2 - SPECIFICATION - FM27-17 - Paint Shop HVAC Repair.pdf
PDF 115 KB Posted
- Solicitation number
- BPM059721
- Issued by
- Calvert County, Maryland
About this file
This is a project specification document issued by the Maryland Department of Planning, Maryland Historical Trust, for Jefferson Patterson Park and Museum (JPPM) in solicitation FM27-17 for Paint Shop HVAC repairs. The project involves furnishing all labor, overhead, equipment, materials, parts, incidentals, tests, supervision, and services necessary to repair the HVAC system at the Paint Shop located at 10515 Mackall Road, Saint Leonard, Maryland 20685. The scope of work includes two annual maintenance visits during which contractors must replace the Daikin Electric Expansion Valve assembly for the outdoor condensing unit, recover lost refrigerant per EPA guidance, pressure test the system with nitrogen to check for leaks, pull vacuum on the system to 500 microns or less with decay testing, charge the system with 410A refrigerant based on the amount removed, and ensure the system is functional. The contract duration is up to thirty days beginning January 1, 2027, or upon execution of the contract and issuance of the purchase order. Contractors must have no less than three years of experience providing services for equipment equal to or comparable to the type and size required, with such experience occurring within the past five years. Site visits are strongly urged, and contractors must familiarize themselves with existing site conditions.
The bid submission packet requires submission of the completed Invitation for Bid form, signed Bid/Proposal Affidavit, signed Conflict of Interest Affidavit and Disclosure, Certified Small Business (CSB) certificate, copy of current insurance certificates listing Maryland Historical Trust as certificate holder, and acknowledgement of receipt of any amendments. JPPM gives preference to Certified Small Businesses (CBS), which include Small Business Reserve (SBR) and Small Business Preference (SBP), or Veteran-Owned Small Business Enterprises (VSBE). Contractors must comply with all applicable Maryland regulations, the Maryland Occupational Safety and Health Act, and OSHA requirements. Payment terms require submission of invoices within thirty days of completion and final inspection approval by the Executive Director, with invoices not exceeding one-half the annual Base Bid amount plus reimbursables. The contractor is responsible for furnishing all parts, materials, and supplies, with all replacement parts meeting specifications and ratings of removed items and subject to Executive Director approval. The selection will be based on the most favorably evaluated bid price, with evaluation criteria including system and site knowledge, cost, responsiveness to project requirements, and which bid is most advantageous to JPPM.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARYLAND DEPARTMENT OF PLANNING
MARYLAND HISTORICAL TRUST
JEFFERSON PATTERSON PARK & MUSEUM
November 13, 2026
PROJECT SPECIFICATIONS
Solicitation No: FM27-17
TITLE: JEFFERSON PATTERSON PARK AND MUSEUM PAINT SHOP HVAC REPAIRS
I. Summary of work
This project consists of furnishing all labor, overhead, equipment, materials, parts, incidentals, tests, supervision, and services necessary for and incidental to perform the repair of the HVAC at the Paint Shop at Jefferson Patterson Park and Museum. The project site is located on Jefferson Patterson Park and Museum (JPPM), 10515 Mackall Road, Saint Leonard, Maryland 20685.
JPPM will give preference to contractors who are Certified Small Business (CBS), which include Small Business Reserve (SBR) and Small Business Preference (SBP), or Veteran-Owned Small Business Enterprise (VSBE).
JPPM strongly urges the contractor to visit the site and familiarize themselves with the conditions under which they will perform the work. At the scheduled site visit, each contractor will be permitted to examine and familiarize themselves with the full nature and extent of the work and obtain answers to questions about or clarifications of the contract. It is the sole responsibility of the contractor to familiarize themselves fully with the contents of these specifications. Failure to do so does not relieve the contractor with the successful bid from their obligations to comply with all aspects of this Bid package for the amount they specify as their bid. The State of Maryland or JPPM will not make allowance for any errors on the contractor’s part for failure to consider any conditions or circumstances existing on the site that may affect the contemplated work. The fact that the contractor submits a bid will be taken as evidence that the contractor has a full knowledge of the extent and character of the work and the problems in performing it.
II. Permits, certificates, laws, Licensing, and ordinances
A. The contractor must procure all necessary permits, certificates, and licenses required by law for the execution of the work. State of Maryland authorized inspection agencies will conduct inspections.
B. The contractor must comply with all requirements of Annotated Code of Maryland, Business Regulation Article (latest revisions and supplements), Code of Maryland Regulations (COMAR)
09.15 (latest revisions and supplements), any and all bulletins, policies, directives, etc. Issued by the Maryland Department of Labor, Licensing, and Regulations (DLLR) (latest edition).
Additionally, the contractor must comply with the latest editions of applicable codes, regulations, standards, and laws in performing this work (for example; COMAR, the National Electric Code, International Building Code, International Mechanical Code, International Plumbing Code, etc.). The contractor will remove, replace, and repair any violations when so directed by the Executive Director of JPPM or a designee, at the contractor’s expense.
C. The contractor and subcontractors must comply with minimum insurance requirements established under Annotated Code of Maryland, Business Regulation Article. The contractor shall submit with the bid a copy of current insurance certificates. The certificate holder must list Maryland Historical Trust, ISAOA/ATIMA, 100 Community Place, Crownsville, MD 21032.
All insurance certificates must be kept current during the term of the work or contract. Please email updated insurance certificates to jppm.accountspayable@maryland.gov or mail to the Business Manager at JPPM.
mailto:jppm.accountspayable@maryland.gov
JEFFERSON PATTERSON PARK AND MUSEUM
FM27-17 - JEFFERSON PATTERSON PARK AND MUSEUM PAINT SHOP HVAC REPAIR
III. Bid Submission Packet
A. JPPM must receive the bid on or before the due date. The contractor may submit their standard bid sheet but must also submit the filled out and signed IFB sheet. The following items must be submitted with the bid:
1. The completed Invitation for Bid form.
2. Signed Bid/Proposal Affidavit (attachment 1).
3. Signed “Conflict of Interest Affidavit and Disclosure” (attachment 2).
4. Provide Certified Small Business (CSB) certificate.
5. Copy of current insurance certificates. The certificate holder must list Maryland Historical
Trust, ISAOA/ATIMA, 100 Community Place, Crownsville, MD 21032. Insurance certificates must be kept current during the term of the work or contract. Please mail updated copies to the business manager at JPPM.
6. Acknowledgement of receipt of any amendment(s) to this IFB. Please supply a letter on the company’s letterhead acknowledging receipt of amendments.
B. Please fill in and submit the “No Reply” form (attachment 5) if you do not wish to provide a bid.
JPPM will regard any bids without the required and completed paperwork, or any bids received after the due date, as non-responsive.
C. If any amendment(s) to the IFB are distributed, all bidders must acknowledge receipt of the amendment(s).
D. The contractor must be validly formed and in good standing (or qualified to do business) in the State with the Maryland State Department of Assessments and Taxation. See website https://egov.maryland.gov/BusinessExpress/EntitySearch.
IV. Safety
The contractor will adhere to the Maryland Occupational Safety and Health Act (MOSHA) and U.S.
Department of Labor, Occupational Safety and Health Administration (OSHA) laws, rules, and regulations as they apply to this project.
V. Quality Assurance and Workmanship
A. Qualifications of contractors
1. Prior to submitting a bid for the work covered by the specifications, the contractor will have no less than three years experience in providing services as specified for equipment equal or comparable to the type and size required by the specifications. The experience must have been within the past five years. The experience of officials gained prior to the formation of a corporation or other business entity can be considered when evaluating responsibility.
2. The contractor must submit with the bid documents references substantiating these qualifications. To expedite the award process, it is very important for bidders to include the references as detailed. With each reference, list details of type and size of equipment serviced, and a current working phone number for contact.
B. The contractor is responsible for any work subcontracted to others. It is the contractor’s responsibility to ensure that any subcontractor hired adheres to the specifications and contract terms and conditions. The contractor will supply the Executive Director of JPPM or a designee the list of subcontractors the contractor intends to utilize prior to any work commencing. The Executive Director of JPPM or a designee must approve the references and certifications of any and all subcontractors selected by the contractor.
VI. Cleaning
A. The contractor shall: remove all debris daily; at the end of each workday, remove empty cans, rags, rubbish, and other discarded materials from the site; continuously keep walkways, https://egov.maryland.gov/BusinessExpress/EntitySearch
FM27-17 - JEFFERSON PATTERSON PARK AND MUSEUM PAINT SHOP HVAC REPAIR
driveways, and outdoor living areas broom clean. The contractor will leave the work site in an orderly and clean manner.
B. Upon completion of this work, the contractor must leave the job site in as good or better condition as they found it before the commencement of the work. At the completion of the project, the contractor will immediately remove all their equipment and construction debris from the project site. The State reserves the right to keep all newly purchased but unused materials, parts, and supplies. The contractor will remove all defective parts and dispose of all project waste offsite unless otherwise stated herein. The contractor must dispose of all federally or state regulated waste (e.g. Asbestos, lead) as mandated by federal and state laws and regulations and must provide a Chain of Custody to the Executive Director of JPPM or a designee.
VII. Other Conditions
A. The contractor will complete all work during a normal workday. A normal workday is defined as Monday through Friday, 7:30 AM to 4:00 PM, except for Maryland State Holidays. The contractor may make mutually agreeable arrangements with the Executive Director of JPPM or a designee to come earlier, later, or on non-working days without extra cost to the State.
B. The contractor must protect existing utilities. The contractor will verify the location of all existing utilities and is responsible for their protection and any relocation as required to complete the project.
C. The contractor will coordinate their work with that of other contractor(s) and staff members working on the premises.
D. The contractor is responsible for all damage to life and property due to its activities or those of its agents or employees in connection with the services required under the work described herein. Damage caused by the contractor will be reported to JPPM on the day of discovery and will be repaired within 30 calendar days.
E. The contractor will notify the Executive Director or a designee prior to any work that would result in the disturbance of soil in or around the work site. The Regional Archaeologist or a designee must be present to approve and monitor soil disturbance on the property.
F. Upon arrival on site to perform an inspection, service call, or repair, contractor must check in with the Maintenance Supervisor or a designee. Immediately upon the conclusion of each inspection, service call, or repair, contractor will notify the Maintenance Supervisor or a designee that the work has been completed.
VIII. Duration of the Contract
This Contract will be for a period of up to thirty (30) days, beginning January 1, 2027, or upon the execution of the contract and the issuance of the purchase order.
IX. Payment to contractor
A. The contractor will submit all invoices for the work described herein within thirty (30) days of the completion of the final inspection of the work and the approval of the Executive Director of JPPM or a designee.
A. The invoice will not exceed one-half (1/2) the annual Base Bid amount of the contract, plus any reimbursable as defined in the contract. The contractor will provide a service report for each service visit. JPPM reserves the right to hold invoices until completed service reports are provided.
B. The contractor must invoice any approved additional work separately and provide the written document signed by the Executive Director of JPPM or a designee authorizing the additional work.
C. The contractor will submit all invoices, upon completion of the work described herein to the satisfaction of the Executive Director of JPPM or a designee, showing the purchase order
FM27-17 - JEFFERSON PATTERSON PARK AND MUSEUM PAINT SHOP HVAC REPAIR
number on each copy and submit them to Jefferson Patterson Park and Museum, ATTN:
Business Manager, 10515 Mackall Road, Saint Leonard, MD 20685-2433. Electronic invoices shall be sent to jppm.accountspayable@maryland.gov with ATTN: Business Manager clearly indicated in the email.
X. Detailed specifications
The contractor is furnishing all materials, labor, tools, equipment, overhead to include travel, and incidentals as necessary to undertake two visits a year during which the following is completed each visit:
A. Replacement of the Daikin Electric Expansion Valve assembly for the outdoor condensing unit.
B. Recover all lost refrigerant per EPA guidance;
C. Pressure test system with nitrogen to check for system leaks;
D. Pull vacuum on system (500 microns or less) and allow for decay test;
E. Charge system with 410A REF (based on amount removed);
F. Ensure that system is functional.
G. The contractor will provide, as if specified herein, any work not specifically mentioned but reasonably implied for the complete, safe, and satisfactory completion of the project.
H. Job Site Contact; After contract award all questions regarding services to be provided should be addressed to the JPPM designee listed below:
Rod Cofield, Executive Director Jefferson Patterson Park and Museum 10515 Mackall Road St. Leonard, Maryland 20685 Telephone: 443-586-8502 Fax: 410-586-0080 Email: rod.cofield@maryland.gov
Eric Frere, Assistant Director Jefferson Patterson Park and Museum 10515 Mackall Road St. Leonard, Maryland 20685 Telephone: 443-845-4350 Fax: 410-586-0080 Email: eric.frere@maryland.gov
I. If the contractor notes any existing defects not caused by the contractor while performing the work, during diagnosis, or start and operational checks, the contractor will provide the Executive Director of JPPM or a designee an immediate verbal notification, followed by a detailed report within five (5) business days from the date that contractor noted the defect, indicating what components require further work or replacement, recommendations, and itemized costs including labor, parts, and materials. Upon approval, the Executive Director of JPPM or a designee will provide a written and signed document approving the additional work necessary to correct the defect.
J. The building(s) will be occupied during all phases of this project. The contractor must plan and execute all work in such a manner as to reduce interference with the normal function of the building(s).
1. The contractor must provide adequate protection where required for the existing building(s), contents of same, and all building occupants.
2. The contractor must take particular care to prevent water infiltration into building(s).
3. The contractor will keep all driveways and walkways clear of materials, debris, etc., so there will be no interference with the usual traffic serving the building(s).
4. The contractor must ensure that emergency vehicles have free and clear access to all points on the property.
5. The contractor must plan and execute all work to ensure, to the extent possible, that there is no interruption in the utilities servicing the building(s). The contractor will schedule any interruptions in advance.
mailto:jppm.accountspayable@maryland.gov mailto:rod.cofield@maryland.gov mailto:eric.frere@maryland.gov
FM27-17 - JEFFERSON PATTERSON PARK AND MUSEUM PAINT SHOP HVAC REPAIR
K. If it is not possible for contractor to avoid interference with the normal use of the building or area, the work shall be performed at such a time or times as mutually agreed upon between the contractor and the Executive Director of JPPM or a designee.
XI. Definitions
A. N/A
XII. Materials and Labor Costs
A. The contractor is furnishing all parts, materials, incidentals, and supplies to complete this work. Replacement parts and material will meet all specifications and ratings of listed or removed items and be of the same type, style, and be interchangeable. The Executive Director of JPPM or a designee must approve parts and materials or any substitutions.
1. All additional or replacement devices that are purchased from and/or installed by qualified technicians will be compatible with the existing equipment and are subject, at the time of attachment to the system, to the same terms and conditions as existing equipment under the contract.
2. Unless otherwise directed, the contractor will furnish and install all parts (those purchased by the State and those purchased by the contractor) for preventive maintenance, modifications, minor repairs, and emergency repairs in accordance with the specifications herein. In cases where the overall cost or critical time frame may be served by replacing a large part, the Executive Director of JPPM or a designee will exercise their right to decide on the desired approach. A copy of the manufacturer’s invoice to the contractor will be submitted to the State with invoice for payment. The contractor will provide replacement parts from the original manufacturers or substitute parts approved by the original manufacturers. The invoice will contain the necessary breakdown of costs with back-up documentation.
B. The contractor will provide, as if specified herein, any materials and supplies not specifically mentioned but reasonably implied for the complete, safe, and satisfactory completion of the project.
C. Asbestos containing material is prohibited. An asbestos containing material is defined as a material that contains one percent or more of asbestos by weight. The contractor will supply paperwork that indicates the composition of materials used (i.e. Supplier’s and/or manufacturer’s legal statement or certification and Safety Data Sheet). The contractor is responsible for the replacement of any asbestos containing material they install at no cost to the State.
XIII. Pricing
The contractor will provide pricing as indicated below. Additional prices are separate and in addition to but not included in the total cost of the work described herein. This covers potentially unforeseen but possible repairs that the contractor may find while performing this work. The contractor may or may not complete this additional work, pending approval of the Executive Director of JPPM or a designee.
A. On the IFB form opposite item no. 1, the contractor shall insert the total cost for the repairs for the Paint Shop HVAC system as outlined in the detailed specifications, Section X.
XIV. Basis for Selection
A. This IFB may be cancelled, and the State may reject any bids when it is in the best interest of the State to do so.
FM27-17 - JEFFERSON PATTERSON PARK AND MUSEUM PAINT SHOP HVAC REPAIR
B. The Selection Committee will choose the bid based on the most favorably evaluated bid price.
Evaluation criteria include responsiveness of the bid to the project requirements, and which bid is the most advantageous to JPPM. The selection of the contractor is based on
1. System and site knowledge.
2. Cost.
XV. IFB MANDATORY STATE PROVISIONS
A. Bidders should give specific attention to the identification of those portions of their proposals that they deem to be confidential, proprietary information or trade secrets and provide any justification why such materials, upon request, should not be disclosed by the State under the Access to Public Records Act, State Government Article, Title 10, Subtitle 6, Annotated Code of Maryland;
B. Minority business enterprises and small businesses are encouraged to respond to this IFB;
C. By submitting a bid to this IFB, a bidder represents that it is not in arrears in the payment of any obligation due and owing the State of Maryland, including the payment of taxes and employee benefits, and that it shall not become so in arrears during the term of the contract if selected for contract award;
D. If JPPM determines before award that facts or circumstances exist giving rise to, or which could in the future give rise to, a conflict of interest, JPPM may request a bidder to provide a conflict of interest affidavit and disclosure. JPPM may also terminate the contract after award, in whole or in part, if it considers termination necessary to avoid an actual or potential conflict of interest;
E. JPPM shall give preference to products and equipment that are mercury-free as required under COMAR 21.11.07.07 where applicable.
F. All bidders certify that they will not engage in the unlawful manufacture, distribution, dispensing, possession, or use of drugs or the abuse of drugs or alcohol in the performance of the procurement, in compliance with the State’s Drug and Alcohol Free Workplace Policy and
COMAR 21.11.08.03.B.
| I. Summary of work |
| II. Permits, certificates, laws, Licensing, and ordinances |
| III. Bid Submission Packet |
| IV. Safety |
| V. Quality Assurance and Workmanship |
| VI. Cleaning |
| VII. Other Conditions |
| VIII. Duration of the Contract |
| IX. Payment to contractor |
| X. Detailed specifications |
| XI. Definitions |
| XII. Materials and Labor Costs |
| XIII. Pricing |
| XIV. Basis for Selection |
| XV. IFB MANDATORY STATE PROVISIONS |
File details come from the government source that posted it. Updated .