2-Plans-Drawings BID SET - South Cove Septic Maintenance.pdf
PDF 1 MB Posted
- Attached to
- South Cove Septic Maintenance
- Solicitation number
- ITB 25-08
- Issued by
- Mccormick County, South Carolina
About this file
This is a construction plans and specifications document prepared by Thomas and Hutton Engineering for Oconee County, South Carolina, detailing the South Cove Septic Maintenance project located at South Cove Park in Oconee County. The project scope includes removal and disposal of an existing septic tank, installation of two new 1,500-gallon septic tanks connected in series with dual risers, installation of approximately 1,000 linear feet of Infiltrator Quick4 Standard Chamber drain field with 28 inches of gravel depth, installation of 40 linear feet of Schedule 40 PVC hard wall pipe, and associated site restoration and erosion control measures. The project is dated January 19, 2026, with drawing revision status marked as "BID SET - NOT FOR CONSTRUCTION" as of February 23, 2026. The construction plans specify that the contractor must coordinate all tie-ins with Oconee County, maintain a minimum of three feet of cover over pipe, verify invert elevations prior to excavation, and ensure all disturbed areas are stabilized with pine straw mulch and vegetative cover. Contractor responsibilities include temporary barricade installation, daily drainage functionality, daily site cleanup, and adjustment of manhole frames to match final grade at no additional cost to the owner.
The specifications require adherence to South Carolina Department of Environmental Services sediment control standards, including inspection of sediment control measures at least once every seven calendar days and after storm events exceeding 0.5 inches of precipitation within 24 hours. All erosion control devices must remain functional until contributing disturbed areas are stabilized, and stabilization measures must be initiated within 14 days of construction cessation. The contractor is responsible for determining the exact location of all existing underground utilities and shall immediately notify the engineer if unsuitable materials are discovered during excavation. All materials shall include PVC C900 for water mains and PVC SDR35 for gravity sewer mains unless otherwise indicated. The document specifies that the infiltration trench width shall be 36 inches with a maximum depth of 60 inches, gravity flow piping must be non-perforated Schedule 40 PVC, and at least 7 feet of undisturbed dirt must exist between infiltration ditches. Final approval is contingent upon satisfactory completion of all landscaping and drainage improvements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Specifications Bid Docs BID SET - South Cove Septic Maintenance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAT: 34.7128
LONG: -82.9659
REV. NO. REVISION
REVISION HISTORY
BY DATE
SUBMITTED TO
SUBMITTAL HISTORY
DATEDATE
Project Manager's Seal
J-
9.
/1
9/
SO
UT
H C
O V
E
SE
PT
IC
M A
IN
TE
N A
N C
E
Know what'sbelow.
before you dig.Call
R
CONSTRUCTION PLANS
OF
SOUTH COVE SEPTIC MAINTENANCE
SOUTH COVE PARK
OCONEE COUNTY, SC
PREPARED FOR:
OCONEE COUNTY
415 S PINE ST
WALHALLA, SC 29691
JANUARY 19, 2026
TM# 208-00-03-013
J-33559.0000
VICINITY MAP
SCALE: 1" = 2000'
SITE
PREPARED BY:
220 North Main Street • Suite 402 Greenville, SC 29601 p.864.412.2222 www.thomasandhutton.com
Z:
\3
\3
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
C
S.
D
W G
Ja n
, 2
- 1
:3
PM
Sheet List Table Sheet Number Sheet Title
CO Cover Sheet G0.0 General Notes and Index C1.0 Site Plan C1.1 Details
BID SET - NOT FOR CONSTRUCTION
2/23/26 http://www.thomasandhutton.com
SCALE: 1" = 200'
INDEX
ENGINEER:
OCONEE COUNTY
TOWN
COUNTY
GENERAL INFORMATION
OWNER: SURVEYOR:
SENECA
OCONEE COUNTY
415 S PINE STREET
WALHALLA, SC 29691
1. CONTRACTOR SHALL COORDINATE TIE-IN OF NEW SEWER FACILITIES TO OCONEE COUNTY.
2. CONTRACTOR SHALL MAINTAIN MINIMUM COVER OVER THE WATER MAIN PIPE BARREL OF 3'-0" UNLESS OTHERWISE INDICATED. TOP OF PIPE ELEVATIONS ARE SHOWN FOR CASES WHERE FUTURE STORM SEWERS ARE TO BE INSTALLED. IN NO
CASE SHALL THE WATER MAIN BE INSTALLED AT A LOWER ELEVATION THAN THAT SHOWN.
3. SHOULD PIPE, FITTINGS, AND OTHER MATERIALS BE NEEDED IN ADDITION TO THAT SHOWN ON THE DRAWINGS BECAUSE PIPELINE WAS NOT INSTALLED TO THE ALIGNMENT AND PROFILE SHOWN, THEN THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING THOSE NECESSARY MATERIALS AND PROVIDING THE EQUIPMENT AND LABOR TO INSTALL THEM TO MEET THE
DESIGN INTENT OF THE WATERMAIN AT NO ADDITIONAL COST TO THE OWNER.
4. THE CONTRACTOR SHALL NOTIFY THE OWNER AND THE ENGINEER 48 HOURS IN ADVANCE OF ALL REQUIRED TESTS AND
INSPECTIONS.
5. THE CONTRACTOR WILL NOTIFY THE ENGINEER IF UNSUITABLE MATERIAL IS DISCOVERED PRIOR TO BEGINNING ANY
REMOVAL OPERATION.
6. ALL WATERMAINS SHALL BE POLYVINYL CHLORIDE (PVC C900) UNLESS OTHERWISE INDICATED.
7. ALL GRAVITY SEWER MAIN SHALL BE POLYVINYL CHLORIDE (PVC SDR35) UNLESS OTHERWISE INDICATED.
8. SURVEYING AND BOUNDARY INFORMATION BY THOMAS AND HUTTON
9. ALL ELEVATIONS SHOWN ARE BASED ON NAVD88.
10. TOPOGRAPHIC SURVEY BY THOMAS AND HUTTON.
11. CONTRACTOR IS TO VERIFY ACCURACY OF ANY TEMPORARY BENCHMARKS SHOWN PRIOR TO UTILIZING THEM FOR
CONSTRUCTION.
12. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE INFORMATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL UTILITIES OTHER THAN THOSE SHOWN ARE ENCOUNTERED DURING CONSTRUCTION , THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY AND TAKE STEPS TO PROTECT THE LINE(S) AND ENSURE CONTINUED SERVICE. DAMAGE CAUSED TO EXISTING UTILITIES BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR. ADDITIONALLY, THE CONTRACTOR SHALL CONFIRM THE CONNECTION POINTS
OF NEW UTILITIES TO EXISTING UTILITIES PRIOR TO BEGINNING NEW CONSTRUCTION.
13. IF WORK IS SUSPENDED OR DELAYED FOR 14 DAYS, THE CONTRACTOR SHALL TEMPORARILY STABILIZE THE DISTURBED AREA
AT NO ADDITIONAL COST TO THE OWNER.
14. THE CONTRACTOR SHALL INSTALL ANY BARRICADES PRIOR TO BEGINNING CONSTRUCTION
16. THE CONTRACTOR SHALL INSTALL ALL EROSION CONTROL AND PREVENTION STRUCTURES SHOWN ON THE PLANS. BOTH MUST BE APPROVED BY OCONEE COUNTY PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES.
17. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IF UNSUITABLE MATERIAL IS DISCOVERED PRIOR TO BEGINNING ANY
REMOVAL OPERATION.
18. CONTRACTOR WILL BE REQUIRED TO ADJUST MANHOLE FRAMES TO MATCH FINAL GRADE AT NO ADDITIONAL COST.
19. THE FOLLOWING NOTES ARE SPECIFIED BY THE SOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES AND ARE TO
BE EXECUTED BY THE CONTRACTOR:
a. ALL SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND AFTER ANY STORM EVENT OF GREATER THAN 0.5 INCHES OF PRECIPITATION DURING ANY 24-HOUR PERIOD. ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED UNTIL FINAL STABILIZATION HAS BEEN OBTAINED.
b. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED, UNLESS ACTIVITY IN THAT PORTION OF THE SITE WILL RESUME WITHIN 14 DAYS.
c. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING LOT CONSTRUCTION OR PROVIDE AN INDIVIDUAL PLAN MEETING SECTION R.72-307 OF THE STORM WATER MANAGEMENT AND SEDIMENT
REDUCTION ACT REQUIREMENTS.
20. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE CONSTRUCTED SIMULTANEOUSLY WITH THE DISTURBANCE OF THE LAND AND SHALL REMAIN FUNCTIONAL UNTIL THE CONTRIBUTING DISTURBED AREAS ARE STABILIZED. SILT BARRIERS WILL BE INSTALLED AS NECESSARY TO PREVENT EXCESSIVE SEDIMENTATION OF DOWNSTREAM AREAS. DEVICES SHALL BE IN ACCORDANCE WITH THE MANUAL OF "EROSION AND SEDIMENT CONTROL PRACTICES FOR DEVELOPING AREAS" BY THE
S.C. LAND RESOURCES CONSERVATION COMMISSION.
21. CONTRACTOR SHALL GRADE AREAS TO DRAIN FOR POSITIVE FLOW PRIOR TO FINAL APPROVAL.
22. ALL TRAFFIC CONTROL SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE MANUAL ON "UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS" AND "SOUTH CAROLINA MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES" BOTH CURRENT EDITIONS.
23. ALL AREAS DISTURBED WILL BE GRASSED IMMEDIATELY AFTER THE INSTALLATION. GRASSING SHALL BE IN ACCORDANCE WITH SECTION 810 OF THE SCDOT STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION CURRENT EDITION.
PAYMENT SHALL BE AS SHOWN IN THE BID FORM AND SHALL BE COMPENSATION FOR ALL NECESSARY WORK AND MATERIALS TO COMPLETE THE SEEDING IN ACCORDANCE WITH THESE SPECIFICATIONS. (SEE SPECIFICATIONS BELOW)
24. ALL DRAINAGE WILL BE MADE FUNCTIONAL DAILY AS WORK PROGRESSES.
25. EACH EXISTING ROAD WILL BE CLEANED UP AND RESTORED DAILY.
26. NEW PAVEMENT TO BE FLUSH WITH EDGE OF EXISTING PAVEMENT.
27. ALL STORM DRAIN PIPE INVERTS IN AND OUT ARE THE SAME AS THE BOX INVERT UNLESS OTHERWISE NOTED ON THE PLAN
SHEETS AND/OR PROFILES.
GENERAL NOTES
ABBREVIATIONS
DBL DOUBLE FM FORCE MAIN (SANITARY SEWER) OC ON CENTER SS SANITARY SEWER
BOT BOTTOM FP FINISH PAD PC POINT OF CURVE TC TOP OF CURB
CB CATCH BASIN FPW FIRE PROTECTION PH POST HYDRANT TH THROAT ELEVATION
CI CURB INLET FR FRAME PT POINT OF TANGENT TG TOP OF GUTTER
CO CLEAN OUT GI GRATE INLET PVC POLYVINYL CHLORIDE TP TOP OF PAVEMENT
CPP CORRUGATED PLASTIC PIPE GV GATE VALVE RCP REINFORCED CONCRETE PIPE TW TOP OF WALK
DBL DOUBLE HDPE HIGH DENSITY POLYETHYLENE RC ROLL CURB INLET TYP TYPICAL
DI DITCH INLET HI HOODED INLET RCP REINFORCED CONCRETE PIPE VI VALLEY INLET
DIP DUCTILE IRON PIPE INV INVERT ELEVATION RI ROOF INLET W WATER
EL ELEVATION JB JUNCTION BOX RJP RESTRAINED JOINT PIPE W/ WITH
ES END SECTION LF LINEAR FEET R/W RIGHT-OF-WAY WV WATER VALVE
FES FLARED END SECTION MAX MAXIMUM SD STORM DRAINAGE YI YARD INLET
FG FINISH GRADE MIN MINIMUM SDMH STORM DRAINAGE MANHOLE
FH FIRE HYDRANT MH MANHOLE SF SQUARE FEET
Z:
\3
\3
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
G
N .D
W G
Ja n
, 2
- 1
:3
PM
THOMAS & HUTTON
220 NORTH MAIN STREET, SUITE 402
GREENVILLE, SC 29601
864.412.2222
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
GENERAL NOTES AND INDEX
G0.0 33559.0000
SOUTH COVE SEPTIC
MAINTENANCE
South Cove Park Oconee County, SC
Oconee County 415 S Pine St Walhalla, SC 29691
01/19/26
LHB
LHB
KES
220 North Main Steet • Suite 402 Greenville, SC 29601 • 864.412.2222 www.thomasandhutton.com
DRAINAGE LEGEND
EXISTING PROPOSED
PIPE
DITCH
CURB INLET (CI)
CATCH BASIN
(CB)
CURB INLET -
RIGHT (CI)
OR
CATCH BASIN -
RIGHT (CB)
OR OR
CURB INLET -
LEFT (CI)
OR
CATCH BASIN -
LEFT (CB)
OR OR
CURB INLET -
BOTH (CI)
OR
CATCH BASIN -
BOTH (CB)
OR OR
CONTROL
STRUCTURE (CS)
DITCH INLET (DI)
GRATE INLET
(GI)
HOODED INLET
(HI)
OR OR
JUNCTION BOX
(JB)
MANHOLE
(SDMH)
ROLL CURB
INLET (RC)
ROOF INLET (RI)
VALLEY INLET
(VI)
YARD INLET (YI)
BEVELED END
SECTION (BES)
END SECTION
(ES)
FLARED END
SECTION (FES)
11-14° BEND -
HORIZONTAL
22-12° BEND -
HORIZONTAL
45° BEND -
HORIZONTAL
90° BEND -
HORIZONTAL
CLEANOUT
PLUG
TEE
WYE
SEWER LEGEND
EXISTING PROPOSED
GRAVITY PIPE
SINGLE SERVICE
LATERAL
DOUBLE
SERVICE
LATERAL
DROP
MANHOLE
(DMH)
MANHOLE (MH)
CLEANOUT
(CO)
FORCEMAIN
AIR RELEASE
VALVE (ARV)
CHECK VALVE
(CV)
PLUG VALVE
AND BOX (PV)
FLUSH HYDRANT
PUMP
CONNECTION
(PC)
REDUCER
TRACER WIRE
ACCESS BOX
(TWAB)
CROSS
TEE
TAPPING
SLEEVE (TS)
90° BEND
HORIZONTAL
45° BEND
HORIZONTAL
22-12° BEND
HORIZONTAL
11-14° BEND
HORIZONTAL
BEND
VERTICAL
PLUG \ CAP
ss
10"FM 10"FM
WATER LEGEND
EXISTING PROPOSED
FIRE
PROTECTION
WATER MAIN
SINGLE SERVICE
LATERAL
DOUBLE
SERVICE
LATERAL
BUTTERFLY
VALVE (BV)
DOUBLE CHECK
DETECTOR
ASSEMBLY
(DCDA)
GATE VALVE
AND BOX (GV)
POST
INDICATOR
VALVE (PIV)
TAPPING
SLEEVE AND
VALVE (TSV)
REDUCED
PRESSURE ZONE
BACKFLOW
(RPZ)
WATER LEGEND
EXISTING PROPOSED
WATER METER
(WM)
TRACER WIRE
ACCESS BOX
(TWAB)
FIRE HYDRANT
W/TEE, VALVE &
BOX (FHA)
POST HYDRANT
(PH)
REDUCER
CROSS
TEE
90° BEND -
HORIZONTAL
45° BEND -
HORIZONTAL
22-12° BEND -
HORIZONTAL
11-14° BEND -
HORIZONTAL
BEND -
VERTICAL
CAP
10"FPW 10"FPW
10"W 10"W
OTHER UTILITIES LEGEND
EXISTING
NATURAL GAS
TELEPHONE
UNDERGROUND TELEPHONE
ELECTRICITY
UNDERGROUND ELECTRICITY
UGG
OHT
UTL
OHP
UGP
GRAPHIC SCALE:
1 INCH =
200 FEET
200 100 200
C1.0
THOMAS & HUTTON
220 NORTH MAIN STREET, SUITE 402
GREENVILLE, SC 29601
864.412.2222
BID SET - NOT FOR CONSTRUCTION
PUMP OUT, REMOVE, AND DISPOSE OF OFFSITE EXISTING SEPTIC TANK
40 LF SCHEDULE 40 PVC HARD WALL PIPE
5' PAVEMENT BUFFER
NO TREE REMOVALS ALLOWED.
DRAINLINE ALIGNMENTS ARE SHOWN AS
REFERENCE FOR TOTAL LENGTH REQUIRED
(1000 LF). ACTUAL ALIGNMENTS SHALL BE
DETERMINED IN FIELD BY CONTRACTOR
AND APPROVED BY OWNER TO AVOID
ANY TREE REMOVALS.
DRAINFIELD TO UTILIZE 1000 LF (TOTAL)
INFILTRATOR QUICK4 STANDARD CHAMBER
WITH 14" GRAVEL BASE, 12" GRAVEL BACKFILL
TO TOP OF PANEL, AND 2" GRAVEL ON TOP
FOR TOTAL GRAVEL DEPTH OF 28".
INSTALL TWO (2) 1,500 GAL SEPTIC TANKS IN SERIES. EACH TANK TO HAVE DUAL RISERS.
CONNECT TO EXISTING COLLECTION PIPE FROM DUMP STATION.
INSTALL COMMERCIAL EFFLUENT FILTER IN FIRST TANK PRIOR TO CONNECTION TO SECOND TANK.
CONTRACTOR TO VERIFY INVERT ELEVATION PRIOR
TO EXCAVATION AND SHOP DRAWING APPROVAL.
COVER ALL DISTURBED AREAS WITH PINE
STRAW MULCH
250 LIF SILT FENCE
1" = 20'
Z:
\3
\3
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
SS
PL
.D W
G
Ja n
, 2
- 1 :3
PM
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
SITE PLAN
C1.0
LHB
GRAPHIC SCALE:
1 INCH =
20 FEET
20 10 20
SEPTIC TANKS IN SERIES REQUIREMENTS:
1. TANKS SHALL BE INTERCONNECTED BY AN UPPER EFFLUENT PIPE
WITH MINIMUM DIAMETER OF FOUR (4) INCHES INSTALLED LEVEL
FROM TANK TO TANK.
2. THERE SHALL BE NO MORE THAN TWO (2) INCHES OF FALL FROM
THE INLET INVERT OF THE FIRST TANK TO THE OUTLET INVERT OF THE
LAST TANK IN SERIES.
DRAINFIELD INSTALLATION REQUIREMENTS:
1. THE WASTEWATER INFILTRATION TRENCH AGGREGATE SHALL BE
INSTALLED PER THE MANUFACTURER RECOMMENDATIONS AND
REGULATORY REQUIREMENTS. MINIMUM GRAVEL DEPTH IS 28
INCHES. MAXIMUM TRENCH DEPTH SHALL BE 60 INCHES.
2. THE WASTEWATER INFILTRATION WIDTH SHALL BE THIRTY-SIX (36)
INCHES.
3. WHERE GRAVITY FLOW FROM THE SEPTIC TANK TO THE SUBSURFACE
WASTEWATER INFILTRATION AREA IS UTILIZED, THE INVERT
ELEVATION OF THE SEPTIC TANK OUTLET SHALL BE INSTALLED AT AN
ELEVATION AT LEAST EQUAL TO OR HIGHER THAN THE TOP OF THE
AGGREGATE IN THE HIGHEST WASTEWATER INFILTRATION
TRENCH(ES).
4. AT LEAST 7' OF UNDISTURBED DIRT SHALL EXIST BETWEEN
INFILTRATION DITCHES.
5. ALL PIPING UTILIZED IN THE CONNECTION OF THE SEPTIC TANK TO
A SUBSURFACE WASTEWATER INFILTRATION AREA SHALL BE
NON-PERFORATED SCHEDULE 40 PVC PIPE.
FINAL LANDSCAPING AND DRAINAGE:
1. INSTALLATION OF DRAINAGE SWALES, DITCHES, CURTAIN DRAINS,
AND RAIN GUTTERS MAY BE REQUIRED TO DIVERT OR INTERCEPT
WATER AWAY FROM THE ONSITE WASTEWATER SYSTEM LOCATION.
THE SEPTIC TANK AND SUBSURFACE WASTEWATER INFILTRATION
AREA SHALL BE BACKFILLED AND SHAPED TO PROMOTE SURFACE
WATER RUNOFF.
2. FOLLOWING FINAL BACKFILL, INSTALL PINE STRAW MULCH OVER
ALL DISTURBED AREAS.
3. FINAL APPROVAL SHALL BE WITHHELD UNTIL ALL LANDSCAPING
AND DRAINAGE IMPROVEMENTS HAVE BEEN SATISFACTORILY
COMPLETED.
M
BID SET - NOT FOR CONSTRUCTION
NOT TO SCALE
05/21/2015EMB
1 of 1DFH
Drawn by:
Scale: Checked by: Sheet:
Date:
INFILTRATOR WATER TECHNOLOGIES
4 Business Park Rd. Old Saybrook, CT 06475
(800) 221-4436
INFILTRATOR ®
water technologies
QUICK4 STANDARD CHAMBER
TYPICAL TRENCH DETAIL
SECTION VIEW
(36" WIDE TRENCH)
8" INVERT
34" SPACING PER CODE 34"
12" COVER
12"12"
* LENGTH AND NUMBER OF TRENCHES DETERMINED BY DESIGN.
TOPSOILNATIVE BACKFILL
INFILTRATOR WATER TECHNOLOGIES
QUICK4 STANDARD CHAMBER
TYPICAL TRENCH DETAIL
SECTION VIEW
(NOT TO SCALE)
NOT TO SCALE
05/21/2015EMB
1 of 1DFH
Drawn by:
Scale: Checked by: Sheet:
Date:
INFILTRATOR WATER TECHNOLOGIES
4 Business Park Rd. Old Saybrook, CT 06475
(800) 221-4436
INFILTRATOR ®
water technologies
QUICK4 STANDARD CHAMBER
SERIAL DISTRIBUTION TYPICAL DETAIL
SECTION VIEW
12"
36" TRENCH
4" PVC
ESTABLISH VEGETATIVE COVER
NATIVE BACKFILL (TYP.)
CONNECT AT END
OF CHAMBER ROWBOTTOM OF TRENCH
ELEVATION PER
COUNTY PERMIT
*NUMBER OF ROWS DETERMINED BY DESIGN
AND CENTER TO CENTER SPACING PER CODE.
INLET AT 8"
SIDE PORT
FROM SEPTIC
TANK
TO NEXT
TRENCH
INFILTRATOR WATER TECHNOLOGIES
QUICK4 STANDARD CHAMBER
SERIAL DISTRIBUTION TYPICAL DETAIL
SECTION VIEW
(NOT TO SCALE)
NOT TO SCALE
05/21/2015EMB
1 of 1DFH
Drawn by:
Scale: Checked by: Sheet:
Date:
INFILTRATOR WATER TECHNOLOGIES
4 Business Park Rd. Old Saybrook, CT 06475
(800) 221-4436
INFILTRATOR ®
water technologies
QUICK4 STANDARD CHAMBER
PRODUCT SPECIFICATIONS
48"
53"
(EFFECTIVE LENGTH)
12"
11.5" OUTLET END*
(EFFECTIVE LENGTH)
TOP VIEW
SIDE VIEW END VIEW
34"
QUICK4 STANDARD MULTIPORT END CAP
34"
12"
INSPECTION PORT
16"
15" INLET END*
(EFFECTIVE LENGTH)
8" INVERT
* ALL VIEWS = INSTALLED LENGTH.
INFILTRATOR WATER TECHNOLOGIES
QUICK4 STANDARD CHAMBER
PRODUCT SPECIFICATIONS
(NOT TO SCALE)
1" = 25'
Z:
\3
\3
.0
0\
EN
G
IN
EE
RI
N
G \D
RA
W
IN
G
S\ C
O N
ST
RU
C
TIO
N P
LA
N
S\
9.
SS
D
T.
D
W G
Ja n
, 2
- 1
:3
PM
DESIGNED:
SCALE:
REVIEWED:
APPROVED:
DRAWN:
JOB NO:
DATE:
NO. REVISIONS DATE
CLIENT/OWNER:
PROJECT LOCATION:
DATUM: HORIZ.: VERT.:
BY
DETAILS
C1.1
LHB
GRAPHIC SCALE:
1 INCH =
25 FEET
25 12.5 25
FILTER FABRIC
BACKFILL TRENCH WITH
COMPACTED EARTH
COMPACTED
EARTH
COMPACTED
EARTH
FILTER FABRIC
FILTER FABRICRUNOFF
RUNOFF
RUNOFF
BURY FABRICUSE EITHER FLAT-BOTTOM
OR V-BOTTOM TRENCH
SHOWN BELOW
FLAT-BOTTOM TRENCH DETAIL
V-SHAPED TRENCH DETAIL
SILT FENCE INSTALLATION
FILTER
FABRIC
FILTER FABRIC
1.25 LB./LINEAR FT. STEEL POSTS
HEAVY DUTY PLASTIC TIE
FOR STEEL POSTS
WHEN AND WHERE TO USE IT:
SILT FENCE IS APPLICABLE IN AREAS:
WHERE THE MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE IS 100-FEET.
WHERE THE MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO FENCE LINE) IS 2H:1V.
THAT DO NOT RECEIVE CONCENTRATED FLOWS GREATER THAN 0.5 CFS.
DO NOT PLACE SILT FENCE ACROSS CHANNELS OR USE IT AS A VELOCITY CONTROL BMP.
MATERIALS:
STEEL POSTS
USE 48-INCH LONG STEEL POSTS THAT MEET THE FOLLOWING MINIMUM PHYSICAL REQUIREMENTS:
COMPOSED OF HIGH STRENGTH STEEL WITH MINIMUM YIELD STRENGTH OF 50,000 PSI.
HAVE A STANDARD "T" SECTION WITH A NOMINAL FACE WIDTH OF 1.38-INCHES AND NOMINAL "T" LENGTH OF 1.48-INCHES.
WEIGH 1.25 POUNDS PER FOOT (± 8%).
HAVE A SOIL STABILIZATION PLATE WITH A MINIMUM CROSS SECTION AREA OF 17-SQUARE INCHES ATTACHED TO THE STEEL POSTS.
PAINTED WITH A WATER BASED BAKED ENAMEL PAINT.
USE STEEL POSTS WITH A MINIMUM LENGTH OF 4-FEET, WEIGHING 1.25 POUNDS PER LINEAR FOOT (± 8%) WITH PROJECTIONS TO AID IN FASTENING THE FABRIC. EXCEPT WHEN HEAVY CLAY SOILS ARE PRESENT ON SITE, STEEL POSTS WILL HAVE A METAL SOIL STABILIZATION PLATE WELDED NEAR THE BOTTOM SUCH THAT WHEN THE POST IS DRIVEN TO THE PROPER DEPTH, THE PLATE WILL BE
BELOW THE GROUND LEVEL FOR ADDED STABILITY.
THE SOIL PLATES SHOULD HAVE THE FOLLOWING CHARACTERISTICS:
BE COMPOSED OF MINIMUM 15 GAUGE STEEL.
HAVE A MINIMUM CROSS SECTION AREA OF 17-SQUARE INCHES.
GEOTEXTILE FILTER FABRIC:
FILTER FABRIC IS:
COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS COMPOSED OF AT LEAST 85% BY WEIGHT OF POLYOLEFINS, POLYESTERS, OR POLYAMIDES.
FORMED INTO A NETWORK SUCH THAT THE FILAMENTS OR YARNS RETAIN DIMENSIONAL STABILITY RELATIVE TO EACH OTHER.
FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS PHYSICAL PROPERTIES AFTER INSTALLATION.
FREE OF DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL AND/OR FILTERING PROPERTIES.
CUT TO A MINIMUM WIDTH OF 36 INCHES.
USE ONLY FABRIC APPEARING ON SCDOT APPROVAL SHEET #34 MEETING THE REQUIREMENTS OF THE MOST CURRENT EDITION OF THE
SCDOT STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.
INSTALLATION:
EXCAVATE A TRENCH APPROXIMATELY 6-INCHES WIDE AND 6-INCHES DEEP WHEN PLACING FABRIC BY HAND. PLACE 12-INCHES OF GEOTEXTILE FABRIC INTO THE 6-INCH DEEP TRENCH, EXTENDING THE REMAINING 6-INCHES TOWARDS THE UPSLOPE SIDE OF THE TRENCH. BACKFILL THE TRENCH WITH SOIL OR GRAVEL AND COMPACT. BURY 12-INCHES OF FABRIC INTO THE GROUND WHEN PNEUMATICALLY INSTALLING SILT FENCE WITH A SLICING METHOD. PURCHASE FABRIC IN CONTINUOUS ROLLS AND CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, WRAPPED THE FABRIC TOGETHER AT A SUPPORT POST WITH BOTH ENDS FASTENED TO THE POST, WITH A 6-INCH MINIMUM OVERLAP.
INSTALL POSTS TO A MINIMUM DEPTH OF 24-INCHES. INSTALL POSTS A MINIMUM OF 1- TO 2- INCHES ABOVE THE FABRIC, WITH NO MORE THAN 3-FEET OF THE POST ABOVE THE GROUND. SPACE POSTS TO MAXIMUM 6-FEET CENTERS. ATTACH FABRIC TO WOOD POSTS USING STAPLES MADE OF HEAVY-DUTY WIRE AT LEAST 1-1/2-INCH LONG, SPACED A MAXIMUM OF 6-INCHES APART. STAPLE A 2-INCH WIDE LATHE OVER THE FILTER FABRIC TO SECURELY FASTEN IT TO THE UPSLOPE SIDE OF WOODEN POSTS. ATTACH FABRIC TO THE STEEL POSTS USING HEAVY-DUTY PLASTIC TIES THAT ARE EVENLY SPACED AND PLACED IN A MANNER TO PREVENT SAGGING OR TEARING OF THE FABRIC. IN CALL CASES, TIES SHOULD BE AFFIXED IN NO LESS THAN 4 PLACES. INSTALL THE FABRIC A MINIMUM OF 24-INCHES ABOVE THE GROUND. WHEN NECESSARY, THE HEIGHT OF THE FENCE ABOVE GROUND MAY BE GREATER THAN 24-INCHES. IN TIDAL AREAS, EXTRA SILT FENCE HEIGHT MAY BE REQUIRED. THE POST HEIGHT WILL BE TWICE THE EXPOSED POST HEIGHT. POST SPACING WILL REMAIN THE SAME AND EXTRA HEIGHT FABRIC WILL BE 4-, 5-, OR 6-FEET TALL.
LOCATE SILT FENCE CHECKS EVERY 100 FEET MAXIMUM AND AT LOW POINTS. INSTALL THE FENCE PERPENDICULAR TO THE DIRECTION OF FLOW AND PLACE THE FENCE THE PROPER DISTANCE FROM THE TOE OF STEEP SLOPES TO PROVIDE SEDIMENT STORAGE AND ACCESS FOR MAINTENANCE AND
CLEANOUT.
INSPECTION AND MAINTENANCE:
CHECK FOR SEDIMENT BUILDUP AND FENCE INTEGRITY. CHECK WHERE RUNOFF HAS ERODED A CHANNEL BENEATH THE FENCE, OR WHERE THE FENCE HAS SAGGED OR COLLAPSED BY FENCE OVERTOPPING. IF THE FENCE FABRIC TEARS, BEGINS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE SECTION OF FENCE IMMEDIATELY. REMOVE SEDIMENT ACCUMULATED ALONG THE FENCE WHEN IT REACHES 1/3 THE HEIGHT OF THE FENCE, ESPECIALLY IF HEAVY RAINS ARE EXPECTED. REMOVE TRAPPED SEDIMENT FROM THE SITE OR STABILIZE IT ON SITE. REMOVE SILT FENCE WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED OR
AFTER TEMPORARY BEST MANAGEMENT PRACTICES (BMPS) ARE NO LONGER NEEDED. PERMANENTLY STABILIZE DISTURBED AREAS RESULTING
FROM FENCE REMOVAL. OCT. 2008
W31
THOMAS & HUTTON
ENGINEERING CO.
BID SET - NOT FOR CONSTRUCTION
2/23/26 http://www.thomasandhutton.com
| Sheets and Views |
| CO Cover Sheet |
| G0.0 General Notes and Index |
| C1.0 Site Plan |
| C1.1 Details |
File details come from the government source that posted it. Updated .