This is an MBE/WBE Subcontractors and Supplier Solicitation and Commitment Form issued by the City of Allentown Purchasing Office for RFP No. 2026-49. The form is designed to ensure that bidders have not discriminated in their selection of subcontractors and suppliers and requires documentation of good faith efforts to solicit Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) participation. Bidders must solicit MBE and WBE vendors for any work they intend to subcontract or for supplies and materials required to perform the contract. The form requires bidders to provide company information, subcontractor details, certification status, descriptions of specific work or materials to be supplied, total dollar amounts of quotes received, and reasons for any quote rejections. Bidders must contact potential MBE/WBE subcontractors and suppliers a minimum of ten days prior to the bid opening date to allow adequate time for quote preparation and response. Completion and submission of this form with bids exceeding $40,000.00 is mandatory; failure to submit the form will result in bid rejection as non-responsive.
The form requires that all solicited and unsolicited quotes from MBE and WBE firms within the scope of work be included on the submission. Bidders must document whether quotes are accepted or rejected and provide detailed reasons for any rejections. The form permits bidders to indicate if no subcontractor is needed or if the prime contractor itself is an MBE or WBE, either of which would satisfy participation requirements. Copies of all MBE/WBE quotes must be submitted with the bid proposal, either in the cost proposal section or as a separate uploaded document. The form explicitly instructs bidders to exclude any cost information from the technical proposal and to ensure that MBE/WBE solicitations align with the vendors' certified areas of expertise to receive proper credit toward meeting minimum participation levels.
View the file
Other files
Show 40 more
Latest 50 of 92 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MBE/WBE SUBCONTRACTORS AND
SUPPLIER
SOLICITATION AND COMMITMENT FORM
CITY OF ALLENTOWN
PURCHASING OFFICE
435 HAMILTON STREET
ALLENTOWN, PA 18101
RFP NO. 2026-49 Page M1
No subcontractor needed _______ Prime Contractor is a MBE or WBE _______
INSTRUCTION FOR COMPLETION OF THE MBE/WBE SUBCONTRACTOR AND SUPPLIER SOLICITATION AND COMMITMENT FORM
The purpose of this form is to determine whether the bidder has discriminated in the selection of subcontractors and suppliers. Bidders must solicit MBE and WBE vendor participation for any work the bidders intend to subcontract or for any supplies/materials required to perform the contract.
1. Provide the company names, address, telephone number, fax number, email address and contact person.
2. Provide subcontractors name, address, zip code, telephone number and contact person.
3. Indicate whether the firm is a certified MBE or WBE. Place an (X) in the appropriate column. If the firm is certified MBE and WBE, the bidder will receive credit for the firm as either MBE or WBE.
4. Briefly describe the specific work to be performed and/or materials to be supplied by the certified MBE or WBE. In order to count towards reaching the MPLs, bidders must solicit certified MBE’s/WBE’s in the areas which they are certified. For example, if an MBE/WBE is certified for electrical supplies and the bidder lists plumbing supplies, the bidder will not receive credit.
5. Enter the total dollar ($) amount of the quote received. If the quote was received in the form of unit prices or hourly rates, a total dollar amount must still be provided. If the subcontractor did not respond to the bidder, the bidder must indicate “No Response”. Copies of all MBE/WBE quotes must be submitted with the bid in the cost proposal or as a separate uploaded document with Page M1. REMINDER: DO NOT include any cost in the technical proposal.
6. Enter acceptance or rejection of the quote.
7. If quote is rejected complete the reason for rejection of the quote.
8. The bidder must complete both pages and submit form Page M1 with its bid.
9. The bidder must include on Page M1 all solicited and unsolicited quotes received by the bidder from MBE’s and WBE’s as long as the quotes are within the scope of work.
10. The bidder’s contact with MBE/WBE subcontractors and suppliers should be a minimum of (10) days prior to the bid opening date. This will ensure that MBE/WBE’s have sufficient time to prepare a quote. Ten days is a guide. However, adequate time must be provided to all subcontractors and suppliers to respond.
If additional forms are needed, you are permitted to photocopy form.
IMPORTANT NOTICE: FAILURE TO COMPLETE THIS FORM AND SUBMIT IT WITH BIDS OVER $40,000.00 WILL BE SUFFICIENT CAUSE FOR
REJECTION OF THE BID AS NOT RESPONSIVE.
COMPANY NAME:______________________________________________ FAX NUMBER:_________________________________________________
ADDRESS:_____________________________________________________ E-MAIL ADDRESS:______________________________________________
_____________________________________________________ CONTACT PERSON: _____________________________________________
TELEPHONE:___________________________________________________
Page M1
Company name, Address, Zip Code, Tel No. w/ Area Code, Contact Person’s Name.
M B E
W B E
Type of Work to be Performed and/or Material to
Be Supplied.
Total Dollar Amount Of
Quote
Quote Accepted
Quote Rejected
Reason for rejection
| No subcontractor needed: |
| Prime Contractor is a MBE or WBE: |
| COMPANY NAME: |
| FAX NUMBER: |
| Textfield-10: |
| EMAIL ADDRESS: |
| CONTACT PERSON: |
| TELEPHONE: |
| Company name Address Zip Code Tel No wArea Code Co: |
| mw: |
| mw-0: |
| Type of Work to be Performed andor Material to Be: |
| Total Dollar Amount Of Quote: |
| Quote Accepted: |
| Quote Rejected: |
| Reason for rejection: |
| Company name Address Zip Code Tel No wArea Code Co-0: |
| mw-1: |
| mw-2: |
| Type of Work to be Performed andor Material to Be-0: |
| Total Dollar Amount Of Quote-0: |
| Quote Accepted-0: |
| Quote Rejected-0: |
| Reason for rejection-0: |
| Company name Address Zip Code Tel No wArea Code Co-1: |
| mw-3: |
| mw-4: |
| Type of Work to be Performed andor Material to Be-1: |
| Total Dollar Amount Of Quote-1: |
| Quote Accepted-1: |
| Quote Rejected-1: |
| Reason for rejection-1: |
| Company name Address Zip Code Tel No wArea Code Co-2: |
| mw-5: |
| mw-6: |
| Type of Work to be Performed andor Material to Be-2: |
| Total Dollar Amount Of Quote-2: |
| Quote Accepted-2: |
| Quote Rejected-2: |
| Reason for rejection-2: |
| Company name Address Zip Code Tel No wArea Code Co-3: |
| mw-7: |
| mw-8: |
| Type of Work to be Performed andor Material to Be-3: |
| Total Dollar Amount Of Quote-3: |
| Quote Accepted-3: |
| Quote Rejected-3: |
| Reason for rejection-3: |
| Company name Address Zip Code Tel No wArea Code Co-4: |
| mw-9: |
| mw-10: |
| Type of Work to be Performed andor Material to Be-4: |
| Total Dollar Amount Of Quote-4: |
| Quote Accepted-4: |
| Quote Rejected-4: |
| Reason for rejection-4: |
| Company name Address Zip Code Tel No wArea Code Co-5: |
| mw-11: |
| mw-12: |
| Type of Work to be Performed andor Material to Be-5: |
| Total Dollar Amount Of Quote-5: |
| Quote Accepted-5: |
| Quote Rejected-5: |
| Reason for rejection-5: |
| Company name Address Zip Code Tel No wArea Code Co-6: |
| mw-13: |
| mw-14: |
| Type of Work to be Performed andor Material to Be-6: |
| Total Dollar Amount Of Quote-6: |
| Quote Accepted-6: |
| Quote Rejected-6: |
| Reason for rejection-6: |
| Company name Address Zip Code Tel No wArea Code Co-7: |
| mw-15: |
| mw-16: |
| Type of Work to be Performed andor Material to Be-7: |
| Total Dollar Amount Of Quote-7: |
| Quote Accepted-7: |
| Quote Rejected-7: |
| Reason for rejection-7: |
| Company name Address Zip Code Tel No wArea Code Co-8: |
| mw-17: |
| mw-18: |
| Type of Work to be Performed andor Material to Be-8: |
| Total Dollar Amount Of Quote-8: |
| Quote Accepted-8: |
| Quote Rejected-8: |
| Reason for rejection-8: |
File details come from the government source that posted it. Updated .