This is a Request for Bid (RFB) document issued by the Portage County Purchasing Department in Wisconsin for the procurement of a mobile pressure washer unit. The County seeks bids to establish a contract for the purchase of a mobile-type pressure washer designed primarily for thawing frozen culverts and pressure washing equipment, buildings, and bridges. The unit must include a dual-gun pressure washer, a 500-gallon water supply tank, and all components mounted on a dedicated trailer. One unit is requested. Bids were due by 2:00 PM on January 4, 2018, with a public bid opening scheduled at the Portage County Purchasing Department office in Stevens Point, Wisconsin. Demonstration of the equipment was required within seven calendar days of request at the bidder's expense. Calvin Winters, Procurement Director, served as the primary contact for questions, with a question submission deadline of December 21, 2017. Award was to be made on the basis of lowest total cost from a responsive, responsible bidder meeting all specifications, with delivery desired as soon as possible after purchase order receipt.

Pricing must be submitted as a total firm price in U.S. dollars and remain firm for 45 calendar days after bid opening. All bid prices must include F.O.B. destination freight, packing, transportation, fuel, insurance charges, and installation/operation manuals, with delivery to the Portage County Highway Department at 850 Cubbie Lane, Plover, Wisconsin. The County is exempt from federal excise and Wisconsin sales taxes. Bidders must be original manufacturers, authorized distributors, or dealers with service and repair capabilities, have been in the industrial equipment business for at least three years, and provide three references from similar institutions served within the past three years. A manufacturer's warranty statement and maintenance agreement information must be included with bids. The contractor must provide in-store or depot repair service with a maximum one-week turnaround and supply minimum four hours of operator training at delivery. Two complete sets of parts and shop service manuals with schematics must be provided. The equipment is subject to comprehensive specifications covering engine, heating system, pump, water system, trailer, paint, and standard equipment requirements detailed in the bid document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Bid (RFB) for

Mobile Pressure Washer

Bid # 2017-53

Issued by:

Portage County Purchasing Department

All required bid documents/copies must be submitted No later than 2 PM 1/4/2018 to:

Portage County Purchasing

1462 Strongs Ave Stevens Point WI 54481

LATE BIDS WILL BE REJECTED

There will be a public opening for this Bid

For further information regarding this RFB contact Calvin Winters

At (715) 346-1393 Email: wintersc@co.portage.wi.us

Issued: 12/4/2017

Portage County Bid #2017-53 Wisconsin Page 2 of 19

Table of Contents

Section Subject Page #

1. General Information and Scope

2. Questions

3. Method of Bid

4. Bid Submission

5. Bid Response Requirements

6. Method of Award

7. Bidder/Contractor Qualifications

8. Specifications

9. Delivery

10. F.O.B. Destination Freight Included

11. Samples/Demonstrations

12. Firm prices

13. Orders

14. Invoicing Requirements

15. Appeals Process

ATTACHMENT A – SIGNATURE AND AUTHORITY AFFIDAVIT FORM

ATTACHMENT B – REFERENCES SHEET

ATTACHMENT C – BID OFFER FORM

ATTACHMENT D – STANDARD TERMS AND CONDITIONS

ATTACHMENT E- SPECIFICATIONS CHECKLIST

Wisconsin Page 3 of 19

1. General Information and Scope The County of Portage Wisconsin (County), through its Purchasing Department (Purchasing), requests bids to establish a contract for the purchase of mobile type pressure washers designed for the main purpose of thawing frozen culverts or pressure washing equipment, buildings, bridges etc. The unit will include a dual gun pressure washer, 500 gallon water supply tank all mounted on a dedicated trailer.

The attached Standard Terms and Conditions shall govern this bid unless specifically modified in these bid documents. Conditions of bid that include the word "must" or "shall,” describe a mandatory requirement. All specifications are defined as mandatory minimum requirements unless otherwise stated. If no bidder is able to comply with a given specification or condition of bid, Purchasing reserves the right to delete that specification or condition of bid. Failure to meet specification requirements shall disqualify your bid. Vendors may not submit their own contract document as a substitute for these terms and conditions.

Retain a copy of these Bid documents for your files. Should you receive an award, these Bid documents become your contract terms and conditions.

Contract Execution: Portage County utilizes a web based electronic signature program (DocuSign) for the execution of contracts that do not require notarization. By submitting your bid you are agreeing to the use of this program to sign documents should you receive an award. There is no cost to the bidder associated with this process.

Definitions: The following definitions are used throughout the RFB documents:

Bidder/Vendor means a company or individual submitting a bid response to this RFB Contractor means bidder awarded the contract County means the County of Portage Wisconsin Purchasing means the County of Portage Purchasing Department RFB means Request for Bid State means the State of Wisconsin VendorNet means the State of Wisconsin’s electronic purchasing information system

2. Questions If a vendor discovers any significant ambiguity, error, conflict, discrepancy, omission, or other deficiency in this RFB they shall notify the Procurement Director named below of such error and request a modification or clarification.

Any communications or questions regarding the specifications, or special conditions of bid should be written and submitted to Purchasing as soon as possible, but no later than 12/21/2017. Purchasing will respond to questions if necessary by issuing an official addendum, posted on VendorNet and on the Portage County Website. Bidders are responsible for checking these websites for any addenda before submitting a bid. Failure to acknowledge addenda may disqualify your bid.

https://vendornet.wi.gov/ http://www.co.portage.wi.us/

Any correspondence or questions submitted must include the bid number

Submit questions in writing via email to:

Calvin Winters, Procurement Director, e-mail: wintersc@co.portage.wi.us Phone: 715-346-1393 https://vendornet.wi.gov/ http://www.co.portage.wi.us/

Wisconsin Page 4 of 19

3. Method of Bid Bidder must submit a total price as designated. All prices must be quoted in U.S. Dollars.

Bids requiring an order minimum shall be disqualified.

Bidder must bid on the enclosed Bid Offer Form.

4. Bid Submission Bidders must submit an original and one copy including all required materials for acceptance of their bid by the date and time listed on the Bid Cover Sheet. Any bids received after that time and date will be rejected. Receipt of a bid by the US mail system does not constitute receipt of a bid by Purchasing, for purposes of this RFB. Also refer to the Bid Response Requirements.

Faxed and e-mailed bids are not accepted. Bids must be mailed or delivered to:

Portage County Purchasing Department

All bids are to be packaged, sealed, and show the following information on the outside of the package:

-Vendor's Name and Address -Request for Bid Title -Request for Bid Number -Bid Due Date

5. Bid Response Requirements In order for your bid to be considered, the following information must be provided by the due date and time listed on the bid cover page. Failure to include any required documents will disqualify your bid.

Include an original and a copy:

5.1 Signature and Authority Affidavit Form, Attachment A (Acknowledge addendum(s) if any.)

5.2 References Sheet, Attachment B

5.3 Bid Offer Form, Attachment C

5.4 2 copies of complete specifications and descriptive brochure or detail for the product(s) bid (if available)

5.5 Manufacturer’s/Bidder’s warranty statement

The Signature and Authority Affidavit submitted in response to this RFB must be signed by the person in the Contractor's organization who is responsible for the decision as to the prices being offered in the Bid or by a person who has been authorized in writing to act as agent for the person responsible for the decision on prices and services. Failure to provide these forms/information with your bid submittal may disqualify your bid. The County encourages all bidders to print their submission double-sided to save paper

6. Method of Award Award(s) shall be made on the basis of the lowest total cost from a responsive, responsible bidder who meets specifications. Timeliness of delivery may be considered when making this award.

Life cycle cost formula which may include, but is not limited to, the applicable costs of energy efficiency, acquisition and conversion, money, transportation, warranties, maintenance fees, licenses, etc. shall be used in evaluation of bid submittals.

Wisconsin Page 5 of 19

7. Bidder/Contractor Qualifications To be eligible for a contract award, you must be qualified and able to provide the following:

7.1 Bidder must be an original manufacturer, or distributor, or dealer authorized by manufacturer with service and repair capabilities for the product.

7.2 Bidder must supply references of 3 firms to which similar products have been provided during the past three years to a comparable-sized institution or company. If contacted, all of those references must verify that a high level of satisfaction was provided. Use Attachment B to list references.

7.3 Bidder must be in the business of industrial equpment for the past 3 years.

7.4 Bidder is requested to quote on maintenance agreements available after expiration of the warranty term. Please include terms, which components shall be covered and annual cost. A sample agreement form, including the terms and conditions, should be included with the bid submittal.

7.5 Contractor must provide in-store or depot repair service for product purchased as a result of this bid. Products will be delivered or shipped prepaid to service center with a maximum of one week turn around upon notification to contractor.

7.6 Contractor must provide designated County personnel a minimum of four hours of training with instructions on set-up and operation of the system and/or products.

7.7 Bidder must provide a written statement of their Warranty Policy on any service or parts they may provide.

8. Specifications The following specifications are minimum acceptable requirements. Any specific reference to manufacturer(s) and/or catalog/model/stock numbers provided is to establish the design, type of construction, quality, functional capability and performance level desired. The bidder may offer an alternate product believed to be an equal. Any alternate product(s) bid must be clearly identified by manufacturer and catalog, model or stock number. Adequate detailed specifications of the product offered must be included with your bid to establish equivalency and to ensure that the product being bid meets all specifications. Failure to provide product specifications and information may disqualify your bid. The County of Portage shall be the sole judge of equivalency and acceptability. Any attachments, documents, price lists, etc. to support your bid, must include the bid number

Bid specifications may not be revised without an official written addendum issued by Purchasing.

8.1 ENGINE

8.1.1. Minimum 22 horsepower liquid cooled diesel engine

8.1.2. Minimum 75 Amp alternator to run unit and provide additional power to operate two 12 volt seen flood lights

8.1.3. Inline fuel filter

8.1.4. Engine hour meter operating only when engine is running

8.1.5. Unit components and design will provide quiet operation

Wisconsin Page 6 of 19

8.2 HEATING SYSTEM

8.2.1. Diesel powered 12 volt burner

8.2.2. Stainless steel protector cover with hinge covering pressure washer unit from elements

8.2.3. Double wall insulated stainless steel jacket on heating coil

8.2.4. Inline fuel filter

8.2.5. System will include a high pressure pop off valve

8.3 PUMP

8.3.1. General brand water pump or equal

8.3.2. Pump shall run approximately 1100 RPMs

8.3.3. Pumps will be driven by a pitched timing style belt to provide positive drive and quiet operation

8.3.4. 10 gallons per minute at 3500 PSI water pressure for dual wand unit

8.4 SYSTEM

8.4.1. On/Off switch for control of cold or hot operation

8.4.2. Temperature control from 60 to 200 degrees Fahrenheit

8.4.3. Water bypass system

8.4.4. Downstream injector for low pressure soap

8.4.5. Operator adjustable pressure regulator with nitrogen liquid filled gauge from 100 to 3,500 PSI

8.4.6. Single 30 gallon EPA compliant fuel tank to supply both the engine and burner

8.4.7. Fuel level gauge

8.4.8. Pressure regulator/unloader valve

8.4.9. One Federal Signal Highlighter mini light bar (Part number 454101HL-25) mounted at front left corner of the trailer unobstructed to the front and rear, wired to a dedicated fused switch powered by the pressure washer unit

8.4.10. Side mount pushup telescopic pole for scene lighting. “Fire Research” brand pole (part# LTP530-DC0-AT100) or equal. Pole will include 30” travel, 12gauge coil cord wiring for 12 volt system, and 2-3/4” pole mounting brackets. One telescopic pole mounted at left front corner the trailer. Pole wired to a dedicated fused switch powered by pressure washer unit

8.5 WATER TANK

8.5.1. 500 - 550 gallon horizontal poly tank banded securely to trailer beds

8.5.2. Suction filter located between tank and pump

8.5.3. Shut off valve at tank supply line prior to filter

8.5.4. The units tank will include a bulkhead with two male couplers located on the side of the tank fill entry neck, to couple hoses from gun reels that will provide circulation during freezing temps along with a one inch hole in the same location to insert ¼” hose for circulation.

8.6 WATER SUPPLY, REELS & GUNS

8.6.1. Minimum 3,500 PSI rated stainless steel hose reels with reel locks and hand cranks

8.6.2. Three hose reels mounted at rear of the trailer

8.6.3. The unit will include a minimum 3,500 PSI rated high pressure ball valve per reel to switch supply on and off or two at once, and also all three at once for circulating during freezing temperatures

8.6.4. All hose to gun connections will have a high pressure rated quick disconnects

8.6.5. Driver side reel will include 200 feet of 3/8” double wire high pressure hose with a minimum rating of 5,000PSI

8.6.6. Center mounted reel will include 200 feet of 3/8” double wire high pressure hose with a minimum rating of 5,000PSI

8.6.7. Passenger side reel will include 200 feet of 1/4” double wire high pressure hose with a minimum rating of 5,000PSI

Wisconsin Page 7 of 19

8.6.8. Two (2) four foot variable pressure triggered gun with dual lance piping

8.7 TRAILER

8.7.1. Tandem axle trailer with treated wood floor

8.7.2. Minimum 10,000 LB GVWR

8.7.3. Pintle hitch (Sized to the trailers GVWR)

8.7.4. Four wheel electric brakes

8.7.5. Passenger side rear corner of trailer will include a 2 foot high leg with top plate strong enough to support a smaller No. 20 pipe vise

8.7.6. Rear lighting will be rubber mounted high count LED stop/tail/turn lights, Grote model G6002 preferred or equal

8.7.7. Rubber mounted LED round clearance lights, Grote model 47122 preferred or equal

8.7.8. Electrical trailer disconnect male 7 pole round plug (Napa Part number 755-5027)

8.7.9. All wiring will have soldered connections with weather tight heat shrink, Deutsch DT Series and/or Weather Pack Series Sealed connectors

8.7.10. All wiring will be enclosed in plastic split wire loom conduit

8.7.11. A weather proof junction box will be installed if any frame to body wire splices are required

8.7.12. All wiring must run through rubber grommets in cross-members

8.7.13. All lighting will meet FMVSS 108 requirements

8.7.14. Spare tire and wheel supplied with trailer (Spare does not need to be mounted to the trailer)

8.7.15. Minimum 5,000 LB top wind swivel jack

8.7.16. Culvert thawing pipe rack to secure 120’ of ½’ pipe in ten foot lengths

8.7.17. 12” high x 12” wide x 24” long weather tight tool box

8.8 PAINT

8.8.1. Factory paint and color for pressure washer unit

8.8.2. Complete trailer will have all mill scale and weld slag removed and be sand/bead blasted to provide guaranteed paint bonding

8.8.3. The trailer shall be primed using a high quality epoxy primer and painted with a high quality urethane two part paint or powered coated.

8.9 STANDARD EQUIPMENT

8.9.1. All usual standard equipment to be included

8.10 SERVICE MANUAL & PARTS BOOKS

8.10.1. Two complete sets of parts and shop service manuals including schematics for: engine, water pump, burner, all electrical, and all mounted equipment will be supplied

8.10.2. A separate list of part numbers for consumables for complete unit must be furnished for cross over vendors. Parts include all filters, belts, fluids and all lubricants required. All manuals and consumables list will be supplied at time of delivery. No exceptions.

9. Delivery Delivery is desired as soon as possible after receipt of a purchase order. Please indicate on the Bid Offer Form your estimated delivery time in calendar days.

10. F.O.B. Destination Freight Included Delivery will be made by common carrier or bidder's truck, with unloading to be performed by the carrier/bidder and carton(s) transported to the interior/ground floor or inside dock at the Portage County Highway Department located at 850 Cubbie Lane, Plover, WI 54467. Bid prices should include all packing, transportation, fuel, insurance charges and installation/operation manuals.

Wisconsin Page 8 of 19

Duty charges (FOB=DDP Destination Duty Paid), if applicable (includes but not limited to documentation fees, freight, customs clearance, tax, etc.), must be included in the bid price and referenced as separate costs in the bid response. A copy of the duty free paperwork, with the vendor portion filled out must be submitted to Purchasing at time of award.

Failure to bid FOB Destination Freight Included may disqualify your bid.

11. Samples/Demonstrations For evaluation purposes an on-site demonstration of the product bid must be furnished within 7 calendar days of the date requested or your bid shall be disqualified. This demonstration is to be without expense or obligation to the County. The County shall not be liable for any loss of or damage to, the demonstration product.

12. Firm prices Prices must remain firm for 45 calendar days after bid opening. Prices established may be lowered due to general market conditions.

13. Orders The County may use the following methods to purchase from this contract:

Specific (Purchase) orders may be placed for one-time shipments.

Purchase Orders, blanket-type, may be issued by Purchasing to allow departmental personnel to call or fax for product or service against the order as needed.

Purchasing card releases: placed by department personnel using their County purchasing card.

14. Invoicing Requirements The County’s terms are to pay or reject invoices within 30 days of receipt. Before payment is made, it also must verify that all invoiced charges are correct as per this contract. Only properly submitted invoices shall be officially received for payment. Thus, your prompt payment requires that your invoices be clear and complete in conformity with the instructions below.

All invoices must be itemized showing:

a. purchase order number d. complete product description as

b. vendor name stated on your bid.

c. remit to address e. prices per the contract

The original invoice must be sent to the bill-to address shown on the Purchase Order.

15. Appeals Process Notices of intent to protest and protests must be made in writing. Protestors should make their protests as specific as possible and should identify Wisconsin Statutes or Portage County Ordinance provisions that are alleged to have been violated.

Wisconsin Page 9 of 19

The written notice of intent to protest the intent to award a contract must be filed with Calvin Winters, Procurement Director, Portage County Wisconsin, 1462 Strongs Ave, Stevens Point, WI 54481, and received in his office no later than five (5) working days after the notice of intent to award is issued.

The written protest must be received in his office no later than ten (10) working days after the notice of intent to award is issued.

The decision of the Procurement Director may be appealed to the Corporation Counsel Office within (5) working days of issuance. The appeal must allege a violation of a Wisconsin Statute or a Portage County Ordinance provision.

Wisconsin Page 10 of 19

Attachment A

Signature and Authority Affidavit Form

BIDDING COMPANY NAME: _________________________________________________________

FEIN (Federal Employer ID Number) OR Social Security # (if Sole Proprietorship)

Address: __________________________________________________________________________

City ____________________________ State ________ Zip + 4 _______________________

Number of years in Business _______

Name the person to contact for questions concerning this bid.

Name __________________________ Title ______________________________

Phone ( ) ______________________ Toll Free Phone ( ) __________________________

Fax ( ) ______________________ Email Address ___________________________

In signing this bid, we also certify that we have not, either directly or indirectly, entered into any agreement or participated in any collusion or otherwise taken any action in restraint of free competition; that no attempt has been made to induce any other person or firm to submit or not to submit a bid; that this bid has been independently arrived at without collusion with any other bidder, competitor or potential competitor; that this bid has not been knowingly disclosed prior to the opening of bids to any other bidder or competitor; that the above statement is accurate under penalty of perjury.

The undersigned, having familiarized themselves with the conditions affecting the cost of the work, having read completely the specifications, hereby proposes to perform everything required and to provide and furnish labor, materials, equipment, tools and all other services and supplies necessary to produce in a complete and workmanlike manner all of the materials or products described in the specifications relating to this Bid.

I further certify that I have carefully examined the bid documents and all terms herein, and site where the work is to be done and have no agreements to prevent the completion of said work.

Signature Title

Name (type or print) Date

This firm hereby acknowledges receipt / review of the following addendum(s) (If any)

Addendum #_____ Addendum #_____Addendum #_____Addendum #_____

Wisconsin Page 11 of 19

Attachment B References

Vendor: _______________________________________________________________________

Provide company name, address, contact person, telephone number, and appropriate information on the product(s) and/or service(s) provided to customers similar to those requested in this solicitation document.

Potential subcontractors cannot be references. Any subcontractor arrangement for the completion of this work shall be listed on a separate page.

Company Name: _________________________________________________________________________

Address (include Zip + 4) ____________________________________________________________________

Contact Person: ____________________________________ Phone No. __________________________

E-Mail Address: __________________________________________________________________________

Product(s) Used and/or Service(s) Provided: ____________________________________________________

Company Name: _________________________________________________________________________

Address (include Zip + 4) ____________________________________________________________________

Contact Person: ____________________________________ Phone No. __________________________

E-Mail Address: __________________________________________________________________________

Product(s) Used and/or Service(s) Provided: ____________________________________________________

Company Name: _________________________________________________________________________

Address (include Zip + 4) ____________________________________________________________________

Contact Person: ____________________________________ Phone No. __________________________

E-Mail Address: __________________________________________________________________________

Product(s) Used and/or Service(s) Provided: ____________________________________________________

Company Name: _________________________________________________________________________

Address (include Zip + 4) ____________________________________________________________________

Contact Person: ____________________________________ Phone No. __________________________

E-Mail Address: __________________________________________________________________________

Product(s) Used and/or Service(s) Provided: ____________________________________________________

Wisconsin Page 12 of 19

Attachment C

Bid Offer Form

Vendor:______________________________________________________________

Line # Description Quantity U/M Unit Price

Pressure washer and trailer per specifications

1 Each

Total Price________________

Lead time for delivery of products or services is __________ days after receipt of order

Product literature is included? Yes_____ No______

Warranty information is included? Yes_____ No______

An original and one copy of all required forms are included in the submittal? Yes_____ No______

PARTS AVAILABILITY

List what percent of entire machine parts that dealer has available to them for next day delivery.

List number of days turn over for the following parts to Portage County Highway Department

Engine

High Pressure Pump

Burner Unit

Heater Coil

Wand

Hose

Item Return Policy ___________________________________________________________________

Portage County is exempt from Federal Excise and Wisconsin Sales Taxes, 77.54(9a). WI Stats.

Portage County’s CES number is ES 43251.

Wisconsin Page 13 of 19

Attachment D

STANDARD TERMS AND CONDITIONS

1.0 SPECIFICATIONS: The specifications in this request are the minimum acceptable. When specific manufacturer and model numbers are used, they are to establish a design, type of construction, quality, functional capability and/or performance level desired, unless otherwise specified. When alternates are bid/proposed, they must be identified by manufacturer, stock number, and such other information necessary to establish an acceptable equivalency. The County shall be the sole and final judge of equivalency.

2.0 HOW TO AMEND A REQUEST FOR BID, PROPOSAL OR QUOTE:

2.1 Public Works Projects are subject to Wis Stats 66.0901(5): If a person submits a bid or proposal for the performance of public work under any public contract to be let by a municipality and the bidder claims that a mistake, omission or error has been made in preparing the bid, the bidder shall, before the bids are opened, make known the fact that an error, omission or mistake has been made. If the bidder makes this fact known, the bid shall be returned to the bidder unopened and the bidder may not bid upon the public contract unless it is re-advertised and relet upon the re-advertisement. If a bidder makes an error, omission or mistake and discovers it after the bids are opened, the bidder shall immediately and without delay give written notice and make known the fact of the mistake, omission or error which has been committed and submit to the municipality clear and satisfactory evidence of the mistake, omission or error and that it was not caused by any careless act or omission on the bidder's part in the exercise of ordinary care in examining the plans or specifications and in conforming with the provisions of this section. If the discovery and notice of a mistake, omission or error causes a forfeiture, the bidder may not recover the moneys or certified check forfeited as liquidated damages unless it is proven before a court of competent jurisdiction in an action brought for the recovery of the amount forfeited, that in making the mistake, error or omission the bidder was free from carelessness, negligence or inexcusable neglect.

2.2 Non-Public Work Projects: After a Request for Bid/Proposal/Quote has been filed with the Portage County Purchasing

Department, the responder may submit an amended response BEFORE THE DUE DATE AND TIME set in the request. All the conditions and provisions of the original Bid/Proposal/Quote will be in effect. No submittals or amendments will be accepted after the due date and time of the request. This does not preclude the County from requesting additional information and/or clarification.

3.0 DEVIATIONS AND EXCEPTIONS: Deviations and exceptions from original text, terms, conditions, or specifications shall be described fully, on the bidder's/proposer's letterhead, signed, and attached to the request. In the absence of such statement, the bid/proposal shall be accepted as in strict compliance with all terms, conditions, and specifications and the bidders/proposers shall be held liable.

4.0 QUALITY: Unless otherwise indicated in the request, all material shall be new, newest model year, and free from defects.

Items which are used, demonstrators, obsolete, seconds, or which have been discontinued are unacceptable without prior written approval by the County.

5.0 QUANTITIES: The quantities shown on this request are based on estimated needs. The County reserves the right to increase or decrease quantities to meet actual needs.

6.0 DELIVERY: Deliveries shall be F.O.B. destination freight prepaid and included unless otherwise specified.

7.0 PRICING AND DISCOUNT: The County qualifies for governmental discounts. Unit prices shall reflect these discounts.

7.1 Unit prices shown on the bid/proposal or contract shall be the price per unit of sale (e.g., gal., cs., doz., ea.) as stated on the request or contract. For any given item, the quantity multiplied by the unit price shall establish the extended price; the unit price shall govern in the bid/proposal evaluation.

7.2 Prices established in continuing agreements and term contracts may be lowered due to general market conditions.

Wisconsin Page 14 of 19

8.0 RESPONSES TO REMAIN OPEN: Responses must remain open and will be deemed to be open and subject to acceptance until awarding of the bid/proposal is finalized, or a minimum of sixty (60) days unless otherwise specified.

9.0 ACCEPTANCE-REJECTION: The County reserves the right to accept or reject any or all bids/proposals, to waive any technicality in any bid/proposal submitted, request clarification of any bid/proposal, award a bid/proposal that is not the lowest price, and to accept any part of a bid/proposal as deemed to be in the best interests of the County.

10.0 GUARANTEED DELIVERY: Failure of the Contractor to adhere to delivery schedules as specified or to promptly replace rejected materials shall render the Contractor liable for all costs in excess of the contract price when alternate procurement is necessary. Excess costs shall include the administrative costs and other costs attributable to the delay.

11.0 CONTRACT AND EXECUTION OF CONTRACT: Unless otherwise specified in the bid/proposal, the successful responder agrees to enter into a contract, a copy of which will be on file in the office of the Portage County Purchasing Department. Contractor shall and will well and truly execute and perform this contract under the terms applicable to the satisfaction of the County, and shall promptly make payment to each and every person or party entitled thereto of all the claims for work or labor performed and materials furnished in the performance of this contract.

12.0 ENTIRE AGREEMENT: These Standard Terms and Conditions shall apply to any contract or order awarded as a result of this request except where special requirements are stated elsewhere in the request; in such cases, the special requirements shall apply. Further, the written contract and/or order with referenced parts and attachments shall constitute the entire agreement and no other terms and conditions in any document, acceptance, or acknowledgment shall be effective or binding unless expressly agreed to in writing by the County.

13.0 APPLICABLE LAW AND COMPLIANCE: This contract shall be governed under the laws of the State of Wisconsin. The

Contractor shall at all times comply with and observe all federal and state laws, local laws, ordinances, and regulations which are in effect during the period of this contract and which in any manner affect the work or its conduct. The County reserves the right to cancel this contract if the contractor fails to follow the requirements of s. 77.66, Wis. Stats., and related statutes regarding certification for collection of sales and use tax. The County also reserves the right to cancel this contract with any state or federally debarred contractor or a contractor that is presently identified on the list of parties excluded from federal procurement and non-procurement contracts.

14.0 LICENSES AND PERMITS: Contractor shall have and/or provide any and all licenses and permits required to perform the work specified and furnish proof of such licensing authorization and permits with their bids if required.

15.0 ASSIGNMENT: No right or duty in whole or in part of the Contractor under this contract may be assigned or delegated without the prior written consent of the County.

16.0 NONEXCLUSIVE CONTRACT: Unless otherwise stated, the County reserves the right to purchase work or materials outside of this contract.

17.0 NONDISCRIMINATION & AFFIRMATIVE ACTION: In connection with the performance of work under this contract, the

Contractor agrees not to discriminate against any employee or applicant for employment because of age, race, religion, color, handicap, sex, physical condition, developmental disability as defined in s. 51.01(5), Wis. Stats., sexual orientation, gender identity and gender expression, or national origin. This provision shall include, but not be limited to, the following:

employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.

18.0 INDEPENDENT CAPACITY: The parties hereto agree that the contractor, its officers, agents, and employees, in the performance of this agreement shall act in the capacity of an independent contractor and not as an officer, employee, or agent of the County. The contractor agrees to take such steps as may be necessary to ensure that each subcontractor of the contractor will be deemed to be an independent contractor and will not be considered or permitted to be an agent, servant, joint venturer, or partner of the County.

Wisconsin Page 15 of 19

19.0 SAFETY REQUIREMENTS: All materials, equipment, and supplies provided to the County must comply fully with all safety requirements as set forth by the Wisconsin Administrative Code and all applicable OSHA Standards.

20.0 WARRANTY: Unless otherwise specifically stated, equipment purchased as a result of this request shall be warranted against defects by the Contractor for one (1) year from date of receipt. The equipment manufacturer's standard warranty shall apply as a minimum and must be honored by the Contractor.

21.0 INSURANCE RESPONSIBILITY: If insurance is required, satisfactory proof of the existence and carriage of such insurance of the kinds and limits specified will be required.

22.0 CANCELLATION: The County reserves the right to cancel any contract in whole or in part without penalty due to non-appropriation of funds or for failure of the contractor to comply with terms, conditions, and specifications of this contract.

23.0 VENDOR TAX DELINQUENCY: Vendors who have a delinquent Portage County tax liability may have their payments offset by the County.

24.0 OPEN RECORDS: Both parties understand that the County is bound by the Wisconsin Public Records Law, and as such, responses and contracts are subject to and conditioned on the provisions of the law. Contractor acknowledges that it is obligated to assist the County in retaining and producing records that are subject to Wisconsin Public Records Law, and that the failure to do so shall constitute a material breach of the contract, and that the Contractor must defend and hold the County harmless from liability under that law. Except as otherwise authorized, those records shall be maintained for a period of seven (7) years after receipt of final payment under the contract.

25.0 MATERIAL SAFETY DATA SHEET: If any item(s) on an order(s) resulting from this award(s) is a hazardous chemical, as defined under 29CFR 1910.1200, the Contractor shall provide one (1) copy of a Material Safety Data Sheet for each item with the shipped container(s) and one (1) copy with the invoice(s).

26.0 ADVERTISING AND NEWS RELEASES: Reference to or use of the County, any of its departments, officials, or employees, for commercial promotion is prohibited. News releases pertaining to this procurement shall not be made without prior approval of the County. Release of broadcast e-mails pertaining to this procurement shall not be made without prior written authorization of the County.

27.0 HOLD HARMLESS: The Contractor will indemnify, pay the cost of defense including attorney’s fees, and save harmless the County and all of its officers, agents and employees from all suits, actions, or claims of any character brought for or on account of any injuries or damages received by any persons or property resulting from the operations of the contractor, or of any of its contractors, in prosecuting work under this agreement.

28.0 FOREIGN CORPORATION: A foreign corporation (any corporation other than a Wisconsin corporation) which becomes a party to this contract is required to conform to all the requirements of Chapter 180, Wis. Stats., relating to a foreign corporation and must possess a certificate of authority from the Wisconsin Department of Financial Institutions, unless the corporation is transacting business in interstate commerce or is otherwise exempt from the requirement of obtaining a certificate of authority. Any foreign corporation which desires to apply for a certificate of authority should contact the Department of Financial Institutions, Division of Corporation, P. O. Box 7846, Madison, WI 53707-7846; telephone (608) 261- 7577.

29.0 FORCE MAJEURE: Neither party shall be in default by reason of any failure in performance of this contract in accordance with reasonable control and without fault or negligence on their part. Such causes may include, but are not restricted to, acts of nature or the public enemy, acts of the government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes and unusually severe weather, but in every case the failure to perform such must be beyond the reasonable control and without the fault or negligence of the party.

Wisconsin Page 16 of 19

Attachment E

MOBILE PRESSURE WASHER CHECKLIST

ENGINE

Minimum 22 horsepower liquid cooled diesel engine

Minimum 75 Amp alternator to run unit and provide additional power to operate two 12 volt seen flood lights

Inline fuel filter

Engine hour meter operating only when engine is running

Unit components and design will provide quiet operation

HEATING SYSTEM

Diesel powered 12 volt burner

Stainless steel protector cover with hinge covering pressure washer unit from elements

Double wall insulated stainless steel jacket on heating coil

Inline fuel filter

System will include a high pressure pop off valve

PUMP

General brand water pump or equal

Pump shall run approximately 1100 RPMs

Pumps will be driven by a pitched timing style belt to provide positive drive and quiet operation

10 gallons per minute at 3500 PSI water pressure for dual wand unit

SYSTEM

On/Off switch for control of cold or hot operation

Temperature control from 60 to 200 degrees Fahrenheit

Water bypass system

Downstream injector for low pressure soap

Operator adjustable pressure regulator with nitrogen liquid filled gauge from 100 to 3,500 PSI

Single 30 gallon EPA compliant fuel tank to supply both the engine and burner

Fuel level gauge

Pressure regulator/unloader valve

One Federal Signal Highlighter mini light bar (Part number 454101HL-25) mounted at front left corner of the trailer unobstructed to the front and rear, wired to a dedicated fused switch powered by the pressure washer unit

Wisconsin Page 17 of 19

Side mount pushup telescopic pole for scene lighting. “Fire Research” brand pole (part# LTP530-DC0-AT100) or equal.

Pole will include 30” travel, 12gauge coil cord wiring for 12 volt system, and 2-3/4” pole mounting brackets. One telescopic pole mounted at left front corner the trailer. Pole wired to a dedicated fused switch powered by pressure washer unit

WATER TANK

500 - 550 gallon horizontal poly tank banded securely to trailer beds

Suction filter located between tank and pump

Shut off valve at tank supply line prior to filter

The units tank will include a bulkhead with two male couplers located on the side of the tank fill entry neck, to couple hoses from gun reels that will provide circulation during freezing temps along with a one inch hole in the same location to insert ¼” hose for circulation.

WATER SUPPLY, REELS & GUNS

Minimum 3,500 PSI rated stainless steel hose reels with reel locks and hand cranks

Three hose reels mounted at rear of the trailer

The unit will include a minimum 3,500 PSI rated high pressure ball valve per reel to switch supply on and off or two at once, and also all three at once for circulating during freezing temperatures

All hose to gun connections will have a high pressure rated quick disconnects

Driver side reel will include 200 feet of 3/8” double wire high pressure hose with a minimum rating of 5,000PSI

Center mounted reel will include 200 feet of 3/8” double wire high pressure hose with a minimum rating of 5,000PSI

Passenger side reel will include 200 feet of 1/4” double wire high pressure hose with a minimum rating of 5,000PSI

Two (2) four foot variable pressure triggered gun with dual lance piping

TRAILER

Tandem axle trailer with treated wood floor

Minimum 10,000 LB GVWR

Pintle hitch (Sized to the trailers GVWR)

Four wheel electric brakes

Passenger side rear corner of trailer will include a 2 foot high leg with top plate strong enough to support a smaller No. 20 pipe vise

Rear lighting will be rubber mounted high count LED stop/tail/turn lights, Grote model G6002 preferred or equal

Rubber mounted LED round clearance lights, Grote model 47122 preferred or equal

Electrical trailer disconnect male 7 pole round plug (Napa Part number 755-5027)

Wisconsin Page 18 of 19

All wiring will have soldered connections with weather tight heat shrink, Deutsch DT Series and/or Weather Pack Series Sealed connectors

All wiring will be enclosed in plastic split wire loom conduit

A weather proof junction box will be installed if any frame to body wire splices are required

All wiring must run through rubber grommets in cross-members

All lighting will meet FMVSS 108 requirements

Spare tire and wheel supplied with trailer (Spare does not need to be mounted to the trailer)

Minimum 5,000 LB top wind swivel jack

Culvert thawing pipe rack to secure 120’ of ½’ pipe in ten foot lengths

12” high x 12” wide x 24” long weather tight tool box

PAINT

Factory paint and color for pressure washer unit

Complete trailer will have all mill scale and weld slag removed and be sand/bead blasted to provide guaranteed paint bonding

The trailer shall be primed using a high quality epoxy primer and painted with a high quality urethane two part paint or powered coated.

TRAINING

Factory trained representative shall provide a minimum of four hours of operator and service technician training at time of delivery

STANDARD EQUIPMENT

All usual standard equipment to be included

SERVICE MANUAL & PARTS BOOKS

Two complete sets of parts and shop service manuals including schematics for: engine, water pump, burner, all electrical, and all mounted equipment will be supplied

A separate list of part numbers for consumables for complete unit must be furnished for cross over vendors. Parts include all filters, belts, fluids and all lubricants required. All manuals and consumables list will be supplied at time of delivery. No exceptions.

WARRANTY

Wisconsin Page 19 of 19

Minimum duration of one year. Must be furnished in writing, or printed material. All warranty work shall be done by selling dealer. All warranty work will be picked up and returned to Portage County Highway Department by the selling dealer with all warranty work completed within one week of notification of needed work, unless dealer can show justification for extension and mutually agreed upon by the county. Failure to comply with warranty specification will be grounds for disqualification for future bids.

DEMONSTRATION

Any vendor of the washer unit which is being considered for award may be required by Portage County to demonstrate the exact machine model bid at the Portage County Highway Department or an agreed upon site, all expenses for this demonstration will be the vendors responsibility. Failure of the demonstration machine to meet customer requirements may be adjudged as nonconformance to these specifications.

PARTS AVAILABILITY

List what percent of entire machine parts that dealer has available to them for next day delivery.

List number of days turn over for the following parts to Portage County Highway Department

Engine

High Pressure Pump

Burner Unit

Heater Coil

Wand

Hose

File details come from the government source that posted it. Updated .