Solicitation 2006-4661-R1 SF-1442
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20064661 Amend 04 RFQ 20064661-JAM-R1 SF-30 .pdf | ||
| Attachment 7 Contractor Quote Summary By Project Element 11-0921.xls | XLS spreadsheet | |
| 20064661 Amend 02 RFQ 20064661-JAM-R1 SF-30 .pdf | ||
| 20064661 Amend 03 RFQ 20064661-JAM-R1 SF-30 .pdf | ||
| Attachment 1 Revised 20064661-JAM-R1 Statement of Work for Headquarters Canine Program.doc | DOC document | |
| Attachment 2 General Decision Number TX100122 11-0408 TX122.doc.doc | DOC document | |
| Attachment 7 Contractor Quote Summary By Project Element 11-0921.xls | XLS spreadsheet | |
| Attachment 3 Exterior Kenne Project El Paso.JPG | JPG image | |
| Attachment 4 INterior Kennel Project El Paso.JPG | JPG image | |
| Attachment 6 Walkways Kennel Project El Paso.JPG | JPG image | |
| Attachment 1 20064661 SOW Kennel Paint 2011-0921 Revised.doc | DOC document | |
| Attachment 5 Side View Main Kennel Project El Paso.JPG | JPG image |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
+ SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
20064661-JAM-R1
2. TYPE OF SOLICITATION
FORMCHECKBOX
QUOTE
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
September 22, 2011
PAGE:
IMPORTANT - The “offer” section on the reverse must be fully completed by the offeror.
4. CONTRACT NO.
| 5. REQUISITION/PURCHASE REQUEST NO. PR 20064661 |
| 6. PROJECT NO. |
7. ISSUED BY CODE
8. ADDRESS OFFER TO
DHS-CBP
FM & E Mission Support Procurement Officer 6650 Telecom Drive, Suite 100 Indianapolis, IN 46278-2010 Same as Block #7
9. FOR INFORMATION
CALL:
A. NAME
Pri: Jon A. Massey, Contract Specialist Alt: Matthew Korn, Contract Specialist B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
P(317) 614-4591 F(317) 298-1344, E-mail: jon.massey@dhs.gov P(317) 614-4546 F(317) 298-1344, E-mail: matthew.korn@dhs.gov
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
Kennel Painting Project – El Paso, TX per the Statement of Work (SOW).
(a) 1. This Request for Proposal (RFP) is a limited to Small Business Contraxtor’s.
2. Wage Determination “General Decision Number: General Decision Number: TX100122 04/08/2011 applies to this solicitation/contract/purchase order (see website: http://www.wdol.gov/dba.aspx).
3. The Cost Range for this solicitation has been identified to be between $25,000 - $100,000.
4. Contractor Proposal shall be submitted by e-,ail to Jon.massey@dhs.gov.
5. Bid Bonds are not required on this solicitation.
6. Performance and Payment Bonds are required on this solicitation.
7. Offerors shall submit no more that three (3) Past Performance References which must include Customer Name, Project Location, Point of Contact and Telephone Number.
8. Contractor must include in their quote submission the time and date of when they visited the work site identified in the Statement of Work (SOW).
9. Contractors shall include, in their quote submission, a breakout of labor and material for each building included in the project.
10. Statement of Work has been revised. Contractor shall review the Statement of Work, dated September 21, 2011 and submit/revise their quotation accordingly. Contractor quotations based upon SOW revised 21 September 2011 must be submitted, on or before, Monday, September 26, 2011. 1:00 P.M. local time of the contracting office (Eastern Time).
11. Quotations not containing the information required by this solicitation shall not be considered non-responsive and will not be considered for award.
12. Contractor’s submitting quotes for this solicitation shall have an active registration in Contractor Clearing Register (CCR), W
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If “YES” , indicate within how many days after award in Item 12B.)
FORMCHECKBOX
YES FORMCHECKBOX
NO
12B. CALENDAR DAYS
Ten (10)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. An offer guarantee is not required.
B. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
C. Offers must provide 60 calendar days for Government acceptance after the date offers are due. Offerors proposals providing less than 60 calendar days will not be considered and will be rejected.
NSN 7540-01-155-3212
STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236.1 (d)
OFFER (Must be fully completed by offeror)
| 14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) |
| 15. TELEPHONE NO. (Include area code) |
(928) 3171208
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE 47RF6 FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within 30 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum re-quirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D).
AMOUNT
Bid item 1 $
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or Print)
| 20B. SIGNATURE |
| 20C. OFFER DATE |
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
FORMCHECKBOX
10 U.S.C. 2304(c) (
FORMTEXT
) 41 U.S.C. 253(c) ( 5 ) FORMCHECKBOX
26. ADMINISTERED BY CODE
27. PAYMENT WILL BE MADE BY
FORMDROPDOWN
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
FORMCHECKBOX
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office.) Contractor agrees to furnish and deliver all terms or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
FORMCHECKBOX
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
RichardA. Travis FORMDROPDOWN
| 30B. SIGNATURE |
| 30C. DATE |
| 31B. UNITED STATES OF AMERICA |
BY
31C. AWARD DATE
| GPO: 1985 0 - 469-796 |
| STANDARD FORM 1442 BACK (Rev. 4-85) |
Table of Contents
Section A – Solicitation/Contract Form SF 1442
Section B – Supplies or Services Section C – Description/Specification Section D – Packaging and Marking
Section E – Inspection and Acceptance Section F – Deliveries or Performance
Section G – Contract Administration Data
Section H – Special Contract Requirements
Section I – Contract Clauses Section J – List of Documents, Exhibits and Other Attachments Section K – Representation, Certifications, and Other Statement of Offerors and Respondents Section L – Instructions, Conditions and Notices to Offerors and Respondents Section M – Evaluation Factors for Award Section A & B Solicitation/Contract Form SF 1442 (Continued) Information regarding proposal submission:
Please submit the following documents for your proposal, the list is not all inclusive, the contractor is required to review the RFP and submit all documents required of this RFP:
1. Standard Form (SF) 1442- Solicitation, Offer & Award (Construction), completed (page 2) and signed in Block 20A, B, & C.
2. Representations, Certifications, and Notices (Section “K” completed and returned with offer (end of solicitation)).
3. Information regarding after award requirements:
Within 10 days of award the contractor will be required to submit the required Performance Bond, Payment Bond and Insurance as follows:
1. If the offer exceeds $100,000, the bidder/offeror to whom award is made will be required to furnish a Payment Bond, Standard Form 25A, and a Performance Bond, Standard Form 25. Copies of Standard Forms 25A and 25 may be obtained by accessing the following website: http://www.gsa.gov/Portal/gsa/ep/formslibrary.do?formType=SF
2. Insurance – FAR 28.307 - 2 Liability.
(a) Workers’ compensation and employer’s liability. Contractors are required to comply with applicable Federal and State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
(b) General liability.
(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.
(c) Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract, the contracting officer shall require aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
(e) Vessel liability. When contract performance involves use of vessels, the contracting officer shall require, as determined by the agency, vessel collision liability and protection and indemnity liability insurance.
NOTE: METRIC PRODUCTS - Products manufactured to metric dimensions will be considered on an equal basis with those manufactured using inch-pound units, providing they fall within the tolerances specified using conversion tables contained in the latest revision of Federal Standards No. 376, and all other requirements of this document are met. If a product is manufactured to metric dimensions and those dimensions exceed the tolerances specified in the inch-pound units, a request shall be made to the Contracting Officer to determine if the product is acceptable. The Contracting Officer, in concert with the COTR, will accept or reject the product.
CONTRACTING OFFICER'S AUTHORITY (MAR 2003)
The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract. In the event the Contractor effects any changes at the direction of any person other than the Contracting Officer, the changes will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof. The Contracting Officer shall be the only individual authorized to accept nonconforming work, waive any requirement of the contract, or to modify any term or condition of the contract. The Contracting Officer is the only individual who can legally obligate Government funds. No cost chargeable to the proposed contract can be incurred before receipt of a fully executed contract or specific authorization from the Contracting Officer. [End of Clause]
SUBMISSION OF INVOICES (JUN 2009)
Copies of invoices will be submitted to the CO and COTR by e-mail. To constitute a proper invoice, the invoice shall include all the items required by Federal Acquisition Regulation (FAR) 32.905 and the invoice shall be accompanied by a Progress Report form (to be provided after award or the contractor may provide an equivalent Progress Report form with approval from the CO). [End of Clause]
Section C – Description/Specification Description of Work:
(a) Cost Range: $25,000 - $100,000
(b) NAICS Code: 238320
(c) The Contractor shall furnish all labor, material, equipment and supervision necessary to complete the Kennel Painting Project for the Customs and Border Protection facility located at East Bliss (formerly known as Biggs Army Air Field, 11617 Old Ironsides Drive, El Paso, TX 79916 in accordance with the Scope of Work, this solicitation/contract, and Federal, State and Local laws.
(d) All work must be coordinated around current operations and scheduled with the Contracting Officer’s Technical Representative (COTR).
Section D – Packaging and Marking This section is not applicable to this contract.
Section E – Inspection and Acceptance 52.246-12 -- Inspection of Construction (Aug. 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not --
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may --
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.(End of Clause) Section F – Deliveries or Performance
52.211-10 -- Commencement, Prosecution, and Completion of Work (Apr 1984).
The Contractor shall be required to
(a) commence work under this contract within 1 calendar day after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 60 calendar days from the Notice to Proceed being issued. (End of Clause)
Section G – Contract Administration Data
GOVERNMENT POINTS OF CONTACT:
Contracting Officer (CO):
Richard L. Marino
(317) 614-4584
Richard.marino@dhs.gov
Contract Specialist (CS):
Jon A. Massey
(317) 614-4591
Jon.Massey@dhs.gov Contracting Officer’s Technical Representative (COTR):
Eugene Montoya
(915) 231-5100 Extension 5308
Eugene.Montoya@dhs.gov
3052.242-72 CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (DEC 2003)
(a) The Contracting Officer may designate Government personnel to act as the Contracting Officer's Technical Representative (COTR) to perform functions under the contract such as review or inspection and acceptance of supplies, services, including construction, and other functions of a technical nature. The Contracting Officer will provide a written notice of such designation to the Contractor within five working days after contract award or for construction, not less than five working days prior to giving the Contractor the notice to proceed. The designation letter will set forth the authorities and limitations of the COTR under the contract.
(b) The Contracting Officer cannot authorize the COTR or any other representative to sign documents, such as contracts, contract modifications, etc., that require the signature of the Contracting Officer. (End of Clause) Section H – Special Contract Requirements
52.203-13 – Contractor Code of Business Ethics and Conduct (Apr 2010)
(a) Definition. As used in this clause--
“Agent” means any individual, including a director, an officer, an employee, or an independent Contractor, authorized to act on behalf of the organization.
“Full cooperation”—
(1) Means disclosure to the Government of the information sufficient for law enforcement to identify the nature and extent of the offense and the individuals responsible for the conduct. It includes providing timely and complete response to Government auditors’ and investigators’ request for documents and access to employees with information;
(2) Does not foreclose any Contractor rights arising in law, the FAR, or the terms of the contract. It does not require—
(i) A Contractor to waive its attorney-client privilege or the protections afforded by the attorney work product doctrine; or
(ii) Any officer, director, owner, or employee of the Contractor, including a sole proprietor, to waive his or her attorney client privilege or Fifth Amendment rights; and
(3) Does not restrict a Contractor from—
(i) Conducting an internal investigation; or
(ii) Defending a proceeding or dispute arising under the contract or related to a potential or disclosed violation.
“Principal” means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
“Subcontract” means any contract entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract.
“Subcontractor” means any supplier, distributor, vendor, or firm that furnished supplies or services to or for a prime contractor or another subcontractor.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Code of business ethics and conduct.
(1) Within 30 days after contract award, unless the Contracting Officer establishes a longer time period, the Contractor shall—
(i) Have a written code of business ethics and conduct;
(ii) Make a copy of the code available to each employee engaged in performance of the contract.
(2) The Contractor shall—
(i) Exercise due diligence to prevent and detect criminal conduct; and
(ii) Otherwise promote an organizational culture that encourages ethical conduct and a commitment to compliance with the law.
(3)
(i) The Contractor shall timely disclose, in writing, to the agency Office of the Inspector General (OIG), with a copy to the Contracting Officer, whenever, in connection with the award, performance, or closeout of this contract or any subcontract thereunder, the Contractor has credible evidence that a principal, employee, agent, or subcontractor of the Contractor has committed—
(A) A violation of Federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in Title 18 of the United States Code; or
(B) A violation of the civil False Claims Act (31 U.S.C. 3729-3733).
(ii) The Government, to the extent permitted by law and regulation, will safeguard and treat information obtained pursuant to the Contractor’s disclosure as confidential where the information has been marked “confidential” or “proprietary” by the company. To the extent permitted by the law and regulation, such information will not be released by the Government to the public pursuant to a Freedom of Information Act request, 5 U.S.C. Section 552, without prior notification to the Contractor. The Government may transfer documents provided by the Contractor to any department or agency within the Executive Branch if the information relates to matters within the organization’s jurisdiction.
(iii) If the violation relates to an order against a Governmentwide acquisition contract, a multi-agency contract, a multiple-award schedule contract such as the Federal Supply Schedule, or any other procurement instrument intended for use by multiple agencies, the Contractor shall notify the OIG of the ordering agency and the IG of the agency responsible for the basic contract.
(c) Business ethics awareness and compliance program and internal control system. This paragraph (c) does not apply if the Contractor has represented itself as a small business concern pursuant to the award of this contract or if this contract is for the acquisition of a commercial item as defined at FAR 2.101. The Contractor shall establish the following within 90 days after contract award, unless the Contracting Officer establishes a longer time period:
(1) An ongoing business ethics awareness and compliance program.
(i) This program shall include reasonable steps to communicate periodically and in a practical manner the Contractor’s standards and procedures and other aspects of the Contractor’s business ethics awareness and compliance program and internal control system, by conducting effective training programs and otherwise disseminating information appropriate to an individual’s respective roles and responsibilities.
(ii) The training conducted under this program shall be provided to the Contractor’s principals and employees, and as appropriate, the Contractor’s agents and subcontractors.
(2) An internal control system.
(i) The Contractor's internal control system shall—
(A) Establish standards and procedures to facilitate timely discovery of improper conduct in connection with Government contracts; and
(B) Ensure corrective measures are promptly instituted and carried out.
(ii) At a minimum, the Contractor’s internal control system shall provide for the following:
(A) Assignment of responsibility at a sufficiently high level and adequate resources to ensure effectiveness of the business ethics awareness and compliance program and internal control system.
(B) Reasonable efforts not to include an individual as a principal, whom due diligence would have exposed as having engaged in conduct that is in conflict with the Contractor’s code of business ethics and conduct.
(C) Periodic reviews of company business practices, procedures, policies, and internal controls for compliance with the Contractor’s code of business ethics and conduct and special requirements of Government contracting, including—
(1) Monitoring and auditing to detect criminal conduct;
(2) Periodic evaluation of the effectiveness of the business ethics awareness and compliance program and internal control system, especially if criminal conduct has been detected; and
(3) Periodic assessment of the risk of criminal conduct, with appropriate steps to design, implement, or modify the business ethics awareness and compliance program and the internal control system as necessary to reduce the risk of criminal conduct identified through this process.
(D) An internal reporting mechanism, such as a hotline, which allows for anonymity or confidentiality, by which employees may report suspected instances of improper conduct, and instructions that encourage employees to make such reports.
(E) Disciplinary action for improper conduct or for failing to take reasonable steps to prevent or detect improper conduct.
(F) Timely disclosure, in writing, to the agency OIG, with a copy to the Contracting Officer, whenever, in connection with the award, performance, or closeout of any Government contract performed by the Contractor or a subcontractor thereunder, the Contractor has credible evidence that a principal, employee, agent, or subcontractor of the Contractor has committed a violation of Federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in Title 18 U.S.C. or a violation of the civil False Claims Act (31 U.S.C. 3729-3733).
(1) If a violation relates to more than one Government contract, the Contractor may make the disclosure to the agency OIG and Contracting Officer responsible for the largest dollar value contract impacted by the violation.
(2) If the violation relates to an order against a Governmentwide acquisition contract, a multi-agency contract, a multiple-award schedule contract such as the Federal Supply Schedule, or any other procurement instrument intended for use by multiple agencies, the contractor shall notify the OIG of the ordering agency and the IG of the agency responsible for the basic contract, and the respective agencies’ contracting officers.
(3) The disclosure requirement for an individual contract continues until at least 3 years after final payment on the contract.
(4) The Government will safeguard such disclosures in accordance with paragraph (b)(3)(ii) of this clause.
(G) Full cooperation with any Government agencies responsible for audits, investigations, or corrective actions.
(d) Subcontracts.
(1) The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts that have a value in excess of $5,000,000 and a performance period of more than 120 days.
(2) In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer. (End of clause) 52.204-7 -- Central Contractor Registration (Apr 2008)
(a) Definitions. As used in this clause—
“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern. “Registered in the CCR database” means that—
(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and
(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.
(b)
(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(g) (1)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the CCR database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757. (End of Clause) Section I – Contract Clauses
52.252-2 - Clauses Incorporated by Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these addresses:
http://www.arnet.gov/far/ & https://dhsonline.dhs.gov/portal/jhtml/dc/sf.jhtml?doid=111686 52.202-1 - Definitions (Jun 2004)
52.203-3 - Gratuities (Apr 1984)
52.203-5 - Covenant Against Contingent Fees (Apr 1984)
52.203-6 - Restrictions on Subcontractor Sales to the Government (Sep 2006) 52.203-7 - Anti-Kickback Procedures (Jul 1995)
52.203-8 - Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (Jan 1997)
52.203-10 - Price or Fee Adjustment for Illegal or Improper Activity (Jan 1997)
52.203-12 -Limitation on Payments to Influence Certain Federal Transactions (Sep 2007)
52.204-4 - Printed or Copied Double-Sided on Recycled Paper (Aug 2000)
52.204-7 - Central Contractor Registration (Apr 2008)
52.204-9 Personal Identity Verification of Contractor Personnel (Sep 2007)
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2006)
52.211-18 Variation in Estimated Quantities (Apr 1984) 52.215-2 - Audit and Records -- Negotiation (Mar 2009)
52.219-8 - Utilization of Small Business Concerns (May 2004)
52.219-14 - Limitations on Subcontracting (Dec 1996)
52.222-1 - Notice to the Government of Labor Disputes (Feb 1997)
52.222-3 - Convict Labor (June 2003)
52.222-4 - Contract Work Hours/Safety Standards Act Overtime Compensation. (Jul 2005)
52.222-6 - Davis-Bacon Act (Jul 2005)
52.222-7 - Withholding of Funds (Feb 1988)
52.222-8 - Payrolls and Basic Records (Jun 2010)
52.222-9 - Apprentices and Trainees (Jul 2005)
52.222-10 - Compliance with Copeland Act Requirements (Feb 1988)
52.222-11 - Subcontracts (Labor Standards) (Jul 2005)
52.222-12 - Contract Termination -- Debarment (Feb 1988)
52.222-13 - Compliance with Davis-Bacon and Related Act Regulations (Feb 1988)
52.222-14 - Disputes Concerning Labor Standards (Feb 1988)
52.222-15 - Certification of Eligibility (Feb 1988)
52.222-21 - Prohibition of Segregated Facilities (Feb 1999)
52. .222-23 - Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999)
52.222-26 - Equal Opportunity (Mar 2007)
52.222-27 - Affirmative Action Compliance Requirements for Construction (Feb 1999)
52.222-35 - Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006)
52.222-36 - Affirmative Action for Workers With Disabilities (Jun 1998)
52.222-37 - Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Sep 2006)
52.222-54 – Employment Eligibility Verification (Jan 2009)
52.223-3 - Hazardous Material Identification and Material Safety Data (Jan 1997)
52.223-5 - Pollution Prevention and Right-to-Know Information (Aug 2003)
52.223-6 - Drug-Free Workplace (May 2001)
52.223-11 - Ozone-Depleting Substances (May 2001)
52.227-1 - Authorization and Consent (Dec 2007)
52.227-2 - Notice and Assistance Regarding Patent and Copyright Infringement (Dec 2007)
52.228-2 - Additional Bond Security (Oct 1997)
52.228-5 - Insurance -- Work on a Government Installation (Jan 1997)
52.228-11 - Pledges of Assets (Sep 2009)
52.228-12 - Prospective Subcontractor Requests for Bonds (Oct 1995)
52.228-14 - Irrevocable Letter of Credit (Dec 1999)
52.228-15 - Performance and Payment Bonds -- Construction (Nov 2006)
52.229-3 - Federal, State, and Local Taxes (Apr 2003)
52.232-5 - Payments under Fixed-Price Construction Contracts (Sept 2002)
52.232-16 - Progress Payments (Aug 2010) Alt I (Mar 2000) 52.232-17 - Interest (Oct 2008)
52.232-23 - Assignment of Claims (Jan 1986)
52.232-27 - Prompt Payment for Construction Contracts (Oct 2008)
52.233-1 - Disputes (July 2002)
52.233-3 - Protest after Award (Aug. 1996)
52.233-4 - Applicable Law For Breach Of Contract Claim (Oct 2004) 52.236-1 Performance of Work by Contractor (Apr 1984) 52.236-2 - Differing Site Conditions (Apr 1984)
52.236-3 - Site Investigation and Conditions Affecting the Work (Apr 1984)
52.236-5 -Material and Workmanship (Apr 1984)
52.236-6 - Superintendence by the Contractor (Apr 1984)
52.236-7 - Permits and Responsibilities (Nov 1991)
52.236-8 - Other Contracts -- (Apr 1984)
52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984)
52.236-10 - Operations and Storage Areas (Apr 1984)
52.236-11 - Use and Possession Prior to Completion (Apr 1984)
52.236-12 - Cleaning Up (Apr 1984)
52.236-13 - Accident Prevention (Nov 1991)
52.236-14 - Availability and Use of Utility Services (Apr 1984)
52.236-15 - Schedules for Construction Contracts (Apr 1984)
52.236-16 Quantity Surveys (Apr 1984) 52.236-17 - Layout of Work (Apr 1984) 52.236-21 - Specifications and Drawings for Construction (Feb 1997)
52.236-26 - Preconstruction Conference (Feb 1995)
52.236-27 - Site Visit (Feb 1995) 52.236-28 - Preparation of Offers-Construction (Oct 1997) 52.242-13 - Bankruptcy (Jul 1995)
52.242-14 - Suspension of Work (Apr 1984)
52.243-4 - Changes (Jun 2007)
52.244-6 - Subcontracts for Commercial Items (Jun 2010)
52.246-12 - Inspection of Construction (Aug 1996) 52.246-21 - Warranty of Construction (Mar 1994)
52.249-2 Alternate I - Termination for Convenience of the Government (Fixed-Price) (May 2004)
52.249-10 - Default (Fixed-Price Construction) (Apr 1984)
52.253-1 - Computer Generated Forms (Jan 1991)
3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006)
3052.209-72 Organizational Conflict of Interest (Jun 2006)
3052.222-70 Strikes or Picketing Affecting Timely Completion of the Contract Work (Dec 2003)
3052.222-71 Strikes or Picketing Affecting Access to DHS Facility (Dec 2003)
3052.242-72 Contracting Officer’s Technical Representative (Dec 2003)
Section J – List of Documents, Exhibits and Other Attachments
Attachment #1: Scope of Work Dated 21 September 2011 Attachment #2: Davis-Bacon Act Wage Determination TX100122 April 8, 2011 TX122 Attachment #3: Exterior Kennel Project Photo Attachment #4: Interior Kennel Project Photo Attachment #5: Side View Main Kennel Photo Attachment #6 Walkways Kennel Project Photo Attachment #7: Contractor Quote Summary By Building Solicitation HSBP1010R0077