicant. The Project Narrative may not exceed 25 pages in length
(excluding cover pages, table of contents, and supporting documentation). FRA will not review or consider for award applications with Project Narratives exceeding the 25-page limitation. If possible, applicants should submit supporting documents via website links rather than hard copies. If supporting documents are submitted, applicants must clearly identify the relevant portion of the supporting document with the page numbers of the cited information in the Project Narrative. The Project Narrative must adhere to the following outline.
i. Cover Page: Include a cover page that lists the following elements in either a table or formatted list:
Project title
Lead Applicant Organization Name
Joint Applicant(s) Organization Name(s), if any
Amount of Federal Funding Requested Under this NOFO
Proposed Non-Federal Match
Total Project Cost
Was a Federal Grant Application Previously Submitted for this Project? Yes/No
If Yes, State the Name of the Federal Grant Program and Title of the Project in the Previous Application Federal Grant Program:
City(-ies), State(s) Where the Project is Located
Congressional District(s) Where the Project is Located
ii. Project Summary: Provide a brief 4–6 sentence summary of the proposed project and what the project will entail.
Include challenges the proposed project aims to address, and summarize the intended outcomes and anticipated benefits that will result from the proposed project.
iii. Project Funding: Indicate the amount of Federal funding requested, the proposed non-Federal match, and total project cost. Identify the source(s) of matching and other funds, and clearly and distinctly reflect these funds as part of the total project cost in the application budget. Also, note if the requested Federal funding under this NOFO or other programs must be obligated or spent by a certain date due to dependencies or relationships with other Federal or non-Federal funding sources, related projects, law, or other factors. If applicable, provide the type and estimated value of any proposed contributions, as well as substantiate how the contributions meet the requirements in 2 CFR 200.306. For a Major Capital Project that would seek future funds beyond fiscal year 2019 funding made available in this notice, provide the anticipated annual Federal funding requests from this grant program for the expected duration of the project. Finally, specify whether Federal funding for the project has previously been sought, and identify the Federal program and fiscal year of the funding request(s), as well as highlight new or revised information in the Partnership Program application that differs from the application(s) to other financial assistance programs.
iv. Applicant Eligibility Criteria:
Explain how the lead applicant and joint applicant(s) meet the applicant eligibility criteria outlined in Section C of this notice, including references to creation or enabling legislation for public agencies and publicly chartered authorities established by one or more states. To submit a joint application, the lead applicant must identify the joint applicant(s) and include a signed statement from an authorized representative of each joint applicant entity that affirms the entity joins the application. Joint applications are expected to include a description of the roles and responsibilities of each applicant, including budget and subrecipient information showing how the applicants will share project costs.
v. Non-NEC Project Eligibility Criteria:
This section provides project eligibility requirements for Non-NEC Projects.
Applicants proposing NEC Projects may skip this section and proceed to section D(2)(a)(vi). For Non-NEC Projects, demonstrate that the proposed project is a Capital Project that meets the project eligibility criteria in Section C(3) of this notice. Further, demonstrate that the infrastructure, equipment and/or facilities involved in the proposed project are Qualified Railroad Assets under 49 U.S.C. 24911(a)(5), as follows:
(A) To demonstrate ownership or control by an eligible applicant under 49 U.S.C. 24911(a)(5)(A), show either:
(1) The lead or joint applicant owns or will, at project completion, have ownership of the infrastructure, equipment, or facility improved by the project; or
(2) The lead or joint applicant controls or will, at project completion, have control over the infrastructure, VerDate Sep<11>2014 21:50 Oct 07, 2019 Jkt 250001 PO 00000 Frm 00143 Fmt 4703 Sfmt 4703 E:\FR\FM\08OCN1.SGM 08OCN1jb el l o n
D S
K 3G
LQ
2P R
O D w ith
N O
T
IC
E S
53815 Federal Register / Vol. 84, No. 195 / Tuesday, October 8, 2019 / Notices equipment, or facility improved by the project including by agreement with the infrastructure, equipment, or facility owner(s). Applicants should describe such agreement(s) in sufficient detail in their application for FRA to understand the extent of the control, including the lead or joint applicant’s management and decision-making authority regarding the infrastructure, equipment, or facility improved by the project, and the remaining or anticipated duration of the agreement(s). Agreements involving railroad rights-of-way should also demonstrate the lead or joint applicant has train dispatching and maintenance-of-way responsibilities for the right-of-way.
(B) To demonstrate the requirements under 49 U.S.C. 24911(a)(5)(B), show that the infrastructure, equipment, or facilities involved in the proposed project are contained in a planning document equivalent to the planning document developed under 49 U.S.C.
24904 and which has a similar cost-allocation policy to the cost-allocation policy developed under 49 U.S.C.
24905(c) has been developed.
Non-NEC Projects may satisfy the equivalent planning document requirement by demonstrating the project is contained in the planning document(s) prepared under 49 U.S.C.
Chapter 227, ‘‘State Rail Plans,’’ for the state(s) where the infrastructure, equipment and facilities are located or in primary use. Applicants with projects contained in a State Rail Plan should indicate the location (e.g., table or page number) where the project is discussed in the document. If a project is not contained in the State Rail Plan, applicants may demonstrate the infrastructure, equipment and facilities involved in the proposed project are contained in an equivalent planning document, or amend the relevant State Rail Plan(s) to contain the project.
Amending a State Rail Plan requires a letter to FRA from an authorized representative of the relevant state rail transportation authority adding the proposed project to the plan and stating that the letter serves as an addendum to the current plan. Such a letter should include the project name, a brief description of the project, and estimated project cost and Federal and non- Federal share by funding source. FRA encourages state rail transportation authorities to make any such addendum letters publicly available with their State Rail Plans. FRA recommends such letters be submitted as part of an applicant’s Partnership Program application via Grants.gov. Whether submitted as part of a Partnership Program application package or separately to FRA, FRA must receive the letter by the application due date of this notice.
Non-NEC Projects must satisfy the similar cost-allocation policy requirement either by demonstrating the infrastructure, equipment or facilities involved in the proposed project are for routes subject to the cost-allocation policy adopted under Section 209 of the Passenger Rail Investment and Improvement Act of 2008 (PRIIA), Public Law 110–432, Oct. 16, 2008; or by demonstrating the infrastructure, equipment or facilities involved in the proposed project are subject to a similar cost-allocation policy.
(C) To demonstrate the state of good repair requirement under 49 U.S.C.
24911(a)(5)(B):
(1) Describe the condition and performance of the infrastructure, equipment, or facility as of the time of enactment of the Passenger Rail Reform and Investment Act of 2015 (Dec. 4, 2015);
(2) indicate how the infrastructure, equipment, or facility’s condition or performance falls short of the definition of ‘‘State of Good Repair’’ in Section A(2); and
(3) indicate, if known, when the infrastructure, equipment, or facility last received comprehensive repair, replacement, or rehabilitation work similar to the applicant’s proposed scope of work.
vi. NEC Project Eligibility Criteria:
This section provides project eligibility requirements for NEC Projects.
(Applicants proposing Non-NEC Projects may skip this section and proceed to Section D(2)(a)(vii).) For NEC Projects, demonstrate that the proposed project is a Capital Project that meets the project eligibility criteria in Section C(3) of this notice including the requirements in 49 U.S.C. 24911(e).
Further, demonstrate that the infrastructure, equipment, and/or facilities involved in the project are Qualified Railroad Assets under 49 U.S.C. 24911(a)(5), as follows:
(A) To demonstrate ownership or control by an eligible applicant under 49 U.S.C. 24911(a)(5)(A), show either:
(1) The lead or joint applicant owns or will, at project completion, have ownership of the infrastructure, equipment, or facility improved by the project; or
(2) The lead or joint applicant controls or will, at project completion, have control over the infrastructure, equipment, or facility improved by the project including by agreement with the infrastructure, equipment, or facility owner(s). Applicants should describe such agreement(s) in sufficient detail in their application for FRA to understand the extent of the control, including the lead or joint applicant’s management and decision-making authority regarding the infrastructure, equipment, or facility improved by the project, and the remaining or anticipated duration of the agreement(s). Agreements involving railroad rights-of-way should also demonstrate the lead or joint applicant has train dispatching and maintenance-of-way responsibilities for the right-of-way.
(B) To demonstrate the requirements under 49 U.S.C. 24911(a)(5)(B), show that the infrastructure, equipment, or facilities involved in the proposed project are contained in the planning document developed under 49 U.S.C.
24904 and for which a cost-allocation policy has been developed under 49 U.S.C. 24905(c), or are contained in an equivalent planning document and for which a similar cost-allocation policy has been developed.
NEC Projects must satisfy the planning document requirement by demonstrating the project is contained in the current approved planning document developed under 49 U.S.C.
24904 (i.e., the NEC Commission Five- Year Capital Investment Plan).
Applicants with projects contained this plan should indicate the location (e.g., table or page number) where the project in discussed in the document. If an NEC Project is not contained in the 49 U.S.C.
24904 planning document at the time of this notice, applicants may demonstrate that the infrastructure, equipment and facilities involved in the proposed project are contained in an equivalent planning document, or update the 49 U.S.C. 24904 planning document to contain the project by the due date for applications under this notice. An equivalent planning document may include a planning document developed under 49 U.S.C. 24320(c).
NEC Projects must satisfy the cost-allocation policy requirement by demonstrating the infrastructure, equipment, or facilities are subject to the cost-allocation policy developed under 49 U.S.C. 24905(c) (i.e., Northeast Corridor Commuter and Intercity Rail Cost Allocation Policy), or a similar cost-allocation policy.
(C) To demonstrate the state of good repair requirement under 49 U.S.C.
24911(a)(5)(C), the NEC applicant must:
(1) Describe the condition and performance of the infrastructure, equipment, or facility as of the time of enactment of the Passenger Rail Reform and Investment Act of 2015 (Dec. 4, 2015);
(2) indicate how the infrastructure, equipment, or facility’s condition or
VerDate Sep<11>2014 21:50 Oct 07, 2019 Jkt 250001 PO 00000 Frm 00144 Fmt 4703 Sfmt 4703 E:\FR\FM\08OCN1.SGM 08OCN1jb el l o n
D S
K 3G
LQ
2P R
O D w ith
N O
T
IC
E S
53816 Federal Register / Vol. 84, No. 195 / Tuesday, October 8, 2019 / Notices performance falls short of the definition of State of Good Repair’’ in Section A(2);
and
(3) indicate, if known, when the infrastructure, equipment, or facility last received comprehensive repair, replacement, or rehabilitation work similar to the applicant’s proposed scope of work.
vii. Detailed Project Description:
Include a detailed project description that expands upon the brief summary required above. This detailed description must provide, at a minimum: Additional background on the challenges the project aims to address; the expected users and beneficiaries of the project, including all railroad operators; the specific components and elements of the project;
and any other information the applicant deems necessary to justify the proposed project. Applicants with Major Capital Projects are encouraged to identify and describe project phases or elements that would be candidates for subsequent Partnership Program funding if such funding becomes available. Include information to demonstrate the project is reasonably expected to begin construction in a timely manner. For all projects, applicants must provide information about proposed performance measures, as described in Section F(3)(c) and required in 2 CFR 200.301.
viii. Project Location: Include geospatial data for the project, as well as a map of the project’s location. Include the Congressional districts in which the project will take place.
ix. Grade Crossing Information, if applicable: For any project that includes grade crossing components, cite specific DOT National Grade Crossing Inventory information, including the railroad that owns the infrastructure (or the crossing owner, if different from the railroad), the primary railroad operator, the DOT crossing inventory number, and the roadway at the crossing. Applicants can search for data to meet this requirement at the following link: http:// safetydata.fra.dot.gov/OfficeofSafety/ default.aspx.
x. Evaluation and Selection Criteria:
Include a thorough discussion of how the proposed project meets all of the evaluation and selection criteria, as outlined in Section E of this notice. If an application does not sufficiently address the evaluation criteria and the selection criteria, it is unlikely to be a competitive application.
xi. Project Implementation and Management: Describe proposed project implementation and project management arrangements including as between the lead and joint applicants.
Include descriptions of the expected arrangements for project contracting, contract oversight, change-order management, risk management, and conformance to Federal requirements for project progress reporting. Describe past experience in managing and overseeing similar projects. For Major Capital Projects, explain plans for a rigorous project management and oversight approach.
xii. Environmental Readiness: If the NEPA process is complete, indicate the date of completion, and provide a website link or other reference to the final Categorical Exclusion determination, Finding of No Significant Impact, or Record of Decision, as well as any other NEPA documents prepared. If the NEPA process is not complete, the application should detail the type of NEPA review underway, if applicable, where the project is in the process, and indicate the anticipated date of completion of all milestones and of the final NEPA determination. If the last agency action with respect to NEPA documents occurred more than three years before the application date, the applicant should describe why the project has been delayed and why NEPA documents have not been updated and include a proposed approach for verifying and, if necessary, updating this material in accordance with applicable NEPA requirements.
Additional information regarding FRA’s environmental processes and requirements are located at https:// www.fra.dot.gov/environment.
b. Additional Application Elements Applicants must submit:
i. A Statement of Work (SOW) addressing the scope, schedule, and budget for the proposed project if it were selected for award. The SOW must contain sufficient detail so FRA, and the applicant, can understand the expected outcomes of the proposed work to be performed and can monitor progress toward completing project tasks and deliverables during a prospective grant’s period of performance. Applicants must use FRA’s standard SOW, schedule, and budget templates to be considered for award. The templates are located at https://www.fra.dot.gov/Page/P0325.
When preparing the budget, the total cost of a project must be based on the best available information as indicated in cited references that include engineering studies, economic feasibility studies, environmental analyses, and information on the expected use of equipment or facilities.
For Major Capital Projects, the SOW must include annual budget estimates and anticipated Federal funding for the expected duration of the project.
ii. A Benefit-Cost Analysis consistent with 49 U.S.C. 24911(d)(2)(A) that demonstrates the merit of investing in the proposed project. The BCA should include anticipated private and public benefits relative to the costs of the proposed project, including:
i. Effects on system and service performance;
ii. effects on safety, competitiveness, reliability, trip or transit time, and resilience;
iii. efficiencies from improved integration with other modes; and
iv. ability to meet existing or anticipated demand.
The BCA should be systematic, data driven, and examine the trade-offs between reasonably expected project costs and benefits. Applicants are encouraged to include quantifiable railroad data related to the Qualified Railroad Assets involved in the project, such as information on delay, failure or safety incidents, passengers carried (e.g., ridership), daily train movements, or similar metrics. The complexity and level of detail in the Benefit-Cost Analysis prepared for the Partnership Program should reflect the scope and scale of the proposed project. Please refer to the Benefit-Cost Analysis Guidance for Discretionary Grant Programs prior to preparing a BCA at https://www.transportation.gov/office-policy/transportation-policy/benefit-cost-analysis-guidance. In addition, please also refer to the BCA FAQs on FRA’s website (https://www.fra.dot.gov/ grants) for some rail-specific examples of how to apply the Benefit-Cost Analysis Guidance for Discretionary Grant Programs to Partnership applications.
iii. Environmental compliance documentation, if a website link is not cited in the Project Narrative.
iv. SF 424—Application for Federal Assistance.
v. SF 424C—Budget Information for Construction, or, for an equipment procurement project without any other construction elements, the SF 424A— Budget Information for Non- Construction.
vi. SF 424D—Assurances for Construction, or, for an equipment procurement project without any other construction elements, the SF 424B— Assurances for Non-Construction.
vii. FRA’s Additional Assurances and Certifications.
viii. An SF LLL—Disclosure of Lobbying Activities.
Forms needed for the electronic application process are at www.Grants.gov.
VerDate Sep<11>2014 21:50 Oct 07, 2019 Jkt 250001 PO 00000 Frm 00145 Fmt 4703 Sfmt 4703 E:\FR\FM\08OCN1.SGM 08OCN1jb el l o n
D S
K 3G
LQ
2P R
O D w ith
N O
T
IC
E S http://safetydata.fra.dot.gov/OfficeofSafety/default.aspx http://safetydata.fra.dot.gov/OfficeofSafety/default.aspx…