2-Pricing Section BT-02MX 1793718463.6570332.xlsx

XLSX spreadsheet 8 KB Posted

Attached to
2027 Generator Maintenance
Solicitation number
US.258627
Issued by
Chester County, Pennsylvania

About this file

This is a pricing evaluation spreadsheet for the Borough of West Chester's 2027 Generator Maintenance contract opportunity in Pennsylvania. The bid solicitation, posted via PennBid, sought sealed bids for generator maintenance services with a contract term of up to three years, including 2027 base bid pricing and two bid alternates for 2028 and 2029. Four vendors submitted bids: EMR Power Systems LLC, Henry's Generator Service, Mid-Atlantic Generators LLC, and Penn Power Group LLC (DBA Penn Power System). Questions regarding the bidding documents were to be submitted via PennBid no later than seven days prior to the November 3, 2026 at 10:00 A.M. bid opening. Site visits could be scheduled with Don Anderson, Public Works Director, at danderson@west-chester.com. Each bid required a certified check or bid bond equal to 10% of the bid price, and no bid could be withdrawn within 24 hours prior to opening or within 60 days after opening. The Borough reserved the right to reject any or all bids and to award to the lowest responsible bidder.

The pricing evaluation indicates four separate cost proposals across three service categories for each contract year: annual generator maintenance (lump sum), service call hourly rates, and emergency call hourly rates. For 2027 base bid pricing, the total costs ranged from $22,457.55 (EMR Power Systems LLC, lowest) to $32,511.73 (Henry's Generator Service). EMR Power Systems LLC offered the lowest annual maintenance cost of $6,950.04 and tied for the lowest service and emergency call rates at $130 and $195 respectively. The spreadsheet shows all selected items marked as $0, indicating no final award determination is reflected in this pricing analysis document. A 10% bid bond or certified check was required as a bid guarantee, and all bids were to be submitted unconditionally.

View the file

Other files

File Type Posted
1-2027 Generator Maintenance.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Legend

Pricing Section (BT-02MX)

Legend

The green cells with bolded numbers indicate that this bid was the lowest price.$ 123
The orange cells indicate that this item from that vendor was selected.
The green cells with orange outline indicate that this item from that vendor was selected, and has the lowest price.

Sheet 1

EMR POWER SYSTEMS LLCHenry's Generator ServiceMid-Atlantic Generators, LLCPenn Power Group, LLC, DBA Penn Power System
Total Cost$ 22,457.550000000003$ 32,511.73$ 22,872.02$ 23,495.92
Selected #0000
Selected ($)$ 0$ 0$ 0$ 0
#LockedItemsSelectedLowestQuantity
RequiredUnit

of

MeasureUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal
CostUnit
PriceTotal

Cost

1Base Bid Pricing (3)
#1-1FALSEAll Work and Costs for Annual Generator Maintenance (2027)$ 0$ 6,950.041LS$ 7,160.85$ 7,160.85$ 9,733.0$ 9,733.0$ 6,950.04$ 6,950.04$ 7,031.0$ 7,031.0
#1-2FALSEService Call Hourly Rate (2027)$ 0$ 1301HR$ 130$ 130$ 240$ 240$ 145$ 145$ 155$ 155
#1-3FALSEEmergency Call Hourly Rate (2027)$ 0$ 1951HR$ 195$ 195$ 340$ 340$ 195$ 195$ 232.5$ 232.5
2Bid Alternate No. 1 (2028) (3)
#2-1FALSEAll Work and Costs for Annual Generator Maintenance (2028)$ 0$ 7,160.851LS$ 7,160.85$ 7,160.85$ 10,219.65$ 10,219.65$ 7,297.54$ 7,297.54$ 7,242.0$ 7,242.0
#2-2FALSEService Call Hourly Rate (2028)$ 0$ 1301HR$ 130$ 130$ 252$ 252$ 150$ 150$ 804.67$ 804.67
#2-3FALSEEmergency Call Hourly Rate (2028)$ 0$ 159.651HR$ 195$ 195$ 357$ 357$ 195$ 195$ 159.65$ 159.65
3Bid Alternate No. 2 (2029) (3)
#3-1FALSEAll Work and Costs for Annual Generator Maintenance (2029)$ 0$ 7,160.851LS$ 7,160.85$ 7,160.85$ 10,730.63$ 10,730.63$ 7,589.44$ 7,589.44$ 7,460.0$ 7,460.0
#3-2FALSEService Call Hourly Rate (2029)$ 0$ 1301HR$ 130$ 130$ 264.6$ 264.6$ 155$ 155$ 164.44$ 164.44
#3-3FALSEEmergency Call Hourly Rate (2029)$ 0$ 1951HR$ 195$ 195$ 374.85$ 374.85$ 195$ 195$ 246.66$ 246.66