200619 Attch 1.pdf
PDF 146 KB Posted
- Attached to
- EROM Federal contract opportunity
- Solicitation number
- FA3099-20-Q-0005
- Issued by
- Department of the Air Force
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electronic Read Out Machine (EROM) Repair Performance Work Statement (PWS)
17 June 2020
BACKGROUND
The EROM has been inconsistent. The display screen sometimes fades away or goes blank. The EROM is crucial to the Air Force mission as it calculates the compressor stator tip & the compressor case land measurements required to mate the compressor case to the compressor rotor of the J85 jet engine.
SCOPE
The EROM will require a repair to correct the display screen from fading causing measurement calculation numbers unreadable. The EROM was manufactured approximately in 2002-2005 time frame.
INSTRUCTIONS
1. Service Provider (SP) will inspect EROM and provide detailed work scope to repair EROM.
2. SP may be required to provide training if necessary in the use of the repaired EROM.
3. EROM shall be repaired as to not affect the operational intent for which it was designed for.
4. If required, provide details for shipping to repair facility and returning EROM back to Laughlin
AFB, TX.
5. Provide timeline describing repair process and completion date.
6. Provide warranty information.
Kenneth P Simon III Chief COR
| 2020-06-19T12:06:46-0500 | |
| SIMON.KENNETH.P.III.1067863514 |
File details come from the government source that posted it. Updated .