2-Plant PS Bypass and Biotower Recycle Project Contract 1 Plan Drawings.pdf

PDF 9 MB Posted

Attached to
Plant PS Bypass and Biotower Recycle Ammonia Upgrades Project – Contract 1 - Install Bypass and Recycle Pipelines, Vaults, and Valves
Solicitation number
Not on record
Issued by
Washington County, Camp Hill Borough, Pennsylvania

About this file

This file consists of plan drawings for the Plant Pump Station (PS) Bypass and Biotower Recycle Ammonia Upgrades Project – Contract 1, prepared for the Canonsburg-Houston Joint Authority in Pennsylvania. The project involves the installation of bypass and recycle pipelines, vaults, and valves at two plant locations. Key work components include excavation to locate a 36-inch pipe from the Clarifier PS and installation of a new 24-inch recycle line to the Biotower PS, construction of a concrete vault containing a new flow meter and flow control valve, installation of a new 36-inch static mixer with associated concrete vault, provision of electrical power and control wiring and conduit, excavation to locate 18-inch and 24-inch force main lines, and installation of tees, bypass lines, and valves at the plant main pump station. Bids must be submitted electronically via PennBid no later than 2:00 p.m. prevailing time on July 1, 2026, with public bid opening at the Canonsburg Municipal Building, 68 East Pike Street, Suite 103, Canonsburg, PA 15317. A mandatory pre-bid meeting and site walkthrough is scheduled for June 12, 2026, at 10:00 a.m. at 315 Curry Hill Road, Canonsburg, PA 15317.

Proposal documents, bidding forms, plans, and specifications are available at no cost through PennBid at https://pennbid.bonfirehub.com. All bids must be submitted on forms furnished by the Canonsburg-Houston Joint Authority and must be accompanied by proposal security in the form of a certified check, bank cashier's check, treasurer's check, or bid bond equal to not less than ten percent (10%) of the total bid price. Proposal security shall be made payable to the Canonsburg-Houston Joint Authority. The contract requires payment of minimum salaries and wages as set forth in the Contract Documents. Bidders may withdraw, alter, or otherwise modify proposals within PennBid at any time prior to the submission deadline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. 230001.4 Sheet 1 of 13

BASE MAP TAKEN FROM CANONSBURG, PA

U.S.G.S. QUADRANGLE

SCALE: 1" = 1000'

CANONSBURG/HOUSTON JOINT AUTHORITY

WASHINGTON COUNTY, PENNSYLVANIA

GENERAL LOCATION MAP

CONTRACT 1

GENERAL AND ELECTRICAL

CONSTRUCTION

128 Tower Street Monongahela, PA 15063

MAY 2026

PREPARED BY :

PROJECT LOCATION

CALL BEFORE YOU DIG!

PENNSYLVANIA LAW REQUIRES

3 WORKING DAYS NOTICE FOR

CONSTRUCTION PHASE AND 10 WORKING

DAYS IN DESIGN STAGE-STOP CALL

Pennsylvania One Call System, Inc.

1-800-242-1776

POCS Serial Numbers- 20251922592

PLANT PUMP STATION BYPASS AND

BIOTOWER RECYCLE AMMONIA UPGRADES

EXISTING GAS MARKER

EXISTING GAS VALVE

EXISTING GAS SHUT-OFF

EXISTING WATER VALVE

EXISTING WATER SHUT-OFF

EXISTING FIRE HYDRANT

EXISTING UTILITY GUY ANCHOR

EXISTING LIGHT POLE

EXISTING UTILITY POLE

EXISTING STORM SEWER INLET

EXISTING SANITARY SEWER MANHOLE

EXISTING CITY MONUMENT

IRON PIN FOUND

LEGEND

DRILL HOLE

EXISTING VALVE PIT

PROPERTY/RIGHT-OF-WAY LINE (PER TAX MAPS)

EXISTING GAS LINE (APPROX.)

EXISTING UNDERGROUND TELEPHONE LINE

EXISTING POTABLE WATER LINE

EXISTING CONTOURS

EXISTING SANITARY SEWER PIPING

EXISTING SEWER LATERAL

EXISTING SANITARY SEWER MANHOLE

EXISTING SANITARY SEWER PIPING

EXISTING TELEPHONE MANHOLE

EXISTING STREET SIGN

MAIL BOX

EXISTING FENCE

EXISTING TREE STUMP

EXISTING GAS WELL

EXISTING TELEPHONE BOX

PROPOSED 12" COMPOST FILTER SOCK

PROPOSED INLET PROTECTION MAT

EXISTING NON-POTABLE WATER LINE

EXISTING YARD HYDRANT

PROPOSED 18" COMPOST FILTER SOCK

PROPOSED EROSION CONTROL BLANKET

File Name:

MILESTONES

CONSTRUCTION

AS-BUILT

AS-BID

PROJECT MANAGER:

PROJECT ENGINEER:

DRAFTSMAN:

DESIGNER:

APPROVED BY:

APPROVED BY:

SHEET NUMBER:

DRAWING NUMBER:

PROJECT NUMBER:

SCALE:

CAD File Plot Date :

DATE

PA ONE CALL

Phone: 724-263-4116

NOT PUBLISHED: ALL RIGHTS RESERVED

128 Tower Street Monongahela, PA 15063

C. GRIFFIN

A. LYNN

A. LYNN

D. ALTLAND

NO. REVISION DESCRIPTIONDATE

BID DOCUMENTSMAY 20260

CANONSBURG HOUSTON JOINT AUTHORITY

WWTP PLANT PUMP STATION BYPASS

AND BIOTOWER RECYCLE AMMONIA UPGRADE

WASHINGTON PENNSYLVANIA

DRAWING INDEX AND GENERAL NOTES

N/A

230001.4

1.2

2 of 13CHJA.PSBYPASS.dwg100.rev0(5.26.26).dwg5/26/26

TYPE

ASTM C-476 GROUT PROPORTIONS by VOLUME

PARTS BY VOLUME OF

PORTLAND CEMENT OR

BLENDED CEMENT

AGGREGATE, MEASURED IN DAMP, LOOSE CONDITION

FINE COARSE

FINE

GROUT 1

4 to 3 TIMES THE SUM OF

THE VOLUMES OF THE

CEMENTITIOUS MATERIALS

COARSE

GROUT 1

4 to 3 TIMES THE SUM OF

THE VOLUMES OF THE

CEMENTITIOUS MATERIALS

1 to 2 TIMES THE SUM OF

THE VOLUMES OF THE

CEMENTITIOUS MATERIALS

0 to 110

0 to 110

PARTS BY VOLUME OF

HYDRATED LIME OR

LIME PUTTY

Lands of:

Southpointe II Prop Owners Assn.

Parcel ID: 140-015-00-00-0011-00

Lan ds o f:

Can ons bur g H ous ton Join t Au tho rity

Par cel ID

: 14 0-0 -00 -00 -00 -14

Lands of:

Canonsburg Houston Joint Authority Parcel ID: 140-015-00-00-0011-02

Lands of:

CSX Transportation

Parcel ID: 520-013-11-00-0 002-00

Lands of:

Canonsburg Houston

Joint Authority

Parcel ID:

140-015-00-00-0011-52

Lan ds o f: N. S trab ane Exem pt P rop

Par cel ID

: 52 0-00

1-00 -00-0

-00

Lan ds o f:

Nor th S trab ane Tow nsh ip

Par cel ID

: 52 0-00

1-00 -00-0

-00

La nd s o f:

US

Po sta l S er vice Ex em pt Pr op er ty

Pa rc el I D:

0-0

-11 -00

-00

-01

Parcel ID: 520-013-11-00-0003-00

La nd s o f:

W as hin gt on Co un ty

Pa rc el I D:

0-0

-11

-00 -00

-01

Lands of:

Colleen E. Dunn & Judith A. Kramer Parcel ID: 520-013-11-00-0034-02

Lands of: Washington County Parcel ID: 520-013-00-00-0034-03

BORE HOLE 5-19

GND=931.70±

BORE HOLE 2-19

GND=929.35±

BORE HOLE 3-19

GND=930.13±

BORE HOLE 6-19

GND=928.93±

BORE HOLE 4-19

GND=927.28±

BORE HOLE 1-19

GND=927.16±

CLARIFIER

DIVISION

BOX

EFFLUENT

BOX

EFFLUENT

BOX

SCUM

BOX

SCUM

BOX

W.L.=936.00±

W.L.=936.00±

F.F.E.=930.67±

F.F.E.=930.00±

F.F.E.=93 4.5

0±

SCALE: 1"=50'

PROJECT SITE PLAN

50 1000

C h a r tie r s c r e e k

C h a r t ie r s c r e e k

C u r r y H il l

R o a d

File Name:

MILESTONES

CONSTRUCTION

AS-BUILT

AS-BID

PROJECT MANAGER:

PROJECT ENGINEER:

DRAFTSMAN:

DESIGNER:

APPROVED BY:

APPROVED BY:

SHEET NUMBER:

DRAWING NUMBER:

PROJECT NUMBER:

SCALE:

CAD File Plot Date :

DATE

PA ONE CALL

Phone: 724-263-4116

NOT PUBLISHED: ALL RIGHTS RESERVED

128 Tower Street Monongahela, PA 15063

C. GRIFFIN

A. LYNN

A. LYNN

D. ALTLAND

NO. REVISION DESCRIPTIONDATE

BID DOCUMENTSMAY 20260

CANONSBURG HOUSTON JOINT AUTHORITY

WWTP PLANT PUMP STATION BYPASS

AND BIOTOWER RECYCLE AMMONIA UPGRADE

WASHINGTON PENNSYLVANIA

PROJECT SITE PLAN

EROSION AND SEDIMENTATION CONTROL MEASURES

1" = 50'-0"

230001.4

1.3

3 of 13CHJA.PSBYPASS.dwg100.rev0(5.26.26).dwg5/26/26

PROPOSED 24" D.I. M.J.

MANUAL PLUG VALVE

W/VALVE BOX AT

SURFACE

PROPOSED 36"x36"x24"

D.I. M.J. WYE

INV. EL. APPROX. 920.5

(TB FIELD VERIFIED)

PROPOSED INFLUENT

CHAMBER BYPASS

VALVES

PROPOSED INLET

PROTECTION MATS

(REFER TO DRAWING 2.3)

(REFER TO DRAWING 3.3)

LEGEND NOTE:

REFER TO DRAWING 1.2 FOR SITE LEGEND

150 200

PROPOSED 9'x17'x10'-2"

PRE-CAST CONCRETE

FLOW METER VAULT

(REFER TO DRAWING 3.6)

PROPOSED 10'-6"x9'-5"x11'

PRE-CAST CONCRETE

STATIC MIXER VAULT

(REFER TO DRAWING 3.7)

(2) PROPOSED

24" D.I. M.J. 45°

ELBOWS

(2) PROPOSED

24" D.I. M.J.

22.5° ELBOWS

PROPOSED SOIL

STOCKPILE AREA

PROPOSED EROSION

CONTROL BLANKET

- 8' WIDE

PROPOSED SOIL

STOCKPILE AREA

PPROPOSED 24" M.J. D.I.

BIOTOWER RECYCLE

PIPE INTO EX. WET WELL

INV. EL.=924.60±

PROPOSED EROSION

CONTROL BLANKET

(IF REQUIRED)

FS12

FS12

30" D.I. OVERFLOW TO

EQUALIZATION TANK

INV. EL.=924.50± @WALL

PROPOSED 18" D.I. M.J.

MANUAL PLUG VALVE

W/VALVE BOX AT SURFACE

PROPOSED 24" D.I. M.J.

MANUAL PLUG VALVE

W/VALVE BOX AT

SURFACE

PROPOSED 24" D.I.

M.J. MANUAL PLUG

VALVE W/VALVE BOX

AT SURFACE

EXISTING 24" D.I. FORCE

MAIN FROM CANONSBURG

INV. EL.=927.10± @ WALL

EXISTING 18" D.I. FORCE

MAIN FROM CANONSBURG

INV. EL.=927.19± @ WALL

INFLUENT

CHAMBER

T/EL. 935.50

B/EL. 909.50

B/EL. 906.50

24" DIMJ CANONSBURG

FORCE MAIN

INV. EL.=927.10±

@ WALL

36" DIA. OPENING

IN MIDDLE WALL

CONC. FILLET

30" D.I. COMBINED SEWER

FROM NORTH STRABANE

SOUTHPOINTE &

WESTERN CENTER,

INV. EL.=926.00± @ WALL

INFLUENT

CHAMBER

WET WELL

WET WELL

30" DIA. OPENING

IN MIDDLE WALL

FOR OVERFLOW

B/EL.=924.50±

RSW-SG-02

INFLUENT

CHAMBER

EXISTING 24" D.I. FORCE

MAIN FROM CANONSBURG

INV. EL.=927.10± @ WALL

EXISTING 18" D.I. FORCE

MAIN FROM CANONSBURG

INV. EL.=927.19± @ WALL

T/EL. 935.50

WET

WELL

PROPOSED

24" D.I. M.J.

PLUG VALVE

PUMP ROOM

DRY WELL

T. MASONRY /EL. 946.00±

B/EL. 907.50

WET

WELL

PROPOSED 24" D.I. M.J.

MANUAL PLUG VALVE

W/VALVE BOX AT

SURFACE

PROPOSED 18" D.I. M.J.

MANUAL PLUG VALVE

W/VALVE BOX AT SURFACE

PROPOSED

24" D.I. M.J.

90° ELBOW

PROPOSED

18" D.I. M.J.

90° ELBOW

B/EL. 925.50

B/EL. 925.50

CORE HOLE INTO WET WELL

AND INSTALL NEW 24" D.I.

INFLUENT PIPE, USE LINK

SEAL OR APPROVED EQUAL

INV. EL.=927.74±

CORE HOLE INTO WET WELL

AND INSTALL NEW 18" D.I.

FORCE MAIN BYPASS, USE LINK

SEAL OR APPROVED EQUAL

CORE HOLE INTO WET WELL

AND INSTALL NEW 24" D.I.

FORCE MAIN BYPASS, USE LINK

SEAL OR APPROVED EQUAL

INV. EL.=927.74±

CORE HOLE INTO WET WELL

AND INSTALL NEW 18" D.I.

INFLUENT PIPE, USE LINK

SEAL OR APPROVED EQUAL

PROPOSED 18" D.I.

M.J. FORCE MAIN

BYPASS

INV. EL.=936.88±

PROPOSED 24" D.I.

M.J. FORCE MAIN

BYPASS

INV. EL.=927.74±

PROPOSED 24" D.I.

M.J. FORCE MAIN

BYPASS

INV. EL.=927.74±

PROPOSED 18" D.I. M.J.

MANUAL PLUG VALVE

W/VALVE BOX AT SURFACE

PROPOSED 18" D.I. M.J.

MANUAL PLUG VALVE

W/VALVE BOX AT SURFACE

PROPOSED 24" D.I.

M.J. MANUAL PLUG

VALVE W/VALVE BOX

AT SURFACE

PROPOSED 18"

D.I. M.J. TEE

PROPOSED 24"

D.I. M.J. TEE

PROPOSED 24"

D.I. M.J. TEE

PROPOSED 24"

D.I. M.J. TEE

PROPOSED 18"

D.I. M.J. TEE

GRADE EL. 933.25±

GRADE EL. 933.25±

PROPOSED

18" D.I. M.J.

90° ELBOWSEXISTING

ELECTRICAL

PANEL

EXISTING

ELECTRICAL

PANEL

EXISTING

ELECTRICAL

PANEL

PROPOSED 18" D.I.

M.J. 90° ELBOW

PROPOSED 18" D.I.

M.J. FORCE MAIN

BYPASS

INV. EL.=936.88±

PROPOSED

PIPE

SUPPORT PROPOSED 18" D.I.

M.J. 90° ELBOW

EL.=927.10± @ WALL

20" D.I. SUCTION

℄EL. 909.75

PROPOSED

18" D.I. M.J.

90° ELBOW

SOIL STOCKPILE

AREA

EROSION CONTROL

BLANKET - 8' WIDE

File Name:

MILESTONES

CONSTRUCTION

AS-BUILT

AS-BID

PROJECT MANAGER:

PROJECT ENGINEER:

DRAFTSMAN:

DESIGNER:

APPROVED BY:

APPROVED BY:

SHEET NUMBER:

DRAWING NUMBER:

PROJECT NUMBER:

SCALE:

CAD File Plot Date :

DATE

PA ONE CALL

Phone: 724-263-4116

NOT PUBLISHED: ALL RIGHTS RESERVED

128 Tower Street Monongahela, PA 15063

C. GRIFFIN

A. LYNN

A. LYNN

D. ALTLAND

NO. REVISION DESCRIPTIONDATE

BID DOCUMENTSMAY 20260

CANONSBURG HOUSTON JOINT AUTHORITY

WWTP PLANT PUMP STATION BYPASS

AND BIOTOWER RECYCLE AMMONIA UPGRADE

WASHINGTON PENNSYLVANIA

WWTP PLANT PUMP STATION

INFLUENT CHAMBER FORCE MAIN BYPASS

PLAN AND SECTIONS

1/4" = 1'-0"

230001.4

2.1

4 of 13CHJA.PSBYPASS.dwg100.rev0(5.26.26).dwg5/26/26

A2.3A2.3

INFLUENT CHAMBER FORCE MAIN BYPASS - PLAN VIEW

INFLUENT CHAMBER FORCE MAIN BYPASS - SECTION A-A

INFLUENT CHAMBER FORCE MAIN BYPASS - SECTION B-B

SCALE: 1/4" = 1'-0"

0 4' 8' 24' 32'16'

B2.3 B2.3

SCALE: 1/4" = 1'-0"

0 4' 8' 24' 32'16'

SCALE: 1/4" = 1'-0"

0 4' 8' 24' 32'16'

F.F.E.=930.67±

F.F.E.=930.00±

12'-9"

4'-8 1 2"

2'-0"

12'-1 3 4"

File Name:

MILESTONES

CONSTRUCTION

AS-BUILT

AS-BID

PROJECT MANAGER:

PROJECT ENGINEER:

DRAFTSMAN:

DESIGNER:

APPROVED BY:

APPROVED BY:

SHEET NUMBER:

DRAWING NUMBER:

PROJECT NUMBER:

SCALE:

CAD File Plot Date :

DATE

PA ONE CALL

Phone: 724-263-4116

NOT PUBLISHED: ALL RIGHTS RESERVED

128 Tower Street Monongahela, PA 15063

C. GRIFFIN

A. LYNN

A. LYNN

D. ALTLAND

NO. REVISION DESCRIPTIONDATE

BID DOCUMENTSMAY 20260

CANONSBURG HOUSTON JOINT AUTHORITY

WWTP PLANT PUMP STATION BYPASS

AND BIOTOWER RECYCLE AMMONIA UPGRADE

BIOTOWER RECYCLE LINE PLAN DETAIL

1" = 10'-0"

230001.4

3.1

5 of 13CHJA.PSBYPASS.dwg100.rev0(5.26.26).dwg5/26/26

PROPOSED 9'x17'x10'-2"

PRE-CAST CONCRETE

FLOW METER VAULT

(REFER TO DRAWING 3.6)

PROPOSED 24" D.I. M.J.

MANUAL PLUG VALVE

W/VALVE BOX AT

SURFACE

PROPOSED 36"x36"x24"

D.I. M.J. WYE

INV. EL. APPROX. 920.5

(TB FIELD VERIFIED)

PROPOSED 24" D.I. M.J.

BIOTOWER RECYCLE

PIPE INTO EX. WET WELL

INV. EL.=923.04±

PROPOSED

24" D.I. M.J.

22.5° ELBOW

(2) PROPOSED

24" D.I. M.J. 45°

ELBOWS

3.5

A3.4

A3.4

3.5 B

B

PROPOSED 4'-0" x 4'-0" ALUMINUM

WATER TIGHT DOUBLE DOOR ACCESS

HATCHES BY BILCO OR APPROVED EQUAL

SCALE: 1"=10'

BIOTOWER RECYCLE LINE PLAN DETAIL

10 200 30 40 50 60

LEGEND NOTE:

REFER TO DRAWING 1.2 FOR SITE LEGEND

PROPOSED

24" D.I. M.J.

22.5° ELBOW

PROPOSED 5'-0" x 5'-0"

ALUMINUM DOUBLE DOOR

ACCESS HATCHES BY

BILCO OR APPROVED EQUAL

PROPOSED 10'-6"x9'-5"x11'

PRE-CAST CONCRETE

STATIC MIXER VAULT

(REFER TO DRAWING 3.7)

PROPOSED 3" S.S. PIPE TO

CLARIFIER PUMP STATION

INV. EL.=924.25±

PROPOSED SOIL

STOCKPILE AREA

PROPOSED EROSION

CONTROL BLANKET

(IF REQUIRED)

PROPOSED INLET

PROTECTION MAT

PROPOSED INLET

PROTECTION MAT

WET WELL

42" DIA. INFLUENT PIPE

INV.=916.67±

W.L.=918.42±

STORAGE ROOM

F.F.E.=930.67±

36" D.I. EMERGENCY

OVERFLOW FROM

CLARIFIER PUMP

STATION WET WELL

INV.=919.00±

36" D.I. EMERGENCY OVERFLOW

TO EXISTING SECONDARY

EQUALIZATION BASIN

INV.=919.83±

OVERFLOW

T/FLARE=924.50±

T/GROUT=908.67±

BEAM "A"

BEAM

"B"

BEAM "A"

BEAM

"B"

BEAM "A"2" COVER, BOTTOM

(OVER WET WELL)

#4 BARS @ 12",

BOTTOM

#4 BARS @ 12", T&B

FROM 4" FLOOR DRAINS

INV.=926.75±

16" D.I. RECIRCULATION

LINE FROM BIO TOWERS

INV.=920.33±

24" FL. 90° FLARE ELBOW

(PUMP SUCTION, TYPCIAL)

2" SCHEDULE 80 PVC SUMP DISCHARGE

INTO WET WELL - INV.=926.00±

SUCTION CENTER

EL.=912.33±

8" S

C H

ED

U

LE

PV

C V

EN

T

PI

PE

SLAB=908.50±

3 4" 3 4"

3 4"

3 4"

PROPOSED 24" D.I.

M.J. RECYCLE LINE

INV. EL.=923.04±

Ex. 18" HDPE Stormwater Drain Pipe INV. EL.=925.55±

BIOTOWER PUMP STATION WET WELL - SECTION A-A

SCALE: 3/8" = 1'-0"

2' 4'0 6' 8' 10' 15' 20'

CORE HOLE INTO WET WELL

AND INSTALL NEW 24" D.I. M.J.

RECYCLE LINE, USE LINK

SEAL OR APPROVED EQUAL

INV. EL.=923.04±

SUPPORT REQUIRED DURING

INSTALATION OF RECYCLE LINE

(REFER TO DRAWING 3.3)

File Name:

MILESTONES

CONSTRUCTION

AS-BUILT

AS-BID

PROJECT MANAGER:

PROJECT ENGINEER:

DRAFTSMAN:

DESIGNER:

APPROVED BY:

APPROVED BY:

SHEET NUMBER:

DRAWING NUMBER:

PROJECT NUMBER:

SCALE:

CAD File Plot Date :

DATE

PA ONE CALL

Phone: 724-263-4116

NOT PUBLISHED: ALL RIGHTS RESERVED

128 Tower Street Monongahela, PA 15063

C. GRIFFIN

A. LYNN

A. LYNN

D. ALTLAND

NO. REVISION DESCRIPTIONDATE

BID DOCUMENTSMAY 20260

CANONSBURG HOUSTON JOINT AUTHORITY

WWTP PLANT PUMP STATION BYPASS

AND BIOTOWER RECYCLE AMMONIA UPGRADE

WASHINGTON COUNTY PENNSYLVANIA

WWTP BIOTOWER PUMP STATION

WET WELL - SECTION A-A

3/8" = 1'-0"

230001.4

3.2

6 of 13CHJA.PSBYPASS.dwg100.rev0(5.26.26).dwg5/26/26

W.L.=918.42±

ELECTRICAL/PUMP

HOIST ROOM

WET WELL

PUMP ROOM

SLAB.=908.50±

16" PLUG VALVE

" D

.I.

36" D.I. EFFLUENT PIPE

INV.=923.87±

C O

N C

R

ET

E

PI

PE

SU

PP

O

R T

8" S

C H

ED

U

LE

PV

C V

EN

T

PI

PE

RIDGE VENT

ALUMINUM GUTTER

& DOWNSPOUTS

STORAGE

ROOM

F.F.E.=930.67±

S.S. ACCESS LADDER

GAS UNIT

HEATER

16" D.I.

4" FLOOR DRAIN @ 2.0% SLOPE

W/ P-TRAP (TYPICAL)

ST

AI

R S

"T

IE

R

T/GROUT=910.00±

T/GROUT=908.67±

BEAM

"D"BEAM "A"

BEAM "B"

36" D.I. EMERGENCY OVERFLOW

FROM CLARIFIER PUMP

STATION WET WELL

INV.=919.00±

W16x57 MONORAIL

MAX. 3 TON CAPACITY

T/FLANGE EL.=942.67

(TYPICAL)

SHINGLES

FLUE EXHAUST & COMBUSTION

AIR DUCTS UP THROUGH ROOF

(TYPICAL)

SUCTION CENTER

EL.=912.33±

SUCTION

CENTER

EL.=912.67±

DISCHARGE CENTER

EL.=915.14±

S T

A

IR

W E

LL

SUMP DISCHARGE

INTO WET WELL

INV.=926.00±

4"

1"

3 4" 3 4"

4"

3 4"

4"

3 4"

MIN. R-38 INSULATION

BEAM

"C"

BEAM "F"

MIN. R-7.5 XPS RIGID

INSULATIONON EXTERIOR

OF CONCRETE WALL

AROUND PUMP ROOM

4"

3 4"

3 4"

GROUT SLOPE TO

PUMP SUCTION

T/SLAB=930.59±

3 4"

SUCTION

CENTER

@ ELBOW

EL.=912.75±

CONCRETE

PUMP

SUPPORT/PIER

PUMP #2

SCALE: 3/8" = 1'-0"

2' 4'0 6' 8' 10' 15' 20'

CORE HOLE INTO WET WELL

AND INSTALL NEW 24" D.I. M.J.

RECYCLE LINE, USE LINK

SEAL OR APPROVED EQUAL

INV. EL.=923.04±

BIOTOWER PUMP STATION WET WELL - SECTION B-B

(REFER TO DRAWING 3.3)

File Name:

MILESTONES

CONSTRUCTION

AS-BUILT

AS-BID

PROJECT MANAGER:

PROJECT ENGINEER:

DRAFTSMAN:

DESIGNER:

APPROVED BY:

APPROVED BY:

SHEET NUMBER:

DRAWING NUMBER:

PROJECT NUMBER:

SCALE:

CAD File Plot Date :

DATE

PA ONE CALL

Phone: 724-263-4116

NOT PUBLISHED: ALL RIGHTS RESERVED

128 Tower Street Monongahela, PA 15063

C. GRIFFIN

A. LYNN

A. LYNN

D. ALTLAND

NO. REVISION DESCRIPTIONDATE

BID DOCUMENTSMAY 20260

CANONSBURG HOUSTON JOINT AUTHORITY

WWTP PLANT PUMP STATION BYPASS

AND BIOTOWER RECYCLE AMMONIA UPGRADE

WASHINGTON COUNTY PENNSYLVANIA

WWTP BIOTOWER PUMP STATION

WET WELL - SECTION B-B

3/8" = 1'-0"

230001.4

3.3

7 of 13CHJA.PSBYPASS.dwg100.rev0(5.26.26).dwg5/26/26

GRADE

SECTION B-B

TOP VIEW

PLAN VIEW

PROPOSED CONCRETE SLAB

TOP RIM=931.17±

PRE-CAST CONCRETE VAULT

BY MACK INDUSTRIES OR

APPROVED EQUAL

PROPOSED CONCRETE SLAB

TOP RIM=931.17±

PROPOSED FLOW METER VAULT DETAIL

PROPOSED

24" D.I. M.J.

PIPE

INV.=923.04±

B 3.6

B 3.6

A 3.

A 3.

PROPOSED CONCRETE SLAB

TOP RIM=931.17±

STRUCTURAL FILL

STEEL REINFORCED POLYPROPYLENE

MANHOLE STEPS OR APPR'D. EQUAL

@ 12" SPACING

PROPOSED D.I.

M.J. PIPE

INV.=923.04±

PROPOSED 4'-0" x 4'-0" ALUMINUM WATER

TIGHT DOUBLE DOOR ACCESS HATCH BY

BILCO OR APPROVED EQUAL

PROPOSED 4'-0" x 4'-0" ALUMINUM

WATER TIGHT DOUBLE DOOR ACCESS

HATCH BY BILCO OR APPROVED EQUAL

(CENTERED IN SLAB TOP)

GRADE = 930.17±

PRE-CAST CONCRETE

VAULT BY MACK INDUSTRIES

OR APPROVED EQUAL

PROPOSED 24"

D.I. M.J. PIPE

INV.=924.60±

PROPOSED STEEL

REINFORCED

POLYPROPYLENE

MANHOLE STEPS @

12" SPACING

PROPOSED

24" D.I. M.J.

COUPLING

PROPOSED

24" D.I. M.J.

COUPLING

PROPOSED

24" D.I. M.J.

COUPLING

BOTTOM EL.=921.66

SECTION A-A

PROPOSED 24" D.I.

M.J. MODULATING

FLOW CONTROL

PLUG VALVE

PROPOSED 24" M.J.

MAGNETIC FLOW

METER (SEE SPECS)

PROPOSED 24" D.I.

M.J. MODULATING

FLOW CONTROL

PLUG VALVE

PROPOSED 24"

M.J. MAGNETIC

FLOW METER

PROPOSED 4'-0" x 4'-0" ALUMINUM

WATER TIGHT DOUBLE DOOR ACCESS

HATCHES BY BILCO OR APPROVED EQUAL

PROPOSED 24"

D.I. M.J. PIPE

INV.=923.04±

PROPOSED

24" D.I. M.J.

COUPLING

PROPOSED 24"

D.I. M.J. PIPE

INV.=923.04±

GRADE = 930.17± GRADE

PRE-CAST CONCRETE VAULT

BY MACK INDUSTRIES OR

APPROVED EQUAL

STRUCTURAL FILL

SCALE: 3/8" = 1'-0"

2' 4'0 6' 8' 10' 15' 20'

(REFER TO DRAWING 3.3)

PIPE SUPPORTS

(SEE D-1)PIPE SUPPORTS

(SEE D-1)

File Name:

MILESTONES

CONSTRUCTION

AS-BUILT

AS-BID

PROJECT MANAGER:

PROJECT ENGINEER:

DRAFTSMAN:

DESIGNER:

APPROVED BY:

APPROVED BY:

SHEET NUMBER:

DRAWING NUMBER:

PROJECT NUMBER:

SCALE:

CAD File Plot Date :

DATE

PA ONE CALL

Phone: 724-263-4116

NOT PUBLISHED: ALL RIGHTS RESERVED

128 Tower Street Monongahela, PA 15063

C. GRIFFIN

A. LYNN

A. LYNN

D. ALTLAND

NO. REVISION DESCRIPTIONDATE

BID DOCUMENTSMAY 20260

CANONSBURG HOUSTON JOINT AUTHORITY

WWTP PLANT PUMP STATION BYPASS

AND BIOTOWER RECYCLE AMMONIA UPGRADE

WASHINGTON PENNSYLVANIA

FLOW METER VAULT

PLAN AND SECTIONS

3/8" = 1'-0"

230001.4

4.1

8 of 13CHJA.PSBYPASS.dwg100.rev0(5.26.26).dwg5/26/26

GRADE

SECTION B-B

TOP VIEWPLAN VIEW

PROPOSED CONCRETE SLAB

TOP RIM=929.50±

PRE-CAST CONCRETE VAULT

BY MACK INDUSTRIES OR

APPROVED EQUAL

PROPOSED CONCRETE SLAB

TOP RIM=929.50±

PROPOSED STATIC MIXER VAULT DETAIL

B 3.7

B 3.7

A 3.

A 3.

PROPOSED CONCRETE SLAB

TOP RIM=929.50±

STRUCTURAL FILL

STEEL REINFORCED POLYPROPYLENE

MANHOLE STEPS OR APPR'D. EQUAL

@ 12" SPACING

PROPOSED 36"

D.I. M.J. PIPE

INV.=920.50±

GRADE = 928.50±

PRE-CAST CONCRETE

VAULT BY MACK INDUSTRIES

OR APPROVED EQUAL

PROPOSED 36"

D.I. M.J. PIPE

INV.=920.50±

PROPOSED STEEL

REINFORCED

POLYPROPYLENE

MANHOLE STEPS @

12" SPACING

BOTTOM EL.=919.16

SECTION A-A

PROPOSED 5'-0" x 5'-0"

ALUMINUM DOUBLE DOOR

ACCESS HATCHES BY

BILCO OR APPROVED EQUAL

PROPOSED 36"

D.I. M.J. PIPE

INV.=920.50±

PROPOSED

36" D.I. M.J.

COUPLING

GRADE = 928.50± GRADE

PRE-CAST CONCRETE VAULT

BY MACK INDUSTRIES OR

APPROVED EQUAL

STRUCTURAL FILL

SCALE: 3/8" = 1'-0"

2' 4'0 6' 8' 10' 15' 20'

(REFER TO DRAWING 3.3)

PROPOSED 5'-0" x 5'-0" ALUMINUM DOUBLE

DOOR ACCESS HATCHES BY BILCO OR

APPROVED EQUAL

PROPOSED 36"

D.I. M.J. PIPE

INV.=920.50±

PROPOSED 5'-0" x 5'-0"

ALUMINUM DOUBLE DOOR

ACCESS HATCHES BY

BILCO OR APPROVED EQUAL

PROPOSED

36" D.I. M.J.

COUPLING

PROPOSED 36"

D.I. M.J. PIPE

INV.=920.50±

PROPOSED

36" D.I. M.J.

COUPLING

PROPOSED

36" D.I. M.J.

COUPLING

PROPOSED 3" S.S. STRAIGHT PIPE

TO CLARIFIER PUMP STATION

INV. EL.=924.25±

PROPOSED RETRACTABLE

S.S. INJECTION QUILL

WITH MANUAL VALVE

AND HEAT TRACING 1/2" I.D. TUBING

WITH HEAT

TRACING

PROPOSED 3" S.S. PIPE

TO CLARIFIER PUMP STATION

INV. EL.=924.25±

PROPOSED RETRACTABLE

S.S. INJECTION QUILL

WITH MANUAL VALVE

AND HEAT TRACING

1/2" I.D. TUBING WITH

HEAT TRACING

PROPOSED

RETRACTABLE

S.S. INJECTION

QUILL WITH

MANUAL VALVE

AND HEAT

TRACING

PROPOSED 36" 316SS

STATIC MIXER WITH

316L MIXING ELEMENT

PROPOSED 36" 316SS

STATIC MIXER WITH

316L MIXING ELEMENT

File Name:

MILESTONES

CONSTRUCTION

AS-BUILT

AS-BID

PROJECT MANAGER:

PROJECT ENGINEER:

DRAFTSMAN:

DESIGNER:

APPROVED BY:

APPROVED BY:

SHEET NUMBER:

DRAWING NUMBER:

PROJECT NUMBER:

SCALE:

CAD File Plot Date :

DATE

PA ONE CALL

Phone: 724-263-4116

NOT PUBLISHED: ALL RIGHTS RESERVED

128 Tower Street Monongahela, PA 15063

C. GRIFFIN

A. LYNN

A. LYNN

D. ALTLAND

NO. REVISION DESCRIPTIONDATE

BID DOCUMENTSMAY 20260

CANONSBURG HOUSTON JOINT AUTHORITY

WWTP PLANT PUMP STATION BYPASS

AND BIOTOWER RECYCLE AMMONIA UPGRADE

WASHINGTON PENNSYLVANIA

STATIC MIXER VAULT

PLAN AND SECTIONS

3/8" = 1'-0"

230001.4

4.2

9 of 13CHJA.PSBYPASS.dwg100.rev0(5.26.26).dwg5/26/26

TRENCH BACKFILL

TIE RODS

TRENCH BACKFILL

PLAN VIEWS

CONCRETE ANCHOR BLOCKS

ELEVATION VIEW

TYPICAL THRUST

BLOCK FOR ALL

REQUIRED BENDS

NOT TO SCALE

THRUST BLOCK LOCATIONS

NOT TO SCALE

VERTICAL CHANGE ANCHOR

(TYPICAL FOR ALL PIPING EXCEPT 36" DIA.)

(TYPICAL FOR ALL FORCE MAIN PIPING)

NOTES:

1. ALL CONCRETE THRUST BLOCKS/CHANGE ANCHORS TO BE CLASS 'AA'.

2. THRUST BLOCK MUST EXTEND A MINIMUM OF 8" BELOW THE BOTTOM AND 8" MIN.

ABOVE THE TOP OF THE PIPE.

3. CHANGE ANCHOR MUST EXTEND A MINIMUM OF 8" EACH SIDE OF THE PIPE.

4. THRUST BLOCK/CHANGE ANCHOR MINIMUM LENGTH "L" MUST BE THE PIPE DIAMETER + 18".

5. THRUST BLOCK SHALL BE PLACED AGAINST UNDISTURBED OR COMPACTED TRENCH WALL.

6. CONCRETE SHALL BE KEPT BEHIND THE BELL OF ALL FITTINGS.

7. ALL FITTINGS TO USE "MEGALUG" MECHANICAL JOINT RESTRAINTS, OR APPROVED EQUAL

"L"

"L

"L

"L"

6-6/8"

11-13/16"

1-3/16"

7/8" DIA.

14"

15-5/16"

1- 1/

2"

3/

1- 1/

8" 9-

3/ 4"

1"

3/ 8"

3/8"

1-3/8" Copolymer Polypropylene Plastic

NO.3 DEFORMED STEEL ROD

TYPICAL VAULT STEPS

NOT TO SCALE

2' MIN.

D

PLAN VIEW

END THRUST BLOCK

2' MIN.

H

TRENCH

PROFILE VIEW

END THRUST BLOCK

HORIZONTAL TRUST BLOCK DETAILS

H

D

W

12"

12"

EPOXY COATED #5 REBARS

(ASTM A615 GRADE 60) (TYP.)

CONCRETE BLOCK SIZE

PER TABLE 1

CONCRETE BLOCK

SIZE PER TABLE 2

UNDISTURBED SOILW

2' M

IN

PLAN VIEW

PROFILE VIEW

VERTICAL THRUST BLOCK DETAILS

PIPE

SIZE DEAD END AND TEE

INCH DIA.

8 .5

2.5 3.5 5.5

2.5 3.5 4.5

.5

.5

6.5

.5 1.5 2.5

D H W CY D H W CY D H W CY

.5

.3 .75 1.5

4.5

HORIZONTAL

1/4 BEND

HORIZONTAL

1/8 BEND

PIPE

SIZE

HORIZONTAL

1/16 BEND

HORIZONTAL

1/32 BEND

INCH DIA.

8 .5

1.5 2.5 3.5

1.5 2.5 3.5

.25 .5

D H W CY

.5

1.5

2.5

1.5

2.5

.25 .4 .6

D H W CY

PIPE

SIZE

HORIZONTAL

1/16 BEND

HORIZONTAL

1/32 BEND

INCH DIA.

8 4.5

3.5

D H W CY

4.5

.5

2.25

D H W CY

TABLE 1

D IS THE DIMENSION INTO UNDISTURBED GROUND IN FEET

H IS HEIGHT OF THE THRUST BLOCK IN FEET

W IS WIDTH OF THRUST BLOCK IN FEET

ALL DIMENSIONS ARE MINIMUM.

THRUST BLOCKS IN LOOSE FILL OR SAND AREAS ARE NOT

INCLUDED IN THERE TABLES AND WILL REQUIRE ADDITIONAL

ANALYSIS.

TABLE 2

18 1 6.5 5 2.5 1 7.75 5.5 3 1 4.5 1.8755.25

18 1 4 4 1.25 1 2.75 2.75 .7

18 8 6 6.5 13 2 5.25 4.5 2.875

BEDDING MATERIAL

- AASHTO #67 OR

AASHTO #8

COARSE AGGREGATE

SPECIAL TRENCH BACKFILL

- PennDOT NO. 2A

COMPACT TO MIN. 95% MPD

MPD = MODIFED PROCTOR DENSITY

(ASTM D-1557)

OR

NATIVE TRENCH BACKFILL

(REFER TO RESTORATION DETAILS)

NOT TO SCALE

STANDARD TRENCH BEDDING DETAIL

12" 12"O.D.

6" 6"

PIPE DIA.

VARIES

TRENCH WIDTH

PROPOSED PIPE (SEE SITE PLANS FOR SIZE)

(FOR USE WITH ALL PIPING EXCEPT CONTINUOUSLY PERFORATED STORM PIPE,

USE INFILTRATION TRENCH BEDDING DETAIL BELOW)

SEE PLANS FOR

PIPE SIZE

6" 6"

VA

R

IE

S

6" 2A CRUSHED LIMESTONE

TRENCH DETAIL #1

MINIMUM CONSTRUCTION & RESTORATION DETAIL FOR

IN

DRIVEWAYS HAVING GRAVEL SURFACES

TRENCHING AND/OR SURFACE EXCAVATIONS

O.D.

AASHTO #8 STONE

PIPE BEDDING

SELECT BACKFILL

PaDOT 2A TYPE 'C'

PIPE TRENCH

+24" min.

(MAX. PAYMENT WIDTH=6')

MIN.

12"

MIN.

12"

NOT TO SCALE

EXISTING GRAVEL

SURFACE

NOT TO SCALE

ADJUSTABLE RISER

& VALVE BOX.

4" SHAFT SIZE

PROPOSED VALVE

GRADE

VA

R

IE

S

NOT TO SCALE

VALVE BOX DETAIL

"WATER" OR "SEWER" ON LID

SOLID CONC. BLOCK

12"x8"x4"

PROVIDE & INSTALL

STEM ROD (NUT)

EXTENSION AS NEEDED

FOR DEEP VALVES TO

WITHIN 3-ft OF GROUND

SURFACE

PROPOSED 34"x8"x8" STEEL

BASE PLATE

2" OF PROPOSED

NON-SHRINK GROUT

(8) PROPOSED 34" DIA. GALVANIZED

HEX NUTS AND WASHERS

5" 6"

C O

N

TR

AC

TO

R T

O

VE

R

IF

Y

H

EI

G H

T R

EQ

U

IR

ED

PROPOSED ADJUSTABLE CRADLE PIPE SUPPORT

(GRINNELL FIG. 264 OR APPROVED EQUAL)

PROPOSED 4" DIA. STD. WT.

STEEL SCH. 40 PIPE

DRILL EXISTING FLOOR SLAB AND

PLACE ALL THREAD IN EPOXY

ADHESIVE "SET" BY SIMPSON

STRONG-TIE OR EQUAL

EXISTING CONCRETE

FLOOR SLAB

SCALE: 1"=1'-0"

TYPE "1" PIPE SUPPORT DETAIL

(4) PROPOSED 34" DIA. x 11" LG.

GALVANIZED ANCHOR ROD OR

ALL THREAD

PROPOSED PIPE

WIDTH "W"

LE

N

G

TH

"L

CLASS "AA" CONCRETE

THRUST BLOCK

36" DIA. M.J. FITTING

24" & 36" DIA. THRUST BLOCK DETAIL

PIPE SIZE MAX. PIPE PRESSURE 90° ELBOW 45° ELBOW 22.5° ELBOW

MIN. BEARING AREA ("L" x "W" x "H") *

24" & 36" DIA. 50 psi 52 SQ.FT.

(11'-6" L x 4'-6" W x 4'-6" H)

* BASE ON 1500 PSF ALLOWABLE SOIL BEARING PRESSURE

28 SQ.FT.

(6'-3" L x 4'-6" W x 4'-6" H)

52 SQ.FT.

(3'-3" L x 4'-6" W x 4'-6" H)

PLAN VIEW

SECTION VIEW

CLASS "AA" CONCRETE

THRUST BLOCK

WIDTH "W"

H

EI

G H

T "H

1' -4

" M

IN

1' -4

" M

IN

36" DIA. M.J. FITTING

NOTES:

1. THRUST BLOCK SHALL BE PLACED AGAINST UNDISTURBED OR COMPACTED TRENCH WALL.

2. CONCRETE SHALL BE KEPT BEHIND THE BELL OF ALL FITTINGS.

3. ALL FITTINGS TO USE "MEGALUG" MECHANICAL JOINT RESTRAINTS, OR APPROVED EQUAL

NOT TO SCALE

File Name:

MILESTONES

CONSTRUCTION

AS-BUILT

AS-BID

PROJECT MANAGER:

PROJECT ENGINEER:

DRAFTSMAN:

DESIGNER:

APPROVED BY:

APPROVED BY:

SHEET NUMBER:

DRAWING NUMBER:

PROJECT NUMBER:

SCALE:

CAD File Plot Date :

DATE

PA ONE CALL

Phone: 724-263-4116

NOT PUBLISHED: ALL RIGHTS RESERVED

128 Tower Street Monongahela, PA 15063

C. GRIFFIN

A. LYNN

A. LYNN

D. ALTLAND

NO. REVISION DESCRIPTIONDATE

BID DOCUMENTSMAY 20260

CANONSBURG HOUSTON JOINT AUTHORITY

WWTP PLANT PUMP STATION BYPASS

AND BIOTOWER RECYCLE AMMONIA UPGRADE

WASHINGTON PENNSYLVANIA

SITE DETAILS

N/A

230001.4

D-1

10 of 13CHJA.PSBYPASS.dwg100.rev0(5.26.26).dwg5/26/26

F.F.E.=930.67±

F.F.E.=930.00±

12'-9"

4'-8 1 2"

2'-0"

12'-1 3 4"

File Name:

MILESTONES

CONSTRUCTION

AS-BUILT

AS-BID

PROJECT MANAGER:

PROJECT ENGINEER:

DRAFTSMAN:

DESIGNER:

APPROVED BY:

APPROVED BY:

SHEET NUMBER:

DRAWING NUMBER:

PROJECT NUMBER:

SCALE:

CAD File Plot Date :

DATE

PA ONE CALL

Phone: 724-263-4116

NOT PUBLISHED: ALL RIGHTS RESERVED

128 Tower Street Monongahela, PA 15063

C. GRIFFIN

A. LYNN

A. LYNN

D. ALTLAND

NO. REVISION DESCRIPTIONDATE

BID DOCUMENTSMAY 20260

CANONSBURG HOUSTON JOINT AUTHORITY

WWTP PLANT PUMP STATION BYPASS

AND BIOTOWER RECYCLE AMMONIA UPGRADE

BIOTOWER RECYCLE LINE ELECTRICAL DETAIL

1" = 10'-0"

230001.4

E-1

11 of 13CHJA.PSBYPASS.dwg100.rev0(5.26.26).dwg5/26/26

3.5

A3.4

30 40 50 60

A3.4

3.5 B

B

SCALE: 1"=10'

BIOTOWER RECYCLE LINE ELECTRICAL DETAIL

10 200

Existing MCC

2#12, 1#12G, IN 3/4"C FROM

EXISTING LP-BPB TO NEW

FLOWMETER TRANSMITTER

Existing

SCADA

Cabinet

NEW FLOWMETER

TRANSMITTER

1x FLOWMETER TRANSMITTER

CABLE IN 1" CONDUIT FROM

NEW FLOWMETER TRANSMITTER

TO FLOWMETER

Existing LP-BPB

208/120V 3PH

4W Panel

1x CAT6A SHIELDED

ETHERNET CABLE IN 1"

CONDUIT FROM EXISTING

SCADA CABINET TO

ACTUATOR IN FLOW

METER VAULT

3#10, 1#10G IN 1"C FROM

SPARE 30A BREAKER IN

EXISTING MCC TO

ACTUATOR DISCONNECT

Existing LP-CPB

208/120V 3PH

4W Panel

2#12, 1#12G IN 1" C

FROM EXISTING LP-CPB

TO NEW RECEPTACLE IN

STATIC MIXER VAULT

PROVIDE WEATHERPROOF WALL

MOUNTED RECEPTACLE IN STATIC

MIXER VAULT. 125V, 20A NEMA

5-20R, 2 POLE, 3 WIRE GROUNDED

TYPE GFCI

NOTES:

1. FOR ALL CONDUIT OUTSIDE, AT MINIMUM 1" CONDUIT

BE INSTALLED UNDERGROUND, 12" BELOW GRADE, 3"

CONCRETE ENCASED IF CROSSING THE ROADWAY.

ACTUATOR DISCONNECT:

3 POLE FUSED DISCONNECT

WITH FAST ACTING FUSES.

NEMA 4XSS. MANUFACTURER

SHALL SUPPLY APPROPRIATE

FUSE HOLDER AND FUSES FOR

INSTALLATION BY CONTRACTOR

NEW FLOW CONTROL

VALVE ACTUATOR

NEW FLOWMETER

3#10, 1#10G IN 1"C FROM

ACTUATOR DISCONNECT

TO ACTUATOR

1x 16/2 TSP WIRE IN

3/4"C FROM NEW

FLOWMETER

TRANSMITTER TO

EXISTING SCADA

CABINET

File Name:

MILESTONES

CONSTRUCTION

AS-BUILT

AS-BID

PROJECT MANAGER:

PROJECT ENGINEER:

DRAFTSMAN:

DESIGNER:

APPROVED BY:

APPROVED BY:

SHEET NUMBER:

DRAWING NUMBER:

PROJECT NUMBER:

SCALE:

CAD File Plot Date :

DATE

PA ONE CALL

Phone: 724-263-4116

NOT PUBLISHED: ALL RIGHTS RESERVED

128 Tower Street Monongahela, PA 15063

C. GRIFFIN

A. LYNN

A. LYNN

D. ALTLAND

NO. REVISION DESCRIPTIONDATE

BID DOCUMENTSMAY 20260

CANONSBURG HOUSTON JOINT AUTHORITY

WWTP PLANT PUMP STATION BYPASS

AND BIOTOWER RECYCLE AMMONIA UPGRADE

EROSION AND SEDIMENTATION DETAILS

NTS

230001.4

ES-1

12 of 13CHJA.PSBYPASS.dwg100.rev0(5.26.26).dwg5/26/26

STANDARD CONSTRUCTION DETAIL #4-1

Compost Filter Sock

SPECIFICATIONS: The Department recommends the use of the Penn State publication, "Erosion Control and Conservation Plantings on Noncropland," as the standard to use for the selection of species, seed specifications, mixtures, liming and fertilizing, time of seeding, and seeding methods. Specifications for these items may also be obtained from PennDOT's Publication # 408, Section 804 or by contacting the applicable county conservation district. Upon selection of a reference, that reference should be used to provide all specifications for seeding, mulching, and soil amendments. The following specification will be used for this project:

STANDARD E&S WORKSHEET #21: TEMPORARY AND PERMANENT

VEGETATIVE STABILIZATION SPECIFICATIONS

(TEMPORARY) SPECIES: Annual Ryegrass Formula "E"*

% PURE LIVE SEED: 98 %

APPLICATION RATE: 48 LB./ACRE

FERTILIZER TYPE: 10/20/20 (X-X-X)

FERTILIZER APPL. RATE: 678 LB./ACRE

LIMING RATE: 40 (see specification 02900) LBS/1000 SF MULCH TYPE: hydroseeding/cellulose wood fiber

MULCHING RATE: 0.75 T./ACRE

(PERMANENT) SPECIES: Annual Ryegrass Formula "B"**

% PURE LIVE SEED: 98 %

APPLICATION RATE 172 LB./ACRE

FERTILIZER TYPE: 10/20/20 (X-X-X)

FERTILIZER APPL. RATE: 678 LB./ACRE

LIMING RATE: 40 (see specification 02900) LBS/1000 SF MULCH TYPE: hydroseeding/cellulose wood fiber

MULCHING RATE: 0.75 T./ACRE

(PERMANENT - STEEP SLOPE) SPECIES: Crown Vetch Formula "C"**

PURE LIVE SEED: 99 %

APPLICATION RATE: 44 LB./ACRE

FERTILIZER TYPE: 10/20/20 (X-X-X)

FERTILIZER APPL. RATE: 678 LB./ACRE

LIMING RATE: 40 (see specification 02900) T./ACRE MULCH TYPE: Curlex I Erosion Control Blanket or equiv

MULCHING RATE: N/A T./ACRE

ANCHOR MATERIAL: PerDetail Drawing ANCHORING METHOD: PerDetail Drawing

RATE OF ANCHOR MATERIAL APPL.: LB./ACRE

(FORESTED AREAS) SPECIES: Annual Ryegrass Formula "D"**

PURE LIVE SEED: 98 %

APPLICATION RATE: 172 LB./ACRE

FERTILIZER TYPE: 10/20/20 (X-X-X)

FERTILIZER APPL. RATE: 678 LB./ACRE

LIMING RATE: 40 (see specification 02900) T./ACRE MULCH TYPE: hydroseeding/cellulose wood fiber

MULCHING RATE: 0.75 T./ACRE

30 98

0.15

0.15

0.15 0.10

0.15 0.15

0.15

0.15

** Seed Specifications Minimum % Max. % % by Mass Purity Germination Weed Seed Formula "E" Annual Ryegrass

Formula "B" Perennial Ryegrass Mix Creeping Red Fescue Or Chewings Fescue Kentucky Bluegrass Mix

Formula "C" Crown Vetch Annual Ryegrass

Formula "D" Tall Fescue Creeping Red Fescue Or Chewings Fescue

STANDARD CONSTRUCTION DETAIL #26

Pumped Water Filter Bag

PLAN VIEW

ELEVATION VIEW

STABILIZATION METHODS AND STANDARDS (Continued)

· SEEDING

Seed mixtures shall comply with Standard E&S Worksheet #21. Seeding rates are stated as pounds per acre (lb/A) of pure live seed (PLS). PLS is the product of the percentage of pure seed times the percentage of germination divided by 100 (e.g. [85% pure seed 72% germination] ÷ 100 = 61% PLS). Seed should not be used later than one year after the test date that appears on the label. Use of seed older than one year could result in less than satisfactory vegetative coverage and the need to re-seed the disturbed area. Actual seeding rates may be determined by dividing the PLS seeding rate by the %PLS shown on the seed tag, or calculated as shown above (e.g. for a PLS seeding rate of 12 lb/A from a seed lot with a PLS of 35%, the actual seeding rate is equal to 12 ÷ 0.35 = 34.3 lb/A). If more than one species is used, indicate the application rate for each species. A nurse crop may be necessary if the selected species do not rapidly germinate. If a nurse crop is used in conjunction with permanent seeding, the nurse crop should not hinder the establishment of the permanent vegetation. A nurse crop should not be applied at a rate exceeding 50% of its temporary seeding rate.

The Department recommends that soil testing be done prior to seeding and mulching to determine the proper soil amendments and application rates for the proposed seed mixture(s). In the absence of a soil test, soil amendments should be added at the rates specified by the selected seeding reference.

Fill slopes should be seeded and mulched at regular vertical increments -- 15 to 25 feet maximum -- as the fill is being constructed. This will allow the bottom of the fill to progress toward stabilization while work continues on the upper portion, making final stabilization easier to achieve and providing some vegetative buffering at the bottom of the slope.

Wherever seed and mulch is applied by hydroseeding methods, the seed and mulch should be applied in separate applications with the seed being applied first and the mulch sprayed on top of the seed. This is to ensure that the seed makes contact with the underlying soil. Soil preparation should be completed prior to adding seed to the hydroseeding equipment. Running seed through the pumping system can result in excessive abrasion of the seed and reduce the percentage of pure live seed in the application. Therefore all site preparation should be completed prior to the arrival of the hydroseeder.

In critical areas (e.g. adjacent to or within 50 feet of streams, ponds, or wetlands) a protective blanket should be provided for all seeded areas. Consideration should be given to use of mulch with netting or protective blankets for all seeded areas on slopes 3H:1V or steeper.

Vehicular traffic should be restricted from areas to be seeded to prevent soil compaction.

· TOPSOIL APPLICATION

Graded areas should be scarified or otherwise loosened to a depth of 3 to 5 inches to permit bonding of the topsoil to the surface areas and to provide a roughened surface to prevent topsoil from sliding down slope.

Topsoil should be uniformly distributed across the disturbed area to a depth of 4 to 8 inches minimum -- 2 inches on fill outslopes. Spreading should be done in such a manner that sodding or seeding can proceed with a minimum of additional preparation or tillage. Irregularities in the surface resulting from topsoil placement should be corrected in order to prevent formation of depressions unless such depressions are part of the PCSM plan.

Topsoil should not be placed while the topsoil or subsoil is in a frozen or muddy condition, when the subsoil is excessively wet, or in a condition that may otherwise be detrimental to proper grading and seedbed preparation.

Compacted soils should be scarified 6 to 12 inches along contour wherever possible prior to seeding.

· SPILL CONTROL

Spill control procedures are implemented anytime chemicals and/or hazardous substances are stored or used at the construction site. Substances include, but are not limited to fuel, lubricants, hydraulic fluids, coolants, paint, etc.

The spillage should be stopped as soon as it can be done safely, and the cleaned up immediately. Clean contaminated area, and properly dispose of contaminated materials properly. For all spills, notify the project foreman. Use the following spill prevention and controls when applicable:

· To the extent that it doesn't compromise clean-up activities, spills shall be covered and protected from stormwater run-on during rainfall,

· Spills shall not be buried or diluted with wash water,

· Used clean up materials, contaminated materials, and recovered spill material shall be stored and disposed of in accordance with federal, state and local regulations,

· Use absorbent materials on spills, rather than using water to hose down the spill,

· When water is used for cleaning and decontamination of a spill, the water shall not be allowed to enter stormwater conveyance or watercourses, and shall be collected and disposed of properly,

· All spill contaminated soil will be removed and disposed of properly,

· The condition of hydraulic equipment shall be visually assessed for potential leaks prior to use in the immediate vicinity approx. 25 feet of Swale.

· MULCHING

All seeded areas should be mulched or blanketed to minimize the potential for failure to establish an adequate vegetative cover. Mulching may also be used as a temporary stabilization of some disturbed areas in non-germinating seasons. Mulches should be applied at the rates shown in Table 11.6 (Appendix).

Straw and hay mulch should be anchored or tackified immediately after application to prevent being windblown. A tractor-drawn implement may be used to "crimp" the straw or hay into the soil -- about 3 inches. This method should be limited to slopes no steeper than 3H:1V. The machinery should be operated on the contour. Note: Crimping of hay or straw by running over it with tracked machinery is not recommended.

Polymeric and gum tackifiers mixed and applied according to manufacturer's recommendations may be used to tack mulch. Avoid application during rain and on windy days. A 24-hour curing period and a soil temperature higher than 45 F. are typically required. Application should generally be heaviest at edges of seeded areas and at crests of ridges and banks to prevent loss by wind. The remainder of the area should have binder applied uniformly. Binders may be applied after mulch is spread or sprayed into the mulch as it is being blown onto the soil. Applying straw and binder together is generally more effective. Synthetic binders, or chemical binders, may be used as recommended by the manufacturer to anchor mulch provided sufficient documentation is provided to show they are non-toxic to native plant and animal species.

Mulch on slopes of 8% or steeper should be held in place with netting. Lightweight plastic, fiber, or paper nets may be stapled over the mulch according to manufacturer's recommendations.

Shredded paper hydromulch should not be used on slopes steeper than 5%. Wood fiber hydromulch may be applied on steeper slopes provided a tackifier is used. The application rate for any hydromulch should be 2,000 lb/acre at a minimum.

E&SCP GENERAL NOTES (Continued)

· Immediately after earth disturbance activities cease in any area or subarea of the project, the operator shall stabilize all disturbed areas. During non-germinating months, mulch or protective blanketing shall be applied as described in the plan. Areas not at finished grade, which will be reactivated within 1 year, may be stabilized in accordance with the temporary stabilization specifications. Those areas which will not be reactivated within 1 year shall be stabilized in accordance with the permanent stabilization specifications.

· Permanent stabilization is defined as a minimum uniform, perennial 70% vegetative cover or other permanent non-vegetative cover with a density sufficient to resist accelerated erosion. Cut and fill slopes shall be capable of resisting failure due to slumping, sliding, or other movements.

· E&S BMPs shall remain functional as such until all areas tributary to them are permanently stabilized or until they are replaced by another BMP approved by the local conservation district or the Department.

· Upon completion of all earth disturbance activities and permanent stabilization of all disturbed areas, the owner and/or operator shall contact the local conservation district for an inspection prior to removal/conversion of the E&S BMPs.

· After final site stabilization has been achieved, temporary erosion and sediment BMPs must be removed or converted to permanent post construction stormwater management BMPs. Areas disturbed during removal or conversion of the BMPs shall be stabilized immediately. In order to ensure rapid revegetation of disturbed areas, such removal/conversions are to be done only during the germinating season.

· Upon completion of all earth disturbance activities and permanent stabilization of all disturbed areas, the owner and/or operator shall contact the local conservation district to schedule a final inspection.

· Failure to correctly install E&S BMPs, failure to prevent sediment-laden runoff from leaving the construction site, or failure to take immediate corrective action to resolve failure of E&S BMPs may result in administrative, civil, and/or criminal penalties being instituted by the Department as defined in Section 602 of the Pennsylvania Clean Streams Law. The Clean Streams Law provides for up to $10,000 per day in civil penalties, up to $10,000 in summary criminal penalties, and up to $25,000 in misdemeanor criminal penalties for each violation.

· Concrete wash water shall be handled in the manner described on the plan drawings. In no case shall it be allowed to enter any surface waters or groundwater systems.

· All channels shall be kept free of obstructions including but not limited to fill, rocks, leaves, woody debris, accumulated sediment, excess vegetation, and construction material/wastes.

· Underground utilities cutting through any active channel shall be immediately backfilled and the channel restored to its original cross-section and protective lining. Any base flow within the channel shall be conveyed past the work area in the manner described in this plan until such restoration is complete.

· Channels having riprap, Reno mattress, or gabion linings must be sufficiently over-excavated so that the design dimensions will be provided after placement of the protective lining.

· Erosion control blanketing shall be installed on all slopes 3H:1V or steeper within 50 feet of a surface water and on all other disturbed areas specified on the plan maps and/or detail sheets.

· Fill material for embankments shall be free of roots, or other woody vegetation, organic material, large stones, and other objectionable materials. The embankment shall be compacted in maximum 8" layered lifts at 95% maximum dry density.

DISPOSAL OF CONSTRUCTION WASTES

All construction wastes associated with erosion and sedimentation control shall be disposed of in a landfill.

Specifically, all compost sock rings will be disposed of in a landfill once removed, after site final stabilization.

DOCUMENTATION

The contractor is responsible for keeping all reports on routine inspections up-to- date, including any records of product replacement or cleaning. Weekly inspections are required for:

1) Compost Filter Sock

2) Inlet Filter Bags

3) Erosion control mulch blanket 4)Riprap slope protection

5) Vegetation stabilization

A log showing dates that E&S BMPs were inspected, as well as any deficiencies found and the date they were corrected, shall be maintained on the site and be made available to regulatory agency officials at the time of inspection.

E&SCP GENERAL NOTES

· All earth disturbances, including clearing and grubbing as well as cuts and fills shall be done in accordance with the approved E&S plan. A copy of the approved drawings (stamped, signed and dated by the reviewing agency) must be available at the project site at all times. The reviewing agency shall be notified of any changes to the approved plan prior to implementation of those changes. The reviewing agency may require a written submittal of those changes for review and approval at its discretion.

· At least 7 days prior to starting any earth disturbance activities, including clearing and grubbing, the owner and/or operator shall invite all contractors, the landowner, appropriate municipal officials, the E&S plan preparer, the PCSM plan preparer, the licensed professional responsible for oversight of critical stages of implementation of the PCSM plan, and a representative from the local conservation district to an on-site preconstruction meeting.

· At least 3 days prior to starting any earth disturbance activities, or expanding into an area previously unmarked, the Pennsylvania One Call System Inc. shall be notified at 1-800-242-1776 for the location of existing underground utilities.

· All earth disturbance activities shall proceed in accordance with the sequence provided on the plan drawings. Deviation from that sequence must be approved in writing from the local conservation district or by the Department prior to implementation.

· Areas to be filled are to be cleared, grubbed, and stripped of topsoil to remove trees, vegetation, roots and other objectionable material.

· Clearing, grubbing, and topsoil stripping shall be limited to those areas described in each stage of the construction sequence. General site clearing, grubbing and topsoil stripping may not commence in any stage or phase of the project until the E&S BMPs specified by the BMP sequence for that stage or phase have been installed and are functioning as described in this E&S plan.

· At no time shall construction vehicles be allowed to enter areas outside the limit of disturbance boundaries shown on the plan maps. These areas must be clearly marked and fenced off before clearing and grubbing operations begin.

· Care should be taken when working along the perimeter of the site; in no event shall work extend beyond the limits shown on the plan.

· Topsoil required for the establishment of vegetation shall be stockpiled at the location(s) shown on the plan maps(s) in the amount necessary to complete the finish grading of all exposed areas that are to be stabilized by vegetation. Each stockpile shall be protected in the manner shown on the plan drawings. Stockpile heights shall not exceed 35 feet. Stockpile slopes shall be 2H:1V or flatter.

· Immediately upon discovering unforeseen circumstances posing the potential for accelerated erosion and/or sediment pollution, the operator shall implement appropriate best management practices to minimize the potential for erosion and sediment pollution and notify the local conservation district and/or the regional office of the Department.

· All building materials and wastes shall be removed from the site and recycled or disposed of in accordance with the Department's Solid Waste Management Regulations at 25 Pa. Code 260.1 et seq., 271.1, and 287.1 et. seq. No building materials or wastes or unused building materials shall be burned, buried, dumped, or discharged at the site.

· All off-site waste and borrow areas must have an E&S plan approved by the local conservation district or the Department fully implemented prior to being activated.

· The contractor is responsible for ensuring that any material brought on site is clean fill. Form FP-001 must be retained by the property owner for any fill material affected by a spill or release of a regulated substance but qualifying as clean fill due to analytical testing.

· All pumping of water from any work area shall be done according to the procedure described in this plan, over undisturbed vegetated areas.

· Until the site is stabilized, all erosion and sediment BMPs shall be maintained properly. Maintenance shall include inspections of all erosion and sediment BMPs after each runoff event and on a weekly basis. All preventative and remedial maintenance work, including clean out, repair, replacement, re-grading, re-seeding, re-mulching and re-netting must be performed immediately. If the E&S BMPs fail to perform as expected, replacement BMPs, or modifications of those installed will be required.

· Sediment tracked onto any public roadway or sidewalk shall be returned to the construction site by the end of each work day and disposed in the manner described in this plan. In no case shall the sediment be washed, shoveled, or swept into any roadside ditch, storm sewer, or surface water.

· All sediment removed from BMPs shall be disposed of in the manner described on the plan drawings.

· Areas which are to be topsoiled shall be scarified to a minimum depth of 3 to 5 inches -- 6 to 12 inches on compacted soils -- prior to placement of topsoil. Areas to be vegetated shall have a minimum 4 inches of topsoil in place prior to seeding and mulching. Fill outslopes shall have a minimum of 2 inches of topsoil.

· All fills shall be compacted as required to reduce erosion, slippage, settlement, subsidence or other related problems. Fill intended to support buildings, structures and conduits, etc. shall be compacted in accordance with local requirements or codes.

· All earthen fills shall be placed in compacted layers not to exceed 9 inches in thickness.

· Fill materials shall be free of frozen particles, brush, roots, sod, or other foreign or objectionable materials that would interfere with or prevent construction of satisfactory fills.

· Frozen materials or soft, mucky, or highly compressible materials shall not be incorporated into fills.

· Fill shall not be placed on saturated or frozen surfaces.

· Seeps or springs encountered during construction shall be handled in accordance with the standard and specification for subsurface drain or other approved method.

· All graded areas shall be permanently stabilized immediately upon reaching finished grade. Cut slopes in competent bedrock and rock fills need not be vegetated. Seeded areas within 50 feet of a surface water, or as otherwise shown on the plan drawings, shall be blanketed according to the standards of this plan.

INITIAL CONSTRUCTION

1. Install compost sock and inlet filter bags.

2. Construct wastewater facilities.

a. Clear and grub area as necessary for construction of tanks, buildings and installation of piping.

b. Separate topsoil from subsoil during excavation.

c. Install proposed piping, valves, vaults.

d. Any groundwater encountered during trench excavation shall be pumped into a pumped-water filter bag.

e. Install outfall structure with riprap.

f. Install erosion control blanket on all disturbed areas on side slope of Chartiers Creek.

g. Disturbed areas shall receive temporary seeding or compacted roadway subbase material within 4 days after disturbance ends.

4. Landscaping: Fine grade, place topsoil, amendments, seed and mulch all areas including staging areas.

a. Scarify graded areas to prevent topsoil from sliding on slopes.

b. Contractor is responsible to test soils prior to the application of amendments such as lime and fertilizer.

c. Do not place topsoil while the topsoil or subsoil is frozen or muddy or when the subsoil is excessively wet to allow proper grading and seedbed preparation.

d. Distribute topsoil across disturbed areas to a minimum depth of 4 inches, 2 inches minimum on fill outslopes. Correct surface irregularities to prevent formation of depressions.

e. Seed and mulch all disturbed areas following “Temporary and Permanent Vegetative Stabilization Specifications”.

6. Remove and properly dispose of temporary E&S controls after a uniform 70% vegetative perennial cover has been established.

EROSION AND SEDIMENT CONTROL INSPECTOR NOTE:

1. Note to Contractor: A written inspection report, on the Washington County Conservation District's Standard Form must be kept on a regular basis and must be available upon request.

STABILIZATION METHODS AND STANDARDS

· GENERAL

As soon as slopes, channels, ditches, and other disturbed areas reach final grade they must be stabilized. Upon completion or temporary cessation of the earth disturbance activity in a special protection watershed, that portion of the project site tributary to the special protection waters must be immediately stabilized. In all other watersheds, cessation of activity for at least 4 days requires temporary stabilization.

Keeping stabilization current with earthmoving is recommended for all projects, regardless of watershed classification. This chapter is intended to provide guidance and specifications for stabilization as well as information that is useful in achieving stabilization in the least amount of time.

· VEGETATIVE STABILIZATION

All disturbed areas that have not otherwise been stabilized and have significant potential for erosion should be stabilized with vegetation. This includes graded areas where it is anticipated that future earthmoving will take place within the coming year. Areas that will be subject to earthmoving within 12 months may be stabilized with temporary seed mixtures, predominantly annual grasses. All others should be stabilized with permanent seed mixtures -- predominantly perennial grasses. When final grade is achieved during non-germinating months, the area should be mulched until the beginning of the next planting season. However, the area will not be considered stabilized until a minimum uniform 70% vegetative cover of erosion resistant perennial species has been achieved. Critical areas --erodible soils, within 50 feet of a surface water, etc. -- should be blanketed.

Temporary erosion control BMPs that were installed for the earthmoving phase of the project must remain in place and be maintained in working order until permanent stabilization is achieved.

NOTE: Areas that do not receive sufficient sunlight to support vegetation (e.g.

under bridge decks) should be stabilized by some means other than vegetation.

As disturbed areas within a project approach final grade, preparations should be made for seeding and mulching to begin (i.e. anticipate the completion date and schedule the seeder).

This is the start of the file's text. The full file is on GovTribe.