This document is a set of engineering plans and specifications prepared by Alfred Benesch & Company for the Mahanoy Township Authority Water Conservation Upgrades Project in Schuylkill County, Pennsylvania. The project consists of the installation of five concrete conservation release weirs on bypass streams serving the Lofty, Mahanoy No. 2, Pole Run No. 4, Wastehouse No. 3, and Wastehouse No. 4 reservoirs. The plans detail the design and construction requirements for monitoring weirs with varying specifications, including 60-degree V-notch weirs, 120-degree V-notch weirs, 90-degree V-notch weirs, and a 1-foot contracted rectangular weir. Each weir location includes detailed cross-sectional drawings, dimensions, flow measurement gauges, and flow rate calculations in gallons per day corresponding to specific head measurements in inches. The sealed bid deadline for this public works contract is June 17, 2026, at 2:00 P.M., with public bid opening and announcement scheduled for 6:00 P.M. during the authority's regularly scheduled meeting the same day. Bidders must submit a certified check or bid bond equal to 10 percent of the total bid amount, and the successful contractor will be required to furnish performance and payment bonds each in the amount of 100 percent of the contract price.
The contract is subject to Pennsylvania prevailing wage rates and the Public Works Employment Verification Act, with all submitted bids requiring the Public Works Employment Verification Form. Bidders must comply with comprehensive erosion and sediment control requirements detailed in the plans, including establishment of temporary erosion control features, sediment removal procedures, and final site stabilization and inspection protocols. All bidding documents are available at no cost through the PennBid Program at http://PennBid.bonfirehub.com. The owner reserves the right to reject any or all bids or waive any informalities in the bidding process, and may hold bids for up to 60 days from the opening date for review and investigation of bidder qualifications prior to contract award. The entire project will be awarded to a single contractor, with the work to be completed in accordance with the approved erosion and sediment control plan and all applicable Pennsylvania Department of Environmental Protection regulations and standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
the property of Alfred Benesch & Company. Use, reuse, reproduction or modification of this plan or
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is
PREPARED BY:
PROJECT MANAGER DATE
31412.20
DRAWING NO.
31412.20 dweist 05\19\2026 15:02:02 Y:\Pottsville\31400S\31412.20_MTA_SRBC_Dam\Eng_Docs\Plans\01_Cover.dgn (Default)
PROJECT
LOCATION MAP
N
- PROJECT LOCATION
SCALE : 1" = 1 MILE
G-001
MAHANOY TOWNSHIP AUTHORITY
SCHUYLKILL COUNTY, PENNSYLVANIA
KLINE & MAHANOY TOWNSHIPS
MAHANOY TOWNSHIP AUTHORITY
- Board Member
- Treasurer
- Secretary
- Vice President
- President
WATER CONSERVATION UPGRADES PROJECT
Samuel Quick
James P. Stevens
Lee Vanhorn
Cheryl Backo
John Kelly, Jr.
MAY 2026
P E
N
N S Y L V
A
N
I A
C O
M
M O
NW EALT
H
O
F
REGISTERED
PROFESSIONAL
ENGINEER
NO. PE055437E
JAMES JOHN RHOADES, JR.
5/19/2026
Sheet No.:Drawn: Designed: Checked:
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.:
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
31412.20 dweist 05\19\2026 15:15:41 Y:\Pottsville\31400S\31412.20_MTA_SRBC_Dam\Eng_Docs\Plans\02_INDEX.dgn (Default)
31412.20reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, SCHUYLKILL COUNTY, PENNSYLVANIA
4/2026
MAHANOY TOWNSHIP AUTHORITY
KLINE AND MAHANOY TOWNSHIPS,
DJW DJW ZRS
UPGRADES PROJECT
WATER CONSERVATION
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
NO. PE055437E
540.3
CIVIL
DRAWING INDEX ABBREVIATIONS
JOINTJT
JUNCTION BOXJB
INVERTINV
INTERIORINT
INSULATIONINSUL
INCHIN
INSIDE DIAMETERID
HEIGHTHT
HORIZONTALHORIZ
HOLLOW METALHM
HOSE BIBBHB
GAS VALVEGV
GROUTGRT
GAS METERGM
GENERALGEN
GALVANIZEDGALV
GAUGEGA
FLAG POLEFP
FOOTINGFTG
FOOTFT
FRAMEFRM
FLUORESCENTFLUOR
FLOORFLR
FINISH FLOORFIN FL
FIRE HYDRANTFH
FINISH GRADEFG
FOUNDATIONFDN
FLOOR DRAINFD
EXTERIOREXT
EXPANSION JOINTEXP JT
EXPANSIONEXP
EXISTINGEXIST
EQUIPMENTEQUIP
EQUALEQ
ELECTRICALELECT
ELEVATIONELEV
EACHEA
DRAWINGDWG
DOWN SPOUTDS
DOWNDN
DUCTILE IRON PIPEDIP
DIMENSIONDIM
DIAGONALDIAG
DIAMETERDIA
DETAILDET
DOUBLEDBL
CONTINUOUSCONT
CONSTRUCTIONCONST
CONCRETECONC
COLUMNCOL
CLEANOUTCO
CONCRETE MASONRY UNITCMU
CORRUGATED METAL PIPECMP
CEILINGCLG
CENTERLINE�
CONTROL JOINTCJ
CAST IRON PIPECIP
CEMENTCEM
CABINETCAB
BOTTOMBOT
BENCH MARKBM
BLOCKBLK
BASELINE�
BUILDINGBLDG
ALUMINUMALUM
APPROXIMATELYAPPROX
CTV
E
UE
6" G
S
P
T
4" W x
CO
MH
GV
GM
FH
WV
WELL
WM
BO
LEGEND
INLET
BLOWOFF
WATER METER
WELL
WATER VALVE
FIRE HYDRANT
GAS METER
GAS VALVE
MANHOLE
CLEANOUT
POST/LAMP POST/BOLLARD
SIGN AND POSTS
SIGN
FLOOD PLAIN
LIGHT STANDARD
GUY WIRE
GROUND ELEVATION
ROAD DELINEATION SIGN
SHRUB ROW
TREE/BRUSH LINE
SHRUB
100-YEAR FLOOD BOUNDRY
PROPERTY LINE
CONTOURS
EDGE OF STREAM
FENCE
WATER LINE
TELEPHONE LINE
PETROLEUM PIPELINE
STORM SEWER LINE
SANITARY SEWER LINE
GAS LINE
UNDERGROUND ELECTRIC LINE
ABOVE GROUND ELECTRIC LINE
TV CABLE LINE
LEGAL RIGHT-OF-WAY
GENERAL NOTES
FP
VERTICAL DATUM IS BASED ON NATIONAL GEODETIC SURVEY.
UNLESS OTHERWISE DIRECTED BY THE OWNER.
PLAN LOCATIONS AND DIMENSIONS SHALL BE STRICTLY ADHERED TO
PROVIDE FOR THEIR PROTECTION.
RESPONSIBILITY TO VERIFY AND ALLOW FOR THEIR LOCATIONS AND
AVAILABLE INFORMATION. IT SHALL BE THE CONTRACTOR'S
EXISTING UTILITIES ARE SHOWN IN ACCORDANCE WITH THE BEST
PHASES OF CONSTRUCTION.
PROVIDED, INSTALLED, AND MAINTAINED BY THE CONTRACTOR DURING ALL
ALL REQUIRED EROSION AND SEDIMENTATION CONTROLS SHALL BE
THE ENGINEER AT NO ADDITIONAL COST TO THE OWNER.
REPAIRED OR REPLACED TO THEIR ORIGINAL CONDITION AS DIRECTED BY
ALL AREAS DISTURBED OUTSIDE THE LIMITS OF CONSTRUCTION SHALL BE
VERIFIED IN THE FIELD BY THE CONTRACTOR.
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND
IMPROVEMENTS.
PRECAUTIONS TO PROTECT STRUCTURES, TREES, UTILITIES, OR OTHER
THE CONTRACTOR SHALL OPERATE IN SUCH A MANNER AND/OR TAKE
WELDED WIRE FABRICWWF
WATER VALVEWV
WATERPROOFWP
WATER METERWM
WITHW/
VERTICALVERT
TOP OF WALLTOW
TOP OF FOOTINGTOF
TOP OF CONCRETETOC
THROUGHTHRU
TOP & BOTTOMT&B
TREADST
STRUCTURALSTRUCT
STEELSTL
STANDARDSTD
SQUARESQ
SPECIFICATIONSPEC
SIMILARSIM
SHEETSHT
SECTIONSECT
SCHEDULESCHED
ROOMRM
RETAININGRET
REQUIREDREQ'D
REINFORCEDREINF
REFERENCERE
ROOF DRAINRD
RADIUSRAD
OR
RADIUSR=
RISERR
QUANTITYQTY
POLYVINYL CHLORIDE PIPEPVC
PLYWOODPLWD
PLATEPL
OPENINGOPG
OWNER FURNISHED, CONTRACTOR INSTALLEDOFCI
OUTSIDE DIAMETEROD
ON CENTEROC
NOT TO SCALENTS
NO TRENCHNT
NECESSARYNEC'Y
MANHOLEMH
MINIMUMMIN
METALMET
MECHANICALMECH
MAXIMUMMAX
MANUFACTURERMANUF
LAVATORYLAV
LAMINATELAM
STABILIZATION HAS BEEN ACHIEVED.
REMOVE ALL TEMPORARY EROSION CONTROLS AFTER A MINIMUM OF 90% 7.
MUST BE COVERED WITH 1.5' DEPTH OF R-4 STONE FOR STABILIZATION.
OF ALL DAMMING AND PIPING.ALL EXCAVATED AREAS SURROUNDING THE WEIR
WILL BE LAID IN DESIGNATED AREAS BY THE CONTRACTOR PRIOR TO REMOVAL
WITH NO MORE THAN A 6" DIFFERENTIAL FROM SIDE TO SIDE. RIP RAP
FOR 48 HOURS MINIMUM.BACKFILL AROUND THE WEIR, COMPACTING IN LIFTS
NO BACKFILLING, FORM REMOVAL, OR STREAM CONTACT SHOULD TAKE PLACE 6.
LEAST ONE FOOT (1 FT.) INTO BOTH THE ROCK AND THE CONCRETE.
THE WEIR.DOWEL PENETRATIONS SHOULD BE ON 1 FT. CENTERS AND AT
REMOVED SHALL BE DOWELED WITH NO.6 STEEL REINFORCING BARS TO ANCHOR
INSTALLED PER DETAIL.ROCK THAT CANNOT BE RIPPED OR OTHERWISE
SULFATE RESISTANT CEMENT. STANDARD NO. 5 REINFORCING BARS TO BE
CONTRACTOR TO FORM AND POUR THE WEIR IN PLACE USING CLASS A, TYPE 2 5.
TAKEN TO ELIMINATE DISCHARGE OF TURBID WATER.
STREAM FLOW BE INTERRUPTED AND PRECAUTIONARY MEASURES SHOULD BE
SITE THROUGH TWO 18" CORRUGATED PLASTIC PIPES.AT NO TIME SHOULD
INTO THE STREAM CHANNEL IMMEDIATELY DOWNSTREAM OF THE CONSTRUCTION
SITE. THE STREAM FLOW WILL BE PIPED OVER THE CONSTRUCTION AREA AND
THE INSTALLATION OF A SANDBAG DAM UPSTREAM FROM THE CONSTRUCTION
CONTRACTOR WILL DIVERT STREAM FLOW FROM THE EXCAVATED AREA THROUGH 4.
ESTABLISH A SAFE PASSAGEWAY TO THE PROPOSED WEIR LOCATIONS.
CONTRACTOR TO PERFORM CLEARING AND GRADING AS NECESSARY TO 3.
OPERATIONS DURING LOW FLOW CONDITIONS WHEN NO RAIN IS FORECASTED.
CONTRACTOR TO MONITOR WEATHER FORECAST AND PERFORM CONSTRUCTION 2.
FEATURES TO CONTROL SEDIMENT DURING THESE OPERATIONS.
PRIOR TO GRUBBING AND EXCAVATING, PLACE TEMPORARY EROSION CONTROL 1.
SCHEDULE OF CONSTRUCTION ACTIVITIES - WEIRS
G-002
ES-003
ES-002
ES-001
C-006
C-005
C-004
C-003
C-002
C-001
G-002
G-001
XXX XXXMAK
EROSION AND SEDIMENT CONTROL SHEET NO.3
EROSION AND SEDIMENT CONTROL SHEET NO.2
EROSION AND SEDIMENT CONTROL SHEET NO.1
SECTIONS & DETAILS
LOFTY UPSTREAM MONITORING WEIR - PLAN & PROFILE
POLE RUN NO. 4 MONITORING WEIR - PLAN & PROFILE
WAHANOY NO. 2 MONITORING WEIR - PLAN & PROFILE
WASTE HOUSE NO. 4 MONITORING WEIR - PLAN & PROFILE
WASTE HOUSE NO. 3 MONITORING WEIR - PLAN & PROFILE
GENERAL NOTES, INDEX OF DRAWINGS & LEGEND
COVER SHEET & L0CATION MAP
Scale: AS NOTED Date: Project No.:
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
31412.20 dweist 05\19\2026 15:21:48 Y:\Pottsville\31400S\31412.20_MTA_SRBC_Dam\Eng_Docs\Plans\07_PLAN_05.dgn (Default)
31412.20reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, SCHUYLKILL COUNTY, PENNSYLVANIA
5/2026
MAHANOY TOWNSHIP AUTHORITY
KLINE AND MAHANOY TOWNSHIPS,
DJW DJW ZRS
excavation
10 business days prior to the start of than 3 business days nor more than
Dial 8-1-1 or 1-800-242-1776 not less
Pennsylvania One Call System Serial Number
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
NO. PE055437E
JAMES JOHN RHOADES, JR.
B
B
A
A
60 DEGREE V-NOTCH WEIR
STREAM FLOW GAUGE
PROPOSED:
LEGEND
(TOP OF V-NOTCH)
RIP-RAP
MONITORING WEIR
N
MONITORING WEIR
WASTEHOUSE NO. 3
4.19
4.13
4.06
4.00
3.94
3.88
3.81
3.75
3.69
3.63
3.56
3.50
3.44
3.38
3.31
3.25
3.19
3.13
3.06
3.00
2.94
2.88
2.81
2.75
2.69
2.63
2.56
2.50
2.44
INCHES
67,082
64,606
62,187
59,823
57,513
55,258
53,057
50,909
48,814
46,772
44,782
42,844
40,957
39,120
37,334
35,598
33,911
32,273
30,684
29,142
27,648
26,201
24,800
23,445
22,135
20,871
19,651
18,474
17,341
GPD
C-001
PLAN
LOOKING NORTHEAST
WASTEHOUSE NO. 3 MONITORING WEIR LOCATION
20261104771
Scale: AS NOTED Date: Project No.:
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
31412.20 dweist 05\19\2026 15:41:53 Y:\Pottsville\31400S\31412.20_MTA_SRBC_Dam\Eng_Docs\Plans\07_PLAN_06.dgn (Default)
31412.20reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, SCHUYLKILL COUNTY, PENNSYLVANIA
5/2026
MAHANOY TOWNSHIP AUTHORITY
KLINE AND MAHANOY TOWNSHIPS,
DJW DJW ZRS
excavation
10 business days prior to the start of than 3 business days nor more than
Dial 8-1-1 or 1-800-242-1776 not less
Pennsylvania One Call System Serial Number
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
NO. PE055437E
JAMES JOHN RHOADES, JR.
B
B
A
A
120 DEGREE V-NOTCH WEIR
STREAM FLOW GAUGE
CONCRETE
RIP-RAP
MONITORING WEIR
N
PLAN
LOOKING NORTH
WASTEHOUSE NO. 4 MONITORING WEIR LOCATION
MONITORING WEIR
WASTEHOUSE NO. 4
172,557
165,791
159,187
152,743
146,458
140,331
134,360
128,544
122,882
117,373
112,014
106,805
101,744
96,829
92,060
87,435
82,952
78,610
74,407
70,342
66,413
62,619
58,958
55,428
52,029
GPD
3.94
3.88
3.81
3.75
3.69
3.63
3.56
3.50
3.44
3.38
3.31
3.25
3.19
3.13
3.06
3.00
2.94
2.88
2.81
2.75
2.69
2.63
2.56
2.50
2.44
INCHES
C-002
20261104259
CROSS-SECTIONS DETAIL
ACORDANCE WITH MONITORING WEIR
APPROXIMATELY 20' UPSTREAM IN
CLEAN AND DEEPEN WEIR ENTRANCE FOR
Scale: AS NOTED Date: Project No.:
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
31412.20 dweist 05\19\2026 15:28:39 Y:\Pottsville\31400S\31412.20_MTA_SRBC_Dam\Eng_Docs\Plans\07_PLAN_07.dgn (Default)
31412.20reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, SCHUYLKILL COUNTY, PENNSYLVANIA
5/2026
MAHANOY TOWNSHIP AUTHORITY
KLINE AND MAHANOY TOWNSHIPS,
DJW DJW ZRS
excavation
10 business days prior to the start of than 3 business days nor more than
Dial 8-1-1 or 1-800-242-1776 not less
Pennsylvania One Call System Serial Number
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
NO. PE055437E
JAMES JOHN RHOADES, JR.
B
B
A A
60 DEGREE V-NOTCH WEIR
STREAM FLOW GAUGE
MONITORING WEIR
N
MONITORING WEIR
MAHANOY NO. 2
C-003
PLAN
59,823
57,513
55,258
53,057
50,909
48,814
46,772
44,782
42,844
40,957
39,120
37,334
35,598
33,911
32,273
30,684
29,142
27,648
26,201
24,800
23,445
22,135
20,871
19,651
18,474
17,341
GPD
4.00
3.94
3.88
3.81
3.75
3.69
3.63
3.56
3.50
3.44
3.38
3.31
3.25
3.19
3.13
3.06
3.00
2.94
2.88
2.81
2.75
2.69
2.63
2.56
2.50
2.44
INCHES
REPLACE WEIR PLATE AND UPSTREAM RIP-RAP ACCORDING TO MONITOR WEIR CROSS-SECTIONS DETAILS
DOWNSTREAM OF WEIR
VEGETATION APPRXIMATELY 20' UPSTREAM AND 10'
MONITORING WEIR CROSS-SECTIONS DETAIL. CLEAN
*REPLACE WEIR PLATE AND RIP-RAP ACCORDING TO
20261104809
LOOKING NORTHEAST
MAHANOY NO. 2 MONITORING WEIR LOCATION
Scale: AS NOTED Date: Project No.:
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
31412.20 dweist 05\19\2026 15:37:19 Y:\Pottsville\31400S\31412.20_MTA_SRBC_Dam\Eng_Docs\Plans\07_PLAN_08.dgn (Default)
31412.20reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, SCHUYLKILL COUNTY, PENNSYLVANIA
5/2026
MAHANOY TOWNSHIP AUTHORITY
KLINE AND MAHANOY TOWNSHIPS,
DJW DJW ZRS
excavation
10 business days prior to the start of than 3 business days nor more than
Dial 8-1-1 or 1-800-242-1776 not less
Pennsylvania One Call System Serial Number
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
NO. PE055437E
JAMES JOHN RHOADES, JR.
B
B
A
A
90 DEGREE V-NOTCH WEIR
STREAM FLOW GAUGE
MONITORING WEIR
N
MONITORING WEIR
POLE RUN NO. 4
C-004
PLAN
103,646
99,645
95,737
91,924
88,202
84,573
81,035
77,587
74,229
70,959
67,778
64,683
61,675
58,753
55,915
53,161
50,490
47,901
45,394
42,967
40,619
38,351
36,160
34,046
32,008
30,044
GPD
4.00
3.94
3.88
3.81
3.75
3.69
3.63
3.56
3.50
3.44
3.38
3.31
3.25
3.19
3.13
3.06
3.00
2.94
2.88
2.81
2.75
2.69
2.63
2.56
2.50
2.44
INCHES
LOOKING SOUTHWEST
POLE RUN NO. 4 MONITORING WEIR LOCATION
STREAM GAUGE ACCORDING TO MONITORING WEIR CROSS-SECTIONS DETAIL.
*INSTALL WEIR PLATE TO COVER EXISTING WEIR OPENING. REPLACE RIP-RAP AND
20261104848
Scale: AS NOTED Date: Project No.:
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
31412.20 dweist 05\19\2026 15:40:16 Y:\Pottsville\31400S\31412.20_MTA_SRBC_Dam\Eng_Docs\Plans\07_PLAN_09.dgn (Default)
31412.20reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, SCHUYLKILL COUNTY, PENNSYLVANIA
5/2026
MAHANOY TOWNSHIP AUTHORITY
KLINE AND MAHANOY TOWNSHIPS,
DJW DJW ZRS
excavation
10 business days prior to the start of than 3 business days nor more than
Dial 8-1-1 or 1-800-242-1776 not less
Pennsylvania One Call System Serial Number
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
NO. PE055437E
JAMES JOHN RHOADES, JR.
B
B
A
A
1-FOOT CONTRACTED RECTANGULAR WEIR
STREAM FLOW GAUGE
MONITORING WEIR
N
UPSTREAM MONITORING WEIR
LOFTY
C-005
LOOKING SOUTH
LOFTY UPSTREAM MONITORING WEIR LOCATION
PLAN
395,343
386,686
378,080
369,526
361,023
352,574
344,178
335,837
327,552
319,324
311,152
303,040
294,986
286,993
279,061
271,192
263,386
255,645
247,969
240,361
232,820
225,349
217,948
210,619
203,363
196,182
189,076
GPD
4.06
4.00
3.94
3.88
3.81
3.75
3.69
3.63
3.56
3.50
3.44
3.38
3.31
3.25
3.19
3.13
3.06
3.00
2.94
2.88
2.81
2.75
2.69
2.63
2.56
2.50
2.44
INCHES
20261104866
Scale: AS NOTED Date: Project No.:
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
31412.20 dweist 05\19\2026 15:44:17 Y:\Pottsville\31400S\31412.20_MTA_SRBC_Dam\Eng_Docs\Plans\08_DETAILS.dgn (Aerial)
31412.20reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, SCHUYLKILL COUNTY, PENNSYLVANIA
4/2026
MAHANOY TOWNSHIP AUTHORITY
KLINE AND MAHANOY TOWNSHIPS,
DJW DJW ZRS
UPGRADES PROJECT
WATER CONSERVATION
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
NO. PE055437E
JAMES JOHN RHOADES, JR.
ALOCATION
MONITORING WEIR DIMENSIONS
DIMENSION
16-3/16" 4-1/16"
B C
LOFTY
MAHANOY NO. 2
POLE RUN NO. 4
WASTEHOUSE NO. 4
WASTEHOUSE NO. 3 16-1/2"
N.T.S.
N.T.S.
SECTION B-B
1'-0"
12" 12"
1" CHAMFER (TYP.)
1'-0"4'-0"5'-0"
RAKE FINISH
FLOW
EXCAVATION
CONSTRUCTION
REQUIRED BY WIER
CLAYEY BACKFILL AS
SLOPE VARIES
SUBGRADE
UNDISTURBED
LOWER GRADE
MATCH EXISTING
CONSTRUCTION WORK
IN AREAS DISTURBED BY
RIP-RAP PROTECTION
6'-0" 2'-6"
6'-0"
(TYP)
(TYP)
3"
EXIS
TING S
TREAM B
ANK
ELEVATION VARIES
EXISTING CHANNEL
6'-0" MIN (TYP)
GAUGE HEIGHT TO BE 2'-0".
MATCH TOP OF WEIR PLATE.
OR APPROVED EQUAL. GAUGE "0" TO
STYLE "A" WITH PORCELAIN FINISH
STREAM GAUGE BY WATERMARK
EXISTING STREAM BANK
@ 1'-0" O.C. E.W.
#5 STEEL REINFORCED
SECTION A-A
3"
DIMENSION A
ANCHOR BOLTS
WITH STAINLESS STEEL
MOUNT WEIR PLATE
(3000 PSI) PENNDOT PUB. 408, SEC. 704
CONCRETE CLASS A
MINIMUM 3" EMBEDNMENT
STAGGARED AT 15" APART
6" NOMINAL RIP-RAP
MONITORING WEIR CROSS-SECTIONS
DIMENSION C
DIMENSION B
1'
(DEPTH = 1'-6" MINIMUM)
R-4 RIP-RAP
(DEPTH = 1'-0" MINIMUM)
#200 SIEVE
PERM., COEF. <10-6, >25% PASSING
COMPACTED CLAYEY BACKFILL
(DEPTH = 2'-0" MIN.)
R-4 RIP-RAP
ON DOWNSTREAM FACE. SEAL W/ POLYURETHANE SEALANT
60 DEGREE V-NOTCH WEIR, ‚" 45 DEGREE BEVEL
42" X DIMENSION B X …" STAINLESS STEEL PLATE WITH
GEOTEXTILE (TYP)
CLASS 2, TYPE A
13'-0"
19'-6"
8'-0"
19'-0"
MINIMUM 4' WIDE.
3. WEIR PLATE WIDTH FOR POLE RUN NO.4 SHALL BE
STREAM HEIGHT.
2.BOTTOM OF WEIR PLATE SHALL BE SET TO EXISTING
PRIOR TO START OF CONSTRUCTION.
1.FIELD LOCATE MONITORING WEIR LOCATION
NOTES:
C-006
4"
4"
3-15/16"
4-3/16"
14'-5"16"
16"
15-13/16"
Scale: AS NOTED Date: Project No.:
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
31412.20 dweist 05\19\2026 15:47:38 Y:\Pottsville\31400S\31412.20_MTA_SRBC_Dam\Eng_Docs\Plans\09_E&S_01.dgn (Default)
31412.20reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, SCHUYLKILL COUNTY, PENNSYLVANIA
4/2026
MAHANOY TOWNSHIP AUTHORITY
KLINE AND MAHANOY TOWNSHIPS,
DJW DJW ZRS
UPGRADES PROJECT
WATER CONSERVATION
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
NO. PE055437E
JAMES JOHN RHOADES, JR.
INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS AND TO SCHEDULE A FINAL INSPECTION.
AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE NORTHAMPTON COUNTY CONSERVATION DISTRICT FOR AN
42. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED
SURFACE WATER AND ON ALL OTHER DISTURBED AREAS SPECIFIED ON THE PLAN MAPS AND/OR DETAIL SHEETS.
41. EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER WITHIN 50 FEET OF A
40. STRAW MULCH SHALL BE APPLIED IN LONG STRANDS, NOT CHOPPED OR FINELY BROKEN.
STEEPER.
39. MULCH OR MULCH CONTROL NETTING OR EROSION CONTROL BLANKETS MUST BE INSTALLED ON ALL SLOPES 3:1 AND
EROSION CONTROL POLICIES & INSPECTION & MAINTENANCE PROGRAM
FILLS.
25. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO
OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
24. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR
23. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS.
COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE
22. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR
INCHES OF TOPSOIL.
6 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 6
INCHES ON COMPACTED SOILS PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM
21. AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES OR 6 TO 12
STOCKPILES.
WETLANDS, FLOODPLAINS OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED, OR PLACED IN TOPSOIL
20. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE
SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY 19.
AT THE TIME OF INSPECTION.
WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS
A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE THEY 18.
PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF E&S BMPS FAIL TO
BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, MUST INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY
UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE 17.
NON-DISTURBED AREAS.
WATER SHALL BE THROUGH A SEDIMENT CONTROL BMP, SUCH AS A PUMPED WATER FILTER BAG DISCHARGING OVER
PLAN, OVER UNDISTURBED VEGETATED AREAS WITHIN THE LIMIT OF DISTURBANCE. ALL PUMPING OF SEDIMENT LADEN
ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN THIS 16.
A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF
THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM 15.
DISTRICT OR THE PADEP FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL COUNTY CONSERVATION 14.
BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
271.1, AND 287.1 ET.SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE
ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN 13.
CONSERVATION DISTRICT AND/OR THE REGIONAL OFFICE OF THE DEPARTMENT.
MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE NORTHAMPTON COUNTY
AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO
IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION 12.
POSSIBLE PRIOR TO SEEDING.
SEEDBED PREPARATION. COMPACTED SOILS SHOULD BE SCARIFIED 6 TO 12 INCHES ALONG CONTOUR WHEREVER
SUBSOIL IS EXCESSIVELY WET, OR IN A CONDITION THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER GRADING AND
TOPSOIL SHOULD NOT BE PLACED WHILE TOPSOIL OR SUBSOIL IS IN A FROZEN OR MUDDY CONDITION, WHEN THE 11.
2H:1V OR FLATTER.
TO BE STABILIZED BY VEGETATION. STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET. STOCKPILE SLOPES MUST BE
THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE
TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON 10.
OR EQUIVALENT, BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
BOUNDARIES SHOWN ON THE PLAN. THESE AREAS MUST BE CLEARLY MARKED USING SURVEY RIBBON, SURVEY STAKES
AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE 9.
PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR
THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN
CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF 8.
CONTROL.
SUBPART C, PROTECTION OF NATURAL RESOURCES, ARTICLE III, WATER RESOURCES, CHAPTER 102, EROSION
EROSION CONTROL RULES AND REGULATIONS, TITLE 25, PART 1, DEPARTMENT OF ENVIRONMENTAL PROTECTION, THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH THE PROVISIONS OF THE APPENDIX 64, 7.
COMPLETELY IMPLEMENTED.
APPLICANT, SUBMITTED TO AND APPROVED BY THE LOCAL CONSERVATION DISTRICT, AND IS BEING PROPERLY AND
THE OPERATOR SHALL ASSURE THAT AN EROSION AND SEDIMENT CONTROL PLAN HAS BEEN PREPARED BY THE 6.
ROOTS AND OTHER OBJECTIONABLE MATERIAL.
AREAS TO BE FILLED SHOULD BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, 5.
TO IMPLEMENTATION.
MUST BE APPROVED IN WRITING FROM THE NORTHAMPTON COUNTY CONSERVATION DISTRICT OR BY THE PADEP PRIOR
GRUBBING SHALL BE LIMITED ONLY TO THOSE AREAS DESCRIBED IN EACH STAGE. DEVIATION FROM THAT SEQUENCE
DRAWINGS. EACH STAGE SHALL BE COMPLETED BEFORE ANY FOLLOWING STAGE IS INITIATED. CLEARING AND
ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE PLAN 4.
THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR
AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA 3.
CONSERVATION DISTRICT TO AN ON-SITE PRECONSTRUCTION MEETING.
OF CRITICAL STAGES OF IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL COUNTY
OFFICIALS, THE E&S PLAN PREPARER, THE PCSM PLAN PREPARER, THE PROFESSIONAL RESPONSIBLE FOR OVERSIGHT
THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL
AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, 2.
CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.
IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE
ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR TO
DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT
ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN
ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILL SHALL BE DONE IN 1.
PROTECTION AND THE REPRESENTATIVE.
AS THEY ARE APPLICABLE AND IN ACCORDANCE TO THE INSTRUCTIONS OF THE DEPARTMENT OF ENVIRONMENTAL
EROSION, IT IS REQUIRED THAT THE CONTRACTOR FOR THIS PROJECT CONFORMS WITH THE FOLLOWING GUIDELINES
IN ACCORDANCE WITH THE CURRENT POLICIES AND PRACTICES IN THE COMMONWEALTH OF PENNSYLVANIA TO CONTROL
BELOW. THE STANDARDS CONTAINED IN THE PENNDOT PUBLICATION 408 ARE AN ACCEPTABLE ALTERNATIVE.
THE PHYSICAL PARAMETERS OF THE COMPOST SHOULD COMPLY WITH THE STANDARDS AS SHOWN IN THE TABLE
REPROCESSED WOOD PRODUCTS ARE NOT ACCEPTABLE AS THE ORGANIC COMPONENT OF THE MIX.
MATERIAL FROM WHICH IT WAS DERIVED. WOOD AND BARK CHIPS, GROUND CONSTRUCTION DEBRIS OR
BY DRY WEIGHT) OF MAN-MADE FOREIGN MATTER. THE COMPOST PRODUCT SHOULD NOT RESEMBLE THE RAW
COMPOSTED. THE COMPOST SHOULD POSSESS NO OBJECTIONABLE ODORS AND SHOULD BE SEASONABLY FREE (<1%
STUMP GRINDINGS, AND YARD OR WOOD/BARK ORGANIC MATTER SOURCES. THE COMPOST SHOULD BE AEROBICALLY
COMPOST SHOULD BE A WELL DECOMPOSED, WEED-FREE ORGANIC MATTER DERIVED FROM AGRICULTURE, FOOD, SOLUBLE SALT CONCENTRATION
PARTICLE SIZE
MOISTURE CONTENT
pH
ORGANIC PORTION
ORGANIC MATTER CONTENT
5.0 DS/M (MMHOS/CM) MAXIMUM
30% - 50% PASS THROUGH 3/8" SCREEN
30% - 60%
5.5 - 8.5
FIBROUS AND ELONGATED
25% - 100% (DRY WEIGHT BASIS)
LONGEVITY
FUNCTIONAL
MINIMUM
(ASTM-G-155)
STRENGTH
ORIGINAL
STABILITY %
ULTRAVIOLET
STRENGTH
TENSILE
MESH OPENINGS
DIAMETERS
SOCK
CHARACTERISTICS
MATERIAL
MATERIAL TYPE
6 MONTHS
1000HR
23% AT
3/8"
18"
12"
DEGRADABLE
PHOTO-
3 MIL HDPE
9 MONTHS
1000HR
23% AT
26 PSI
3/8"
32"
24"
18"
12"
DEGRADABLE
PHOTO-
5 MIL HDPE
9 MONTHS
26 PSI
3/8"
32"
24"
18"
12"
DEGRADABLE
PHOTO-
5 MIL HDPE
1 YEAR
1000 HR
100% AT
44 PSI
3/8"
32"
24"
18"
12"
DEGRADABLE
PHOTO-
(MFPP)
POLYPROPYLENE
MULTI-FILAMENT
1 YEAR
1000 HR
100% AT
44 PSI
3/8"
32"
24"
18"
12"
DEGRADABLE
PHOTO-
(MFPP)
POLYPROPYLENE
MULTI-FILAMENT
HEAVY DUTY
3/16" MAX APERTURE SIZE
MECHANICALLY FUSED VIA NEEDLE PUNCH)
(WOVEN LAYER AND NON-WOVEN FLEECE
COMPOSITE POLYPROPYLENE FABRIC
3/4" X 3/4" MAX APERTURE SIZE
FUSION-WELDED JUNCTURES
CONTIINUOUSLY WOUND
HDPE BIAXIAL NET
OUTER FILTRATION
INNER CONTAINMENT NETTING
SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS
PLACED 10' O.C.
2" X 2" WOODEN STAKES
FILTER MEDIA
BLOWN / PLACED
COMPOST FILTER SOCK
PLACED 10' O.C.
2" X 2" WOODEN STAKES
FILTER SOCK
COMPOST
F L
O W F
L O
W
MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE
7. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED.
MANUFACTURER'S RECOMMENDATIONS.
SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO
6. BIODEGRADABLE FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTO DEGRADABLE
HOURS OF INSPECTION.
BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24
5. SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL
OF THE SOCK AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
4. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVEGROUND HEIGHT
3. TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS.
IMMEDIATELY DOWN SLOPE OF THE SOCK IF SO SPECIFIED BY THE MANUFACTURER.
POLLUTION CONTROL PROGRAM MANUAL (363-2134-008). STAKES MAY BE INSTALLED
EROSION AND SEDIMENT CONTROL REPORT AND/OR THE PADEP EROSION AND SEDIMENT
ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY SOCK SHALL NOT EXCEED THAT IN THE
SOCK SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN SOCK
2. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE
STANDARDS AS SHOWN IN TABLE BELOW.
1. SOCK FABRIC SHALL MEET STANDARDS AS SHOWN IN TABLE BELOW. COMPOST SHALL MEET THE
NOTES:
BELOW. THE STANDARDS CONTAINED IN THE PENNDOT PUBLICATION 408 ARE AN ACCEPTABLE ALTERNATIVE.
THE PHYSICAL PARAMETERS OF THE COMPOST SHOULD COMPLY WITH THE STANDARDS AS SHOWN IN THE TABLE
REPROCESSED WOOD PRODUCTS ARE NOT ACCEPTABLE AS THE ORGANIC COMPONENT OF THE MIX.
MATERIAL FROM WHICH IT WAS DERIVED. WOOD AND BARK CHIPS, GROUND CONSTRUCTION DEBRIS OR
BY DRY WEIGHT) OF MAN-MADE FOREIGN MATTER. THE COMPOST PRODUCT SHOULD NOT RESEMBLE THE RAW
COMPOSTED. THE COMPOST SHOULD POSSESS NO OBJECTIONABLE ODORS AND SHOULD BE SEASONABLY FREE (<1%
STUMP GRINDINGS, AND YARD OR WOOD/BARK ORGANIC MATTER SOURCES. THE COMPOST SHOULD BE AEROBICALLY
COMPOST SHOULD BE A WELL DECOMPOSED, WEED-FREE ORGANIC MATTER DERIVED FROM AGRICULTURE, FOOD, COMPOST STANDARDS
SOLUBLE SALT CONCENTRATION
PARTICLE SIZE
MOISTURE CONTENT
pH
ORGANIC PORTION
ORGANIC MATTER CONTENT
5.0 DS/M (MMHOS/CM) MAXIMUM
30% - 50% PASS THROUGH 3/8" SCREEN
30% - 60%
5.5 - 8.5
FIBROUS AND ELONGATED
25% - 100% (DRY WEIGHT BASIS)
LONGEVITY
FUNCTIONAL
MINIMUM
(ASTM-G-155)
STRENGTH
ORIGINAL
STABILITY %
ULTRAVIOLET
STRENGTH
TENSILE
MESH OPENINGS
DIAMETERS
SOCK
CHARACTERISTICS
MATERIAL
MATERIAL TYPE
COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
6 MONTHS
1000HR
23% AT
3/8"
18"
12"
DEGRADABLE
PHOTO-
3 MIL HDPE
9 MONTHS
1000HR
23% AT
26 PSI
3/8"
32"
24"
18"
12"
DEGRADABLE
PHOTO-
5 MIL HDPE
9 MONTHS
26 PSI
3/8"
32"
24"
18"
12"
DEGRADABLE
PHOTO-
5 MIL HDPE
1 YEAR
1000 HR
100% AT
44 PSI
3/8"
32"
24"
18"
12"
DEGRADABLE
PHOTO-
(MFPP)
POLYPROPYLENE
MULTI-FILAMENT
1 YEAR
1000 HR
100% AT
44 PSI
3/8"
32"
24"
18"
12"
DEGRADABLE
PHOTO-
(MFPP)
POLYPROPYLENE
MULTI-FILAMENT
HEAVY DUTY
TWO-PLY SYSTEMS
3/16" MAX APERTURE SIZE
MECHANICALLY FUSED VIA NEEDLE PUNCH)
(WOVEN LAYER AND NON-WOVEN FLEECE
COMPOSITE POLYPROPYLENE FABRIC
3/4" X 3/4" MAX APERTURE SIZE
FUSION-WELDED JUNCTURES
CONTIINUOUSLY WOUND
HDPE BIAXIAL NET
OUTER FILTRATION
INNER CONTAINMENT NETTING
SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS
UNDISTURBED AREADISTURBED AREA
PLACED 10' O.C.
2" X 2" WOODEN STAKES
UNDISTURBED AREA
UNDISTURBED AREA
GROUND
EXISTING
ELEVATION VIEW
SECTION VIEW
COMPOST FILTER SOCK
10' O.C.
2" X 2" WOODEN STAKES PLACED
FILTER SOCK
COMPOST
NTS
COMPOST FILTER SOCK
F L
O W F
L O
W
MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE
7. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED.
MANUFACTURER'S RECOMMENDATIONS.
SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO
6. BIODEGRADABLE FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTO DEGRADABLE
HOURS OF INSPECTION.
BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24
5. SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL
OF THE SOCK AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
4. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVEGROUND HEIGHT
3. TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS.
IMMEDIATELY DOWN SLOPE OF THE SOCK IF SO SPECIFIED BY THE MANUFACTURER.
POLLUTION CONTROL PROGRAM MANUAL (363-2134-008). STAKES MAY BE INSTALLED
EROSION AND SEDIMENT CONTROL REPORT AND/OR THE PADEP EROSION AND SEDIMENT
ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY SOCK SHALL NOT EXCEED THAT IN THE
SOCK SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN SOCK
2. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE
STANDARDS AS SHOWN IN TABLE BELOW.
1. SOCK FABRIC SHALL MEET STANDARDS AS SHOWN IN TABLE BELOW. COMPOST SHALL MEET THE
NOTES:
38. HAY OR STRAW MULCH MUST BE APPLIED AT 3.0 TONS PER ACRE.
THE DESIGN DIMENSIONS WILL BE PROVIDED AFTER PLACEMENT OF THE PROTECTIVE LINING.
37. CHANNELS HAVING RIPRAP, RENO MATTRESS, OR GABION LININGS MUST BE SUFFICIENTLY OVER-EXCAVATED SO THAT
RESTORATION IS COMPLETE.
CHANNEL SHALL BE CONVEYED PAST THE WORK AREA IN THE MANNER DESCRIBED IN THIS PLAN UNTIL SUCH
CHANNEL RESTORED TO ITS ORIGINAL CROSS-SECTION AND PROTECTIVE LINING. ANY BASE FLOW WITHIN THE
36. UNDERGROUND UTILITIES CUTTING THROUGH ANY ACTIVE CHANNEL SHALL BE IMMEDIATELY BACKFILLED AND THE
WOODY DEBRIS, ACCUMULATED SEDIMENT, EXCESS VEGETATION, AND CONSTRUCTION MATERIAL/WASTES.
35. ALL CHANNELS SHALL BE KEPT FREE OF OBSTRUCTIONS INCLUDING BUT NOT LIMITED TO FILL, ROCKS, LEAVES, $25,000 IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO
DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP
MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE PADEP AS
CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS
34. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE
GERMINATING SEASON.
REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS SHOULD BE DONE ONLY DURING THE
REMOVED. AREAS DISTURBED DURING REMOVAL SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID
33. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE
BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE BMP'S.
32. EROSION AND SEDIMENT BMP'S MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE
OR THE PADEP.
OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE NORTHAMPTON COUNTY CONSERVATION DISTRICT
31. E&S BMPS MUST REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY STABILIZED
AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT
30. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70 PERCENT VEGETATIVE COVER OR
ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS
SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN
REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION
BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE
OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE
29. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE
THIS PLAN.
WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF
IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE
28. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT SLOPES
AND PROJECT SPECIFICATION(S) FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
27. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARDS
26. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
FILTER MEDIA
BLOWN / PLACED
ES-001
EROSION & SEDIMENT CONTROL PLAN
ANNUAL RYEGRASS (LOLIUM MULTIFLORUM)
FORMULA E:
CREEPING RED FESCUE OR CHEWING FESCUE
TALL FESCUE (FESTUCA ARUNDINACEA VAR KENTUCKY 31)
FORMULA D:
ANNUAL RYEGRASS (LOLIUM MULTIFLORUM(
CROWNVETCH (CORONILLA VARIA)
FORMULA C:
25% OF THE TOTAL BLUE GRASS COMPONENT.
IMPROVED CERTIFIED VARIETIES WITH NO ONE VARIETY EXCEEDING
KENTUCKY BLUEGRASS MIXTURE (POA PRATENSIS) A COMBINATION OF
CREEPING RED FESCUE OR CHEWINGS FESCUE
EXCEEDING 50% OF THE TOTAL RYEGRASS COMPONENT.
OF IMPROVED CERTIVIED VARIETIES WITH NO ONE VARIETY
PERENNIAL RYEGRASS MIXTURE (LOLIUM PERENNE) A COMBINATION
FORMULA B:
WEIGHTFORMULA AND SPECIES
TABLE A
PURITY GERMINATION WEED SEED
MAX %
1000 SQ. YD (LBS.)
SEEDING RATE PERMINIMUM %
70*
0.10
0.10
0.10
0.10
0.10
0.15
0.10
0.10
10.0
10.0 TOTAL
15.0
30.0
45.0 TOTAL
6.5
5.5
12.0 TOTAL
21.0
12.5
8.5
42.0 TOTAL
ITEM NO. 0804-0004 - FORMULA E
ITEM NO. 0804-0002 - FORMULA C
* INCLUDES HARDSEED AND NORMAL SEEDLINGSITEM NO. 0804-0001 - FORMULA B
SEEDING.
APPLIED, USE TILLAGE AND SOIL SUPPLEMENTS PRIOR TO PERMANENT
ON TOP SOILED AREAS, WHERE TEMPORARY SEEDING OR MULCHING HAS BEEN
WITHIN THE NEXT SEEDING DATES, AS DIRECTED IN WRITING.
PERMANENT SEEDING AND SOIL SUPPLEMENTS AND APPLY THE REMAINING 50%
IF EXTENDED, EITHER APPLY FULL TREATMENT OR APPLY ONLY 50% OF THE
WHERE PROJECT CONDITIONS WARRENT, SEEDINGS DATES MAY BE EXTENDED.
- MARCH 15 TO OCTOBER 15FORMULA E
AND OCTOBER
ANYTIME EXCEPT SEPTEMBER
- CROWN VETCH PORTION:
MARCH 1 TO OCTOBER 15
- RYE GRASS PORTION:FORMULA C
AUGUST 1 TO OCTOBER 15
- MARCH 15 TO JUNE 1FORMULA B & D
FOLLOWING DATES, OR AS OTHERWISE INDICATED OR DIRECTED.
TABLE A, OR AS OTHERWISE INDICATED. SPREAD SEEDS WITHIN THE
GENERAL, SPREAD SEEDS WHERE INDICATED AND AT THE RATES SPECIFIED IN
TABLE B
SCHEDULE OF SEEDING AND SOIL SUPPLEMENT
SUPPLEMENT FORMULA
SEEDING AND SOIL
APPLICATION
- TEMPORARY SEEDING
AND SWALES, DITCHES
- SLOPES 3:1 AND FLATTER,
- SLOPES STEEPER THAN 3:1
LAWNS
- SLOPES 3:1 AND FLATTER,
E
D
C
B
MULCH NETTING MUST BE INSTALLED ON ALL SLOPES 3:1 AND STEEPER.
NOTE:
ALL DISTURBED AREAS MUST BE 85% STABILIZED BY NOVEMBER 1.
PERMANENT SEED MIXTURE AND MULCH.
REDISTURBED WITHIN 1 YEAR MUST BE SEEDED AND MULCHED WITH A
DISTURBED AREAS WHICH ARE EITHER AT FINISHED GRADE OR WILL NOT BE
MULCHED WITH A QUICK GROWING TEMPORARY SEEDING MIXTURE AND MULCH.
GRADE AND WHICH WILL BE REDISTURBED WITHIN 1 YEAR MAY BE SEEDED AND
MULCHED IMMEDIATELY. DISTURBED AREAS WHICH ARE NOT AT FINISHED
ANY DISTURBED AREA ON WHICH ACTIVITY HAS CEASED MUST BE SEEDED AND
(WEIGHT).
SEED, WELL-CURED TO LESS THAN 20% MOISTURE CONTENT, BY MASS
1.B. STRAW. EITHER WHEAT OR OAT STRAW, REASONABLY FREE OF VIABLE
20% MOISTURE CONTENT, BY MASS WEIGHT).
ACCEPTABLE NATIVE OR FORAGE GRASSES, WELL-CURED TO LESS THAN
1.A. HAY. TIMOTHY HAY, MIXED CLOVER AND TIMOTHY HAY, OR OTHER
SPECIFIED:
1. SEEDED AREAS. EITHER ONE OR A COMBINATION OF THE FOLLOWING, AS
CRUSHED AGGREGATE WITH WEED BARRIER MAT.
BARRIER MAT, AS SPECIFIED IN SECTION 808.2(q), BUT DO NOT USE
USE MULCHES SEPARATELY OR, IF INDICATED IN COMBINATION WITH WEED
PHYSICAL AND CHEMICAL ANALYSIS FOR MULCHES.
WHEN REQUESTED, AND PRIOR TO PROJECT DELIVERY, FURNISH A CERTIFIED
DEFINED BY LAW.
BEARING STALKS OR ROOTS OF PROHIBITED AND NOXIOUS WEEDS, BOTH AS
SUBSTANCES TOXIC TO PLANT GROWTH. ALSO, FREE FROM MATURE SEED
MULCHES. FREE FROM FOREIGN MATERIAL, COARSE STEMS, MOLD, AND ANY
MESH OPENING -NOMINAL 2 IN. BY 2 IN.
WEIGHT -6 OUNCES PER SQ. YARD MINIMUM
WOVEN INTO A MESH MEETING THE FOLLOWING REQUIREMENTS:
2 COCONUT COIR. UNDYED, BIODEGRADABLE COCONUT COIR YARN
MESH OPENING -NOMINAL ƒIN. BY ƒIN.
WEIGHT -0.23 OUNCE PER SQUARE YARD,MINIMUM
COLOR -BLACK,GREEN, OR CLEAR
MEETING THE FOLLOWING REQUIREMENTS:
1. PLASTIC. A UNIFORMLY EXTRUDED, RECTANGULAR, PLASTIC MESH
WIDTHS BY NOT LESS THAN 8 INCHES.
EDGES AT 6• TO 7 FOOT INTERVALS. OVERLAP ADJACENT FABRIC
STRETCH FABRIC TIGHTLY AND ANCHOR WITH WOOD STAKES ALONG ALL
2. COCONUT COIR. INSTALL NETTING OVER DESIGNATED MULCH SURFACE.
PER SQUARE YARD OF AREA.
REMAINING FABRIC AREAS BY PUTTING IN APPROXIMATELY 1 STAPLE
INCHES. STAPLE FROM CENTER OF FABRIC TO OUTSIDE EDGES. SECURE
INTERVALS. OVERLAP ADJACENT FABRIC WIDTHS BY NOT LESS THAN 4
STAPLE UPSLOPE ENDS, EDGES, BOTTOM, AND OVERLAPS AT 2-FOOT
1. PLASTIC. INSTALL NETTING OVER DESIGNATED MULCH SURFACE.
- 61 POUNDS PER 1,000 S.Y.31-0-0 IBDU FERTILIZER
-OR-
S.Y.AS DIRECTEDCOATED UREA FERTILIZER
- 59 TO 50 POUNDS / 1,00032-0-0 TO 38-0-0 SULFUR
-OR-
UREAFORM FERTILIZER
- 50 POUNDS PER 1,000 S.Y.38-0-0 UREA FORM
FERTILIZER
- 140 POUNDS PER 1,000 S.Y.10-20-20 ANALYSIS COMMERCIAL
PULVERIZED AGRICULTURAL LIMESTONE - 800 POUNDS PER 1,000 S.Y.
APPLY SOIL SUPPLEMENTS AS FOLLOWS, UNLESS OTHERWISE INDICATED
PROPERTY TEST METHOD MINIMUM STANDARD
AOS% RETAINED
UV RESISTANCE
MULLEN BURST
PUNCTURE
GRAB TENSILE
AVG WIDE WIDTH STRENGTH
ASTM-D-4751
ASTM-D-4355
ASTM-D-3786
ASTM-D-4833
ASTM-D-4632
ASTM-D-4884
80 SIEVE
70%
350 PSI
110 LB
205 LB
60 LB/IN
RESUME UNTIL THE PROBLEM IS CORRECTED.
7. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT
WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED.
6. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
5. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND
WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING SURFACE
4. NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK
UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE PLACED
PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN
AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE
3. BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT
REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE
FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE
2. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED.
FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:
STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME
1. LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE
NOTES:
FILTER BAG
WELL VEGETATED, GRASSY AREA
WELL VEGETATED, GRASSY AREA
PLAN VIEW
ELEVATION VIEW
NTS
FILTER BAG
DISCHARGE HOSE
CLAMPS
HEAVY DUTY LIFTING STRAPS (RECOMMENDED)
DISCHARGE HOSE
PUMP
INTAKE HOSE
PUMP
INTAKE HOSE
CLAMPS
3'-0"
ANCHORS(TYP)
PLACE 1.5 ANCHOR/SY
SEEDING APPLICATION DATES
MULCH NETTING APPLICATION RATES
MULCH CONTROL NETTING
MULCH TYPES
PUMPED WATER FILTER BAG
SOIL SUPPLEMENTS APPLICATION RATES
MULCH APPLICATION RATES
(INCLUDING 3:1)
BETWEEN 3:1 AND 2:1
ANCHOR PATTERN FOR SLOPES
SOIL SUPPLEMENTS
MULCH TEMPORARY SEEDED AREAS WITH HAY.
WITH TILLAGE PRIOR TO PERMANENT SEEDING.
ON TOPSOILED AREAS TEMPORARILY SEEDED AND/OR MULCHED INCORPORATE
SQUARE YARDS
RECYCLED CELLULOSE FIBER/WOOD FIBER MIXTURE, 160 POUNDS PER 1,000
POLYVINYL ACETATE, AT MANUFACTURER'S RECOMMENDED RATES
NONASPHALTIC EMULSION, AT MANUFACTURER'S RECOMMENDED RATES
RECYCLED - CELLULOSE FIBER, 160 POUNDS PER 1,000 SQUARE YARDS
FOLLOWING RATES:
PERMITTED. ANCHOR MULCH WITH SPECIFIED MULCH BINDERS APPLIED AT THE
MULCH. MACHINES WHICH CUT MULCH INTO SHORT PIECES WILL NOT BE
APPLICATION. AN ACCEPTABLE MECHANICAL BLOWER MAY BE USED TO APPLY
UPON THE MATERIAL USED, SEASON, SOIL CONDITIONS, OR METHOD OF
INDICATED. IF DIRECTED, INCREASE THE RATE OF APPLICATION, DEPENDING
RATE OF 1,200 POUNDS PER 1,000 SQUARE YARDS, OR AS OTHERWISE
PLACE HAY OR STRAW UNIFORMLY, IN A CONTINUOUS BLANKET, AT A MINIMUM
AREAS AS INDICATED OR SPECIFIED.
FIBER OVER TOPSOILED AREAS. USE HAY, STRAW, OR WOOD FIBER IN OTHER
COMPLETED. UNLESS OTHERWISE INDICATED, PLACE ONLY STRAW OR WOOD
IMMEDIATELY AFTER SEEDING OR WITHIN 48 HOURS AFTER SEEDING IS
MULCHING SEEDED AREAS. PLACE MULCH, OF THE KIND INDICATED,
SEEDED AREAS. DO NOT APPLY SLOW-RELEASE NITROGEN FERTILIZER SUPPLEMENTS TO FORMULA C SEEDED AREA.
PRIOR TO PROJECT COMPLETION, APPLY SLOW-RELEASE, NITROGEN FERTILIZER TO THE SURFACE OF FORMULA B AND D
BE PERFORMED DURING TILLAGE OPERATIONS.
DISKING, HARROWING, OR BY ANOTHER ACCEPTABLE METHOD. THE BLENDING OF THE SUPPLEMENTS INTO THE SOIL MAY
ON TOPSOILED AREAS, BLEND THE INITIAL SOIL SUPPLEMENTS INTO THE SOIL AT LEAST 2 INCHES BY RAKING, FORMULA E. PROPERLY DOCUMENT BULK DELIVERY, AS SPECIFIED IN SECTION 804.2(a)2.
SOIL SUPPLEMENTS. UNIFORMLY APPLY SUPPLEMENTS TO THE AREAS TO BE SEEDED, EXCEPT AREAS TO BE SEEDED WITH
POTTSVILLE, PA 17901, 570-622-4225
PENSYLVANIA STATE UNIVERSITY ANALYTICAL SERVICES COOPERATIVE EXTENSION 1202 AG CENTER DRIVE, OTHER ANALYSIS AS INDICATED, CONTRACTOR SHALL CONDUCT SOIL TESTS. TESTS TO BE IN ACCORDANCE WITH THE
WATER INSOLUBLE NITROGEN (WIN) - 27% MINIMUM
31-0-0 IBDU - COARSE GRADE (0.7 TO 2.5 MM)
DISSOLUTION RANGE OF 20% TO 30%
32-0-0 TO 38-0-0 COATED UREA WITH A 7-DAY
UREA NITROGEN - 3.5% MINIMUM
ACTIVITY INDEX (AI) - 40% MINIMUM
COLD WATER INSOLUBLE - 25% MINIMUM NITROGEN (WIN)
38-0-0 UREAFORM - 38% MINIMUM TOTAL NITROGEN (TN)
ANOTHER ANALYSIS AS INDICATED; AND MEETING THE FOLLOWING REQUIREMENTS:
DRY FORMULATIONS OF EITHER 38-0-0 UREAFORM, 32-0-0 TO 38-0-0 SULFUR COATED UREA, 31-0-0 IBDU, OR
AND PLANT GROWTH SUBSTANCE LAW, ACT OF DECEMBER 1, 1977, P.L. 258, NO. 86 (3P.S.68.2) AS AMENDED. USE
SLOW RELEASE NITROGEN FERTILIZER. CONFORMING TO THE REQUIREMENTS OF THE PENNSYLVANIA SOIL CONDITIONER 3.
OTHER ANALYSIS AS INDICATED OR SPECIFIED IN THE PROPOSAL.
FORMULATIONS OF 19-6-12 ANALYSIS CONTROLLED RELEASE FOR HERBACEOUS WETLAND PLANTING OPERATIONS. USE
16-8-16 ANALYSIS CONTROLLED RELEASE FOR TREE, SHRUB, AND VINE TYPE PLANTING OPERATIONS. USE DRY
FORMULATIONS OF 10-20-20 ANALYSIS FOR SEEDED AND SODDED AREAS. USE DRY FORMULATIONS OF 20-10-5 AND
GROWTH SUBSTANCE LAW, ACT OF DECEMBER 1, 1977 P.L. 258, NO. 86 (P.S.68.2) AS AMENDED. USE DRY
COMMERCIAL FERTILIZER. CONFORMING TO THE REQUIREMENTS OF THE PENNSYLVANIA SOIL CONDITIONER AND PLANT 2.
L-36 FOR GROUP 1, CLASS B, TYPE MO; AND HAVING AN EFFECTIVE NEUTRALIZING POWER OF NOT LESS THAN 64.
ACT OF 1978, P.L. 15 NO. 9 (3P.S.132-1), AS AMENDED; CONFORMING TO THE CURRENT STATE SPECIFICATIONS NO.
PULVERIZED AGRICULTURAL LIMESTONE. CONFORMING TO THE REQUIREMENTS OF THE AGRICULTURAL LIMING MATERIALS 1.
12" DIAMETER AROUND FILTER BAG
PLACE COMPOST FILTER SOCK,
ES-002
EROSION & SEDIMENT CONTROL PLAN
Sheet No.:Drawn: Designed: Checked:
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.:
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza
Alfred Benesch & Company
31412.20 dweist 05\19\2026 15:50:45 Y:\Pottsville\31400S\31412.20_MTA_SRBC_Dam\Eng_Docs\Plans\10_E&S_02.dgn (Default)
31412.20reuse, reproduction or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of Alfred Benesch & Company. Use, SCHUYLKILL COUNTY, PENNSYLVANIA
4/2026
MAHANOY TOWNSHIP AUTHORITY
KLINE AND MAHANOY TOWNSHIPS,
DJW DJW ZRS
UPGRADES PROJECT
WATER CONSERVATION
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
NO. PE055437E
WATER FLOW
IN DIRECTION OF
SLOPE, ROLL BLANKETS
STARTING AT TOP OF
AND STAPLED.
OVERLAPPED 4" (MIN.)
BLANKET EDGES
AND COMPACT SOIL.
TRENCH, STAPLE, BACKFILL
ROLL IN 6" x 6" ANCHOR
INSTALL BEGINNING OF
INSTALLATION OF BLANKET.
SEED) PRIOR TO
OF LIME, FERTILIZER, &
(INCLUDING APPLICATION
PREPARE SEED BED
BEING BLANKETED.
AND LENGTH OF SLOPE
PATTERN FOR STEEPNESS
RECOMMENDED STAPLING
REFER TO MANUFACTURER'S
STYLE). STAPLE SECURELY.
THE DOWNSLOPE BLANKET (SHINGLE
WITH THE UPSLOPE BLANKET OVERLYING
OVERLAP BLANKET ENDS 6" (MIN.)
CALENDAR DAYS.
DISPLACED BLANKETS SHALL BE RESTORED OR TRPLACED WITHIN 4
UNIFORM 70% COVERAGE THROUGHTOUT THE BLANKETED AREA. DAMAGED OR
EVENT UNTIL PERENNIAL VEGETATION IS ESTABLISHED TO A MINIMUM
BLANKETED AREAS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF 6.
MANUFACTURER'S RECOMMENDATIONS.
THE BLANKET SHALL BE STAPLED IN ACCORDANCE WITH THE 5.
BLANKET.
STAPLE TO MAINTAIN DIRECT CONTACT WITH SOIL. DO NOT STRETCH
THROUGHTOUT ENTIRE LENGTH. LAY BLANKET LOOSELY AND STAKE OR
BLANKET SHALL HAVE GOOD CONTINUOUS CONTACT WITH UNDERLYING SOIL 4.
SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS, AND GRASS.3
TOP OF SLOPE.
PROVIDE ANCHOR TRENCH AT TOE OF SLOPE IN SIMILAR FASHION AS AT 2.
IN THE PLAN DRAWINGS PRIOR TO INSTALLING THE BLANKET.
SEED AND SOIL AMENDMENTS SHALL BE APPLIED ACCORDING TO THE RATES 1.
NOTES:
NTS
SOIL CONTACT.
MUST MAINTAIN GOOD
NOT BE STRETCHED; IT
THE BLANKET SHOULD
1 MIN
1 MIN
1 MIN
FABRIC FENCE
BALES OR FILTER
HEIGHT OF STRAW
FILTER = 5/6
HEIGHT OF ROCK
NTS
OUTLET CROSS-SECTION
UP-SLOPE FACE
R-3 ROCK
WOOD POSTS
3' MIN
1'1'
PUMP
PERMANENT RISER
TEMPORARY OR
6" MIN
AASHTO #57
FILTER FABRIC
STRAW BALES OR
AASHTO #57
ANCHORED
6" COMPOST LAYER FIRMLY
6" SUMP
THE HEIGHT OF THE OUTLET.
2. SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH 1/3
USED ON UPSLOPE FACE IN HQ AND EV WATERSHEDS.
TO CONCENTRATED FLOW. ANCHORED COMPOST LAYER SHALL BE
OF A SILT FENCE OR STRAW BALE BARRIER HAS OCCURRED DUE
1. A ROCK FILTER OUTLET SHALL BE INSTALLED WHERE FAILURE
NOTES:
PUMP
FILTER**
ROCK
FILTER BAG
PUMPED WATER
IMPROVEMENTS
PROPOSED SWALE
INTAKE PIPE
PUMP
PIPE
DISCHARGE
BYPASS AROUND IN-CHANNEL WORK AREAS
TEMPORARY DIVERSION DEVICE AND PUMP
DEVICE TO PREVENT BACKFLOW INTO THE WORK AREA.
FILTER MAY BE REPLACED BY AN IMPERVIOUS TEMPORARY DIVERSION
** SEE ROCK FILTER DETAIL. FOR LOW GRADIENT CHANNELS, THE ROCK
NON-EROSIVE MATERIAL, NO EARTH FILL.
* SANDBAGS (SEE TEMPORARY DIVERSION DEVICE DETAIL) OR OTHER
ANCHORED PLASTIC
SECURELY
DISSIPATER OR
ENERGY
PUMP DISCHARGE
DEVICE*
DIVERSION
TEMPORARY
ENTERING THE SYSTEM.
PREVENT SEDIMENT FROM
DISTANCE FROM BOTTOM TO
MAINTAINED A SUFFICIENT
NOTE: PUMP INTAKE SHALL BE
STACKED SANDBAGS OPTION
2 BAG MIN. HEIGHT ABOVE NORMAL BASE FLOW
NORMAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .