This is Addendum No. 3 to the contract documents and specifications for Taxiway F Reconstruction at Baton Rouge Metropolitan Airport, issued by the City of Baton Rouge and Parish of East Baton Rouge on behalf of the Greater Baton Rouge Airport District. The project encompasses construction of new airfield pavement, drainage systems, electrical infrastructure, and earthwork at the airport. The addendum revises the bid opening date to August 18, 2026 at 2:00 p.m. local time and extends the deadline for submitting questions to Monday, August 10, 2026 at 5:00 p.m. A non-mandatory pre-bid conference was held on July 22, 2026 at 10:00 a.m. at the Baton Rouge Metropolitan Airport Terminal Building. The contract duration is 170 consecutive calendar days for the base bid, 208 days for base bid plus alternate No. 1, and 256 days for base bid plus alternates No. 1 and No. 2, contingent upon owner acceptance of alternates under Louisiana State Bid Laws. Electronic or sealed bids are submitted through Central Bidding at www.centralbidding.com or delivered to the Purchasing Division at City Hall, 222 Saint Louis Street, Baton Rouge, Louisiana 70802.
The addendum clarifies specifications and responds to bidder questions regarding vacuum sweeper truck requirements for Foreign Object Debris (FOD) prevention, lime slurry dust control, dowel bar specifications (1-inch diameter, 18-inch length with 12-inch spacing), hydro-excavation requirements for FAA cable identification, and material storage locations shown on contractor access plans. Pricing is structured as 100% unit price bid with all components reflected in unit price extensions on the Louisiana Uniform Public Works Bid Form. Bidders must submit a certified check, cashier's check, or bid bond equal to five percent of the total bid amount and include fully executed bid forms, corporate resolutions, and various certifications. Award is contingent upon receipt of grants from the Federal Aviation Administration and Louisiana Department of Transportation and Development - Office of Aviation. Liquidated damages are assessed at $2,000 per consecutive calendar day for work not completed by the contract completion date. Contractors must hold an active Louisiana State License for Highway, Street, and Bridge Construction and comply with Disadvantaged Business Enterprise (DBE) participation requirements under 49 CFR Part 26, the Buy American Provision, and Executive Order 11246 regarding equal employment opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20008-31585.01-4.pdf | ||
| 20008-31585.01-2.pdf | ||
| 20008-31585.01-1.pdf | ||
| 20008-31585.01.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS
AND
SPECIFICATIONS
FOR
AIP NO. TBD
TAXIWAY F RECONSTRUCTION
BATON ROUGE METROPOLITAN AIRPORT
ADDENDUM NO. 3
DATE ISSUED: AUGUST 6, 2026
SCOPE:
This Addendum shall be part of the Contract Documents as provided in the Instructions to Bidders.
The following items are issued to add, modify, and clarify the Contract Documents and Specifications. These items shall have full force and effect, as the contract Documents and the cost involved shall be included in the bid prices.
Acknowledge receipt of the addendum by its number and date on the Louisiana Uniform Public Work Bid Form.
Failure to do so may subject the bidder to disqualification.
Individual document changes consist of the following:
REVISIONS TO PROJECT SPECIFICATIONS:
The following sections have been added, deleted, or amended in the Specifications and Contract Documents dated
July 7, 2026.
• Advertisement – Revised Bid Opening to August 18 at 2:00 local time.
• Instructions to Bidders – Revised Bid Opening to August 18 at 2:00 local time.
• Additional Q&A
• Last Day for Questions –Revised to Monday, August 10 at 5:00 local time.
Question(s) Response
Addendum #1 added language in S-1000 Construction Safety and Phasing Plan section 2.7
Foreign Object Debris (FOD) management stating”
b. All crossings of active airport facilities by vehicles carrying construction material shall be followed by a vacuum sweeper truck equipped with magnetic bars for FOD prevention.
c. Sweeper equipment shall be available for use at the discretion of BTR Ops and the
Owner's Program Manager.
d. Documented FOD inspections must be made by the contractor, inspector, and BTR Ops twice daily at all intersections of work areas and active airport pavements.
Please clarify if a Vacuum truck will be required to clean all crossings after every vehicle carrying construction debris is brought in and out of the site for the duration of the project. (limestone, concrete, asphalt, dirt, bedding, etc…)
Please see General Notes 2-5 on Addendum 1 - Sheet GI101 Construction
Safety Plan and Airport Safety Plan Phase 1 for this clarification. Note 4 states, "All crossings of active airport facilities by vehicles carrying construction material shall be followed by a vacuum sweeper truck equipped with magnetic bars for FOD prevention. Contractor to estimate use of a vacuum sweeper truck for the entire duration of Phase 2 which is estimated at 125 calendar days for base bid, 163 calendar days for base bid plus alt. 1, 211 calendar days for base bid plus alt. 1 plus alt. 2."
Will lime slurry be required?
Yes, lime slurry is required for dust prevention. Addendum 4 will add notes to plan sheets accordingly.
What size dowel bars will be required for type C and E joints?
Dowel bars shall be 1 inch in diameter, 18 inch in length, with a 12 inch spacing.Addendum 4 will add notes to plan sheets accordingly.
Will it be acceptable to install an asphalt treated permeable base course in lieu of a cement treated permeable base course in concrete paving areas?
No. The pavement section will remain as shown in the plans.
During the prebid meeting, it was mentioned that hydro-excavation would be required to identify
FAA lines. Please describe to what extent this will be required. For example, will it just be required where proposed drainage crosses the FAA lines?
Hydro-excavation will be required to expose FAA Cables in the presence of an FAA Resident Engineer in areas of conflict with all work activities.
Plans state: “Disposition of salvaged material shall be at an on-airport location.” T-905-5.1 also states this is to come from onsite or stockpile.
Please state if and where Topsoil and Excavation shall be stored. Also, if pavement removal is to be stockpiled on site
Please see the Contractor Access Plan Sheet GI002 and the CSPP Sheets
GI101 and GI102 that were all issued via Addendum 1. Staging, material storage, and parking areas are shown on the contractor access plan. A temporary stockpile area is shown along with notes regarding the management of that stockpile on the CSPP sheets.
Is the project being awarded on base bid or base bid + alts?
The owner will review the bids and award the base bid plus potentially any alternates based on Louisiana State Bid Laws (RS 38:2212.1.B.3) if the alternates fit within the owner’s budget constraints.
RS 38:2212.1.B.3 states, “(3) Any proposal shall include no more than three alternates. An alternate bid by any name is still an alternate.
Alternates, if accepted, shall be accepted in the order in which they are listed on the bid form. Determination of the low bidder shall be on the basis of the sum of the base bid and any alternates accepted. However, the public entity may accept alternates in any order which does not affect determination of the low bidder.”
For Addendum No. 3 Issuance
Baton Rouge Metro Airport Taxiway F Reconstruction
Question(s) Response
For Addendum No. 3 Issuance
Baton Rouge Metro Airport Taxiway F Reconstruction
Bid tab structure is atypical. Components of material BOMs are broken out into separate pay items i.e. base plates, cans, frangible couplings, etc
It would be much cleaner bid and would yield more accurate estimates to have inclusive pay items such as taxiway fixture, can materials, transformer, connector kit all in a single pay item.
Will revise Taxiway lights, Runway Guard Lights and Signs into one pay item each in Addendum 4.
Counts are showing discrepancy. Quantity of 3 for primary connector kits but every light fixture and new sign will need a connector kit.
Corrected in upcoming Addendum 4.
Frangible couplings are a part of our light fixture and sign assemblies. No need to break out unless there is a spare parts requirement. Same with mounting flanges.
Included in pay item for signs. Will be revised in Addendum 4.
Bid tab calls for 5 total sign concrete foundations across the base bid and alt schedules. But the sign schedule shows 2 new signs and 11 signs to be relocated. Relocated signs will need new concrete foundation including can materials.
There are a total of 4 signs to be relocated as part of Base Bid. There is one new sign to be installed as part of Alternate Bid Item #2. The rest of the signs are not in contract at this time. The signage schedule will be updated to reflect this.
Two separate pay items for L-867D cans with covers. Assuming one pay item is for handholes and other is for junction cans- also there is about a 30% difference in the engineer pricing estimate between the two pay items despite being the same material requirement. Need separate details if the can configurations are different
The “L-867 Base Can 12" diameter X 24" deep with two 2" grommets” is for the elevated taxiway lights. The “Electrical Junction Structure, L-867D, 16" diameter, 24" deep” is the junction structure. Details are included for each on drawings E501 and E502.
Plans call out electrical demo but there is no pay item for this. ED101-ED102 L-110-5.1 includes conduit demo and installation. L-125-5.1 includes demo of existing taxiway lights and replacement.
L-108-5.2 – trenching, turf, and pavement restoration, protection of existing circuits. What pavement will need to be replaced here?
No pavement is to be cut for trenching. If any is damaged as part of this work then it must be restored.
What is required for the protection of existing circuits or can you elaborate so we know what the intent is there.
Existing underground circuits not part of this work are to be protected from damage.
L-110-5.1 – Can the 2” pvc conduit be abandoned in place? Intent is for Conduits made obsolete by this work to be demo’ed.
Will Temporary lighting be required and if so can a scope be given for this? Temporary lighting is not included.
Add 1 included a pay item for L-110-5.8 Jack and bore L-867D base can and cover. Is this just a base can? Base can only.
Baton Rouge Metropolitan Airport I-3 Addendum No. 3
Taxiway F Reconstruction August 6, 2026
Taxiway F Reconstruction
ADVERTISEMENT
To be published three times Legal – July 7, July 14, July 21, 2026
THE ADVOCATE
BATON ROUGE, LOUISIANA
NOTICE TO CONTRACTORS
The City of Baton Rouge and Parish of East Baton Rouge for the Greater Baton Rouge Airport District, will receive electronic or paper bids for the construction of the following project:
Taxiway F Reconstruction Baton Rouge Metropolitan Airport, East Baton Rouge Parish, Louisiana.
PROJECT DESCRIPTION: This project will include new airfield pavement, drainage, electrical and earthwork.
There will be a Non-Mandatory Pre-Bid Conference held on Wednesday, July 22, 2026, at 10:00 a.m. local time in the 1st floor conference room at the Baton Rouge Metropolitan Airport Terminal Building.
Electronic or sealed bids will be received until 2:00 p.m. Local Time, Tuesday, August 18, 2026, by the Purchasing Division, Room 826, City Hall, 222 Saint Louis Street, Baton Rouge, Louisiana 70802. No bids will be received after 2:00 p.m. on the same day and date.
Bid Openings can be in person or via teleconference. Teleconference Call-in Information.
Join by phone +1-408-418-9388 United States Toll Access code: 263 373 080 (followed by the # button)
Alternate numbers to call if number above is not available, which may occur due to network traffic (use the same Access Code, followed by the # button):
United States Toll (Boston) +1-617-315-0704 United States Toll (Chicago) +1-312-535-8110 United States Toll (Dallas) +1-469-210-7159 United States Toll (Denver) +1-720-650-7664 United States Toll (Jacksonville) +1-904-900-2303 United States Toll (Los Angeles) +1-213-306-3065
Baton Rouge Metropolitan Airport I-4 Addendum No. 3
Electronic bids and electronic bid bonds for the solicitation will be downloaded by the City of Baton Rouge and Parish of East Baton Rouge, Purchasing Division.
Beginning as soon as feasible after the bid closing time all electronic bids will be downloaded and publicly read aloud along with all paper bids received, if any, in 806 of City Hall immediately after the 2:00 p.m. bid closing.
Bids, amendments to bids, or request for withdrawal of quotations, received after time specified for bid opening shall not be considered for any cause whatsoever.
Bids shall be firm for a period of sixty (60) days from the date of the opening of bids and no bid shall be withdrawn for any reason during this period of time except as allowed per R.S. 38:2214.C.
Official Bid Documents are available at Central Bidding www.centralbidding.com .
Electronic Bids may be submitted at Central Bidding (www.centralbidding.com). For questions related to the electronic bidding Form Revised Apr 2, 2009 NC 2 of 2 process, please call Central Bidding at 225-810-4814. Copies of the Contract Documents may be obtained and examined without charge in the office of the Project Engineer, or as requested for electronic copies via PDF from the Project Manager by emailing Blake Roussel at RousselBlake@stanleygroup.com and Brady Richard at RichardBrady@stanleygroup.com. For additional information, contact Stanley Consultants, Inc. at the above email or phone number 225.387.2422.
A Certified Check or Cashier's Check, payable to the Parish of East Baton Rouge or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to five percent (5%) of the total bid, shall be submitted with each bid.
Bids shall be received electronically via www.centralbidding.com or on solicitation bid forms furnished by the City of Baton Rouge and Parish East Baton Rouge, and only those bids shall be received by the City-Parish which is submitted by those Contractors in whose names the solicitation bid forms and/or specifications were issued. In no event shall paper solicitation forms be issued later than twenty-four (24) hours prior to the hour and date set for receiving proposals.
The Bidder is advised that the City of Baton Rouge and Parish of East Baton Rouge is an Equal Opportunity Employer. Therefore, the Bidder is encouraged to utilize minority participation in this contract to the extent possible through the use of small, disadvantaged and women-owned businesses as suppliers or subcontractors.
All Contractors bidding on this work shall comply with all provisions of the State Licensing Law for Contractors, R.S. 37:2150-2163, as amended, for all public contracts.
It shall also be the responsibility of the General Contractor to assure that all subcontractors comply with this law. If required for bidding, Contractors must hold an
Baton Rouge Metropolitan Airport I-5 Addendum No. 3 active license issued by the Louisiana State Licensing Board for Contractors in the classification of Highway, Street, and Bridge Construction, and must show their license number on the face of the bid envelope and the Uniform Public Works Bid Form.
Bidders should be aware that award of this contract is contingent upon receipt of a grant or grants from the Federal Aviation Administration (FAA) and the State of Louisiana Department of Transportation and Development - Office of Aviation (DOTD), along with the securing of other required approvals. Project numbers will be assigned upon approval by the FAA.
1. Policy: It is the policy of the Department of Transportation (DOT) that Disadvantaged Business Enterprises as defined in 49 CFR Part 26 shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with Federal funds.
2. Baton Rouge Metropolitan Airport has established a Disadvantaged Business Enterprise (DBE) program in accordance with regulations of the U.S. Department of Transportation, 49 CFR Part 26. It is the policy of the Baton Rouge Metropolitan Airport to ensure that DBEs, as defined in 49 CFR Part 26, have an equal opportunity to receive and participate in DOT-assisted contracts. All Respondents or Proposers shall make good faith efforts, as defined in Appendix A of 49 CFR Part 26, to utilize DBE participation on the project. Until further notice – at this time, contractors are not required to complete Forms A, B, C.
3. The proposed Contract is under and subject to Executive Order 11246 of September 24, 1965, and to the Equal Opportunity Clause. The Bidder’s (Proposer’s) attention is called to the “Equal Opportunity Clause” and the “Standard Federal Equal Employment Opportunity Construction Contract Specifications” set forth in the Project Manual.
4. The Bidder (Proposer) must supply all the information required by the bid or proposal forms. The Bidders will be required to submit a Certification of Nonsegregated Facilities, and to notify prospective Subcontractors of the requirements of such Certification as Notice to Subcontractors appears in the Project Manual.
5. Women will be afforded equal opportunity in all areas of employment. However, the employment of women shall not diminish the standards or requirements for the employment of minorities.
6. For contracts for $50,000 or more, a Contractor having 50 or more employees, and his Subcontractors having 50 or more employees and who may be awarded a subcontract of $50,000 or more, will be required to maintain an affirmative action program within 120 days of the commencement of the contract.
7. Compliance Reports. Within 30 days after award of this contract, the Contractor shall file a compliance report (Standard Form 100) if:
a. The Contractor has not submitted a complete compliance report within 12 months preceding the date of Award; and
Baton Rouge Metropolitan Airport I-6 Addendum No. 3
b. The Contractor is within the definition of “employer” in Paragraphs 2e (3) of the instructions included in Standard Form 100.
The Contractor shall require the Subcontractor on all-tier subcontracts, irrespective of dollar amount, to file Standard Form 100 within 30 days after award of the subcontract if the above two conditions apply. Standard Form 100 will be furnished upon request.
8. Buy American Provision. The proposed Contract is subject to the Buy American Provision under Section 9129 of the Aviation Safety and Capacity Expansion Act of 1990. Details of such requirements are contained in the Project Manual.
In accordance with La. R.S. 38:2214 (B) the City of Baton Rouge and Parish of East Baton Rouge reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212 (A)(1)(b), the provisions and requirements of this Section, those stated in the advertisement for bids, and those required on the bid form, shall not be considered as informalities and shall not be waived by any public entity.
For additional information please contact Blake Roussel or Brady Richard, at the number and email(s) noted above.
Baton Rouge Metropolitan Airport I-7 Addendum No. 3
INSTRUCTIONS TO BIDDERS
The Bidder shall agree to fully complete the contract within 170 consecutive calendar days for the base bid, 208 consecutive calendar days for the base bid and additive alternate No. 1 and 256 consecutive calendar days for the base bid, additive alternate No. 1 and additive alternate No. 2 pending acceptance of alternates by Owner and subject to such extensions as may be granted in the
General and Special Provisions and acknowledges that this construction time will start on or before the date specified in written "Notice to Proceed" from the Owner's Representative.
The Bidder shall agree to pay as Liquidated Damages the amount TWO THOUSAND DOLLARS
($2,000) for each consecutive calendar day for which the work is not complete, beginning with the first day beyond the contract and/or phase completion times as stated in the "Notice to Proceed" or as amended by change order.
The Bidder shall note that this is a 100% Unit Price Bid and that the Total Bid will equal the total sum of all Unit Price Extensions on the Louisiana Uniform Public Work Bid Form.
Electronically submitted Bids shall be submitted through www.centralbidding.com prior to 2:00 p.m.
on the Bid Date. Hard copy proposals submitted shall be placed in a sealed envelope plainly marked with the project name and number, and name, business address, and Louisiana Contractor's License number of the bidder on the outside. When sent by mail, preferably registered, the sealed proposal, marked as indicated above, shall be enclosed in an additional envelope. No proposal will be considered unless received at the place specified in the advertisement before the time specified for opening of bids.
Proposals received after the bid opening time shall be returned to the bidder unopened. The right is reserved to reject any and all bids and to waive informalities. Beginning at 2:00 p.m. on Tuesday, August 18, all electronic Bids will be downloaded and read aloud along with paper Bids received, if any, on the 8th Floor in Room 826, City Hall, 222 Saint Louis Street, Baton Rouge, LA 70802 immediately thereafter. Bidders or their authorized representatives are invited to be present.
Bids, amendments to Bids, or request for withdrawal of Bids, received after the time specified for Bid
Opening shall not be considered for any cause whatsoever.
Bidders should be aware that award of this contract is contingent upon receipt of a grant or grants from the Federal Aviation Administration (FAA) and/or the State of Louisiana Department of Transportation and Development - Office of Aviation (DOTD), along with the securing of other required approvals.
Bids shall be firm for a period of sixty (60) days from the date of the opening of Bids and no Bid shall be withdrawn for any reason during this period of time except as allowed per La. R.S. 38:2214.C.
Electronic copies of the Contract Documents may be obtained online at www.centralbidding.com.
BID DOCUMENTS: The Instructions to Bidders, Bid Form, Contract, Plans, Specifications, and
Forms of Bid Bond, Performance Bond and Payment Bond, and other bidding documents for the project may be viewed and downloaded free of charge (with the option to purchase hard copies) at www.centralbidding.com. Addenda will be posted at www.centralbidding.com. You will be notified of addenda automatically, through email, if you downloaded your plans and specifications via www.centralbidding.com. Additionally, PDF version of the Bidding Documents may be obtained from the Project Engineer’s Office. Please submit questions for the project by Monday, August 10, 2026 at
5:00pm CT through www.centralbidding.com in the Q&A portal or via email to
Baton Rouge Metropolitan Airport I-8 Addendum No. 3
RousselBlake@stanleygroup.com and RichardBrady@stanleygroup.com.
Each Bid shall be accompanied by a certified check, cashier’s check, or Bid bond in an amount equal to five percent (5%) of Bid and shall be made payable to the City of Baton Rouge/Parish of East Baton
Rouge on behalf of the Greater Baton Rouge Airport District in accordance with La. R.S. 38:2218.
Bidders shall include the following documents as part of their Bid submitted on the Bid Date, to be submitted only through www.centralbidding.com or via hand delivery:
a. Fully executed Bid Form
b. Corporate Resolution
c. Bid security/Bid Bond (Bidder responsible for compliance with La. R.S. 38:2212)
The following documents shall be furnished by the two (2) apparent lowest bidders, no later than three
(3) days after the bid opening. The three (3) day period shall not be altered or waived. All other bidders shall be prepared to submit the following documents, if necessary, in accordance with LA. RS. 38:2212
(B)(3)(a). All bidders shall fully complete and submit all bid forms required by statute or by Louisiana
Administrative Code to the Purchasing Department. Failure of a bidder to fully complete and submit these forms in accordance with instructions noted above shall result in the bid being declared “non-responsive”. These documents shall be received by the City of Baton Rouge and Parish of East Baton
Rouge Purchasing Division on the 8th Floor in Room 826 of the City Hall Building.
The forms to be submitted are as follows:
1. Bidders Organization Form
2. Certification of Restrictions on Lobbying
3. Certification of Non-segregated Facilities
4. Certification of Bidder Regarding Equal Employment
5. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion
6. Certification Regarding Foreign Trade Restrictions
7. Buy American Certification
8. Certification of Non-Discrimination
9. Non-Collusion Affidavit
10. Attestation Regarding Past Criminal Convictions
11. E-Verify Affidavit
12. Affidavit
All persons or entities bidding or receiving bids or sub-bids in connection with this project shall comply with all provisions of the State Licensing Law for Contractors, La. R.S. 37:2150-2165, as amended.
Bidders shall hold an active license issued by the Louisiana State Licensing Board for Contractors in the classification of: HIGHWAY, STREET AND BRIDGE CONSTRUCTION.
Any Bidder in doubt as to the accuracy, completeness, meaning or interpretation of any part of the
Contract Documents shall submit to the Project Engineer a written request for an interpretation thereof no later than 5:00 PM CST Monday, August 10, 2026. Submittal of questions may be made through www.centralbidding.com in the Q&A portal or by email to RousselBlake@stanleygroup.com and
RichardBrady@stanleygroup.com. Interpretation of the Contract Documents will be made only by written addenda issued before bidding in accordance with Louisiana State law. Bidders shall not rely upon any interpretation of the Contract Documents pre-bid not issued by written addenda. Bidders shall
Baton Rouge Metropolitan Airport I-9 Addendum No. 3 not take advantage of any discrepancy, error or omission in the Contract Documents of which Bidder was aware or should have reasonably been aware prior to bidding. Failure to submit a written request for an interpretation when the bidder aware or should have been aware of any such discrepancy, error or omission in the Contract Documents shall serve as grounds for rejecting any later request for change to the Contract Sum or Contract Time.
Sales and/or Use Taxes: Bidders shall include in their bids all sales and/or use taxes on materials, supplies and equipment to be furnished for use on the project. Further, by submitting a Bid, Bidder agrees that all such sales and/or use taxes will be remitted to the proper taxing authorities, subject to audit. All Bidders shall be bound by and comply with the EAST BATON ROUGE PARISH SALES
AND USE TAX RULES AND REGULATIONS, as amended
(http://brgov.com/dept/finance/pdf/rules®s.pdf).
A performance and payment bond, in the amount of 100 percent of the Contract Sum, with a corporate surety approved by the Owner, will be required from the successful bidder for the faithful performance of the contract.
Louisiana law shall govern and control in the interpretation and enforcement of the Contract Document and Bonds.
By submitting any Bid, the Bidder and its Surety agree, to the fullest extent permitted by law, to exclusive jurisdiction and venue for any litigation in the Nineteenth Judicial District Court of the Parish of East Baton Rouge, Louisiana. Note that administrative remedies for disqualification and protests are provided below.
All bonds shall be issued by an insurance company with a rating of A-, Class VI, or better as rated by
Best’s Key Rating Guide, and shall comply with all statutory requirements of the State of Louisiana.
If bid bond is used, it shall be written by a surety or insurance company currently on the U.S.
Department of the Treasury Financial Management Service list of approved bonding companies which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an A- rating in the latest printing of the A.M. Best's Key Rating Guide to write individual bonds up to ten percent of policyholders' surplus as shown in the A.M. Best's Key Rating Guide or by an insurance company in good standing licensed to write bid bonds which is either domiciled in Louisiana or owned by Louisiana residents.
The Bidder to whom the contract is being awarded will be required to execute the Agreement and obtain the performance and payment bond, and insurance certificates within fifteen (15) calendar days from the date when Notice of Award is issued by the Owner or Program Manager. The necessary documents will accompany the Notice of Award.
The Owner or Program Manager will conduct a Pre-Construction Conference within 30 days of the execution of the Contract. Should there be reasons why the Notice to Proceed cannot be issued within 30 days of the Pre-Construction Conference, the time may be extended by mutual agreement between the
Owner and Contractor.
A conditional or qualified bid will not be accepted.
All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over
Baton Rouge Metropolitan Airport I-10 Addendum No. 3 construction of the project shall apply to the Contract throughout. All requirements set forth in the
Contract Documents shall be considered as Primarily Contractual in nature whether or not required by any law, statute or regulation.
If required in the Contract Documents, minimum wage rates for the construction of the proposed Work have been established by the Secretary of Labor, and a schedule of labor classifications and wage rates to be paid are included in the contract document and will be a part of the contract.
By submitting a bid, Bidder agrees and stipulates that the Owner may, at its sole option, cancel the entire solicitation or the award of the contract for this project at any time before execution of the contract for this project, and Bidder shall have no claim for any damages of any kind against Owner, Program
Manager or Architect arising from or connected with such cancellation.
Owner shall have the right to inspect, audit and copy any portion of the Contractor’s project file including, but not limited to, all pre-bid estimates and working papers, all financial records relating to the project, full certified copies of all insurance policies, complete copies of all subcontracts, complete copies of all purchase orders or other agreements regarding the project, within five (5) days after issuance of a written request from the Owner or Program Manager. Contractor shall maintain intact the entirety of the project file for a minimum of five (5) years from commencement of the Work.
Disqualification Procedure
If, after Bid opening and prior to the award, the Owner should elect to disqualify any bidder, a recommendation to that effect will be made to the Metropolitan Council. The Bidder will be provided written notice of the proposed disqualification, which shall include all reasons for the proposed disqualification, the date, time and location for the Metropolitan Council meeting, at which meeting, the bidder shall have opportunity to rebut the reasons for the proposed disqualification. Bidder stipulates and agrees that the foregoing shall satisfy any and all due process requirements under Louisiana Public Bid
Law.
By submitting a bid, Bidder stipulates and agrees that any Bidder may be disqualified for any of the following non-exclusive reasons, or any other reasonable doubt as to the ability of a Bidder to perform the Work in strict accordance with the Contract Documents, or to complete the Project within the
Contract Time and for the Contract Sum:
A. Bidder or their proposed surety is in default or either has been terminated from a previous City-
Parish Contract, or has failed to execute a previous City-Parish Contract after award.
B. Bidder has been disqualified or debarred by any governmental entity in connection with any contract.
C. An owner, member or officer of the bidding entity is an owner, member or officer of an entity which has been declared by the City-Parish, or any other governmental entity, to be ineligible to bid in connection with any contract.
D. There is evidence that Bidder has been involved in collusion, price setting or bid shopping among bidders or sub-bidders.
E. Failure of the bidder to pay, or satisfactorily settle, all outstanding bills or liens due for labor and materials on previous construction contracts.
F. Bidder has a demonstrated history of litigious conduct involving construction contracts.
G. Bidder has a demonstrated history of failing to complete construction work on time or within 10% of the original contract amount.
Baton Rouge Metropolitan Airport I-11 Addendum No. 3
The Owner shall have the right to take any action deemed necessary to determine the responsibility of
Bidders or ability of the Bidder to perform the Work, and the Owner shall have the right to reject and
Bid or disqualify any Bidder deemed to be non-responsible or unqualified. Upon request of the Program
Manager, a Bidder whose bid is under consideration for award of a contract shall submit evidence, satisfactory to the Owner, of the Bidder's financial resources, construction experience and organization available for performance of the Work, in addition to the information contained in AIA Document A305, Contractor’s Qualification Statement. Audited financial statements for the three (3) years prior to bidding this Project may be required and shall be submitted by the Bidder to the Program Manager within five (5) days after written request by the Program Manager.
By submitting a Bid, Bidder agrees to abide by the above Disqualification Procedure which shall be a condition precedent to any other proceedings or actions in connection with disqualification. Bidder stipulates and agrees that the Disqualification Procedure set forth herein shall be deemed and considered as the administrative remedy available to the disqualified bidder who is dissatisfied, and any appeal shall be filed within five (5) days of the informal hearing identifies hereinabove, and Bidders stipulate and agree, to the fullest extent permitted by law, that the Nineteenth Judicial District Court for the Parish of
East Baton Rouge shall have exclusive venue over any litigation brought in connection with any disqualification or proposed disqualification. All Bidders further stipulate and voluntarily concede that the appropriate standard of review by any court of a decision to disqualify a bidder shall be abuse of discretion.
Protest Procedure
Any and all disputes or claims of any nature or kind arising from or in any way connected with the bidding process, Bidding Documents, award or proposed award of the contract (except for disqualification which shall be governed by the Disqualification Procedure set forth above), shall be resolved utilizing the procedure set forth below:
• Any Bidder or other interested party with direct financial interest adversely affected by an action, decision or determination by the City-Parish may file a protest.
• A protest shall (1) be in writing; (2) specifically state each and every fact, with supporting documentation, and all legal grounds in support of the protest and the relief requested; and (3) be received by the Purchasing Director prior to bidding if the protest relates to a pre-bid matter, or within 3 calendar days from the date the basis of the protest was, or should have been known by the Bidder or was available to be known through review of public records.
• The City-Parish will take action on protests within 45 days of the receipt thereof. The City-
Parish may, at its sole option, suspend or cancel the procurement, in whole or in part, upon receipt of a procedurally adequate and timely protest at the City-Parish’s discretion.
Failure to timely submit a protest to the City Parish as set forth above shall serve as a voluntary and knowing forfeiture of any and all right to contest the matter which shall then become final and binding, and not subject to further review. By submitting a Bid, Bidder agrees to abide by the Protest Procedure which shall be a condition precedent to any other proceedings and shall be deemed and considered as the administrative remedy available, and any appeal shall be filed in the Nineteenth Judicial District Court for the Parish of East Baton Rouge which court shall have exclusive venue over any such action.
END OF INSTRUCTIONS TO BIDDERS