Approved_Board_RFP.doc

DOC document 521 KB Posted

Attached to
Advisory Board on Radiation and Worker Health Support Services
Solicitation number
2013-N-15014
Issued by

About this file

Technical Support for the Advisory Board on Radiation and Worker Health Review.

View the file

Other files

File Type Posted
Questions_and_Answers_for_Advisory_Board_Requirement.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

RATING

PAGE OF

2. CONTRACT NO.

3. SOLICITATION NO.

2013-N-15011

4. TYPE OF SOLICITATION

X

NEGOTIATED (RFP)

5. DATE ISSUED

06/11/2013

6. REQUISITION/PURCHASE NO.

0000HCCN-2013-56819

7. ISSUED BY
CODE
2576
8. ADDRESS OFFER TO (If other than Item 7)

Centers for Disease Control and Prevention (PGO)

Acquisition & Assistance Field Branch

4676 Columbia Parkway

Cincinnati, OH 45226-1922

Approved as to Form and Legality: _____________________________

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

SOLICITATION

9. Sealed offers in original and 6 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in Taft North, 1090 Tusculum Ave., Cincinnati, OH 45226 until 2:00p local time 07/12/2013 CAUTION -- LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME

Dwight D. Favors

B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER: EXT:

(513) 533-8137

C. E-MAIL ADDRESS

Dyf3@cdc.gov

11. TABLE OF CONTENTS

(x)

DESCRIPTION

(x)

DESCRIPTION

PART I – THE SCHEDULE
PART II – CONTRACT CLAUSES
X
A
SOLICITATION/CONTRACT FORM
1
X
I
CONTRACT CLAUSES
42
X
B
SUPPLIES OR SERVICES AND PRICES/COSTS
2
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
X
C
DESCRIPTION/SPECS./WORK STATEMENT
7
X
J
LIST OF ATTACHMENTS
54
X
D
PACKAGING AND MARKING
17
PART IV – REPRESENTATIONS AND INSTRUCTIONS

X

E
INSPECTION AND ACCEPTANCE
18

REPRESENTATIONS, CERTIFICATIONS, AND

X
F
DELIVERIES OR PERFORMANCE
19
X
K
OTHER STATEMENTS OF OFFERORS
55
X
G
CONTRACT ADMINISTRATION DATA
22
X
L
INSTRS., CONDS., AND NOTICES TO OFFERORS
61
X
H
SPECIAL CONTRACT REQUIREMENTS
31
X
M
EVALUATION FACTORS FOR AWARD
77

OFFER (Must be fully completed by offeror)

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52-232-8)

10 CALENDAR DAYS

20 CALENDAR DAYS

30 CALENDAR DAYS

AMENDMENT NO.
DATE
AMENDMENT NO.
DATE

CODE

FACILITY

16. NAME AND ADDRESS OF PERSON AUTHORIZED TO SIGN OFFER

15B. TELEPHONE NO.

AREA CODE NUMBER EXT.

15C. CHECK IF REMITTANCE ADDRESS

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE

18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED

20. AMOUNT

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

21. ACCOUNTING AND APPROPRIATION

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

24. ADMINISTERED BY (If other than Item 7)
CODE
2576
25. PAYMENT WILL BE MADE BY
CODE
434

Centers for Disease Control and Prevention (PGO)

Acquisition & Assistance Field Branch

4676 Columbia Parkway Cincinnati, OH 45226-1922

Centers for Disease Control and Prevention (FMO)

PO Box 15580 404-718-8100

Atlanta, GA 30333-0080

26. NAME OF CONTRACTING OFFICER (Type or print)

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

IMPORTANT -- Award will be made on this form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

STANDARD FORM 33 (REV. 9-97)

PREVIOUS EDITION IS UNUSABLE

Prescribed by GSA

FAR (48 CFR) 53.214©

Section B - Supplies Or Services And Prices/Costs

Base Year

ITEM
SUPPLIES / SERVICES
Estimated Cost
Award Fee
Cost plus award fee
0001
Technical Support for the Advisory Board on Radiation and Worker Health Review of NIOSH Dose Reconstruction Program

Option 1 – Year Two

ITEM
SUPPLIES / SERVICES
Estimated Cost
Award Fee
Cost plus award fee
0002
Technical Support for the Advisory Board on Radiation and Worker Health Review of NIOSH Dose Reconstruction Program

Option 2 - Year Three

ITEM
SUPPLIES / SERVICES
Estimated Cost
Award Fee
Cost plus award fee
0003
Technical Support for the Advisory Board on Radiation and Worker Health Review of NIOSH Dose Reconstruction Program

Option 3 - Year Four

ITEM
SUPPLIES / SERVICES
Estimated Cost
Award Fee
Cost plus award fee
0004
Technical Support for the Advisory Board on Radiation and Worker Health Review of NIOSH Dose Reconstruction Program

Option 4 - Year Five

ITEM
SUPPLIES / SERVICES
Estimated Cost
Award Fee
Cost plus award fee
0005
Technical Support for the Advisory Board on Radiation and Worker Health Review of NIOSH Dose Reconstruction Program

NOTE: “TBD” throughout this document denotes information to be completed by the Government within a resultant award document only.

B.1 Estimated Cost and Award Fee

The estimated cost and potential award fee for performance of all work, including option years, are as follows:

POTENTIAL

ESTIMATED

AWARD

ITEM

DATES

COST

FEE

TOTALS

01 JAN 2014 – 31 DEC 2014

$TBD

01 JAN 2015 – 31 DEC 2015

01 JAN 2016 – 31 DEC 2016

01 JAN 2017 – 31 DEC 2017

01 JAN 2018 – 31 DEC 2018

TOTAL

B.2 Funding and Accounting and Appropriation Data

(a) The funds allotted to this contract for performance are as follows:

POTENTIAL

ESTIMATED

AWARD

ITEM

DATES

COST

FEE

TOTALS

01 JAN 2014 – 31 DEC 2014

01 JAN 2015 – 31 DEC 2015

$0.00

01 JAN 2016 – 31 DEC 2016

01 JAN 2017 – 31 DEC 2017

01 JAN 2018 – 31 DEC 2018

(b) The accounting and appropriation data for the above dollar amounts are as follows:

(1) BASE PERIOD

ACCOUNT

AMOUNT

TBD

$ TBD

TBD

B.3 Compensation (Cost Plus Award Fee)

Maximum Contract Amount (see Paragraph B2. for contract funded amounts)

a. The total estimated contract amount including allowable costs and award fee is

b. The contractor will not be paid a base fee hereunder, however, the contractor may earn up to ______________ in fees based upon an evaluation and determination by the Government as to the contractor’s level of performance in accordance with the following conditions and the attached Award Fee Performance Evaluation Plan. The specific criteria and points assigned to the criteria are listed in the plan.

c. The estimated cost and potential award fee amount for the contract is:

Estimated Cost Maximum Award Fee

d. The contractor’s performance shall be evaluated approximately six (6) months from the effective date of the contract and semi-annually thereafter. The Contractor may earn up to the maximum award fee for the highest level of technical performance at the lowest possible evaluated cost. The total available award fee payable for each twelve (12) month period will be divided into two equal amounts, each of which represents the maximum fee the contractor may earn for each six (6) month evaluation period.

e. Award Fee

(1) The contractor’s performance hereunder shall be evaluated semi-annually by the Award Fee Evaluation Board composed of individuals appointed by the Chairperson, Award Fee Evaluation Board. The Board will determine whether, and to what extent, the contractor’s performance of the preceding six (6) month period warrants payment of a prorated share of the fee pool provided for in the paragraph c. of this section. The Board will make a recommendation to the Fee Determining Official who will establish the final amount to be awarded for the period. The Fee Determining Official for this contract shall be the Contracting Officer.

The award fee shall be subject to the limitation of the Government’s obligation in the FAR Clause No. 52.232-22, Limitation of Funds, included in Section I.

(2) The contactor will be notified by letter of the award fee payable. Upon receipt of the notification, the contractor may submit a public voucher for payment of the balance of the award fee earned but not yet billed for the period evaluated. Payment of the award fee shall be subject to the withholding provisions as set forth in FAR Clause 52.216-7, Allowable Cost and Payment, included in Section I.

(3) During performance of the contract the contractor may monthly bill and be paid on a provisional basis, five percent (5%) of the maximum award fee, specified in Paragraph B.3, Subparagraph c. above, for a given period and available for payment pursuant to Paragraph B.4, Funding below. If the maximum award fee actually earned during any given period is less than the provisional award fee paid to the contractor, the contractor shall reimburse the Government the difference between the provisional award fee paid and the actual award fee earned. The Government may either withhold the difference on subsequent billings or require the contractor to repay the difference by check.

B.4 Funding

a. Total funds currently available for payment and allotted to this contract are _____________________, of which ________________________ represents the estimated reimbursable costs and _________________ represents the award fee funded.

b. It is estimated that the amount currently allotted will cover contractor performance through _______________.

c. The Contracting Officer may allot additional funds to the contract on a unilateral basis.

B.5 352.232-71 Estimated cost - incrementally funded contract.

As prescribed in 332.705-2(b)(2), the Contracting Officer shall insert the clause provided below in “Section B: Supplies or Services and Prices/Costs” in all cost-reimbursement contracts for severable services using incremental funding. The Contracting Officer must insert applicable information as shown below, including information about the planned periods or other increments of performance and their associated funding. The Contracting Officer also may revise the language to reflect the specific type of cost-reimbursement contract awarded (e.g., cost-plus-fixed-fee, cost-plus-award-fee).

Estimated Cost - Incrementally Funded Contract (June 2010)

(a) The total estimated cost to the Government for full performance of this contract, including all allowable direct and indirect costs, is $_TBD_____.

(b) The following represents the schedule* by which the Government expects to allot funds to this contract:

CLIN,

Task Number, or Description

Start Date of Period or Increment of Performance
End Date of Period or Increment of Performance
Estimated Cost

Potential Award Fee ($)

(as appropriate) Estimated Cost

Plus Fee

(as appropriate)

[Total]
[Total]
[Total]

* To be inserted after negotiation

(c) Total funds currently obligated and available for payment under this contract are $______[insert amount funded to date].

(d) The Contracting Officer may issue unilateral modifications to obligate additional funds to the contract and make related changes to paragraphs (b) and/or (c) above.

(e) Until this contract is fully funded, the requirements of the clause at FAR 52.232–22, Limitation of Funds, shall govern. Once the contract is fully funded, the requirements of the clause at FAR 52.232-20, Limitation of Cost, govern.

(End of clause)

Section C - Description/Specification/Work Statement Technical Support for the Advisory Board on Radiation and

Worker Health’s Review of NIOSH Dose Reconstruction Program

C1. Purpose

The purpose of this acquisition is to provide technical support to the Board to fulfill its obligations under its HHS Charter to review the scientific validity and quality of radiation dose reconstructions conducted by NIOSH and to advise the Secretary of HHS on whether doses can be estimated with sufficient accuracy for classes of employees at DOE and AWE facilities petitioning to be added to the SEC. More specifically, the objectives are to perform the following activities in support of the Board, using review methods and criteria consistent with relevant statutes and the HHS regulations cited above, as interpreted by HHS, and conforming to the current policies, procedures, and precedents of completed Board reviews:

Evaluate the scientific validity and quality of a sample of dose reconstructions completed by NIOSH under EEOICPA;

Evaluate the scientific validity and quality of procedures and methods by which NIOSH conducts dose reconstructions under EEOICPA, including but not limited to the review of site profiles, implementation guidelines, technical basis documents, technical information bulletins, workbooks, and other forms of dose reconstruction procedures; and

Evaluate the technical merits of SEC petitions and NIOSH evaluations of these petitions.

C2. Background and Need

In October 2000, President Clinton signed into law the Energy Employees Occupational Illness Compensation Act of 2000 (EEOICPA), establishing a federal compensation program for employees of the Department of Energy (DOE), its predecessor agencies and their contractors and subcontractors, and Atomic Weapons Employers (AWEs). On July 31, 2001, covered employees with cancer, beryllium disease, or silicosis that may be related to work at nuclear weapons production programs of DOE and its predecessor agencies began applying to the Department of Labor (DOL) under the procedures and requirements of 20 C.F.R. pt. 30.

Under Part B of EEOICPA, a covered employee with cancer may submit a claim for a lump sum monetary compensation of $150,000 and medical benefits by either obtaining a probability of causation determination or becoming a member of the Special Exposure Cohort (SEC). EEOICPA established an SEC consisting of classes of employees who have one or more of 22 specific cancers and have worked for a specific period of time at one of the SEC work sites. These employees’ cancers are presumed to be radiogenic and a dose reconstruction is not required. The EEOICPA permits individuals to petition the Secretary of HHS on behalf of a class of employees to be added to the SEC.

For most employees with cancer, EEOICPA requires a probability of causation determination that the cancer was “at least as likely as not” caused by the occupational radiation dose incurred by the employee. Specifically, EEOICPA mandates that guidelines for determining the probability of causation should be based on the radiation dose received by the employee (or a group of employees performing similar work) at such facility and the upper 99 percent confidence interval of the probability of causation in the radioepidemiological tables published by the National Cancer Institute. The radiation dose would then be incorporated into the dose reconstruction methods established by the Department of Health and Human Services (HHS), while taking into consideration the type of cancer, past health-related activities (such as smoking), information on the risk of developing a radiation-related cancer from workplace exposure, and other relevant factors.

On May 2, 2002, HHS published 42 C.F.R. pt. 81, “Guidelines for Determining the Probability of Causation,” and 42 C.F.R. pt. 82, “Methods for Radiation Dose Reconstruction under the Employees Occupational Illness Compensation Program Act of 2000,” as final rules in the Federal Register (Vol. 67, No. 85). 42 C.F.R. pt. 81 is used by DOL to determine the probability of causation for a claimant’s cancer; while 42 C.F.R. pt. 82 is used by NIOSH to provide DOL with dose estimates for claimants who submitted Part B claims for dose reconstructions.

The dose reconstruction rule describes the general methods that NIOSH uses in estimating occupational radiation doses under EEOICPA. These methods are designed to provide fair and efficient processing of a high volume of dose reconstructions.

Specifically, once DOL receives a Part B claim, it forwards the claims to NIOSH and requests it to provide an estimate of the radiation dose received by the employee. NIOSH uses the dose reconstruction guidelines to reconstruct the occupational radiation doses incurred by the employee. As discussed in the rule, the radiation dose estimates will first take into account information from personnel monitoring records (for example dosimeter badge readings and bioassay sample analyses) and then apply dose reconstruction methods as necessary. DOL then uses the radiation dose and the HHS probability of causation guidelines to determine the probability of causation for a claimant’s cancer.

DOL has referred more than 35,000 claims to NIOSH for dose reconstruction through November 30, 2011. DOL continues to refer new and rework cases to NIOSH at the rate of about 275 per month.

As stated above, EEOICPA established an SEC consisting of classes of employees who have at least one of the 22 specific cancers and have worked for a specific period of time at one of the SEC work sites. Congress also allowed for additional groups, or classes of, employees to be added to the SEC, and this task is delegated to HHS per Executive Order 13,179. On May 28, 2004, HHS issued 42 CFR 83 as a final rule (Federal Register Vol. 69, No. 104). This rule describes the procedures HHS will use to designate additional classes of employees as members of the SEC. Classes are added to the SEC when HHS determines that radiation dose reconstruction is not feasible because the information available is not adequate to allow doses to be reconstructed with sufficient accuracy. The SEC petition process is administered by NIOSH on behalf of HHS.

There are two ways to initiate an SEC petition for adding a class of workers to the SEC. Individuals may initiate the evaluation of a class by submitting a petition to NIOSH documenting reasons why dose reconstruction is not feasible (as described in 42 C.F.R. § 83.13); or NIOSH may initiate the addition of a class on its own, based upon its research into the potential exposures at a covered facility (as described in 42 CFR . § 83.14). When NIOSH initiates the addition of a class, a simplified petition is obtained from a representative claimant from the class. Regardless who initiates the SEC petition, NIOSH prepares a petition evaluation report, which describes the information available for reconstructing doses, reaches a conclusion about the feasibility of dose reconstruction, and determines if there was a potential for harm to the members of the class.

EEOICPA also established the Advisory Board on Radiation and Worker Health (referred to hereafter as “ABRWH” or “the Board”) to provide independent review of the scientific validity and quality of the NIOSH dose reconstruction program and to recommend to the Secretary of HHS whether it is feasible to “estimate doses with sufficient accuracy” for each class of employees petitioning to be added to the SEC. The Board is also charged more specifically under its dose reconstruction review function to review a sample of dose reconstruction cases, as an element of evaluating scientific validity and quality. The scope of the sample is unspecified by EEOICPA and the Board’s charter but the Board has a target of reviewing up to 2 percent of the total number adjudicated dose reconstruction cases. For the evaluation of SEC petitions, the Board begins its work once NIOSH has presented its evaluation report providing its recommendations for the disposition of the petition. The Board evaluates the NIOSH evaluation report but also independently evaluates the petition and any other information it deems pertinent to establishing its recommendation for the disposition of the petition.

The Board is supported technically in all of its abovementioned functions by a contractor, which is the subject of this contract solicitation. The contractor is responsible for providing a variety of evaluative work products (technical reports), as specified below, that the Board considers in performing its various types of reviews and producing its recommendations. These work products are heavily dependent on health physics science and practices, related disciplines (e.g., statistics, ionizing radiation physics, nuclear engineering), and extensive informational research and analysis relying on NIOSH-accumulated reports as well as de-novo data collection from DOE and its site contractors, and other sources. The contractor is also responsible for providing technical support to the Board (and its subcommittees and work groups) as it works to resolve findings of its technical support contractor with the determinations of the NIOSH Division of Compensation Analysis and Support (DCAS), which operates the NIOSH dose reconstruction program. The NIOSH DCAS Web page at: www.cdc.gov/niosh/ocas includes detailed information on the legal infrastructure of the dose reconstruction program, its policies and technical procedures (both generic and specific to individual DOE and Atomic Weapons Employer [“AWE”] facilities), Board policies and procedures, SEC recommendations and final HHS designations and determinations, transcripts from the Board and its work groups and subcommittees, as well as the work products of its current technical support contractor. Careful review of this information would provide a thorough grounding in the nature, methods, and conditions of technical support of the Board described here, and it would also be instructive on the scope and content of this support.

C.3. Contract Tasks The support services that the contractor will provide are listed below. It is expected that the level of support required during the base year and during each option year will vary. However, while the number of dose reconstruction cases, dose reconstruction procedures, and SEC petitions and petition evaluation reports to be reviewed may vary substantially from year to year, offerers should prepare their proposals assuming that the levels of support specified below will be required annually. It should be understood that this is not a guarantee of this level of effort annually, but these target values will facilitate comparison of proposals from multiple offerers.

The contractor providing technical support to the Board will have access to all NIOSH documentation, procedures, and data used in dose reconstruction and in the evaluation of SEC petitions. This includes the following:

(1) All documents that describe radiation exposures, radiological operations, radiological conditions, and other information useful to performing dose reconstruction, evaluating SEC petitions, or performing other functions of the project will be stored in the Site Research Data Base (SRDB). The SRDB contains documents that relate to DOE and AWE facilities. These documents can include, but are not limited to, general overview documents, publications for a site that describe a particular process or operation, or reports from a site addressing particular issues such as specific contaminants to which some workers might have been exposed. Project personnel populate and use the SRDB to develop and write Site Profiles, TBDs and TIBs, as well as to perform dose reconstructions.

(2) Information relevant to individual claims will be stored in the NIOSH OCAS Claims Tracking System (NOCTS). NOCTS was developed to track the claims made under EEOICPA. The NOCTS application tracks claimant data and documents, and is thus a central repository for all information related to each claim. The web-based interface allows the application to be accessed by any computer equipped with Internet connection and browser software. The primary goal of NOCTS is to facilitate the processing of claims in an efficient and accurate manner. The application also provides an instrument for effective and timely communications with claimants during this process. Another goal is to establish and maintain interagency communications among all the parties involved in the claims process.

The contractor will also need to conduct data captures from DOE and employees of DOE and AWEs to fulfill this requirement, which will be governed by existing Board policy and procedures to ensure national security (see Board “Data Access and Interview Procedures, Proc-010” on the NIOSH DCAS Web page) and appropriate stewardship of Federal records. The contractor will be required to submit to NIOSH immediately upon release to the contractor all data, reports, and other information it acquires during its data captures from DOE and AWE facilities, other sources of documentation accessed, and completed (DOE cleared – as applicable) interviews of current and former employees of these facilities. NIOSH will maintain these submissions as require by law and Federal regulations under the NIOSH system of records associated with the EEOICPA dose reconstruction program, which is organized as described above. NIOSH recordkeeping will ensure these submissions remain available to the contractor as needed.

Support Services Requirements

1.0 Dose Reconstruction Case Reviews

The contractor will complete up to 60 dose reconstruction case reviews annually.

A. OBJECTIVES

A.1 For full internal and external (i.e., “best estimate”) dose reconstructions (up to 45 annually), reviews must:

Report on compliance with DCAS dose reconstruction procedures (current at the time of the dose reconstruction) including site specific and generic procedures.

Report on defects of procedures employed in the dose reconstruction that underestimate dose or improperly overestimate dose OR have the potential to result in such errors for other cases not reviewed.

Report on data employed in or omitted from the dose reconstruction that by use, misapplication, or omission, inaccurately underestimate dose or improperly overestimate dose OR have the potential to result in errors for other cases not reviewed.

Report on errors or patterns of errors when such are indicative of a potential deficiency in quality management.

Characterize errors with respect to their consequence for the compensability of the review case and their likely consequence for other cases not reviewed.

Specify whether assumptions conferring claimant favorability were applied to uncertain information employed in estimating doses.

Report on the extent to which claimant-provided information is acknowledged and addressed in dose reconstruction report to the claimant.

With respect to the appropriateness and adequacy of procedures and data sources used in the dose reconstruction, reviews must be fully consistent with decisions produced from the Board’s issue resolution process from its reviews of site profiles, SEC petitions, and dose reconstruction procedures. However, reviews should re-raise resolved issues if the review produces a new perspective on the resolved matter not previously considered by the Board that substantially calls into question the agreed upon resolution. Further, reviews should identify any issues brought to light by the individual case that have not been addressed by the Board through prior reviews of relevant dose reconstruction procedures, the site profile, or SEC petitions.

A.2 For dose reconstruction cases representing efficiency-driven overestimates and underestimates (up to 15 annually) , reviews must:

Report on compliance with DCAS dose reconstruction procedures (current at the time of the dose reconstruction) including site specific and generic procedures, specifying instances of non-compliance that result in errors in the estimation of dose.

Report on the appropriateness of the efficiency processes applied in the case.

Report on procedures employed to underestimate or overestimate dose if such procedure may not have underestimated or overestimated dose (as intended) in the specific case or may not consistently underestimate or overestimate dose (as intended) for other cases not reviewed.

Report on data incorrectly employed in or omitted from the dose reconstruction.

Report on errors or patterns of errors when such are indicative of a potential deficiency in quality management.

Characterize errors with respect to their consequence for the compensability of the review case and their likely consequence for other cases not reviewed.

Specify whether “worst case” assumptions and/or assumptions conferring claimant favorability were consistently applied as appropriate in place of further research in cases that are non-compensable “overestimates”.

Report on the extent to which claimant-provided information is acknowledged and addressed in dose reconstruction report to the claimant.

With respect to the appropriateness and adequacy of procedures and data sources used in the dose reconstruction, reviews must be fully consistent with decisions produced from the Board’s issue resolution process from its reviews of site profiles, SEC petitions, and dose reconstruction procedures. However, reviews should re-raise resolved issues if the review produces a new perspective on the resolved matter not previously considered by the Board that substantially calls into question the agreed upon resolution. Further, reviews should identify any issues brought to light by the individual case that have not been addressed by the Board through prior reviews of relevant dose reconstruction procedures, the site profile, or SEC petitions.

B. REQUIRED PROCEDURES

The procedure for the review of dose reconstructions should include (but is not limited to) the following elements, as appropriate:

B.1. Review Data Collection

Evaluate whether NIOSH received all requested data for the DOE or AWE site from any relevant data source or repository and whether all relevant data sources, including sources maintained by NIOSH, were appropriately queried and applied to the case (not necessary for compensable cases).

Review the entire administrative record to evaluate whether all relevant information was considered by NIOSH (not necessary for compensable cases)

Review the relevant data elements of the Site Profile, Technical Basis Document, and other dose reconstruction procedures, as they apply to the individual case, to evaluate the adequacy and completeness of the data used in the case and to evaluate whether the information from the procedures is consistent with the information used for the case.

B.2. Review Claimant Interview and Documentation

Evaluate whether NIOSH appropriately addressed all documentation and reported work history and events submitted by the claimants including but not limited to a) incidents or occurrences, b) actual monitoring practices, c) personal protection practices, and d) work practices.

Assure that interview information is consistent with data used for the dose estimate, and when not, evaluate whether there is appropriate justification for inconsistencies.

B.3. Review Internal and External Dose Estimates

Evaluate whether the data were appropriately adjusted, as necessary, to reflect limitations of site radiological monitoring protocols of the time period (not necessary for efficiency-driven underestimates).

Evaluate the treatment of ‘missed dose’ and/or ‘unmonitored dose’ when relevant to the case.

Evaluate whether the dose estimate is consistent with relevant radiological information in the NIOSH site profile (e.g. evaluate whether air monitoring or swipe data are consistent with bioassay results, to the extent expected in light of work and safety practices and other factors).

Evaluate whether appropriate doses from co-worker models were derived and applied, when relevant to the case.

B.4. Evaluate relevant portions of the methods and/or procedures used by NIOSH

This includes, but is not limited to:

Evaluate methods for estimating each component of dose (internal, external, ambient, medical) relevant to the case.

Evaluate methods for estimating ‘missed dose’ and ‘un-monitored dose’ (for cases related to monitoring technology and for cases where monitoring was not performed, monitoring data are not available, incomplete, or otherwise inadequate).

Evaluate the statistical approaches developed for multiple dose reconstructions.

Evaluate methods or procedures used for substituting exposure information (area monitoring, swipe samples, source term and process analyses) for unavailable or incomplete personal monitoring information, Evaluate methods for accounting for uncertainty in dose distributions and uncertainty distributions around internal and external dose estimates on a facility and time specific basis and evaluate whether the uncertainties were addressed by a claimant favorable approach.

Review the relevant aspects of the Site Profile, Technical Basis Document, and other dose reconstruction procedures, as they apply to the individual case, to evaluate their appropriate application to the case and their adequacy for estimating all doses associated with the case. Review should also reflect the current status of reviews of relevant procedures by the Board, taking into account the Board’s approval of procedures as well as any unresolved consideration by the Board of procedures that remain under review.

B.5. Evaluate Effectiveness of Quality Control

Identify any quality control failures as evidenced by defects in cases that represent non-compliance with established dose reconstruction procedure and characterize the seriousness of the defects as they impact the case or potentially impact other cases not reviewed.

B.6. Provide Case Reports

Summarize the findings of individual cases reviewed, present summary findings to Board member teams (assigned to each case by the Board Chair), incorporate any changes arising from this consultation with Board members, and produce and distribute a written report.

C. BLIND DOSE RECONSTRUCTION CASE REVIEWS

The contractor will complete up to 6 “blind dose reconstructions reviews” annually in which the contractor independently conducts dose reconstructions on cases already completed by NIOSH (without information on the results of the NIOSH dose reconstruction) to examine the scientific validity of dose reconstruction procedures, the adequacy of available data, and the degree of professional judgment implicit in the procedures and its impact on dose reconstruction results. Blind dose reconstructions will:

Use all raw data available to NIOSH, Produce two cases; one which follows all NIOSH dose reconstruction procedures, and a second which follows all NIOSH dose reconstruction procedures reviewed and approved by the Board but uses independent discretion in applying or diverging from procedures not yet approved by the Board, Apply independent professional judgment on all matters left by dose reconstruction procedures to be determined by professional judgment, Formulate and apply procedures to address any matters not addressed by approved NIOSH procedures, Estimate radiation doses and apply IREP to the results, Compare the resulting dose reconstruction(s) (potentially 2) to that completed by NIOSH, identify and characterize the causes and consequences of any differences, and discuss the acceptability or potential problems associated with these findings.

Propose follow-up evaluations or actions, as necessary, based on the findings.

D. ISSUE RESOLUTION

The contractor will provide technical support to the Subcommittee on Dose Reconstruction Review in the resolution of findings from its own reviews and from those of members of the Board or the Subcommittee that may be questioned or disputed by NIOSH or by members of the Board or Subcommittee. This existing resolution process is documented in the transcripts of the Subcommittee, which can be found at www.cdc.gov/niosh/ocas. It will include producing matrix-style reports summarizing the findings of individual and groups of dose reconstruction case reviews, as directed, and updating these reports as findings are resolved.

2.0 Dose Reconstruction Procedures Reviews

As part of NIOSH’s program of completing individual dose reconstructions, NIOSH has established and is routinely updating and improving dose reconstruction procedures that include site-specific procedures, guidance, and data, such as “site profiles,” and “technical basis documents”, and related “work books” (programmed implementation tools), as well as generic multi-site and universal procedures, such as “technical information bulletins -- TIBs”, “implementation guidelines IGs”, “program evaluation reports “PERs”, and other reports. These various procedures, as well as past reviews of such procedures by the Board’s technical support contractor can be found at www.cdc.gov/niosh/ocas. NIOSH also maintains a “Site Research Data Base” (“SRDB”) which includes extensive records and reports that provide some of the bases for these dose reconstruction procedures as well as data applied by these procedures for completing individual dose reconstructions.

The contractor shall review selected procedures and related implementation tools and data established by NIOSH to evaluate their scientific validity and quality as applied for purposes of individual dose reconstructions under EEOICPA.

A. Scope

The contractor will complete annually up to 6 site profile reviews, up to 6 reviews of generic dose reconstruction procedures, and up to 6 reviews of program evaluation reports. Actual activity annually may vary from these estimates, which are provided to facilitate comparison of proposals from multiple offerers.

B. Review Approach

Reviews will focus on whether the procedures and related data used by NIOSH are scientifically valid and of adequate quality for correctly determining individual eligibility for compensation. The review should include a close evaluation of the health physics, statistical treatments, and other dose reconstruction methods employed and an evaluation of whether NIOSH identified, evaluated, and where appropriate, incorporated all available and necessary data sources (from the NIOSH SRDB, DOE, and other sources as applicable) within the procedure. In some instances, evaluating whether the data identification, collection, and evaluation processes were adequate may require the contractor to conduct interviews (one-on-one or group) with employees, employee representatives, advocacy organizations, health and academic researchers and other site ‘experts’ (those with long standing knowledge of processes, materials, events, and exposures). The contractor may be required to conduct meetings with these individuals or groups at locations near the facilities of interest. It will frequently be important for the contractor to examine the availability of dosimetrically relevant information in relation to scope, characteristics, and times and locations of radiological exposures. This information will often be relevant in evaluating the adequacy of related dose reconstruction procedures. For certain procedure reviews, such as select PER reviews, the contractor may also be directed to review a small number of individual dose reconstructions completed under the procedure to examine the adequacy of the procedure and its implementation.

C. Issue Resolution

The contractor will provide technical support to the Subcommittee on Procedure Reviews, Board work groups (many of which are site-specific), and the Board in the resolution of findings from its own reviews or Board member reviews that may be questioned or disputed by NIOSH or by other members of the Board, the Subcommittee, or Board work groups. This existing resolution process is documented in the transcripts of the Subcommittee, the Board work groups, and the Board, which can be found at www.cdc.gov/niosh/ocas. The process will include producing a matrix-style report summarizing findings of the procedure review and updating the report as findings are resolved. It may also include producing “white papers” and other limited analyses required to examine, verify, and/or validate findings and or approaches proposed by NIOSH, Board members, or the Board’s contractor to resolve findings. The volume of this resolution work may vary widely from one procedure review to another. Offerers should assume that resolution work for a procedure review will require 10 percent of the effort involved in producing its initial review report.

3.0 Review of SEC Petitions

42 C.F.R. pt. 83, Procedures for Designating Classes of Employees as Members of the Special Exposure Cohort under EEOICPA of 2000, describes the general procedures to be followed in the review of SEC Petitions. Section 83.15 describes how the Board will consider and advise the Secretary of HHS on a petition.

The contractor shall evaluate SEC petitions and associated NIOSH Evaluation Reports as requested, consistent with the provisions of sections 83.13, 83.14, 83.15, and in accordance with related NIOSH and Board Procedures. These and other relevant materials, including past reviews of the Board’s technical support contractor, can be found at www.cdc.gov/niosh/ocas.

A. Scope

The contractor will review annually up to 8 SEC Petitions and associated NIOSH Evaluation reports, or review parts thereof as directed. The extent of original research, data capture, and interviews of experts and site employees and retirees required of the contractor will vary. It will depend on the extent to which this information has already been captured by NIOSH and the Board’s technical support contractor and is available through the SRDB or in holdings set aside for NIOSH and the Board at DOE. At the recommendation of the Board, the contractor may be asked to review either the complete SEC Petition and NIOSH Evaluation Report or specified elements of these.

B. Review Approach

Reviews will focus on the adequacy and reliability of available documents and monitoring data as well as an analysis of the scientific validity and quality of methods proposed by NIOSH to accomplish individual dose reconstructions for all members of a petitioning class. The review will examine whether all radiological doses associated with the class can be bounded or estimated more precisely using approved methods and adequate data. The central concern of reviews will be to support the Board with technical information and analyses by which it can deliberate and recommend to the Secretary whether, in its view, doses can be reconstructed with sufficient accuracy. Complete reviews of petitions will typically involve the following:

some original data capture and interviews of petitioners, site experts, employees, and/or retirees;

analysis of proposed procedures and available monitoring, process, and source term data and information in comparison to information indicating actual and potential radiological conditions;

statistical analyses to assess data completeness and representativeness;

assessment of the pedigree and reliability of essential data;

evaluation of the appropriateness of any use of surrogate data in light of Board and NIOSH criteria for such use; and consideration of illustrative dose reconstructions examples provided by NIOSH to demonstrate the feasibility of dose reconstruction with sufficient accuracy.

C. Issue Resolution

The contractor will provide technical support to the Board and its relevant work groups in the resolution of findings from its own petition review analyses and from those of members of the Board that may be questioned or disputed by NIOSH or by members of the Board. This existing resolution process is documented in the transcripts of Board work groups and the Board, which can be found at www.cdc.gov/niosh/ocas. The process will include producing a matrix-style report summarizing findings of the petition review and updating the report as findings are resolved. It may also include producing “white papers” and other limited analyses required to examine, verify, and/or validate findings and/or approaches proposed by NIOSH, Board members, or the Board’s contractor to resolve findings. The volume of this resolution work may vary widely from one SEC petition review to another. Offerers should assume that resolution work for a SEC petition review will require 30 percent of the effort involved in producing its initial review report.

4.0 Program Management

A. Within 90 days of award, the contractor will develop and implement procedures for complying with NIOSH’s Conflict of Interest Policy, provided as Attachment 3. Copies of those procedures and the completion of documentation required for their implementation will be provided to NIOSH at that time.

B. The contractor will prepare and submit to NIOSH monthly performance and cost reports covering all tasks under this contract. The monthly report shall include but need not be limited to progress reports on the following:

dose reconstruction case reviews (on a per-set basis), using an earned value management (EVM) system of reporting;

dose reconstruction procedure reviews (on an individual review basis);

SEC petition reviews (on an individual review basis); and

Program management actions.

Reports will clearly specify the tasks, progress and monthly and cumulative cost of each activity (and items within the activity) above that is scheduled or underway and summarize each activity completed. For each activity underway (e.g., review of site profile “xyz”), the report will specify the individuals who worked on the activity during the month, and the hours and task(s) conducted by individual.

D.

Within 30 days of award, the contractor will ensure that all personnel intended to access the relevant NIOSH system of records and CDC information technology systems have submitted appropriate applications and completed relevant mandatory CDC training for security IDs, information security, and records management. This standard of 30 days also applies to all new personnel recruited during the award period. No personnel shall receive such access until all approvals are complete.

E.

The contractor must provide among its staff an adequate number of individuals with the proper level of Department of Energy (DOE) security clearances (“Q clearances”) to complete the work envisioned under this contract. All contractor staff must comply with applicable HHS and CDC policies for safeguarding information retrieved from HHS, DOE, and other government and non-government information, including the NIOSH/Board Security Plan with DOE.

F.

All reports produced by the contractor shall be 508 compliant. Additionally, the recipient of the records (the contractor) will maintain the records captured in accordance with the Privacy Act (5 U.S.C. § 552) and the U.S. Department of Health and Human Services Privacy Act Regulations (5 C.F.R. § 5b), Freedom of Information Act (5 U.S.C. § 552), the U.S. Department of Health and Human Services Freedom of Information Regulations (45 C.F.R. § 5.65), Executive Order No. 12,600, and the Federal Trade Secrets Act, 18 U.S.C. § 1905 as applicable.

Section D - Packaging And Marking

There are no clauses/provisions included in this section.

Section E - Inspection And Acceptance

FAR SOURCE
TITLE AND DATE
52.246-5
Inspection of Services - Cost-Reimbursement (Apr 1984)

E.1 Inspection and Acceptance (Jul 1999)

Inspection and acceptance of the articles, services, and documentation called for herein shall be accomplished by the Contracting Officer, or a duly authorized representative (who for the purposes of this contract shall be the Contracting Officer’s Representative) at the destination of the articles, services or documentation.

(End of Clause)

Section F - Deliveries Or Performance

FAR SOURCE
TITLE AND DATE
52.242-15
Stop-Work Order - Alternate I (Apr 1984)

F.1 Deliverables Schedule

Item #
Description
Quantity
Delivery Date
Deliver To
1
Procedures for implementing the NIOSH Conflict of Interest Policy and implementation documentation (Scope of Work 4.0 - A)
copy via email
Due 60 calendar days after date of award
Contracting Officer and Contracting Officer’s Representative (COR)
Up to fifteen dose reconstruction case review reports should be delivered per quarter, unless fewer reviews are tasked (Scope of Work 1.0-B.6)
copy via email
Due quarterly, beginning 90 calendar days after date of award
Contracting Officer, COR, Board members, appropriate DCAS leads
3
Up to three “blind’ dose reconstruction case review reports should be delivered semiannually, unless fewer reviews are tasked (Scope of Work 1.0-C)
copy via email
Due semiannually, beginning 182 calendar days after date of award
Contracting Officer, COR, Board members, appropriate DCAS leads
4
Matrix-style dose reconstruction case review findings summaries delivered per quarter, to accompany item 2, and updated as findings are resolved by Dose Reconstruction Review Subcommmittee (Scope of Work 1.0 - D)
copy via email
Due semiannually, beginning 182 calendar days after date of award
5
Up to six site profile reviews, six generic dose reconstruction reviews, and six PER reviews annually, unless fewer reviews are tasked (Scope of Work 2.0-B)
copy via email
Due annually after date of award and within six months of assignment.
COR, Subcommittee or WG members, appropriate DCAS leads
6
Matrix-style procedure review findings summaries and white papers delivered as required in support of Subcommittee/WG meetings, to accompany item 5, and updated as findings are resolved (Scope of Work 2.0 - C)
copy via email
Due in advance of Subcommittee/WG meetings, as directed
COR, Subcommittee or WG members, appropriate DCAS leads
7
Up to eight SEC petition reviews annually, unless fewer reviews are tasked (Scope of Work 3.0-B)
copy via email
Due annually after date of award and within six months of assignment.
COR, WG members, appropriate DCAS leads
8
Matrix-style SEC petition review findings summaries and white papers delivered as required in support of WG meetings, to accompany item 5, and updated as findings are resolved (Scope of Work 2.0 - C)
copy via email
Due in advance of WG meetings, as directed
COR, WG members, appropriate DCAS leads
8
Monthly progress reports
copy via email
On or before 15 days after end of reporting period
COR, Contracting Officer, and Board members
9
Monthly Financial Reports
copy via email
On or before 15 days after end of reporting period
COR and Contracting Officer
10
Subcontracting Reports
1 copy
In accordance with G.12
Contracting Officer

Item # Description Quantity Delivery Date Deliver To Procedures for implementing the NIOSH Conflict of Interest Policy and implementation documentation (Scope of Work 4.0 - A) copy via email Due 60 calendar days after date of award Contracting Officer and Project Officer

Up to fifteen dose reconstruction case review reports should be delivered per quarter, unless fewer reviews are tasked (Scope of Work 1.0-B.6) copy via email Due quarterly, beginning 90 calendar days after…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .