2018503 2020100 Cancellation of Bid - Signed.pdf
PDF 142 KB Posted
- Attached to
- Lyons RD N of L30 Canal to Boynton Bch Blvd
- Solicitation number
- IFB 360 2018503_2020110 3
- Issued by
- Palm Beach County, Florida
About this file
This is a bid cancellation notice issued by the Palm Beach County Engineering and Public Works Department on July 29, 2026, regarding Palm Beach County Projects 2018503 and 2020110. The projects involved infrastructure improvements to Lyons Road north of the L-30 Canal to Boynton Beach Boulevard and improvements to the Lyons Road and Boynton Beach Boulevard intersection in Palm Beach County, Florida. The bid solicitation for these projects was cancelled per Palm Beach County Ordinance 2-54(c)(5), with the cancellation notification posted on July 30, 2026, at the Engineering and Public Works Department Roadway Production Division reception area on the 3rd Floor at 2300 North Jog Road, West Palm Beach, Florida, and on the county's bid documents website.
No additional details regarding project specifications, quantities, contract terms, pricing, or funding were provided in the cancellation notice. The document notes the county's appreciation for continued interest in bidding Palm Beach County projects and includes distribution to county commissioners, administrators, and relevant departmental staff across engineering, construction coordination, traffic engineering, and other divisions involved in the project.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineering and Public Works Department
P.O. Box 21229
West Palm Beach, FL 33416-1229
(561) 684-4000
FAX: (561) 684-4050
www.pbc.gov
Palm Beach County Board of County Commissioners
Sara Baxter, Mayor
Marci Woodward, Vice Mayor
Maria G. Marino
Gregg K. Weiss
Joel G. Flores
Maria Sachs
Bobby Powelljr
County Administrator
Joseph Abruzzo
DATE: July 29, 2026
FROM: David L. Ricks, P.E., County Engineer
RE: CANCELLATION OF BID SOLICITATION
LYONS ROAD NORTH OF LAKE WORTH
DRAINAGE DISTRICT (LWDD) L-30 CANAL TO
BOYNTON BEACH BOULEVARD & LYONS ROAD
AND BOYNTON BEACH BOULEVARD
INTERSECTION IMPROVEMENTS
PALM BEACH COUNTY PROJECT NO. 2018503 &
2020110
Engineering and Public Works is cancelling the bid solicitation for this project per Palm Beach County Ordinance 2-54(c)(5).
The enclosed notification will be posted at the Engineering and Public Works Department / Roadway Production Division reception area on the 3rd Floor at 2300 North Jog Road, West Palm Beach, Florida on July 30, 2026 and to http://discover.pbcgov.org/engineering/roadwayproduction/Pages/Bid- Documents.aspx
We thank you for your continued interest in bidding Palm Beach County projects.
ec:
Maria Sachs, County Commissioner Joseph Abruzzo, County Administrator Patrick Rutter, Chief Deputy County Administrator David L, Ricks, P.E., County Engineer Joanne M. Keller, P.E., Deputy County Engineer Steven B. Carrier, P.E., Assistant County Engineer Kathleen O. Farrell, P.E., Acting Director, Roadway Production Division Maroun Azzi, P.E., Thoroughfare Roads Manager, Roadway Production Division Carlos Bojorge, P.E., Special Projects Manager, Roadway Production Division Kristine Frazell-Smith, P.E., Local Roads Manager, Roadway Production Division Toni Sharp, Right of Way Manager, Roadway Production Division Grant Bessing, P.E., Project Manager, Roadway Production Division Holly B. Knight, P.E., Contracts Section Manager, Roadway Production Division Harvey Phillips III, Project Coordinator I, Roadway Production Division Lyndonia Smith, Project Coordinator II, Roadway Production Division Kenny Rampersad, Director, Administrative Services Division
“An Equal Opportunity Employer"
Official Electronic Letterhead
Danny Ramlalsingh, Division Director, Administrative Services Division Yicel Corcino, Fiscal Manager, Administrative Services Division Susan Hudson, Financial Analyst II, Administrative Services Albert Hoffman, Director, Construction Coordination Division Zach King, Chief Construction Coordinator, Construction Coordination Division William Tanto, Chief Construction Coordinator, Construction Coordination Division Motasem Al-Turk, P.E., Director, Traffic Engineering Division Melissa Ackert, P.E., Assistant Director, Traffic Engineering Division Adam Faustini, Director, Road and Bridge Division Ali Bayat, Director, Water Utilities Department Fernando DelDago, CID Director, Facilities Development and Operations Jennifer Cirillo, Director, Parks and Recreation Department Deborah Drum, Director, Environmental Resources Management Meri Weymer, Director, Business & Economic Development, HED Layren Calvo, Director, Office of Small Business Development, OSBD Allen Gray, Manager, SBE Division, OSBD Terry Newton, Small Business Development Specialist III, OSBD HED Tiffany Thomas, Contract Oversight Specialist, Office of the Inspector General Yelizaveta B. Herman, Assistant County Attorney Sean Reilly, Construction Coordinator, Traffic Division Amar Kalabic, Construction Coordinator, Traffic Division Casey Pranckun, Manager, Streetscape Section Elizabeth McBride, Director, Office of Cost Compliance and Control Raul Mejia, Cost Control Administrator, Office of Cost Compliance and Control Darci Garbacz, Director, Palm Beach County School Board pc:
The Associated General Contractors of America Palm Beach County AFL-CIO c:\iisers\likniglil\appdala\local\inicrosoft\windows\inetcache\conlent.oiitlook\d5aokm9p\20l8503 2020100 cancellation of bid.docx
File details come from the government source that posted it. Updated .