2-P2204 2027-1720 TEC Modernization Area of Work Schedule 2026-09-01.pdf
PDF 91 KB Posted
- Attached to
- TEC Modernization & Addition
- Solicitation number
- 2027-1720
- Issued by
- Alameda County, California
About this file
This is an Area of Work Schedule document for AC Transit's TEC Modernization & Addition project (IFB 2027-1720), a renovation initiative to modernize the Training and Education Center to support the agency's conversion to a zero-emission bus fleet. The project is divided into three phases: Phase 1 (Core Improvements/Base Bid) focusing on northern section improvements including maintenance areas and lobby; Phase 2a (Multi-purpose Room/Additive Alternate 1) for the multipurpose room addition; and Phase 2b (Balance of Plan/Additive Alternate 2) covering remaining southern area work including the auditorium and associated facilities. The document details room-by-room designations across both the northern and southern areas post-project, identifying 48 distinct spaces including administrative offices, training classrooms, technical services areas, restrooms, storage facilities, mechanical rooms, and support spaces distributed across ground and second floor levels. The work encompasses comprehensive facility modernization to create dedicated training infrastructure for bus operators and mechanics.
A single firm fixed price contract will be awarded to the lowest responsive, responsible bidder based on the Base Bid Price. The project includes a 7% Small Business Enterprise (SBE) goal and requires a 20% minimum prime self-performance requirement. The contract is subject to the complete requirements outlined in IFB 2027-1720 documents. This is a California state and local government contract opportunity involving capital renovation work to support AC Transit's fleet electrification objectives.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phase 1 - Core Improvements (formally called "Base Bid") Phase 2a - Multi-purpose Room (formally called "Additive Alternate 1") Phase 2b - Balance of Plan (formerly called "Additive Alternate 2)
Area Room # Description (Post Project) Area Room # Description (Post Project) South 101 Lobby South 102 Multipurpose Room South 101A Conference Room South 113 Janitor South 101B Exhibition Area South 111 Unisex South 126 Training and Education Manager South 110 Mens Restroom South 118 Roof Access UPS Room South 109 Womens Restroom South 119 Phone South 120 Data North 130 Tech Services Office North 128 Electrical North 131 Apprenticeship Area Room # Description (Post Project) North 135 Lactation South 125 Operations Training Office North 141 Corridor South 115 Corridor North 132 Admin Office South 153 Corridor North 133 Elevator Machine Room South 103 A/V Storage North 160 Elevator Machine Room South 121 Classroom North 142 Training Module Room South 123 Storage North 142A Tool Cage South 124 Storage North 140 Stairs South 122 Printer/Admin Storage North 137 Unisex South 104 Utility/Boiler Room North 139 Janitor South 117 Classroom North 136 Women Restroom South 106 Cafeteria North 138 Mens Restroom South 107 Janitor Storage North 134 A/V Storage South 116 Classroom North 143 AV/VR Classroom South 108 Transportation Training Manager North 146 Tool Storage North 127 Classroom North 145 Computer Lab North 144 Electrical Room North 148 Advanced Learning Lab North 151 Material Lift North 149 Storage Room North 150 Inspection Pit North 206 Second Floor Conference Room North 205 Storage Room North 209 Unisex North 207 Corridor North 210 Janitor North 211 Storage Room North 203 Tech Services Manager North 201 Maintenance Training Office North 204 Classroom North 202 Maintennce Training Manager
TEC Modernization AC Transit - Project 2204
Area of Work Designation by Bid Line Item
2026-09-01
Phase 2b - Balance of Plan
Phase 1 - Core Phase 2a - Multi-purpose Room
Scope Room Reference
File details come from the government source that posted it. Updated .