This is a Project Manual for the Church Street Streetscape Project prepared by Edwardsville Borough, Pennsylvania, through its engineer, Verdantas. The project encompasses roadway widening for street parking, sidewalk reconstruction, ADA-compliant ramps, driveway restoration, bituminous pavement milling and overlay of the existing roadway, and full-depth pavement of the proposed roadway expansion. Sealed bids will be accepted online via the PennBid Program until 12:00 PM local time on October 6, 2026, with public bid opening at Verdantas' offices located at 613 Baltimore Drive, Suite 300, Wilkes-Barre, PA 18702-7903. Bids will be considered at the Edwardsville Borough Council's regularly scheduled meeting on Thursday, October 8, 2026, at 6:00 p.m. at the Edwardsville Borough Municipal Building, 470 Main Street, Edwardsville PA 18704. All construction work is included in one prime contract awarded on a unit and/or lump sum price basis. No pre-bid conference has been scheduled.
Bidders must submit bid security equal to 10% of their maximum bid price along with all required forms, statements, affidavits, and certifications as listed in Article 7 of the Bid Form. Prevailing wage requirements in accordance with the Pennsylvania Prevailing Wage Act 442 apply throughout the contract duration. The Borough of Edwardsville is an Equal Employment Opportunity Employer and does not discriminate based on race, color, national origin, sex, religion, age, disability, or familial status. The successful bidder will be required to furnish and pay for additional contractual requirements as specified in the contract documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-PLANS SR 1004 Church Street Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Verdantas.com
613 Baltimore Dr, Suite 300 Wilkes-Barre, PA 18711
570-821-1999
September 2026
PROJECT MANUAL
Edwardsville Borough Church Street Streetscape Project Edwardsville Borough, Luzerne County, PA
Prepared for:
Edwardsville Borough 470 Main Street Edwardsville, PA 18704
Project Number: 18899 https://www.verdantas.com/
TABLE OF CONTENTS
BIDDING REQUIREMENTS, FORMS, AND NUMBER OF PAGES
CONDITIONS OF THE CONTRACT
SECTION 00 11 16 - INVITATION TO BID 1
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS 12
SECTION 00 22 13 - PENNBID INSTRUCTIONS TO BIDDERS AND VENDORS 2
SECTION 00 41 13 - BID FORM 7
SECTION 00 43 13 - BID BOND 2
SECTION 00 45 13 - BIDDER’S QUALIFICATION STATEMENT 12
SECTION 00 45 19 - NON-COLLUSION AFFIDAVIT (INCLUDING INSTRUCTIONS) 3
SECTION 00 45 26 - AFFIDAVIT ACCEPTING PROVISIONS OF THE WORKMENS COMPENSATION ACT 1
SECTION 00 45 36 - CERTIFICATION OF NON SEGREGATED FACILITIES 1
SECTION 00 45 46.1 - NONDISCRIMINATION/SEXUAL HARASSMENT CLAUSE 1
SECTION 00 45 46.2 - EMPLOYMENT ELIGIBILITY VERIFICATION COMPLIANCE FORM 1
SECTION 00 45 46.3 - PUBLIC WORKS EMPLOYMENT VERIFICATION FORM 1
SECTION 00 52 13 - AGREEMENT BETWEEN OWNER AND CONTRACTOR (STIPULATED PRICE) 8
SECTION 00 61 13.13 - PERFORMANCE BOND 4
SECTION 00 61 13.16 - PAYMENT BOND 4
SECTION 00 62 76 - CONTRACTOR’S APPLICATION FOR PAYMENT 6
SECTION 00 72 00 - STANDARD GENERAL CONDITIONS 79
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS (INCLUDING WAGE RATES) 30
GENERAL REQUIREMENTS
SECTION 01 00 00 - GENERAL REQUIREMENTS 9
SECTION 01 20 00 - MEASUREMENT AND PAYMENT 14
TECHNICAL SPECIFICATIONS
SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS 2
SECTION 01 57 13 - TEMPORARY EROSION AND SEDIMENT CONTROL 5
SECTION 02 41 00 - DEMOLITION 4
SECTION 31 10 00 - SITE CLEARING 2
SECTION 31 22 00 - GRADING 3
SECTION 31 23 16 - EXCAVATION 2
SECTION 31 23 16.26 – ROCK REMOVAL 2
SECTION 31 23 23 - FILL 6
SECTION 32 11 23 - AGGREGATE BASE COURSES 4
SECTION 32 12 16 - ASPHALT PAVING 7
SECTION 32 13 13 – CONCRETE PAVEMENT 9
SECTION 32 17 23.13 – PAINTED PAVEMENT MARKINGS 5
SECTION 32 17 26 – TACTILE WARNING SURFACE 4
SECTION 34 01 03 – STRUCTURAL SOIL 4
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
INVITATION FOR BIDS 00025-5
Z:\Project Files\EA-FZ\EDWBOR\18899 - Church Street Streetscape Project\104-001 Construction Documents\FRONT_END\(3) 00 00 25 INVITATION FOR BIDS.doc
EDWARDSVILLE BOROUGH
EDWARDSVILLE, PA
CHURCH STREET STREETSCAPE PROJECT
INVITATION FOR BIDS
Edwardsville Borough will receive Bids online for the Church Street Streetscape Project, general compromised of the widening of the roadway for street parking, sidewalk reconstruction, ADA ramps, driveway restoration, bituminous pavement mill and overlay of existing roadway, full depth pavement of proposed roadway expansion, utility pole relocation, and all incidental work related thereto. Sealed bids will be accepted online via the PennBid Program until 12:00 PM local time on the 6th day of October 2026. Bids will be publicly opened at that time at the offices of Verdantas, located at 613 Baltimore Drive, Suite 300, Wilkes-Barre, PA 18702-7903. Bids will be considered at the regularly scheduled meeting of the Edwardsville Borough Council to be held on Thursday, October 8, 2026, at 6:00 p.m. (local time) in the Edwardsville Borough Council Chambers at the Edwardsville Borough Municipal Building, located at 470 Main Street, Edwardsville PA 18704.
All construction Work is included in one (1) Prime Contract. All Bids shall be on a unit and/or lump sum price basis.
Each Bid, when submitted, must be accompanied by a "Bid Security" in an amount of 10% of Bidder’s maximum Bid price to be furnished in accordance with the Instructions to Bidders; and (B) all forms, statements, affidavits and certifications, as more particularly listed in Article 7 of the Bid Form.
A Pre-Bid Conference has not been scheduled at this time.
Bidder(s) attention is called to the fact that not less than the minimum wages and salaries in accordance with provisions of Pennsylvania Prevailing Wage Act 442 and contained in the Contract Documents, must be paid throughout the duration of the Contract.
The Borough of Edwardsville does not discriminate on the basis of race, color, national origin, sex, religion, age, disability or familial status in employment or the provision of services. The Borough of Edwardsville is an Equal Employment Opportunity Employer.
The successful Bidder will be required to furnish and pay for a satisfactory Performance Bond, and a Labor and Material Payment Bond, in an amount at least equal to 100% of the Contract Price.
The Borough of Edwardsville reserves the right to reject any or all Bids and to waive informalities in the Bidding.
Bids may be held by Owner for a period of not to exceed sixty days (60) from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of a Contract.
This Project was financed, in whole or in part, by a grant from the Commonwealth of Pennsylvania.
END OF INVITATION FOR BIDS
INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
Page
Article 1— Defined Terms
Article 2— Bidding Documents
Article 3— Qualifications of Bidders
Article 4— Pre-Bid Conference
Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program; Other Work at the Site
Article 6— Bidder’s Representations and Certifications
Article 7— Interpretations and Addenda
Article 8— Bid Security
Article 9— Contract Times
Article 10— Substitute and “Or Equal” Items
Article 11— Subcontractors, Suppliers, and Others
Article 12— Preparation of Bid
Article 13— Basis of Bid
Article 14— Submittal of Bid
Article 15— Modification and Withdrawal of Bid
Article 16— Opening of Bids
Article 17— Bids to Remain Subject to Acceptance
Article 18— Evaluation of Bids and Award of Contract
Article 19— Bonds and Insurance
Article 20— Signing of Agreement
Article 21— Sales and Use Taxes
Article 22— Contracts to Be Assigned
Article 23— Partnering
Article 24— Wages And Salaries
Article 25— Equal Employment Opportunity
INSTRUCTIONS TO BIDDERS 00 21 13 - 1
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.
B. The term “Owner” – (as defined in the General Conditions, Paragraph 1.01.A.) shall also mean and is identified as the Edwardsville Borough, Luzerne County, Pennsylvania represented by Ms. Cathy Soprano.
C. The term “Engineer” (as defined in the General Conditions, Paragraph 1.01.A) shall be specific in that the functions and duties shall be performed by and under the direction and supervision of one or more of the registered Engineers or Surveyors of staff of Verdantas who may be designated to perform, direct or supervise the performance of such functions and duties. Written notices and communications to the Engineer should be addressed to:
Verdantas 613 Baltimore Drive, Suite 300 Wilkes-Barre, PA 18702-7903
(570)821-1999
D. “PennBid”, “PennBID” or “PENNBID” – The electronic procurement program being utilized by the Owner for this Bid solicitation.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or Invitation to Bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website.
Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by the Engineer on behalf of the Owner.
2.04 Plan rooms (including construction information subscription services, and electronic and virtual plan rooms) may make them available for examination. Those prospective bidders that obtain an electronic (digital) copy of the Bidding Documents from a plan room are encouraged
INSTRUCTIONS TO BIDDERS 00 21 13 - 2
to register as plan holders from the Bidding Documents Website or Issuing Office. Owner is not responsible for omissions in Bidding Documents or other documents obtained from plan rooms, or for a Bidder’s failure to obtain Addenda from a plan room.
2.05 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader Version 1.4 (Acrobat 5.x) or later. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.05.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within three (3) days of Owner’s request, Bidder must submit the following information:
A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.
B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.
C. Bidder’s state or other contractor license number, if applicable.
D. Subcontractor and Supplier qualification information.
E. Other required information regarding qualifications.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
INSTRUCTIONS TO BIDDERS 00 21 13 - 3
ARTICLE 4—PRE-BID CONFERENCE
4.01 A non-mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or Invitation to Bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference;
however, attendance at this conference is not required to submit a Bid.
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents.
Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
INSTRUCTIONS TO BIDDERS 00 21 13 - 4
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
5.03 Other Site-related Documents
A. No other Site-related documents are available.
5.04 Site Visit and Testing by Bidders
A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
D. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
5.05 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should
INSTRUCTIONS TO BIDDERS 00 21 13 - 5
review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing via the selected Electronic Document & Bid Management and Procurement Service using the appropriate “Question” tab.
7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda, posted within the selected Electronic Document & Bid Management and Procurement Service in the “Documents” section, and emailed to all parties recorded as having registered and receiving the Bidding Documents. Questions received less than ninety-six (96) hours prior to the date for opening of Bids may not be answered.
7.04 Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten (10) percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond may be issued in the form included in the Bidding Documents.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within fifteen (15) days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven (7) days after the Effective Date
INSTRUCTIONS TO BIDDERS 00 21 13 - 6
of the Contract or sixty-one (61) days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven (7) days after the Bid opening.
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
11.02 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for certain portions of the Work within five (5) days after Bid opening.
11.03 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, without an increase in Bid price.
11.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be
INSTRUCTIONS TO BIDDERS 00 21 13 - 7
deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents and can be accessed by selecting the “BID FORM – PRICING” tab on the electronic Bid Form.
A. All blanks on the electronic Bid Form must be completed. All unit Price fields must be filled out. To no-Bid a line item, insert a zero (0). PennBid will automatically complete the line extensions and Bid totals. Additional instructions can be found in the Contract Documents in Section 00 22 13 – PennBid Instructions to Bidders and Vendors.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
12.02 The Bidder/Vendor that registers with the PennBid Electronic Procurement Program on behalf of their company and selects their password protected login ID acknowledges they are the individual, or have done so under the direct supervision of the individual, having the authority to submit a Bid for a corporation, partnership, limited liability company, individual, or joint venture on behalf of their company.
12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.
12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign.
The official address of the partnership must be shown.
12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.06 A Bid by an individual must show the Bidder’s name and official address.
12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venture in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.08 All names must be printed in ink below the signatures.
12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach
INSTRUCTIONS TO BIDDERS 00 21 13 - 8
such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.
ARTICLE 13—BASIS OF BID
13.01 Unit Price
A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
13.02 Base Bid with Alternates
A. Bidders must submit a Bid for the base Bid and include a separate price for each alternate (if any) described in the Bidding Documents and as provided for in the Bid Form. The price for each alternate will be the amount added to or deleted from the base Bid if Owner selects the alternate.
B. In the comparison of Bids, alternates (if any) will be applied in the same order of priority as listed in the Bid Form.
13.03 Allowances
A. For cash allowances the Bid price must include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.
ARTICLE 14—SUBMITTAL OF BID
14.01 Each prospective Bidder will submit an online Bid as described in Section – 00 22 13 - PennBid Instructions to Bidders and Vendors.
14.02 A Bid shall be submitted no later than the date and time prescribed and at the online PennBid electronic procurement Program. Bids submitted by mail or other delivery system will not be accepted.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 A Bid may be modified or withdrawn at any time up to the date and time prescribed in the advertisement or Invitation to Bid by clicking PennBid’s “Withdraw Bid” button as described in the PennBid Instructions for Bidders and Vendors.
15.02 If within twenty-four (24) hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the
INSTRUCTIONS TO BIDDERS 00 21 13 - 9
Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the Advertisement or Invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
18.05 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers
INSTRUCTIONS TO BIDDERS 00 21 13 - 10
proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 19—BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to Performance and Payment Bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing Bid Bonds as part of the bidding process.
ARTICLE 20—SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within fifteen (15) days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within ten (10) days thereafter, Owner will deliver one (1) fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 21—SALES AND USE TAXES
21.01 Refer to Paragraph-7.10 of the General Conditions.
ARTICLE 22—CONTRACTS TO BE ASSIGNED
22.01 NONE.
ARTICLE 23—Partnering
23.01 Not Used.
ARTICLE 24—Wages And Salaries
24.01 Attention of Bidders is particularly called to the requirement concerning the payment of not less than the prevailing wage and salary rates specified in the CONTRACT DOCUMENTS and the conditions of employment with respect to certain categories and classifications of employees.
24.02 The rates of pay set forth hereunder are the minimum to be paid during the life of the CONTRACT. It is therefore the responsibility of Bidders to inform themselves as to local labor conditions, such as the length of work week, overtime compensation, health and welfare contributions, labor supply and prospective changes or adjustments of rates.
INSTRUCTIONS TO BIDDERS 00 21 13 - 11
ARTICLE 25—Equal Employment Opportunity
Attention of Bidders is particularly called to the requirement for ensuring that employees and applicants for employment are not discriminated against because of their race, sex, color, national origin, or religion, age, disability, or familial status. Each BIDDER must submit a completed Certification of Bidders Regarding Equal Employment Opportunity.
EJCDC® C-200, Instructions to Bidders Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, SUPPLEMENTARY INSTRUCTIONS TO BIDDERS PENNBID 00 22 13 - 1
INSTRUCTIONS TO BIDDERS AND VENDORS
USING THE PENNBID ELECTRONIC BID MANAGEMENT SYSTEM TO RESPOND TO
THIS REQUEST-FOR-QUOTATION
Edwardsville Borough is utilizing the PennBid electronic procurement Program for their solicitations, RFPs, and RFQs. Using PennBid is beneficial to both the agencies as well as the Bidders. Costs and Bidding effort is greatly reduced as Bid Documents are available online, all Q&A’s and Addenda are posted online and can be emailed, and sealed Bids can be submitted and updated online. Interested Bidders need to register only once, a free process that takes only a few minutes. Once registered, Bidders have access to publically available Bids and solicitations from every Agency within PennBid, plus are available for By-Invitation-Only RFPs and RFQs. Bidders can obtain all Project documents and submit and update their confidential Bids online.
Sealed Bid Confidentiality – The confidentiality of the sealed Bid system is a cornerstone of the PennBid Program. At no time before Bid Opening can anyone see your electronic Bid.
Confidentiality of Identity – When questions are asked and answered, Bidder identity is not disclosed to other Bidders.
1. Documents – All documents may be downloaded directly to your computer. Documents can be electronically sent to your suppliers and sub contractors.
2. Being added to the “Bidders List” – By downloading any document, you are automatically added to the list of Bidders for this solicitation.
3. Questions – by clicking on the “Questions” tab, you can see all questions that have been asked and answered related to this solicitation. You can also ask questions directly through this tab. When the agency answers the question, both the question and answer is emailed directly to all Bidders.
4. Submitting and Updating Bids – You may submit and update your Bid anytime up to the Bid due date and time by clicking on the “Bid” tab. You need only to provide the per unit price. The PennBid Program will automatically calculate the extended price (no more math errors). You can update any line item without affecting the rest of your quote.
What to submit with this Bid
Click on the “Bid” tab
Enter financial Bid (Unit cost only)
Attach a single electronic file or zipped folder containing the requested support documents
Important Note 1 - Upon request only, Bidders will need to submit other documents in original form and signatures to the agency within [three (3)] business days. Documents such as non-collusion affidavits, detailed financial information, paper Bid bond, etc. will be requested prior to award.
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS PENNBID 00 22 13 - 2
How to submit your Bid The Bid tab contains the electronic Bid Form. All Per Unit Price fields must be filled out. To no-Bid a line item, insert a zero (0). PennBid will automatically complete the line extensions and Bid totals. At the bottom of the page, check the Verification Statement and click Submit Bid. Completed Bid Form can be printed or saved to Excel by clicking the icons in the middle of the Bid Form page.
Submitting documents with electronic Bid An electronic copy of the documents listed above is to be submitted with the electronic Bid. To attach theses documents:
1. Fill out required documents and scan to create a single electronic file or save as a single zipped folder containing all documents
2. From the Bid tab, click on “browse” (middle of the page), then click on the file or zipped folder name.
The file will be attached to your Bid submission when the Submit Bid button is clicked.
Important Note 2 – when uploading a proposal or other document, the maximum individual file or folder size is 20Mb.
Verifying that your Bid was submitted If submitted properly, you will receive an acknowledgement appearing in the middle of your screen saying “Your Bid has been recorded” and a Bid receipt number will be provided.
Withdrawing Your Bid You may withdraw your Bid anytime up to Bid due date and time by simply clicking on Withdraw Bid, located at the bottom of the Bid tab.
Help Guides There are several Help Guides and video tutorials available from the PennBid™ Home Page or www.PennBid.net
Additional Support If additional support is needed, click on the “Contact Us” button located at the upper right of each PennBid screen or call us at (717)488-0035.
http://www.pennbid.net/
BID FORM 00 41 13 - 1
BID FORM
The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 1—OWNER AND BIDDER
1.01 This Bid is submitted to: Edwardsville Borough, Attn: Cathy Soprano, 470 Main Street, Edwardsville, PA 18704.
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2—ATTACHMENTS TO THIS BID
2.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security;
B. List of Proposed Subcontractors;
C. List of Proposed Suppliers;
D. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such authority within the time for acceptance of Bids;
E. Contractor’s license number as evidence of Bidder’s State Contractor’s License or a covenant by Bidder to obtain said license within the time for acceptance of Bids;
F. Workman’s Compensation Act Affidavit;
G. Nondiscrimination/Sexual Harassment Clause;
H. Employment Eligibility Verification Compliance Form;
I. Public Works Employment Verification Form;
J. Non-Collusion Affidavit;
K. Certification of Bidder Regarding Equal Opportunity;
L. Certification of Non-Segregated Facilities
M. Supplemental COVID-19 Safety Plan Implementation
ARTICLE 3—BASIS OF BID—UNIT PRICES
3.01 Unit Price Bids
A. Bidder will perform the following Work at the indicated unit and lump sum prices:
BID FORM 00 41 13 - 2
BASE BID
CHURCH STREET STREETSCAPE
UNIT PRICE SCHEDULE
Description Estimated Quantity
Bid Unit Price Bid Price
1 LUMP SUM – Mobilization and Demobilization, Complete
1 $ . $ .
2 LUMP SUM – Construction Surveying, Complete
1 $ . $ .
3 LUMP SUM - Maintenance and Protection of Traffic, Complete
1 $ . $ .
4 LUMP SUM - Signing and Pavement Markings, Complete
1 $ . $ .
5 LUMP SUM – Erosion and Sediment Pollution Controls, Complete In Place
1 $ . $ .
6 EACH – Removal of Existing Tree, Including Stump Grinding and Removal of Root System, Complete In Place
3 $ . $ .
7 EACH – Various Species, Selective Tree Replacement Planting, Complete in Place 24 $ . $ .
8 LINEAR FEET - Plain Cement Concrete Curb, Complete in Place 1100 $ . $ .
9 SQUARE YARDS – Cement Concrete Sidewalk, 4” Depth, Complete In Place
527 $ . $ .
10 SQUARE YARDS – 6” Cement Concrete Sidewalk on Aggregate Base at Driveways, Including Aprons, Complete In Place
63 $ . $ .
11 SQUARE YARDS – Permanent Pavement Restoration Behind Newly Installed Sidewalk, Complete in Place
113 $ . $ .
12 SQUARE YARDS – Permanent Lawn Restoration Behind Newly Installed Sidewalk, Complete in Place
114 $ . $ .
13 CUBIC YARDS – CU-Structural Soil, Tree Lawn Subsoil Replacement, Complete in Place 180 $ . $ .
14 SQUARE YARDS - Full Width Milling of Existing Bituminous Concrete Pavement Structure, 1-1/2" Depth, with Millings to be retained by Owner
1758 $ . $ .
15 SQUARE YARDS - 6” PennDOT No. 2A Crushed Stone Aggregate Subbase, Complete in Place
530 $ . $ .
16 SQUARE YARDS - Superpave Ashpalt Mixture Design, Wearing Course, PG 64-22, 9.5 mm Mix, 1-1/2" Depth, SRL-L, Complete in Place
2285 $ . $ .
BID FORM 00 41 13 - 3
Description Estimated Quantity
Bid Unit Price Bid Price
17 SQUARE YARDS - Superpave Ashpalt Mixture Design, Base Course, PG 64-22, 25 mm Mix, 5" Depth, Complete in Place
530 $ . $ .
18 SQUARE YARDS – Superpave Ashpalt Mixture Design, Binder Course Structural Overlay, PG 64-22, 19.0 mm Mix, 2-1/2”Depth, SRL-L Complete in Place
530 $ . $ .
19 TONS - Bituminous Concrete Superpave Asphalt Mixture Design, WMA Fine-Graded Scratch / Leveling Course, PG 64-22, 9.5 mm Mix, SRL-L, Complete in Place
200 $ . $ .
20 TONS –Superpave Ashpalt Mixture Design, Base Course, PG 64-22, 25 mm Mix, Complete in Place
250 $ . $ .
21 SQUARE FEET – Detectable Warning Surface, Complete in Place 60 $ . $ .
22 SQUARE YARDS - 4” Topsoil, Seeding and Mulch Permanent Tree Lawn Surface Replacement Restoration, Complete in Place
290 $ . $ .
23 EACH – Type D-H Inlet Boc, Height < / = 10', , Complete in Place 2 $ . $ .
24 EACH – Type D-H Level Concrete Top Unit and Bicycle Safe Grate, Complete in Place 2 $ . $ .
25 EACH - Manhole Frame and Cover, Complete in Place 2 $ . $ .
EACH - Type 4 Manhole, Storm Water, Height >5' and </= 10', Complete In Place 2 $ . $ .
LF - 10” Perforated SLCCP Storm Drainage Conveyance Pipe, Complete In Place 40 $ . $ .
DOLLAR – Unforeseen Retaining Wall Repair
15000 $ . $ .
SQUARE YARDS – Bituminous Concrete Base Course Replacement, Including Subbase, Superpave Asphalt Mixture Design, WMA Base Course, PG-64-22, 0.0 to 0.3 Million ESAL’s 25.0 mm Mix, 4” Compacted Depth, Where Directed, Complete in Place
300 $ . $ .
CUBIC YARDS – Over-Excavation, When Authorized and Where Directed, Complete In Place
75 $ . $ .
TOTAL OF BASE BID FOR CHURCH STREET STREETSCAPE_____________________________________
BID FORM 00 41 13 - 4
Bidder acknowledges that:
1. Each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and
2. Estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Work will be based on actual quantities, determined as provided in the Contract Documents.
ARTICLE 4—TIME OF COMPLETION
4.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
4.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 5—BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT
OF ADDENDA
5.01 Bid Acceptance Period
A. This Bid will remain subject to acceptance for sixty (60) days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
5.02 Instructions to Bidders
A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.
5.03 Receipt of Addenda
A. Bidder hereby acknowledges receipt of the following Addenda:
Addendum Number Addendum Date
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Bidder’s Representations
A. In submitting this Bid, Bidder represents the following:
1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.
2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
This hard copy Bid Form is for informational purposes only. All Bids shall be submitted electronically via the PennBid website. Refer to Section 00 22 13 – PennBid Instructions TO Bidders and Vendors.
BID FORM 00 41 13 - 5
4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions, if any, at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Bidder has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.
6. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, if selected as Contractor; and (c) Bidder’s (Contractor’s) safety precautions and programs.
7. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
8. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
9. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and…