Summary
This Request for Proposals (RFP) is issued by the Union Council of Governments (Union COG) for a feasibility study and master site plan for the Union COG Pool Park located at 189 Parkway Drive, Sligo, Pennsylvania, in Clarion County. The consultant will assess existing facilities including a pool, changing facilities, concessions, pavilions, picnic areas, and play area; evaluate community needs; conduct public engagement with at least two committee meetings and two public input meetings; develop and compare at least three distinct alternatives for improvements; and prepare a full-park conceptual master site plan with cost estimates and operating forecasts. Optional proposer site visits may be scheduled by appointment before the question deadline of December 21, 2026 at 4:00 p.m. Eastern Time. Sealed proposals must be submitted electronically via PennBid no later than December 31, 2026 at 4:00 p.m. Eastern Time. Award is anticipated within 30 days after the proposal deadline, with the consultant to begin work within 14 days of contract execution and written notice to proceed. The project must be completed within 270 calendar days from the notice to proceed, with intermediate milestones for initiation, assessment, alternatives development, and draft and final deliverables.
The maximum total contract amount is $45,000, which must include all labor, subcontractors, travel, meetings, data collection, printing, administration, taxes, and reimbursable expenses as a firm lump-sum fee. Proposals exceeding $45,000 will not be considered. The consultant must demonstrate relevant public-pool feasibility and park master planning experience, include Pennsylvania-licensed professionals as required, and employ an aquatic operations specialist with at least three years of relevant management experience. Deliverables include an integrated report with executive summary, full-park master site plan, cost estimates, operating forecasts, implementation plan, accessible PDF, editable Word documents, Excel workbooks with formulas, presentation slides, editable drawings in native format plus print-ready PDFs, bound reports, and a final board presentation. The project will be supported by Pennsylvania Local Share Account (LSA) funding, and the consultant must comply with Pennsylvania nondiscrimination requirements, prevailing wage determinations if applicable to covered public work, and grant conditions including records maintenance and audit cooperation. Evaluation criteria include public-pool and park master planning experience (30 points), technical approach and understanding of scope (30 points), community engagement and operating feasibility approach (15 points), schedule and staffing availability (15 points), and fee completeness and value (10 points).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-GrantManual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Union COG Pool Park Feasibility Study and Master Site Plan Request for Proposals
Maximum total contract amount $45,000
Park address: Union COG Pool Park, 189 Parkway Drive, Sligo, PA 16255 (Clarion County)
Issuing organization: Union Council of Government (Union COG), referred to below as the Owner.
Mailing address: P.O. Box 241, Sligo, PA 16255
1 Invitation and purpose
The Owner invites proposals from qualified consultants to prepare a feasibility study and conceptual master site plan for the entire Union COG Pool Park. The work will evaluate existing facilities, identify community needs, compare improvement options, and recommend a financially sustainable plan for future investment and funding applications.
The park includes a pool, changing facilities, concessions, pavilions, picnic areas, and a play area. The consultant will verify current conditions. No construction alternative or capital budget has been selected.
2 Proposed solicitation schedule and contact
Item Details and proposed schedule
RFP number and issue date
UCOG-POOL-2026-01
Issue date: November 15, 2026 at 10:00 a.m. Eastern Time
RFP questions Questions shall be submitted via the “Ask a Question” feature in PennBid
Optional proposer site visit By appointment at 189 Parkway Drive, Sligo, PA 16255; before the question deadline
Written questions due December 21, 2026 at 4:00 p.m. Eastern Time
Responses and addenda Emailed to registered proposers 7 days before proposals are due
Proposals due December 31, 2026 at 4:00 p.m. Eastern Time
Submission destination Submissions shall be received via PennBid (www.pennbid.bonfirehub.com)
Anticipated award and start Award within 30 days after proposals are due; start within 14 days of contract execution and written notice to proceed
3 Budget and pricing
The total contract amount shall not exceed $45,000. Propose a firm lump-sum fee for the complete required scope. Include all labor, subcontractors, travel, meetings, data collection, printing, administration, applicable taxes, and reimbursable expenses. Proposals exceeding $45,000 will not be considered.
The feasibility study and full-park conceptual master site plan must both be included within the single $45,000 cap. Required services may not be shifted into separately priced options. Any authorized change must be documented in writing before work begins and must keep the total contract amount at or below $45,000.
Union COG Pool Park | RFP | 1
4 Scope of services
The proposal must address every task below and identify the staff, methods, meetings, and deliverables included in the total fee.
Task 1 Project initiation and records review
Conduct a kickoff meeting with the Owner and study committee. Confirm the full park boundary, decision points, a public participation plan, and schedule. Review available drawings, inspections, maintenance history, utilities, attendance, staffing, fees, and financial records for up to five recent years. Identify missing information and explain how estimates will be developed when records are incomplete.
Review Owner-provided ownership, lease, operating, and partnership documents to identify issues that could affect future improvements or funding. Refer questions requiring legal interpretation to the Owner’s solicitor.
Provide a work plan, records request, and meeting summary.
Task 2 Facility and site assessment
Perform at least one on-site assessment with personnel qualified to evaluate public aquatic facilities. Examine accessible systems and available records, including:
● Pool shell, finishes, deck, drainage, fencing, gates, pool entry, circulation, filtration, pumps, chemical treatment, visible piping, and electrical systems.
● Bathhouse, restrooms, changing areas, concessions, storage, pavilions, play areas, parking, paths, utilities, and emergency access.
● Accessibility throughout the complex, apparent health and safety deficiencies, remaining useful life, maintenance needs, and opportunities to reduce water and energy use.
Provide a photo-supported condition inventory with urgent, near-term, and longer-term priorities; planning estimates for corrective work; and recommended follow-up investigations. Immediately notify the Owner of apparent urgent safety concerns. Identify applicable accessibility, public-pool, building, and permitting requirements for the alternatives.
Review available mapping for property limits, topography, vegetation, floodplains, drainage, and utility constraints. State limitations, including concealed systems, missing site data, and equipment that cannot be observed operating. Identify seasonal access needs in the proposal; schedule observation of the pool while operating during its normal open season, without requiring the Owner to alter normal operations for the study.
Task 3 Community needs and participation
Assess the likely service area, population characteristics, nearby aquatic and recreation facilities, current park use, unmet needs, and barriers involving cost, transportation, and accessibility. Include users and nonusers, families, youth, older adults, people with disabilities, and potential community partners.
Include two committee meetings, with the kickoff counting as one; two public input meetings, one early and one to review alternatives; up to eight stakeholder interviews; and one community survey available online and on paper for at least three weeks. A final board presentation is also required under Section 5. The Owner will help distribute notices and provide meeting space.
Prepare meeting materials, summarize input and survey methods, report participation levels and limitations, and explain how feedback affected the recommendations. Protect personal contact information in public deliverables.
Union COG Pool Park | RFP | 2
4 Scope of services continued
Task 4 Alternatives and master site plan
Develop and compare at least three distinct alternatives:
● Essential repairs and continued operation, addressing immediate needs and documenting remaining limitations.
● Renovation and modernization of the existing pool complex, with accessibility and operating improvements.
● Replacement or substantial reconfiguration of the aquatic facilities, with phased implementation where practical.
Consider features such as accessible pool entry, children’s water play, shade, seating, bathhouse upgrades, and supporting park improvements when justified by community demand and affordability. Identify any alternative that is technically or financially impractical and explain why. Do not assume that a particular feature must be built.
Provide a conceptual layout for each viable alternative. Compare capacity, public benefit, accessibility, construction disruption, expected life, maintenance, staffing, environmental constraints, and risks.
Prepare a preferred conceptual master site plan covering the entire park. Show existing facilities to remain or be removed; proposed pool and park improvements; buildings, pavilions, play and picnic areas; parking, accessible routes, walkways, emergency access, shade and landscaping; and conceptual utility and drainage needs. Include a north arrow, scale, legend, source information, and approximate property limits. Identify phases and tie each phase to a cost estimate. Use available mapping and site observations; label unverified boundaries and elevations. Provide legible plan sheets for public presentation and funding applications. The plan is a required base deliverable, not an optional service.
Task 5 Capital and operating cost analysis
Prepare itemized planning estimates for each viable pool and park alternative, separating construction, demolition, utilities and site work, equipment, professional services, permitting, contingency, and escalation.
Identify the estimate date, assumptions, exclusions, likely accuracy range, and costs requiring later investigation.
Separate essential work from discretionary amenities.
Prepare a ten-year operating forecast for each viable alternative showing attendance, admissions, memberships, rentals, concessions, programs, staffing, utilities, chemicals, insurance, routine maintenance, and replacement reserves. State wage, fee, inflation, and attendance assumptions. Distinguish earned revenue, recurring public support, donations, and speculative funding.
Show annual operating surplus or subsidy, reserve needs, and the effect of any assumed borrowing separately.
For the preferred alternative, test lower, expected, and higher attendance or revenue conditions and higher operating costs. Explain the implications for affordability, staffing availability, and the Owner’s ability to sustain operations.
Union COG Pool Park | RFP | 3
4 Scope of services continued
Task 6 Funding and implementation plan
Recommend a phased sequence of improvements with estimated costs, responsible parties, likely approvals, funding prerequisites, and target time frames. Address management and partnership options, staffing needs, maintenance responsibilities, and practical steps to limit disruption to pool use.
Identify potential public, private, and philanthropic funding sources. Provide a matrix of eligible activities, likely applicant requirements, matching funds, application timing, and required supporting material, with sources and verification dates. Provide a concise project narrative and cost summaries that the Owner can adapt for future funding requests; preparation and submission of complete grant applications are excluded.
Use current Pennsylvania DCNR swimming-pool feasibility-study and master site development planning guidance as references. Include coordination with the DCNR regional advisor and a checklist linking relevant guidance to report sections. Identify unresolved eligibility or scope issues early. The issued RFP will identify funding sources and attach any grant-specific scope requirements, which must be included in the fee. Funding awards and agency acceptance are not guaranteed.
5 Deliverables and completion schedule
Target completion is within 270 calendar days after written notice to proceed, including public input and Owner review. The schedule must account for seasonal site inspections, including observation of pool operations while the pool is open during the study, and reasonable Owner and agency review periods. Explain any proposed adjustments to individual milestone dates.
Milestone Target from notice to proceed
Required output
Initiation Days 1–20 Work plan, records request, participation plan, schedule
Assessment and needs
Days 21–100 Condition inventory, community findings, initial constraints
Alternatives Days 101–175 Concept layouts, comparative estimates, draft operating forecasts
Draft study By Day 215 Draft integrated report and full-park master site plan
Final study By Day 270 Final report, master site plan, supporting files, board presentation
Provide an integrated report covering all tasks, with an executive summary, full-park master site plan, cost estimates, operating forecasts, and implementation plan. Distinguish verified findings from assumptions and identify investigations needed before design or construction.
Submit an accessible PDF, editable Word report, Excel workbooks with formulas, presentation slides, and editable drawings and master site plan in native format plus print-ready PDF. Include calculations, nonidentifying survey data, photographs, references, and two bound reports.
Include one consolidated Owner review, one consolidated agency review if applicable, revisions, and a final board presentation within the fee. Correct contracted-work errors without added charge. Address delayed agency comments through an agreed schedule adjustment within the cap.
Acceptance requires completion of all tasks, resolution of consolidated comments, and delivery in the required formats. Include professional seals and certifications required by the final scope, funding conditions, and applicable professional practice requirements.
Union COG Pool Park | RFP | 4
6 Consultant qualifications
The lead firm must demonstrate relevant public-pool feasibility and park master planning experience and the capacity to coordinate a multidisciplinary team. Identify the project manager and the individuals responsible for aquatic systems, landscape and park planning, public engagement, cost estimating, and operating analysis.
● Provide three comparable projects, preferably completed within the past seven years, with scope, budget, completion date, client contact, and the proposed team’s role.
● Include Pennsylvania-licensed professionals for services requiring licensure and an aquatic operations specialist with at least three years of relevant management experience.
● Describe experience with municipal or nonprofit clients, accessibility evaluations, grant-supported planning, and construction and operating cost estimates.
● Disclose subcontractors, availability, conflicts of interest, and any exceptions to the requested scope or contract terms.
7 Proposal content and submission
Proposals shall be submitted electronically via PennBid (www.pennbid.bonfirehub.com) before the deadline in Section 2. A maximum of 20 pages is requested, excluding resumes, project examples, and the fee form.
Proposers will receive a system confirmation email upon receipt. Proposals submitted late, or by other means will not be considered.
Organize the proposal in the following order:
● Signed cover letter naming the firm, authorized representative, contact information, and confirmation that the proposal is valid for 90 days after the submission deadline.
● Understanding of the project, proposed approach to every task, community participation methods, and handling of missing data and seasonal limitations.
● Team organization, qualifications, comparable projects, and three references.
● Work schedule showing milestones, meetings, review periods, staff availability, and the proposed completion date.
● Completed fee form in Section 10 and supporting task-level hours, rates, subcontractor fees, and reimbursable costs. Identify all assumptions and exclusions.
● Acknowledgment of each addendum, disclosure of conflicts, proposed contract exceptions, and evidence of insurability.
Questions shall be submitted via the “Ask a Question” feature within PennBid. The Owner will issue clarifications as written addenda to all registered proposers. Proposers must confirm receipt of all addenda and acknowledge them in their proposals. Oral statements do not change the RFP. Relevant information from any optional site visit will be shared through the same process.
Union COG Pool Park | RFP | 5
8 Evaluation and selection
The Owner will first review proposals for timely receipt, completeness, required qualifications, and compliance with the $45,000 maximum. Responsive proposals will be evaluated using the following proposed criteria.
Evaluation criterion Maximum points
Public-pool and park master planning experience and qualifications 30
Technical approach and understanding of the required scope 30
Community engagement and operating feasibility approach 15
Schedule, staffing availability, and references 15
Fee completeness, reasonableness, and value within the cap 10
Total 100
The Owner may interview shortlisted firms and request clarifications using consistent procedures. The Owner intends to negotiate scope, schedule, and an agreement with the highest-ranked firm. If agreement cannot be reached, negotiations may proceed to the next-ranked firm. Selection is subject to governing-board approval and any applicable funding requirements; lowest price alone does not determine award.
9 Proposed agreement conditions
The award requires a written professional-services agreement. The following conditions are proposed for that agreement and must be finalized before execution.
● Authorization and payment. Work begins upon written notice to proceed. Invoices must show completed tasks, accepted deliverables, and the remaining balance. Payments follow the agreed schedule and may not exceed $45,000 in total.
● Changes. The Owner must approve scope, staffing, schedule, and fee changes in writing before affected work proceeds. The total may not exceed $45,000.
● Records and use of work. Upon payment, the Owner receives project-specific reports, data, calculations, drawings, and the master site plan, with rights to use and share them for future work. Identify proprietary tools and provide files and use rights sufficient for independent use.
● Professional responsibility. Comply with applicable laws, licensing, and disclosed funding conditions. The agreement will address records retention, public records, confidentiality, and insurance. Insurance coverage and limits will be established in the final professional-services agreement based on the Owner’s applicable requirements and advice from its insurer and solicitor.
● Termination. The agreement will allow termination for cause or convenience on written notice, with payment for accepted authorized work and approved unavoidable costs within the contract maximum.
● Scope limits. The master site plan is conceptual. Construction documents, final engineering, permitting, construction administration, new boundary or topographic surveys, geotechnical work, destructive testing, and remediation are excluded unless expressly included within the capped fee. Identify follow-up work and estimated costs.
The Owner may reject any or all proposals, cancel the solicitation, or waive minor irregularities to the extent permitted by applicable requirements. Proposal preparation and interview costs are the proposer’s responsibility. This RFP does not obligate the Owner to award a contract or authorize later design or construction work.
Union COG Pool Park | RFP | 6
10 Fee proposal form
The quoted fee must include both the feasibility study and conceptual master site plan for the entire park. The below is for reference only. The proposing consultant shall provide this information using the Bid Table and Questionnaires within PennBid.
Firm: ______________________________________________
Project manager: _____________________________________
Email: __________________________ Telephone: __________________________
Cost component Lump-sum amount
Task 1 Initiation and records review $________________
Task 2 Facility and site assessment $________________
Task 3 Community needs and participation $________________
Task 4 Alternatives and full-park master site plan $________________
Task 5 Capital and operating analysis $________________
Task 6 Funding and implementation plan $________________
Reporting, revisions, files, and final presentation $________________
Total all-inclusive fee Must not exceed $45,000 $________________
All subcontractor fees and reimbursable expenses must be allocated to the lines above without double counting.
Attach the supporting hours, rates, and assumptions requested in Section 7.
Proposed completion time: __________ calendar days after notice to proceed
Addenda acknowledged by number and date: ______________________________________
The undersigned confirms that this fee includes all required services, subcontractors, expenses, meetings, revisions, and deliverables; includes the full-park conceptual master site plan; and does not exceed $45,000. Any assumptions or exceptions are separately identified in the proposal.
Authorized signature: __________________________________________
Printed name and title: _________________________________________
Date: ____________________
11 Pennsylvania LSA grant compliance requirements
The Owner intends to use or may use Pennsylvania Local Share Account (LSA) funding for this planning contract.
The selected consultant and all subcontractors shall comply with the applicable requirements of the specific LSA program, award letter, executed grant agreement, Commonwealth requirements, and applicable federal, state, and local law. In the event of a conflict, the Owner will obtain written clarification from the grant administrator before authorizing affected work.
11.1 Nondiscrimination and equal opportunity
The consultant shall not discriminate against any employee, applicant for employment, subcontractor, or participant in the performance of this contract on any basis prohibited by applicable law, including the Pennsylvania Human Relations Act (43 P.S. §§ 951 et seq.) and applicable federal civil-rights laws. The consultant
Union COG Pool Park | RFP | 7 shall comply with applicable equal-employment-opportunity, accessibility, and nondiscrimination obligations, including obligations relating to recruitment, hiring, assignment, compensation, and employment practices. The consultant shall communicate applicable requirements to its subcontractors.
If required by the applicable LSA grant agreement, the Commonwealth’s official nondiscrimination clause, in the exact form furnished by the grant administrator, shall be attached as an exhibit to the final contract and incorporated by reference. The consultant shall execute any required certifications. The Owner shall obtain and verify the official clause before contract execution; this summary is not a substitute for the official Commonwealth clause.
11.2 Pennsylvania prevailing wage and wage determinations
The Pennsylvania Prevailing Wage Act (43 P.S. §§ 165-1 et seq.) and 34 Pa. Code Chapter 9 apply to covered public-work construction, reconstruction, demolition, alteration, and repair contracts when statutory conditions and thresholds are met. This RFP is for professional planning, feasibility, and conceptual master site planning services only; it does not authorize construction or physical improvements. The $45,000 planning contract amount does not, by itself, establish that prevailing wages apply to these professional services.
If any proposed activity is potentially covered public work, including on-site work that may be subject to a prevailing-wage determination, the consultant shall identify it in its proposal and shall not begin that activity until the Owner obtains an applicability determination or other appropriate guidance from the Pennsylvania Department of Labor & Industry. Where required, the Owner will obtain the project-specific wage-rate determination and incorporate the applicable wage schedule and mandatory contract provisions into the solicitation and agreement before covered work begins. The contractor and subcontractors performing covered work shall comply with applicable classifications, wage and fringe-benefit rates, posting, payroll certification, recordkeeping, and enforcement requirements. No wage rate is represented as having been issued for this planning RFP.
Any later construction procurement is separate from this planning contract and must include its own prevailing-wage applicability review, project-specific determination where required, and wage schedule in the construction bid documents and contract.
11.3 Grant conditions, flow-down, and records
The consultant shall maintain accurate project records, invoices, supporting documentation, and subcontract records; cooperate with lawful monitoring and audits; disclose actual or potential conflicts of interest; and comply with records-retention and access provisions in the executed grant agreement. Applicable grant requirements shall be incorporated into subcontracts.
Reference documents
Sligo Borough Union COG Pool Park facility information
Pennsylvania DCNR 2026–2027 C2P2 Grant Manual Planning projects section
Union COG Pool Park | RFP | 8 https://www.sligoborough.com/unioncogpool/ https://elibrary.dcnr.pa.gov/PDFProvider.ashx?PromptToSave=False&Size=2671473&ViewerMode=2&action=PDFStream&docID=3491054&docName=GrantManual2021&nativeExt=pdf&overlay=0&revision=4
| Union COG Pool ParkFeasibility Study and Master Site Plan |
| 1 Invitation and purpose |
| 2 Proposed solicitation schedule and contact |
| 3 Budget and pricing |
| 4 Scope of services |
| Task 1 Project initiation and records review |
| Task 2 Facility and site assessment |
| Task 3 Community needs and participation |
| 4 Scope of services continued |
| Task 4 Alternatives and master site plan |
| Task 5 Capital and operating cost analysis |
| 4 Scope of services continued |
| Task 6 Funding and implementation plan |
| 5 Deliverables and completion schedule |
| 6 Consultant qualifications |
| 7 Proposal content and submission |
| 8 Evaluation and selection |
| 9 Proposed agreement conditions |
| 10 Fee proposal form |
| 11 Pennsylvania LSA grant compliance requirements |
| 11.1 Nondiscrimination and equal opportunity |
| 11.2 Pennsylvania prevailing wage and wage determinations |
| 11.3 Grant conditions, flow-down, and records |
| Reference documents |