20-091 CD ReplNrsCall Dwgs20210210.pdf

PDF 14 MB Posted

Attached to
Z1DA--659-20-201: Nurse Call Federal contract opportunity
Solicitation number
36C24621B0004
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document contains details of a federal contract opportunity for nurse call services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 is soliciting bids for contract number 36C24621B0004 to provide nurse call services. Bidders must submit a completed SF-1442 form, representations and certifications, bid bond or guaranty, documentation of their safety record, and any other required forms or certifications by the specified due date. The opportunity is set aside for verified veteran-owned or service-disabled veteran-owned small businesses. The solicitation includes specifications for the required nurse call services.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--659-20-201: Nurse Call, newest first.
File Type Posted
20-091 CD ReplNrsCallSpecs 20210210.pdf PDF
36C24621B0004_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P

M

G-001

COVER SHEET

PROJECT SITE MAPPROJECT LOCATION MAP

PROJECT

LOCATION

PROJECT SITE

NORTH

NORTH

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

FEBRUARY 10, 2021 RER

REPLACE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

2, 5, 8, 21

5KK

Engineers Architects

U.S. Department of Veterans Affairs

SALISBURY VA MEDICAL CENTER

1601 BRENNER AVENUE

SALISBURY, NC 28144

NC License #: C-1848

REPLACE NURSE CALL SYSTEM

SALISBURY VA MEDICAL CENTER

1601 BRENNER AVENUE

SALISBURY, NC 28144

VA PROJECT #: 659-20-201 APOGEE PROJECT #: 20-091

DRAWING LIST

11811

KO

RLA K . KUDJ IKU

C

HARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

G I

STERED ARCH ITECT

DocuSign Envelope ID: 60368EC4-1477-4FAA-ABB4-1158A2CA06AA

2/9/2021

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

FEBRUARY 10, 2021 RER

REPLACE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

2, 5, 8, 21

5KK

Engineers Architects

U.S. Department of Veterans Affairs

SALISBURY VA MEDICAL CENTER

1601 BRENNER AVENUE

SALISBURY, NC 28144

NC License #: C-1848

SITE KEY PLAN

G-002

LEGEND

EXISTING BUILDING

EXISTING BUILDING - PART OF SCOPE

SITE KEY PLAN

Scale: 1"=100'

BUILDING ENTRANCE

BID ALTERNATES

REFERENCE SECTION 01 00 00 OF THE SPECIFICATIONS FOR THE SCHEDULE OF BID ALTERNATES TO

BE INCLUDED WITH THE BID PACKAGE.

BID DEDUCT ALTERNATE # 1:

1. REMOVE ALL WORK ASSOCIATED WITH BUILDING 21 SECOND FLOOR.

BIDDER SHALL PROVIDE A SEPARATE BID PRICE FOR THIS WORK. IF THE BID DEDUCT ALTERNATE IS

NOT ACCEPTED, THE AREA WILL BE RENOVATED PER DRAWINGS AND SPECIFICATIONS.

N

O

R

T

H

50' 100' 200'0

11811

KO

RLA K . KUDJ IKU

C

HARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

G I

STERED ARCH ITECT

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE

REPLACE NURSE CALL SYSTEM

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

PLEASE USE ALTERNATE EXITS AS MARKED

1'-5"

INFECTION CONTROL RISK

ASSESSMENT, INTERIM LIFE

SAFETY MEASURES, FIRE WATCH

AND MISCELLANEOUS FORMS

PAPER

CADDY

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

SUPPLY DUCTS

EITHER KEEP

RUNNING OR COVER

WHEN RUNNING TO

KEEP DUST OUT

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

F L

E X

D

U C

T

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

G-100

G-100

G-100

DUCT TO OUTSIDE

OF BUILDING

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE KEPT CLEAN. FLOORS NOT BEING

REPLACED MUST BE PROTECTED. COVER WITH ROSIN PAPER /

FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V I F

V.I.F.

E X

I S

T I N

G

W

A L

L

V I F

E X

I S

T I N

G

W

A L

L

V I F

V I F

A P

P R

O X

A

F

F

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

POST ICRA,

ILSM, FIRE

INSPECTION

SHEETS VISIBLE

TO PUBLIC

G-100

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX

OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

Class III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction

Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2

Medium Risk

- Therapy Areas

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

I

Patient Risk Group

TYPE

D

Group 3

High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLCs

- SPD

- AMCU

- Respiratory Isolation Rooms

I

TYPE DTYPE CTYPE B

o r control procedures are necessary.

During Construction Project

C L A

S S

I I I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area.

Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III.

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers.

Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace walk-off mats per manufacturer's recommendations. Do not remove work area barriers until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company. Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering.

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

Class IV

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control

Precautions depending upon the Area Class Designation

II

I

LOW Risk Group 1

HIGH Risk Group 3

HIGHEST Risk Group 4

MEDIUM Risk Group 2

IV

IV

IV

III/IV

III/IV

III/IV

III/IV

III

III

III

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

TYPE

B

I

TYPE

C

Group 4

Highest Risk

C L A

S S

I V

TYPE

A

Group 1

Low Risk

II

C L A

S S

I

C L A

S S

I I

A

M

G-100

TYPICAL ICRA DETAILS

Scale: No Scale

ILSM SIGNAGE

Scale: No Scale

ILSM BARRIER TAG

Scale: 1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 1/2" = 1'-0"

CROSS SECTION A

Scale: 1/2" = 1'-0"

ROOM ELEVATION

A.

B.

C.

D.

NOTE:

TAG SHALL BE PLACED ON ALL ILSM

TEMPORARY BARRIERS. FINAL LOCATION BY G.C.

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

FEBRUARY 10, 2021 RER

REPLACE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

2, 5, 8, 21

5KK

Engineers Architects

U.S. Department of Veterans Affairs

SALISBURY VA MEDICAL CENTER

1601 BRENNER AVENUE

SALISBURY, NC 28144

NC License #: C-1848

TAPE ALL SERVICES TO PROTECT AGAINST

CONTAMINATION.

THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR AND THE MEDICAL CENTER.

USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER

AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.

ANY CEILING ACCESS PANELS OPENED FOR

INVESTIGATION BEYOND SEALED AREAS SHALL BE

SEALED IMMEDIATELY WHEN UNATTENDED.

AT COMPLETION, REMOVE CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS. VACUUM AND

CLEAN ALL SURFACES FREE OF DUST AFTER THE

REMOVAL.

CONTRACTOR TO VERIFY AND COORDINATE FINAL

AND APPROVED ICRA MEASURES WITH THE

SALISBURY VA MEDICAL CENTER'S ICRA PERSONNEL,

PRIOR TO THE COMMENCEMENT OF CONSTRUCTION

ACTIVITY.

E.

11811

KO

RLA K . KUDJ IKU

C

HARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

G I

STERED ARCH ITECT

EXAM

EXAM

PH 2 RM 3

STORAGE

ELECT

4129A

TOILET

M I N

C L

E A

R

3073A

PATIENT

TLT

3072A

PATIENT

TLT

3071A

CHARTING

STATION

3071B

CHARTING

STATION

3066A

PATIENT

TLT

PATIENT

ROOM

PATIENT

ROOM

ROOM

ANT. ISO

3072B

C

L

E

A

R M

I

N

TLT

CL.UTIL

1-BED

1-BED

3160A

ELEC

TLT

TELEPHONE

3163A

FAC

TLT

TLT

5 6

4 5

M I N

C L

E A

R

MECH RM

CLEAN SUP

3039A

PAT. TLT

PAT. ROOM

3054A

PAT. TLT

PAT. ROOM

3040A

PAT. TLT

3045B

CORRIDOR

ALCOVE

3042A

PAT. TLT

5 6

5 6

M

I

N

C

L

E

A

R

BREAK

TLT

WAITING

M.TLT

CLEAN SUP

CLEAN SUP

EQUIP STOR

HAC

ELEC

F. TLT

M. TLT

EQUIP

STOR

STAIR #6

LINEN CHUTE

4 5 6

C L

E A

R

M I N

Soiled

1C134

Telecom

1C135

Elec

1C136

Kitchen

1C100

Patio

1E119

Corridor

C1-26

1C118

Laundry

1C119

Bath

1C117A

Staff Tlt

Resident Kitchen

1C101

Dining Room

LOCKERS

TLT

ELECT

FEC

3045A

CORRIDOR

NURSE STATION

STAIR #6

4 5 6

6'-0"

MIN.

CLEAR

C L E

A R

M I N

C L E

A R

M I N

CORRIDOR

STORAGE

ICU

4 5 6

M

I

N

C

L

E

A

R

2 2

PRE OP

4017A

STORAGE

4017B

TLT

EXAM

CORRIDOR

ELEC

4 5 6

M I N

C L

E A

R

PH 1 PACU

4100A

EQUIP STORAGE

FAC

PH 1 PACU

SOILED

TOILET

CORR

4 5

M I N

C L

E A

R

1 TYPICAL EXAM ROOM (CLASS IV)

SCALE: 1/8" = 1' 0"

G-101

5 TYPICAL LAUNDRY ROOM (CLASS II)

SCALE: 1/8" = 1' 0"

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

FEBRUARY 10, 2021 RER

REPLACE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

2, 5, 8, 21

X

5KK

Engineers Architects

U.S. Department of Veterans Affairs

SALISBURY VA MEDICAL CENTER

1601 BRENNER AVENUE

SALISBURY, NC 28144

NC License #: C-1848

SS

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

WALL RATING LEGEND

1. PROVIDE TEMPORARY PLASTIC BARRIER

PARTITION TO THE UNDERSIDE OF CEILING WITH

ZIPPER ENTRY. PARTITION SHALL BE INSPECTED

BY VA ICRA STAFF PRIOR TO START OF

CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE

PRESSURE VENTILATION IN THE CONSTRUCTION

SPACE.

2. PROVIDE TWO STICKY MATS AT EACH

CONSTRUCTION ACCESS POINT IN ALL PHASES.

3. WORK TO BE PERFORMED AT THE MASTER AND

SLAVE CONTROL PANEL LOCATIONS SHALL BE

PERFORMED AT ONE LOCATION AT A TIME.

4. USE A PORTABLE DUST EXTRACTOR AND AIR

SCRUBBER WITH HEPA FILTRATION SYSTEM.

5. CONTRACTOR SHALL COVER ALL FURNITURE

WITHIN ROOM WITH PLASTIC, PRIOR TO

COMMENCING WORK IN A SPACE AND REMOVE

PRIOR TO POST-CONSTRUCTION TERMINAL

CLEANING.

6. THE AIR WITHIN THE CONSTRUCTION AREA SHALL

BE NEGATIVE WITH RESPECT TO SURROUNDING

AREAS AND WITH NO DISRUPTION OF AIR

SYSTEMS OF ADJACENT AREAS. USE OF THE

NEGATIVE AIR PRESSURE SYSTEM WITHIN THE

ENCLOSURE TO REMOVE DUST SHALL PASS AIR

THROUGH AN INDUSTRIAL GRADE, PORTABLE

HEPA FILTER CAPABLE OF FILTRATION RATES OF

300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR

EXHAUST AIR DIRECTLY TO THE OUTSIDE IF

APPROVED BY VAMC. IF EXHAUST INTO A ROOM,

A PRE-FILTER AND HEPA FILTER SHALL BE USED

BEFORE EXHAUST.

A. REMOVE ALL TRASH DAILY FROM THE WORK AREA.

B. THESE DRAWINGS ARE BASED ON FIELD SURVEY

AND EXISTING PLANS. VERIFY ALL FIELD

CONDITIONS.

C. COORDINATE WITH VA COR FOR OFF-HOURS

SCHEDULE AND TEMPORARY REROUTING ACCESS

FOR HOSPITAL STAFF AND VISITORS, PRIOR TO

ERECTING TEMPORARY BARRIERS.

D. CONSULT WITH VA SAFETY DEPARTMENT TO

MAINTAIN MINIMUM CLEARANCE IN CORRIDORS AND

HALLWAYS.

E. EXISTING WINDOWS THAT NEED TO BE

TEMPORARILY REMOVED TO ACCOMMODATE

DISCHARGED AIR EXHAUST DUCT, SHALL BE

RE-INSTALLED AFTER CONSTRUCTION.

F. CONTRACTOR TO VERIFY AND COORDINATE FINAL

AND APPROVED ICRA MEASURES WITH THE

SALISBURY VA MEDICAL CENTER'S ICRA

PERSONNEL, PRIOR TO THE COMMENCEMENT OF

CONSTRUCTION ACTIVITY.

2 TYPICAL PATIENT ROOM (CLASS IV)

SCALE: 1/8" = 1' 0"

3 TYPICAL 1-BED PATIENT ROOM (CLASS IV)

SCALE: 1/8" = 1' 0"

4 TYPICAL PATIENT ROOM (CLASS IV)

SCALE: 1/8" = 1' 0"

10 TYPICAL ELECT ROOM (CLASS II)

SCALE: 1/8" = 1' 0" 6 MALE TOILET (CLASS IV)

SCALE: 1/8" = 1' 0"

7 TYPICAL OFFICE (CLASS II)

SCALE: 1/8" = 1' 0"

8 PATIENT TLT (CLASS II)

SCALE: 1/8" = 1' 0"

9 AND ELEC ROOM (CLASS II)

SCALE: 1/8" = 1' 0"

11 TYPICAL NURSE STATION (CLASS IV)

SCALE: 1/8" = 1' 0"

12 TYPICAL ICU (CLASS IV)

SCALE: 1/8" = 1' 0"

13 TYPICAL PRE-OP ROOM (CLASS IV)

SCALE: 1/8" = 1' 0"

14 TYPICAL PH 1 PACU ROOM (CLASS IV)

SCALE: 1/8" = 1' 0"

14 TYPICAL MEN'S AND WOMEN'S TOILETS (CLASS II)

SCALE: 1/8" = 1' 0"

15 TYPICAL TELECOMM ROOM (CLASS II)

SCALE: 1/8" = 1' 0"

ENLARGED ICRA PLANS

TYPICAL TELECOM AND

TYPICAL FEMALE AND

TYPICAL OFFICE/

11811

KO

RLA K . KUDJ IKU

C

HARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

G I

STERED ARCH ITECT

2C105

SOILED UTILITY

2C15

CORR

2C106A

TOILET

2C114

TELECOMM

2C112A

TOILET

2C106

GENERAL

INFUSION

C213A

CRASH CART

ALCOVE

2C108

CHEMO

INFUSION

C213

CORR

2C108A

TOILET

2C107

GENERAL

INFUSION

2C108B

CHEMO

INFUSION

2C109A

CHEMO

INFUSION

2C109

CHEMO

INFUSION

5 6

5 64

5 64

5 64

DINING

AC302A

SCREENED

PORCH 1

A309

PATIENT ROOM

LAUNDRY

A307

5 64

C L

E A

R

M I N

EXERCISE

ROOM

A323

DINING

AC303A

PATIENT

CORRIDOR

AC303

5 64

6'-0"

CLEAR

MIN.

DOUBLE

PATIENT ROOM

A329

TV AREA

A328

SINGLE

PATIENT ROOM

A327

BATHROOM 10

A329A

BATHROOM 11

A326A

DOUBLE

PATIENT ROOM

A326

SINGLE

PATIENT ROOM

A324

DAY

AC303B

5 64

2A119

ENDO

PROCEDURE

SALLY PORT

2A100

ENDO

2A120

SALLY PORT

2A121

ENDO

PROCEDURE

5 6

G-102

ENLARGED ICRA PLANS

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

FEBRUARY 10, 2021 RER

REPLACE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

2, 5, 8, 21

X

5KK

Engineers Architects

U.S. Department of Veterans Affairs

SALISBURY VA MEDICAL CENTER

1601 BRENNER AVENUE

SALISBURY, NC 28144

NC License #: C-1848

SS

2 HOUR FIRE SEPARATION

1 HOUR FIRE SEPARATION

SMOKE RATED

WALL RATING LEGEND

5 CHEMO INFUSION BAYS (CLASS IV)

SCALE: 1/8" = 1' 0"

1 TYPICAL SCREENED PORCH (CLASS IV)

SCALE: 1/8" = 1' 0"

2 TYPICAL EXERCISE ROOM (CLASS IV)

SCALE: 1/8" = 1' 0"

3 TYPICAL TV AREA (CLASS IV)

SCALE: 1/8" = 1' 0"

4 TYPICAL ENDO PROCEDURE (CLASS IV)

SCALE: 1/8" = 1' 0"

TYPICAL GENERAL AND

1. PROVIDE TEMPORARY PLASTIC BARRIER

PARTITION TO THE UNDERSIDE OF CEILING WITH

ZIPPER ENTRY. PARTITION SHALL BE INSPECTED

BY VA ICRA STAFF PRIOR TO START OF

CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE

PRESSURE VENTILATION IN THE CONSTRUCTION

SPACE.

2. PROVIDE TWO STICKY MATS AT EACH

CONSTRUCTION ACCESS POINT IN ALL PHASES.

3. WORK TO BE PERFORMED AT THE MASTER AND

SLAVE CONTROL PANEL LOCATIONS SHALL BE

PERFORMED AT ONE LOCATION AT A TIME.

4. USE A PORTABLE DUST EXTRACTOR AND AIR

SCRUBBER WITH HEPA FILTRATION SYSTEM.

5. CONTRACTOR SHALL COVER ALL FURNITURE

WITHIN ROOM WITH PLASTIC, PRIOR TO

COMMENCING WORK IN A SPACE AND REMOVE

PRIOR TO POST-CONSTRUCTION TERMINAL

CLEANING.

6. THE AIR WITHIN THE CONSTRUCTION AREA SHALL

BE NEGATIVE WITH RESPECT TO SURROUNDING

AREAS AND WITH NO DISRUPTION OF AIR

SYSTEMS OF ADJACENT AREAS. USE OF THE

NEGATIVE AIR PRESSURE SYSTEM WITHIN THE

ENCLOSURE TO REMOVE DUST SHALL PASS AIR

THROUGH AN INDUSTRIAL GRADE, PORTABLE

HEPA FILTER CAPABLE OF FILTRATION RATES OF

300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR

EXHAUST AIR DIRECTLY TO THE OUTSIDE IF

APPROVED BY VAMC. IF EXHAUST INTO A ROOM,

A PRE-FILTER AND HEPA FILTER SHALL BE USED

BEFORE EXHAUST.

A. REMOVE ALL TRASH DAILY FROM THE WORK AREA.

B. THESE DRAWINGS ARE BASED ON FIELD SURVEY

AND EXISTING PLANS. VERIFY ALL FIELD

CONDITIONS.

C. COORDINATE WITH VA COR FOR OFF-HOURS

SCHEDULE AND TEMPORARY REROUTING ACCESS

FOR HOSPITAL STAFF AND VISITORS, PRIOR TO

ERECTING TEMPORARY BARRIERS.

D. CONSULT WITH VA SAFETY DEPARTMENT TO

MAINTAIN MINIMUM CLEARANCE IN CORRIDORS AND

HALLWAYS.

E. EXISTING WINDOWS THAT NEED TO BE

TEMPORARILY REMOVED TO ACCOMMODATE

DISCHARGED AIR EXHAUST DUCT, SHALL BE

RE-INSTALLED AFTER CONSTRUCTION.

F. CONTRACTOR TO VERIFY AND COORDINATE FINAL

AND APPROVED ICRA MEASURES WITH THE

SALISBURY VA MEDICAL CENTER'S ICRA

PERSONNEL, PRIOR TO THE COMMENCEMENT OF

CONSTRUCTION ACTIVITY.

11811

KO

RLA K . KUDJ IKU

C

HARLOTTE , NORTH CAROL

I N

ANOR T H C A R O L I N

A

RE

G I

STERED ARCH ITECT

TECHNOLOGY SYMBOL LEGEND

DATA OUTLET - 2-4 PR UTP

SYMBOL HEIGHT DESCRIPTION

18"

18"

48"

ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.

ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.

SEE DRAWINGS FOR MORE INFORMATION.

NOTE: NOT ALL SYMBOLS ARE USED.

ENHANCED NURSE CALL PATIENT STATION WITH ENHANCED PILLOW SPEAKER AND

CLEAR BUTTON COVER (X - NO CLEAR BUTTON COVER)

NURSE CALL EMERGENCY STATION WITH PULL CORD WITH AUDIO IN

RESTROOM (+40"), NO AUDIO IN SHOWER (V - VANDAL RESISTANCE, PB - PUSH BUTTON,

HS - HIGH SECURITY STEEL COVER PLATE)

NURSE CALL DOME LIGHT - CEILING MOUNTED

(Z - ZONE LIGHT, V - VANDAL RESISTANCE)

18"

44"

84"/96"

HEADWALL

/40"

18"

HEADWALL

/40"

40",72"

60"

CEILING

CEILING

6' TO

TOP

NURSE CALL PATIENT STATION WITH CALL CORD AND CLEAR PLASTIC COVER.

(1 - SINGLE, 2 - DUAL, V - VANDAL RESISTANCE, HS - HIGH SECURITY STEEL

COVER PLATE, X - NO PLASTIC COVER)

42"

CEILING

ABOVE

DOOR

FLOOR

FLOOR

18"

N

NW

W

FLOOR

NURSE CALL PATIENT STATION

(PB - PUSH BUTTON, M - MICROPHONE, K -KEYED, HS - HIGH SECURITY STEEL

COVER PLATE)

42"

HEADWALL

/40"

HEADWALL

/40"

CEILING

DESK/ 42"

HEADWALL

/40"

M

DATA OUTLET - 4-4 PR UTP

DATA OUTLET - 4-4 PR UTP, 1-COAX - OPTIONAL, 1 - FIBER - OPTIONAL

DATA OUTLET - 1-4 PR UTP

TELCO OUTLET - 1-4 PR UTP

WALL PHONE

WIRELESS ACCESS POINT - 2 - 4 PR UTP

TV OUTLET - CEILING MOUNTED

TV OUTLET - WALL MOUNTED

NURSE CALL EQUIPMENT CABINET

NURSE CALL AUXILIARIES

NURSE CALL CODE BLUE STATION WITH CLEAR BUTTON COVER

NURSE CALL DUTY STATION

NURSE CALL MASTER STATION/CONSOLE

NURSE CALL DOME LIGHT - WALL MOUNTED

(Z - ZONE LIGHT, V - VANDAL RESISTANCE)

NURSE CALL PATIENT BED INTERFACE RECEPTACLE

STAFF ASSIST/ CODE BUTTON WITH CLEAR PLASTIC COVER

(P - PUSH FOR HELP, HS - HIGH SECURITY STEEL COVER PLATE, X - NO CLEAR

BUTTON COVER)

NURSE CALL STAFF TERMINAL

NURSE CALL WIRELESS ANTENNAS

NURSE CALL WIRELESS PENDANT

TWO POST OIT EQUIPMENT RACK

FOUR POST EQUIPMENT RACK

OIT EQUIPMENT RACK

FLOOR

D

B

A

C

E

N

R

P

T

S

N

N

NCE

A

TECHNOLOGY SYMBOL LINE TYPE

EXPLANATIONS

SYMBOLS THAT ARE GRAY OR HALF-TONE IN APPEARANCE ARE DEVICES THAT ARE EXISTING TO REMAIN.

THESE LINES MATCH THE TONE OF THE BUILDING'S LINES. THESE SYMBOLS CAN APPEAR ON SHEETS

WITH EITHER DEMOLITION OR NEW WORK PLANS. THEY ARE TYPICALLY ACCOMPANIED WITH A SHEET

NOTE OR KEY NOTE.

A

SYMBOLS THAT ARE DARK AND/OR DASHED IN APPEARANCE ARE DEVICES THAT ARE EXISTING TO BE

DEMOLISHED. THESE SYMBOLS SHOULD ONLY APPEAR ON DEMOLITION SHEETS UNLESS NOTED

OTHERWISE.

A

SYMBOLS THAT ARE DARK IN APPEARANCE AND ARE NOT DASHED ARE NEW DEVICES TO BE

INSTALLED. THESE SYMBOLS SHOULD ONLY APPEAR ON SHEETS WITH NEW WORK PLANS UNLESS

NOTED OTHERWISE.

TYPICAL

SYMBOL

DESCRIPTION

NURSE CALL SYMBOLS, NOTES AND

ABBREVIATIONS

ADO AUTOMATIC DOOR OPERATOR

AFF ABOVE FINISH FLOOR

CCTV CLOSED CIRCUIT TELEVISION

COAX COAXIAL CABLE

COMM COMMUNICATION

COR CONTRACTING OFFICER

REPRESENTATIVE

DC DOOR CONTACT SWITCH

DN DOWN

DO DOOR OPERATOR

DVR DIGITAL VIDEO RECORDER

EEB EMERGENCY EXIT BUTTON

EL ELECTRICAL STRIKE

FA FIRE ALARM

FAP FIRE ALARM PANEL

FAAP FIRE ALARM ANNUNCIATOR PANEL

FO FIBER OPTIC

IT INTERCOMMUNICATION ROOM

MATV MASTER ANTENNA TELEVISION

MM MULTI MODE FIBER

NAC NETWORK APPLIANCE CIRCUIT PANEL

NS NO SCALE

NTS NOT TO SCALE

NVR NETWORK VIDEO RECORDER

TECHNOLOGY ABBREVIATIONS LIST

OC ON CENTER

OIT OFFICE OF INFORMATION TECHNOLOGY

PACS PHYSICAL ACCESS CONTROL SYSTEM

PAMN PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM

PB PUSH BUTTON

PDU RACK POWER DISTRIBUTION UNITS

POE POWER OVER ETHERNET

PR PAIR

RX REQUEST TO EXIT

SEP SERVICE ENTRANCE PROTECTION

SLC SIGNALING LINE CIRCUIT

TEL TELEPHONE

TGB TELECOMM GROUND BUS BAR

TM TELEMONITORING

TMGB TELECOMM MAIN GROUND BUS BAR

TP TWISTED PAIR

TR TELECOMM ROOM

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

WM WIRE MANAGEMENT

WAP WIRELESS ACCESS POINT

UL UNDERWRITERS LABORATORY

UPS UNINTERRUPTIBLE POWER SUPPLY

UTP UNSHIELDED TWISTED PAIR

N NEW DEVICES

NCA NETWORK CONTROL ANNUNCIATOR

DVC DIGITAL VOICE COMMAND

SS STAINLESS STEEL

E EXISTING DEVICES

BOD BASIS OF DESIGN

CLG CEILING

EG EQUIPMENT GROUND

NCE NURSE CALL EQUIPMENT

SM SINGLE MODE FIBER

CATV CABLE TELEVISION

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

ADR

REPLACE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

2, 5, 8, 21

29JVE

Engineers Architects

U.S. Department of Veterans Affairs

W.G. (BILL) HEFNER VAMC

SALISBURY, NC 28144

N

O

T

F

R

C

O

N

S

T

R

U

C

T

I

O

N

N

R

C

O

N

S

T

R

U

C

T

I

O

N

FEBRUARY 10, 2021

NC License #: C-1848

T-001

UNO UNLESS NOTED OTHERWISE

TECHNOLOGY GENERAL NOTES

1. ALL COMMUNICATIONS DEVICES AND EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE

WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED

PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES

ACT AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI

STANDARDS, VA TELECOMMUNICATIONS AND SPECIAL TELECOMMUNICATION SYSTEMS

DESIGN MANUAL.

2. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND

ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN

ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING

REQUIREMENT AND THE APPLICABLE BUILDING CODES.

3. PROVIDE DRAWINGS SHOWING ALL PENETRATIONS. ALL CABLING SHALL COMPLY WITH

THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION METHOD MANUAL AND

ANSI/TIA/EIA PUBLICATIONS.

4. COMPLY WITH THE LATEST ANSI/TIA/EIA 607 - STANDARD FOR

TELECOMMUNICATION BONDING COMMERCIAL BUILDING.

5. COMPLY WITH THE LATEST ANSI/TIA/EIA 568 - 2006 STANDARD FOR INSTALLATION

COMMERCIAL BUILDING TELECOMMUNICATIONS CABLING.

6. COMPLY WITH THE LATEST ANSI/TIA/EIA 569 - COMMERCIAL BUILDING STANDARD FOR

TELECOMMUNICATIONS PATHWAYS AND SPACES.

7. COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.

8. COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.

9. COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.

10. COMPLY WITH THE LATEST OIT DESIGN GUIDE.

11. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO

AS TO AVOID CONFLICT DURING CONSTRUCTION.

12.

13.

MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR

EQUIPMENT UNLESS NOTED OTHERWISE.

14.

ALL CONDUITS SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED.

15.

ALL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN

APPROVED THIRD PARTY TESTING AGENCY.

16.

ANY DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS SHALL BE BROUGHT TO THE

ATTENTION OF THE VA COR, ARCHITECT, AND ENGINEER OF RECORD FOR CLARIFICATION.

THE MORE STRINGENT OF THE THEM SHALL TAKE PRECEDENCE.

17.

18.

ALL COPPER OUTLETS/CONNECTORS SHALL BE TIA/EIA CAT 6A.

19.

ALL WORK AREA OUTLETS SHALL BE 8 PIN, CAT 6A KEYSTONE JACK WIRED PER T568B AS

DIRECTED BY THE VA COR.

20.

LABELING SHALL BE ACCORDING TO LATEST ANSI/TIA 606A&B EDITION AS WELL AS THE

STANDARDS SET FORTH BY VA HOSPITAL OIT.

INSTALL NURSE CALL SYSTEM PER VA TELECOMMUNICATIONS AND SPECIAL

TELECOMMUNICATIONS SYSTEMS DESIGN MANUAL.

PROGRAM ALL NURSE CALL SYSTEM PER VA REQUIREMENT FOR EACH AREA.

A. CONTRACTOR SHALL COORDINATE WORK IN PATIENT ROOM(S)/

WING(S)/ BUILDING(S) OR OTHER AREAS WITH THE NURSE MANAGER

AND COR PRIOR TO ANY WORK.

B. ROOM(S) WILL BE TURNED OVER TO THE CONTRACTOR FOR WORK AND

WILL BE AT THE DIRECTION OF THE NURSE MANAGER AND COR.

C. THE NURSE CALL WORK SHALL BE DONE ON ONE OR TWO PATIENT

ROOM(S) AT A TIME.

D. AFTER THE FIRST PATIENT ROOM(S) ARE COMMISSIONED ON THE NEW

NURSE CALL SYSTEM, THE CONTRACTOR CAN MOVE TO THE NEXT SET

OF PATIENT ROOM(S).

E. WORK SHALL BE LIMITED TO ONE OF THE WINGS AT A TIME.

F. PRIOR TO CONDUCTING WORK WITHIN SPECIFIC WINGS THE

CONTRACTOR SHALL DO THE FOLLOWING:

F.1. INSTALL NURSE CALL EQUIPMENT CABINETS.

F.2. INSTALL NURSE CALL CONSOLES.

F.3. CONNECT NURSE CALL EQUIPMENT CABINETS TO THE VA IT

NETWORK.

F.4. INSTALL NEW NURSE CALL CABLING IN EXISTING RACEWAY UNLESS

OTHERWISE INDICATED ON THE DRAWINGS.

F.5. COMMISSION NEW MASTER CONSOLE AND REMOTE CONSOLES AND

TRAIN STAFF ON FLOOR IN OPERATION OF THE NEW SYSTEM.

F.6. REPLACE ALL NURSE CALL DEVICES WITH NEW DEVICES IN EACH

PATIENT ROOM(S) AND COMMISSION THESE DEVICES.

F.7. REPEAT PROCESS ON WING UNTIL COMPLETE.

F.8. REPEAT PROCESS FOR OTHER WINGS, UNTIL ALL WORK IS

COMPLETE.

F.9. PERFORM FINAL TEST OF THE COMPLETED SYSTEM INCLUDING ALL

NURSE CALL STATIONS, DEVICES, WIRING, TV INTERFACE, AND

LIGHTING INTERFACE. PROVIDE A SPREAD SHEET FOR EACH TASK

ON AN EXCEL SPREAD SHEET.

F.10. ONCE ALL ROOMS FOR ALL FLOORS ARE COMPLETE, THEN REMOVE

THE EXISTING NURSE CALL EQUIPMENT CABINET, MASTER

CONSOLE AND TURN OVER ALL EXISTING NURSE CALL EQUIPMENT

AND DEVICES TO THE VA/COR.

PHASING NOTES

OWNER FURNISHED EQUIPMENT

SCOPE OF WORK

1. RAULAND ENTERPRISE PLATFORM INTEGRATION AND TESTING OF SOFTWARE PROVIDED

BY VA.

2. INSTALLATION AND ALL HARDWARE SHALL BE PROVIDED BY THE GENERAL CONTRACTOR.

02/10/2021

8 8

1. MAIN SERVER ROOM IN BUILDING 5 - ROOM 1012A.

2. NEW NURSE CALL ENTERPRISE PLATFORM FILE

SERVER IN EXISTING BIO-MED DATA RACK

BUILDING 21 - ROOM BA-122.

3. RUN FIBER THROUGH EXISTING WALL

PENETRATION INTO CORRIDOR ABOVE CEILING

TILES.

4. RUN FIBER THROUGH EXISTING 2" CONDUIT ABOVE

CEILING IN BUILDING 2 AND 4. REMOVE EXISTING

CABLING IN CONDUIT.

5. HARD CEILING IN TUNNEL CONNECTING BUILDINGS

4 AND 2. EXISTING 2" CONDUIT ABOVE CEILING.

6. PROVIDE 3" CONDUIT FOR CABLING IN BUILDING 8

AND TUNNEL CONNECTING BUILDING 8 TO

BUILDING 21.

7. DROP IN CEILING IN HALLWAY. PROVIDE "J-HOOKS"

2' O.C. FOR HORIZONTAL, ABOVE CEILING CABLING.

SEE SECTION 27 10 00 SUBSECTION 3.1 FOR MORE

INFORMATION.

8. NEW NURSE CALL EQUIPMENT CABINET.

9. PROVIDE UL LISTED FIRE STOP FOR CONDUIT

PENETRATIONS THROUGH RATED WALL.

A. ROUTING SHOWN IS PRIMARILY FOR HORIZONTAL

ROUTING IN AND BETWEEN BUILDINGS. FOR

ROUTING UP TO VARIOUS FLOORS WITHIN

BUILDINGS REFER TO 1/TK601.

B. ROUTING SHOWN (INCLUDING ROUTING THROUGH

BUILDINGS) IS CONCEPTUAL ONLY. DETERMINE

EXACT FIELD ROUTING.

C. INSTALL FIBER PER DETAILS (TK501).

D. PROVIDE PULL BOXES AS REQUIRED UNLESS

OTHERWISE NOTED OR APPROVED.

E. PROVIDE A SINGLE SEGMENT OF FIBER WITH NO

SPLICES BETWEEN EACH NURSE CALL CABINET

TERMINATION. IF A SINGLE UN-SPLICED SEGMENT

IS NOT POSSIBLE, PROVIDE FUSION SPLICES IN

ENCLOSURES. SPLICES ARE NOT PERMITTED IN

MANHOLES. PROVIDE EACH PROPOSED SPLICE

LOCATION WITH SHOP DRAWING SUBMITTALS.

F. REFER TO NURSE CALL RISER 1/TK601 FOR

ADDITIONAL INFORMATION.

G. PATCH ALL PENETRATIONS AND OPENINGS IN

SMOKE AND FIRE WALLS WITH APPROVED UL

LISTED MATERIALS.

NEW NURSE CALL NETWORK CABLE ROUTING

1" = 100'

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

FEBRUARY 10, 2021

ADR

UPGRADE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

29JVE

Engineers Architects

U.S. Department of Veterans Affairs

W.G. (BILL) HEFNER VAMC

SALISBURY, NC 28144

N

R

C

O

N

S

T

R

U

C

T

I

O

N

N

R

C

O

N

S

T

R

U

C

T

I

O

N

BID ALTERNATES:

NC License #: C-1848

TS101

NEW NURSE CALL NETWORK

CABLE ROUTING

N

O

R

T

H

50 100 2000

2, 5, 8, 21

1. ALTERNATE 1 - SEE G-002

BUILDINGS NOT IN

SCOPE OF WORK

BUILDINGS IN

SCOPE OF WORK

02/10/2021

STAIRS

XRAY

CONTROL RM

DRESSING

XRAY

CONT RM

DRESSING

XRAY

FILM PROCESS

WORK ROOM

CT SCANNER

XRAY

HALLWAY

CT OPER.

CLEAN STOR

2110A

OFFICE

2110B

OFFICE

EXAM

TOILET

2110C

WAITING

NUC MED

NUC MED

CONFERENCE

WAITING ROOM

OFFICE

2098A

OFFICE

2098B

OFFICE

2098C

OFFICE

2098D

OFFICE

2098E

OFFICE

2098F

OFFICE

OFFICE

OFFICE

GEN STOR

TOILET

TOILET

D/W

EXAM

EXAM

EXAM

OFFICE

OFFICE

TLT

STAIRS

WAITING ROOM

TOILET

GEN STOR

TOILET

OFFICE

OFFICE

TLT

OFFICE

OFFICE

TLT

EXAM

FEC

TOILET

EXAM

CLEAN SUP

TOILET

OFFICE

HAC

TLT

CLOSET

2059A

TOILET

EXAM

EXAM

OFFICE

LOCK

COMPUTER ROOM

OFFICE

OFFICE

BLOOD BANK

HEMATOLOGY

STAIRS

2155A

OFFICE

2153B

OFFICE

LINEN CHUTE

OFFICE

OFFICE

LOCKERS

TOILET

LOCKERS

TLT

ELECT

TOILET

2168A

TEL

STORAGE

TOIL.

TLT

TLT

TLT

BREAK ROOM

OFFICE

HAC

CONT RM

2130A

ELECT

FEC

ELECT.

2098G

BATHROOM

2098I

CLOSET

2095A

GEN STOR.

2098H

RECEPT.

FAC

WAITING

2107A

HOT LAB

2090A

OFFICE

BONE DENS

EXAM

2027A

Corridor

CT SCANNER 2

HAC

CORRIDOR

LAB

LAB

F. STAFF

TLT

LOCKERS

S

W

K

S

N

F

I

C

E

CHIEF OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

OFFICE

A

H

A

L

Y

HALL WAY

HALL WAY

2030A

TECH WKSTN

STAIRS

R

O

O

F

BLOOD

STAGING

WAITING

BLOOD

DRAW

BLOOD

DRAW

BLOOD

DRAW

STORAGE

2133A

ELE CLST

CORRIDOR

ELEC

CORRIDOR

CORRIDOR

FEC

STAIRS

STAIRS

LINEN CHUTE

2161A

OFFICE

B WING CENTER WING CENTER WING A WING

BREAK AREA

FEC

TELE

SPECIMEN TLT

SPECIMEN TLT

PIPE CHASE

FLEX SPACE

EXAM

EXAM

EXAM

TREADMILL 2

NURSE

WORK

TREADMILL 1

ECHO

READING

ASST.

CHIEF

PHYS.

WKRM

ECHO 1

STORAGE

ECHO WORK

ECHO 2

EXAM

EXAM

EKG

EKG

HOLTER

EXISTING

TOILET

CORRIDOR

STORAGE

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

ADR

UPGRADE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

29JVE

Engineers Architects

U.S. Department of Veterans Affairs

W.G. (BILL) HEFNER VAMC

SALISBURY, NC 28144

N

R

C

O

N

S

T

R

U

C

T

I

O

N

N

R

C

O

N

S

T

R

U

C

T

I

O

N

FEBRUARY 10, 2021

NC License #: C-1848

1 BUILDING 2 - SECOND FLOOR NURSE CALL OVERALL PLAN

SCALE: 1/16" = 1' 0"

02T-120

BUILDING 2 - SECOND FLOOR

NURSE CALL OVERALL PLAN

02TD121

02TD121

02TN121

02TN121

N

O

R

T

H

8 16 320

AREA WITH NO

NURSE CALL

EQUIPMENT

02/10/2021

FAC

3165A

FAC

F A

C

CORR

3091A

TEL

STOR

CONF

3101A

OFFICE

OFFICE

BREAK

TLT

F.TLT

LAB.STO

WAITING

EQUIP STOR

CORR

3094A

OFFICE

3094K

OFFICE

3094J

OFFICE

3094B

OFFICE

3094L

GEN STOR

3094C

CONF RM

3094I

OFFICE

3094H

OFFICE

3094D

OFFICE

3094E

OFFICE

3094F

OFFICE

3094G

OFFICE

M.TLT

SOIL LN

MOP

EQUIP STORAGE

EKG

TLT

CL.UTIL

MECH RM

BARIATRIC

ROOM

HAC

WORK RM

MECH

PATIENT

ROOM

3110A

CHARTING

STATION

3110B

CHARTING

STATION

3006A

PATIENT

BATH

3005A

PATIENT

BATH

PATIENT

ROOM

ELEC

3125A

BARIATRIC

BATH

3126A

PATIENT

BATH

PATIENT

ROOM

CORRIDOR

PATIENT

ROOM

3127A

PATIENT

BATH

3128A

PATIENT

BATH

PATIENT

ROOM

3110C

CHARTING

STATION

3110D

CHARTING

STATION

PATIENT

ROOM

3003A

PATIENT

BATH

3004A

PATIENT

BATH

PATIENT RM

3003A

MECH RM

3001A

STAIR #1

CLEAN

UTILITY

STAFF WORKROOM

MEDICATION

3002A

STAIR #1

NURSE ST

STAIR #5

1-BED

1-BED

1-BED

1-BED

1-BED

1-BED

1-BED

1-BED

CORR

1-BED

1-BED

1-BED

LOCKER

OFFICE

OFFICE

BLD GAS

3160A

ELEC

TLT

DIST RM

SUPP

CORR

3161A

TELEPHONE

3163A

FAC

PIPE

CLEAN SUP

CLEAN SUP

EQUIP STOR

HAC

ELEC

F. TLT

M. TLT

EQUIP

STOR

TLT

TLT

TLT

TLT

EQUIP STOR

TLT

TLT

TLT

TLT

TLT

SOILED

UTILITY

STORAGE

EMS

NOUR.

OFFICE

CLEAN

LINEN

EQUIPMENT

STORAGE

ELEC

3121C

CHARTING

STATION

ANTE

ROOM

3113A

ISOLATION

BATH

3121A

STORAGE

ISOLATION

ROOM

CORRIDOR

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

3121B

CHARTING

STATION

3121A

CHARTING

STATION

3117A

PATIENT

BATH

PATIENT

ROOM

3115A

PATIENT

BATH

3114A

PATIENT

BATH

PATIENT RM

STAIR #4

STAIR #4

3116A

PATIENT

ROOM

3118A

PATIENT

BATH

3119A

PATIENT

BATH

PATIENT

ROOM

3121D

CHARTING

STATION

DIALYSIS

EQUIP STOR

CLEAN SUP

3039A

PAT. TLT

NOUR

3045A

EQUIP

PAT. ROOM

PAT. ROOM

PAT. ROOM

3054A

PAT. TLT

PAT. ROOM

PAT. ROOM

BARIATRIC

PAT. ROOM

PAT. ROOM

ISO. PAT. ROOM

ISO. PAT. ROOM

3043A

STAIR

3044A

STAIR

EQUIP. STOR

3040A

PAT. TLT

3045B

CORRIDOR

SOIL UTIL

ALCOVE

FAC

3042A

PAT. TLT

3051A

BARIATRIC

PAT. TLT

3043B

PAT. TLT

3050A

PAT. TLT

ANTE ISOL.

3044B

PAT. TLT

3045D

ALCOVE

ANTE ISOL

3058A

PAT. TLT

3059A

PAT. TLT

PAT. ROOM

CORRIDOR

NURSE STATION

STAIR #6

LINEN CHUTE

FAC

BARIATRIC

ROOM

EQUIPMENT

STORAGE

HAC

3082A

BARIATRIC

TLT

MEDICATION

PAT. ROOM

BARIATRIC

ROOM

3063A

PAT. TLT

3075A

BARIATRIC

TLT

3071C

CHARTING

STATION

3074A

PATIENT

TLT

3073A

PATIENT

TLT

3072A

PATIENT

TLT

3071A

CHARTING

STATION

3071B

CHARTING

STATION

3068A

PATIENT

TLT

3066A

PATIENT

TLT

3064A

PATIENT

TLT

CORR

PATIENT

ROOM

PATIENT

ROOM

PATIENT

ROOM

ISO PAT

ROOM

ANT. ISO

STAIR #3

STAIR #3

3069A

STORAGE

ISO PAT

ROOM

ANT. ISO

PAT. ROOM

3072B

ALCOVE

TLT

3071A

ELEC

B WING CENTER WING CENTER WING A WING

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

ADR

UPGRADE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

29JVE

Engineers Architects

U.S. Department of Veterans Affairs

W.G. (BILL) HEFNER VAMC

SALISBURY, NC 28144

N

R

C

O

N

S

T

R

U

C

T

I

O

N

N

R

C

O

N

S

T

R

U

C

T

I

O

N

FEBRUARY 10, 2021

NC License #: C-1848

1 BUILDING 2 - THIRD FLOOR NURSE CALL OVERLL PLAN

SCALE: 1/16" = 1' 0"

02T-130

BUILDING 2 - THIRD FLOOR

NURSE CALL OVERALL PLAN

02TD131

02TD132

02TD132

02TN131

02TN132

02TN132

N

O

R

T

H

8 16 320

AREA WITH NO

NURSE CALL

EQUIPMENT

02/10/2021

PRE OP

4017A

STORAGE

OFFICE

EXAM

EXAM

PH 2 RM 3

TLT/SHW

4017B

TLT

EXAM

EXAM

CORRIDOR

CORRIDOR

ELEC

GEN STORAGE

CLEAN SUPPLY

WASH ROOM

4013A

PAT. LOCKER

OPER. ROOM #1

STORAGE

MECH RM

SCRUB RM

SCRUB ROM

STORAGE

MECH

OPER. ROOM #2

OPER. ROOM #3

STAIRS

FAC

CORRIDOR

GEN STORAGE

GEN STORAGE

PH 1 PACU

4100A

EQUIP STORAGE

4100B

EQUIP STORAGE

TOILET

TOILET

STORAGE

SURGERY WAITING

OFFICE

FAC

ELECT CLS

TOILET

GEN STORAGE

TOILET

PASS

HAC

TOILET

OFFICE

UTILITY

STORAGE

LINEN

4154A

TELE

D/W

ELECT

PH 1 PACU

OFFICE

RECEPTION

EQUIP STOR

NURSE STATION

CORRIDOR

TELECOM

STAIRS #6

NOUR. RM

CONTROL

CORRIDOR

BREAKROOM

CORRIDOR

OFFICE

CORRIDOR

ICU

HAC

ICU EQUIP

STAFF TOILET

LOCKER RM

ON-CALL

CLEAN LINEN

STORAGE

4058A

BATH

RESP OFFICE

BREAK/CONF ROOM

CORRIDOR

RESP EQUIPMENT

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

STAIR #3

ISOLATION ICU

SOIL UTILITY

ANTE

ISOLATION-ICU

PACU

ICU

CORRIDOR

STORAGE

DISTRIBUTION

ICU

ICU

ICU

ICU

STAIR #2

MED ROOM

WOMEN'S LOCKERS

MEN'S LOCKERS

TOILET

TOILET

STAIRS

4110B

CORRIDOR

4110A

CORRIDOR

4129A

DICTATION

CASE CART

MED GAS

SOILED UTILITY

PATIENT HOLDING

CLEAN UTILITY

SOILED

TOILET

LINEN CHUTE

MINOR OR

ELEC

4152B

MINOR OR

STAFF WORKSTATION

OR #5

SUB STERILE

OR #6

SURGICAL CORRIDOR

OR #7

EQUIP STORAGE

ELECTRICAL

EQUIP. STORAGE

HAC

STAIRS

CORR

PACU

B WING CENTER WING CENTER WING A WING

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

4130A

TOILET

4131A

TOILET

4132A

TOILET

4129A

TOILET

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

ADR

UPGRADE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

29JVE

Engineers Architects

U.S. Department of Veterans Affairs

W.G. (BILL) HEFNER VAMC

SALISBURY, NC 28144

N

R

C

O

N

S

T

R

U

C

T

I

O

N

N

R

C

O

N

S

T

R

U

C

T

I

O

N

FEBRUARY 10, 2021

NC License #: C-1848

1 BUILDING 2 - FOURTH FLOOR NURSE CALL OVERALL PLAN

SCALE: 1/16" = 1' 0"

02T-140

BUILDING 2 - FOURTH FLOOR

NURSE CALL OVERALL PLAN

02TD141

02TN141

N

O

R

T

H

8 16 320

AREA WITH NO

NURSE CALL

EQUIPMENT

02/10/2021

DN

STAIR

A135

PATIENT ROOM 15

A134

DOUBLE PATIENT

ROOM 14

A133

BATHROOM 15

A134A

BATHROOM 14

A133A

SECLUSION

A131

ANTE ROOM

A131A

TLT

A131B

SINGLE PATIENT

ROOM 13

A122

BATHROOM 12

A124A

BATHROOM 13

A122A

SINGLE PATIENT

ROOM 12

A124

DOUBLE PATIENT

ROOM 11

A126

BATHROOM 11

A126A

BATHROOM 10

A129A

DOUBLE PATIENT

ROOM 10

A129

SINGLE PATIENT

ROOM 9

A127

BATHROOM 8

A125A

BATHROOM 9

A127A

PATIENT ROOM 8

A125

SCREENED

PORCH 2

A123

GROUP ROOM

A121

BARIATRIC

BATHROOM 7

A112A

PAT TLT

A108

PAT TLT

A110

BARIATRIC

PATIENT ROOM 7

A112

SINGLE PATIENT

ROOM 6

A114

BATHROOM 6

A114A

BATHROOM 5

A116A

SINGLE PATIENT

ROOM 5

A116

DOUBLE PATIENT

ROOM 4

A118

BATHROOM 4

A118A

TV AREA

A117

BATHROOM 3

A115A

DOUBLE PATIENT

ROOM 3

A115

SINGLE PATIENT

ROOM 2

A113

BATHROOM 1

A111A

BATHROOM 2

A113A

PATIENT ROOM 1

A111

SCREENED

PORCH 1

A109LAUNDRY

A107

SECURE

VESTIBULE

A101

FAMILY

CONFERENCE

A102

CONSULT 1

A104

HALL

AC110

CONSULT 2

A106

OFFICE 7

A158

OFFICE 3

A159

OFFICE 4

A160

OFFICE 5

A161

ELEVATOR

VESTIBULE

A175

OFFICE 2

A156

OFFICE 1

A155

STAFF BREAK

A154

OFFICE 12

A153

OFFICE 11

A152

OFFICE 10

A151

OFFICE 9

A150

WARD CLERK

A120C

WORK ROOM

A120B

TEAM ROOM

A141

CLEAN STORAGE

A142

ST TLT

A144B

ST TLT

A144A

STAFF LOCKERS

A144

MEDICATION

A120A

CLEAN LINEN

A140

QUIET ROOM

A130

SHOWER

A132

CORRIDOR

AC104

ELECTRICAL 3

A146

COMM

A171

ELEVATOR 2

S2

ELEVATOR 1

S1

OFFICE 8

A157

OFFICE 6

A162

PATIENT

PROPERTY

A163

DAY

AC102B

DINING

AC103A

DAY

AC103B

SERVICE

CORRIDOR

AC106

PUBLIC

CORRIDOR

AC111

SOILED UTILITY

A145

HAC

A143

AIR HANDLER

ROOM

A172

LOBBY

A100

EXAM

A103

SERVING

A105

ELEVATOR

MACHINE ROOM

A170

STAIR 1

AS101

HALL

AC105

NURSING

STATION

A120

PATIENT

CORRIDOR

AC103

HALL

AC107

HALL

AC108

HALL

AC109

PATIENT

CORRIDOR

AC102

DINING

AC102A

ELECTRICAL 1

A173

ELECTRICAL 2

A174

GROUP ROOM

CLOSET

A121A

PATIENT

CORRIDOR

AC101

CORRIDOR

AC104A

A105A

ABOVE

SUB PORCH

(GROUP)

A121B

TV AREA

A128

STANDPIPE

CHASE

AS101A

ELEVATOR

P1

ELEVATOR

P2

ENTRY

VESTIBULE

SECURITY

OPEN TO ABOVE

OPEN

TO

ABOVE

HAS OFFICE

A L

I G

N

UP

TO BUILDING 4

TO BUILDING 4

UP

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

ADR

UPGRADE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

29JVE

Engineers Architects

U.S. Department of Veterans Affairs

W.G. (BILL) HEFNER VAMC

SALISBURY, NC

N

R

C

O

N

S

T

R

U

C

T

I

O

N

N

R

C

O

N

S

T

R

U

C

T

I

O

N

FEBRUARY 10, 2021

NC License #: C-1848

1 BUILDING 8 - FIRST FLOOR NURSE CALL OVERALL PLAN

SCALE: 1/16" = 1' 0"

08T-110

BUILDING 8 - FIRST FLOOR

NURSE CALL OVERALL PLAN

08TD111

08TD111

08TN111

08TN111

N

O

R

T

H

8 16 320

AREA WITH NO

NURSE CALL

EQUIPMENT

02/10/2021

UPDN

DN

DOUBLE

PATIENT ROOM

A229

TV AREA

A228

SCREENED

PORCH 1

A209

PATIENT ROOM

A211

BATHROOM 1

A211A

SINGLE

PATIENT ROOM

A213

BATHROOM 2

A213A

DOUBLE

PATIENT ROOM

A215

BATHROOM 3

A215A

TV AREA

A217

DOUBLE

PATIENT ROOM

A218

BATHROOM 4

A218A

SINGLE

PATIENT ROOM

A216

BATHROOM 5

A216A

SINGLE

PATIENT ROOM

A214

BATHROOM 6

A214A

BARIATRIC

PATIENT ROOM

A212

BARIATRIC

BATHROOM 7

A212A

Clean

Linen

A210

Nourish

A208

GROUP ROOM

A221

GROUP ROOM

CLOSET

A221A

SUB PORCH

(GROUP)

A221B

SCREENED

PORCH 2

A223

PATIENT ROOM

A225

SINGLE

PATIENT ROOM

A227

BATHROOM 9

A227A

BATHROOM 8

A225A

BATHROOM 10

A229A

BATHROOM 11

A226A

DOUBLE

PATIENT ROOM

A226

SINGLE

PATIENT ROOM

A224

BATHROOM 12

A224A

BATHROOM 13

A222A

SINGLE

PATIENT ROOM

A222

TLT

A231B

ANTE ROOM

A231A

SECLUSION

A231

DOUBLE

PATIENT ROOM

A233

BATHROOM 14

A233A

BATHROOM 15

A234A

PATIENT ROOM

A234

ELECTRICAL 3

A246

SOILED UTILITY

A245

SHOWER

A232

HAC

A243

QUIET ROOM

A230

STAFF

LOCKERS

A244

STAFF BREAK

A254

OFFICE 12

A253

OFFICE 11

A252

OFFICE 10

A251

OFFICE 9

A250

CLEAN

STORAGE

A242

TEAM ROOM

A241

WORK ROOM

A220B

WARD CLERK

A220C

MEDICATION

A220A

ST TLT

A244B

ST TLT

A244A

NURSING

STATION

A220

OFFICE 1

A255

OFFICE 2

A256

OFFICE 8

A257

PATIENT

PROPERTY

A263

OFFICE 7

A258

OFFICE 6

A262

OFFICE 3

A259

OFFICE 4

A260

OFFICE 5

A261

FAMILY

CONFERENCE

A202

CONSULT 1

A204

CONSULT 2

A206

SERVING

A205

EXAM

A203

SECURE

VESTIBULE

A201

COMM

A271

AIR HANDLER

ROOM

A272

DAY

AC202B

DINING

AC202A

DINING

AC203A

DAY

AC203B

PATIENT

CORRIDOR

AC202

LAUNDRY

A207

PATIENT

CORRIDOR

AC203

HALL

AC207

HALL

AC208

HALL

AC210

HALL

AC209

CORRIDOR

AC204

CORRIDOR

AC204A

HALL

AC205 CLEAN LINEN

A240

SERVICE

CORRIDOR

AC206

ELEVATOR

VESTIBULE

A275

STORAGE

A276

STORAGE

A273A

FEMALE PUBLIC

TOILET

A277

STAIR 1

AS201

EXIST.

ELEVATOR 2

P2

EXIST.

ELEVATOR 1

P1

MALE PUBLIC

TOILET

A278

GROUP ROOM

A273

PUBLIC

CORRIDOR

AC211

ELEVATOR

VESTIBULE

A274

EXIST ELEV

S1

EXIST ELEV

S2

STAIR 2

AS202

HAC

A280

PUBLIC

CORRIDOR

AC212

A205-A

OPEN TO BELOW

OPEN TO BELOW

FUTURE

CONFERENCE

ROOM

A279

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

ADR

UPGRADE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

29JVE

Engineers Architects

U.S. Department of Veterans Affairs

W.G. (BILL) HEFNER VAMC

SALISBURY, NC

N

R

C

O

N

S

T

R

U

C

T

I

O

N

N

R

C

O

N

S

T

R

U

C

T

I

O

N

FEBRUARY 10, 2021

NC License #: C-1848

1 BUILDING 8 - SECOND FLOOR NURSE CALL OVERALL PLAN

SCALE: 1/16" = 1' 0"

08T-120

BUILDING 8 - SECOND FLOOR

NURSE CALL OVERALL PLAN

08TD121

08TD122

08TD121

08TN121

08TD122

08TN121

N

O

R

T

H

8 16 320

AREA WITH NO

NURSE CALL

EQUIPMENT

02/10/2021

SINGLE

PATIENT ROOM

A316

BATHROOM 5

A316A

SINGLE

PATIENT ROOM

A314

BATHROOM 6

A314A

BARIATRIC

PATIENT ROOM

A312

PAT TLT

A310

CLEAN

LINEN

A308

GROUP ROOM

CLOSET

A321A

EXERCISE

ROOM

A323

PATIENT ROOM

A325

SINGLE

PATIENT ROOM

A322

TLT

A331B

ANTE ROOM

A331A

QUIET ROOM

A330

OFFICE 9

A350

TEAM ROOM

A341

WORK ROOM

A320B

MEDICATION

A320A

DAY

AC302B

WARD CLERK

A320C

GROUP ROOM

A321

BARIATRIC

BATHROOM

A312A

DINING

AC302A

CLEAN LINEN

A340

DINING

AC303A

NURSE

STATION

A320

PATIENT

CORRIDOR

AC303

SECLUSION

A331

DN

AIR HANDLER

ROOM

A372

STORAGE

A373A

MALE PUBLIC

TOILET

A378

GROUP ROOM

A373

EXIST

ELEVATOR 1

P1

EXIST.

ELEVATOR 2

P2

ELEVATOR

VESTIBULE

A374

PUBLIC

CORRIDOR

AC312

STAIR 2

AS302

HAC

A380

FEMALE TOILET

A377

EXIST ELEV

S1

EXIST ELEV

S2

DOUBLE

PATIENT ROOM

A329

TV AREA

A328

SCREENED

PORCH 1

A309

PATIENT ROOM

A311

BATHROOM 1

A311A

SINGLE

PATIENT ROOM

A313

BATHROOM 2

A313A

DOUBLE

PATIENT ROOM

A315

BATHROOM 3

A315A

TV AREA

A317

DOUBLE

PATIENT ROOM

A318

BATHROOM 4

A318A

SINGLE

PATIENT ROOM

A327

BATHROOM 9

A327A

BATHROOM 8

A325A

BATHROOM 10

A329A

BATHROOM 11

A326A

DOUBLE

PATIENT ROOM

A326

SINGLE

PATIENT ROOM

A324

BATHROOM 12

A324A

BATHROOM 13

A322A

DOUBLE

PATIENT ROOM

A333

BATHROOM 14

A333A

BATHROOM 15

A334A

ELECTRICAL 3

A346

SOILED UTILITY

A345

SHOWER

A332

HAC

A343

STAFF

LOCKERS

A344

STAFF BREAK

A354

OFFICE 12

A353

OFFICE 11

A352

OFFICE 10

A351

CLEAN

STORAGE

A342

ST TLT

A344B

ST TLT

A344A

OFFICE 1

A355

OFFICE 2

A356

OFFICE 8

A357

PATIENT

PROPERTY

A363

OFFICE 7

A358

OFFICE 6

A362

OFFICE 3

A359

OFFICE 4

A360

OFFICE 5

A361

FAMILY

CONFERENCE

A302

CONSULT 1

A304

CONSULT 2

A306

EXAM

A303

LAUNDRY

A307

HALL

AC307

HALL

AC308

HALL

AC310

HALL

AC309

CORRIDOR

AC304A

HALL

AC305

SERVICE

CORRIDOR

AC306

ELEVATOR

VESTIBULE

A375

PATIENT ROOM

A334

PUBLIC

CORRIDOR

AC311

STAIR 1

AS301

COMM

A371

SECURE

VESTIBULE

A301

SERVING

A305

CORRIDOR

AC304

DAY

AC303B

PATIENT

CORRIDOR

AC302

A305-A

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

ADR

UPGRADE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

29JVE

Engineers Architects

U.S. Department of Veterans Affairs

W.G. (BILL) HEFNER VAMC

SALISBURY, NC

N

R

C

O

N

S

T

R

U

C

T

I

O

N

N

R

C

O

N

S

T

R

U

C

T

I

O

N

FEBRUARY 10, 2021

NC License #: C-1848

1 BUILDING 8 - THIRD FLOOR NURSE CALL OVERALL PLAN

SCALE: 1/16" = 1' 0"

08T-130

BUILDING 8 - THIRD FLOOR

NURSE CALL OVERALL PLAN

08TD131

08TD131

08TN131

08TN131

N

O

R

T

H

8 16 320

AREA WITH NO

NURSE CALL

EQUIPMENT

02/10/2021

121 SF

78 SF

PIPE CHASE

B WING A WING A WING C WING

BA-122

OI&T COMPUTER RM

CB-7

CORRIDOR

CB-4

CORRIDOR

CB-1

CORRIDOR

CB-2

CORRIDOR

CB-3

CORRIDOR

CB-5

CORRIDOR

BB106

STAIRWELL

BA-121

STAIRWELL

BB-149

OFFICE

BB-145

OFFICE

BB-144

OFFICE

BB-142

OFFICE

BB-141

OFFICE

BB-140

OFFICE

BB-139

OFFICE

BB-138

OFFICE

BB-137

OFFICE

BB-136

OFFICE

BB-135

OFFICE

BB-134

OFFICE

BB-133

OFFICE

BB-132

OFFICE

BB-152

OFFICE

BB-151

OFFICE

BB-150

OFFICE

BB-148

OFFICE

BB-146

OFFICE

BB-143

OFFICE

BB-131

OFFICE

CB-6

CORRIDOR

BB-105

MECHANICAL

BB-104

ELEC

BB-103

TELE

BB-100A

PIPE CHASE

BB-111

VESTIBULE

BB-112

BATH

BB-130

BATHROOM

BB-129

BATHROOM

BB-125

Storage

BB-128

OFFICE

BB-106

OFFICE

BB-107

OFFICE

BB-108

OFFICE

BB-109

OFFICE

BB-110

OFFICE

BB-113

Command Room

BB-114

OFFICE

BB-115

OI&T STORAGE

BB-118

GEN STORAGE

BB-117

OFFICE

BB-127

OFFICE

BB-126

OFFICE

BB-119

OFFICE

BB-120

OFFICE

BB-124

OFFICE

BB-123

OFFICE

BB-122

OFFICE

BB-121

OFFICE

BB-101

LINEN CHUTE

BB-100

STORAGE

BA-110A

OFFICE

BA-110

OFFICE

BA111A

BA-122A

OI&T

BB-102

Entrance

BA101

ELECT.CLOSET

BA-103

OFFICE

BA102

OFFICE - EMS

BA100

ELEV.EQ.RM.

BA111

BA112B

OI&T

BA112A

OI&T

BA112

GEN STORAGE

BC100A

OFFICE

BC100B

OFFICE

BC100C

OFFICE

BC100

OFFICE

BC101

OFFICE

BC102E

LOGISTICS

BC102D

CONF.RM.

BC102A

LOGISTICS

BC102B

LOGISTICS

BC102C

LOGISTICS

BC102F

LOGISTICS

BC102

LOGISTICS OFFICES

BC105

OFFICE

BC106

RECEIVING

BC107

OFFICE

BC108

OFFICE

BC109

MECHANICAL ROOM

STAIRWELL

BC111

H.A.C.

BC113

F.TLT.

BC114

M.TLT.

B C

B A

T C

H A

R R

M

BC112

OFFICE

BC110

OFFICE

B C

B R

E A

K R

O O

M

BC119

ELEC. CLOSET

BC118

TEL. CLOSET

BC116

ELECT. SWITCHGEAR RM.

BC120

SOILED LINEN

BC121

MECHANICAL ROOM

BC-122

GEN STORAGE

BA-120

OFFICE

BA-121

OFFICE

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

Revisions: Date

CONSULTANTS:

ADR

UPGRADE NURSE CALL

SYSTEM

659-20-201

20-091

CONSTRUCTION DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120

Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

© COPYRIGHT Apogee Consulting Group, P.A.

29JVE

Engineers Architects

U.S. Department of Veterans Affairs

W.G. (BILL) HEFNER VAMC

SALISBURY, NC

N

R

C

O

N

S

T

R

U

C

T

I

O

N

N

R

C

O

N

S

T

R

U

C

T

I

O

N

FEBRUARY 10, 2021

NC License #: C-1848

1 BUILDING 21 - GROUND FLOOR NURSE CALL OVERALL PLAN

SCALE: 1/16" = 1' 0"

21T-100

BUILDING 21 - GROUND FLOOR

NURSE CALL OVERALL PLAN

TK401

N

O

R

T

H

8 16 320

AREA WITH NO

NURSE CALL

EQUIPMENT

02/10/2021

2C102

TOILET

C212

CORR

2C100

STOR

2C101

OFFICE

2A112

HAC

S2-3

STAIR 3

C203

CORR

2A101

ELEC

2B105

S LINEN

C205

CORR

2B106A

TOILET

2B131

EXAM

C208

NURSE STA - HAS

2B132

BREAK ROOM

2B133

EQUIP STOR

2B134

EQUIP STOR

2B135

SPD

C202

CORR

S2-1

STAIR 1

2B121A

TOILET

C206

CORR

2B118

EXAM

2B119

EXAM

2B119A

TOILET

2B117A

TOILET

2B117

EXAM

2B126

EQUIP STOR

2B125

STAFF

2B116

SPD

C209

C0RR

2B130

HAC

2B128

EXAM

2B127

GEN STOR

2B123A

TOILET

2B115

ELEC

2B114

TELE

2B106

EXAM

2B113

EXAM

2B112A

TOILET

2B107A

TOILET

2B107

EXAM

C207

C0RR

2B112

EXAM

2B111

EXAM

2B108

EXAM

2B108A

TOILET

2B109

EXAM

2B110

EXAM

2B110A

TOILET

C201

CORR

2A100A

HALLWAY

2B120

EXAM

2B124

EXAM

2A105B

XRAY ROOM

2A104

GI Recovery Room

2A119

ENDO

PROCEDURE

2A118

ENDO PROCEDURE

2A123

RECOVERY

2A114

RECOVERY

2A115

RECOVERY

2A117

SALLY PORT

2A113

MEDS

2A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .