2-RFB 4491 - Bid Table.pdf
PDF 141 KB Posted
- Attached to
- Service Contract
- Solicitation number
- 4491
- Issued by
- Daviess County, Kentucky
About this file
This is a bid table for a service contract issued by the City of Owensboro, Kentucky, establishing a list of contractors to provide various technical services on an as-needed basis. The bid encompasses 32 distinct service categories, including asphalt seal coating and striping, audio visual repair, backflow preventer inspection, boiler inspection and repair, brush and debris removal, bush hogging, construction crews, dozer and excavator work, electrical work, fencing repair and replacement, glass window replacement, HVAC repair, herbicide and insecticide applications, irrigation repair, landscape lighting repair, landscape maintenance, masonry repairs, mowing and property clean-up, pipe boring, plumbing repair, pump work, radio tower and generator repair/installation, roofing repair, tornado siren repair/installation, trenching, trucking/hauling in two categories, vibratory plowing in two categories, and welding services in on-site and in-house capacities. Several service categories require state licensure or specific certifications, including boiler inspection and repair, electrical work, HVAC repair, herbicide and insecticide applications, and plumbing repair. The bid references Attachment B for detailed specifications for most service categories.
Bidders must submit hourly rates and percentage markups for materials for each service category. The scoring structure allocates seven points for hourly rates and three points for materials markups on most line items. Certain services with differentiated skill levels, including electrical work, HVAC repair, and plumbing repair, require separate hourly rates for licensed journeymen and helpers, with journeymen rates weighted at seven points and helper rates at two points. Trucking/hauling services are priced as hourly rates inclusive of truck operating expenses, driver costs, insurance, fuel, and tarps. The bid table does not specify contract duration, renewal options, response deadlines, or award dates in the document provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Owensboro Bid Table
#1 Asphalt Seal Coating and Striping (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark up for Materials (3 points) ________ %
#2 Audio Visual Repair and Service (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#3 Backflow Preventer Inspection (Certified) (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#4 Boiler Inspection and Repair (Certified – State License Required) (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#5 Brush and Debris Removal (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#6 Bush Hogging – 7” or more
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#7 Construction Crews (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#8 Dozer/Excavator Work (See Attachment B for Details)
Small
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#9 Dozer/Excavator Work (See Attachment B for Details)
Large
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#10 Electrical Work (State License Required) (See Attachment B for Details)
Hourly Rate (Licensed Journeyman) (7 points) $ ________
Hourly Rate (Helper) (2 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#11 Fencing Repair/Replacement – Chain Link Fencing – Wood Fencing – Vinyl Fencing (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#12 Glass Window Replacement Service (See Attachment B for Details)
#13 HVAC Repair (State License Required) (See Attachment B for Details)
Hourly Rate (Licensed Journeyman) (7 points) $ ________
Hourly Rate for (Helper) (2 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#14 Herbicide and Insecticide Applications (Applicable License & Certifications Required) (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#15 Irrigation Repair (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#16 Landscape Lighting Repair (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#17 Landscape Maintenance (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#18 Masonry Repairs (See Attachment B for Details)
Hourly Rate (7 points) $ ________
#19 Mowing and Property Clean-Up – Property Maintenance/Tall Grass Mowing (10” or More) (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#20 Pipe Boring – Directional – 6” and Smaller (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#21 Plumbing Repair (State License Required) (See Attachment B for Details)
Hourly Rate (Licensed Plumber) (7 points) $ ________
Hourly Rate (Helper) (2 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#22 Pump Work (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#23 Radio Tower and Generator Repair/Installation
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#24 Roofing Repair – Commercial/Residential (See Attachment B for Details)
Hourly Rate (7 points) $ ________
#25 Tornado Siren Repair/Installation (See Attachment B for Details)
Percentage Mark-Up for Materials (3 points) ________ %
#26 Trenching (See Attachment B for Details)
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#27 Trucking/Hauling* (See Attachment B for Details)
Category 1
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#28 Trucking/Hauling* (See Attachment B for Details)
Category 2
* Both categories are hourly rates to include truck operating expenses and driver costs, insurance, fuel, tarps, etc.
#29 Vibratory Plowing – 2” and Smaller (See Attachment B for Details)
Hourly Rate (7 points) $ ________
#30 Vibratory Plowing – 4” and Larger (See Attachment B for Details)
Percentage Mark-Up for Materials (3 points) ________ %
#31 Welding (Certified) (See Attachment B for Details)
On-Site
Hourly Rate (7 points) $ ________
Percentage Mark-Up for Materials (3 points) ________ %
#32 Welding (Certified) (See Attachment B for Details)
In-House/Shop
Hourly Rate (7 points) $ ________
| undefined: |
| undefined_2: |
| undefined_3: |
| undefined_4: |
| undefined_5: |
| undefined_6: |
| undefined_7: |
| undefined_8: |
| undefined_9: |
| undefined_10: |
| undefined_11: |
| undefined_12: |
| undefined_13: |
| undefined_14: |
| undefined_15: |
| undefined_16: |
| undefined_17: |
| undefined_18: |
| undefined_19: |
| undefined_20: |
| undefined_21: |
| undefined_22: |
| undefined_23: |
| undefined_24: |
| undefined_25: |
| undefined_26: |
| undefined_27: |
| undefined_28: |
| undefined_29: |
| undefined_30: |
| undefined_31: |
| undefined_32: |
| undefined_33: |
| undefined_34: |
| undefined_35: |
| undefined_36: |
| undefined_37: |
| undefined_38: |
| undefined_39: |
| undefined_40: |
| undefined_41: |
| undefined_42: |
| undefined_43: |
| undefined_44: |
| undefined_45: |
| undefined_46: |
| undefined_47: |
| undefined_48: |
| undefined_49: |
| undefined_50: |
| undefined_51: |
| undefined_52: |
| undefined_53: |
| undefined_54: |
| undefined_55: |
| undefined_56: |
| undefined_57: |
| undefined_58: |
| undefined_59: |
| undefined_60: |
| undefined_61: |
| undefined_62: |
| undefined_63: |
| undefined_64: |
| undefined_65: |
| undefined_66: |
| undefined_67: |
File details come from the government source that posted it. Updated .