2-RFP 26-11 Addendum 1 Playground Equipment for Trailblazer Park.docx

DOCX document 171 KB Posted

Attached to
Design-Install Playground for Trailblazer Park
Solicitation number
RFP 26-11
Issued by
Oconee County, Georgia

About this file

This is Addendum #1 to RFP 26-11 issued by the Newton County Board of Commissioners for the design and installation of playground equipment at Trailblazer Park in Georgia. The project involves designing and installing a new composite play structure within a 42' x 32' area, including removal of existing equipment, site grading, equipment footings, certified mulch, two trashcans, and two benches. Proposers may submit a maximum of two design proposals and must attend a mandatory bidders' conference on January 27, 2026, at 10:00 AM in Covington, Georgia to maintain bid eligibility. The proposal submission deadline is February 12, 2026, at 9:00 AM through the Bonfire electronic portal. The Addendum clarifies that the county is requesting pricing for both poured-in-place and wood mulch surfacing options, with poured-in-place being the preferred choice if budget allows. The addendum also confirms that the park is open for equipment inspection prior to the meeting and that no specific color or design requirements exist for equipment selection.

The project has a maximum budget of $150,000, with contractors required to itemize equipment and labor costs separately. All proposal costs must include delivery, technical installation instructions, maintenance manuals, permits, and certifications, with Newton County waiving local permit fees. The contract term is 90 calendar days, with a daily penalty of $100 for schedule overruns. A 10 percent bid bond based on the base proposal price must be submitted, and the successful contractor must provide payment and performance bonds at 100 percent of the contract amount from a Georgia-licensed surety company. Contractors must maintain comprehensive insurance coverage, including general liability, commercial automobile liability, and workers' compensation, each with minimum $1,000,000 limits. Evaluation criteria include ADA, ASTM, IPEMA, and CPSC compliance, design quality, play value, equipment durability, manufacturer reputation, and overall proposal quality. The county reserves the right to reject any or all proposals without cause.

View the file

Other files

File Type Posted
1-RFP 26-11 Playground Equipment for Trailblazer Park.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM # 1

RFP 26-11 Design -Install Playground Equipment for Trailblazer Park

This Addendum modifies the Advertisement for Request for Proposal Design-Install Playground Equipment for Trailblazer Park. Unless specifically modified by this Addendum, the previously issued documents remain unchanged and in the event of a conflict between this Addendum and previously issued documents, this Addendum shall prevail.

1. What does it means when it says Poured in Place and Wood mulch as the surfacing, is this asking for both or one or the other if budget allows? We would like prices for both. We are hoping to use poured in place if the budget allows.

1. Can we look at the equipment that needs to be removed before the meeting? The park is always open

1. Is there any colors or specific needs for playground equipment choices? No specific colors or needs image1.emf