This document is a comprehensive engineering design and construction plan set for the Mountain Water Authority's Potable Water Storage Tank project located in Tremont Township, Schuylkill County, Pennsylvania. The project involves constructing a new 300,000-gallon water storage tank with associated infrastructure, including a foundation, fencing, access gate, potential canopy, and necessary water line connections. The design documents, prepared by Benesch engineering firm in August 2025, include 15 detailed sheets covering existing site conditions, proposed site layout, tank specifications, erosion and sediment control plans, and technical construction details.
The project scope includes demolishing an existing water tank and installing a new glass-fused-to-steel tank with a nominal inside diameter of 33.57 feet and a total height of approximately 23.8 feet. The design incorporates specific technical elements such as an aluminum dome roof, external ladder, 30-inch round access doors, overflow and inlet piping systems, and a concrete ring wall foundation. The plans also detail extensive erosion and sediment control measures, including compost filter socks, rock construction entrances, and specific seeding and stabilization requirements. The project appears to be funded through the Mountain Water Authority and follows Pennsylvania Department of Environmental Protection guidelines for water infrastructure development.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P E
N
N S Y L V
A
N
I A
C O
M
M O
NW EALT
H
O
F
REGISTERED
PROFESSIONAL
ENGINEER
PE073238
MICHAEL J. PELESCHAK
P L
O T
T E
D
F I
L
N A
M E
Y
P e n n s y l v a n i a
S
S c h
M W
A
T a n k
E n g
D o c s
P l a n s
C o v e r d g n
P l o t
O P
E R
A T
O R
D-9012 CADD (02-90) REVISED (05-97)
dweist 08\19\2025 15:21:5531086.02
PREPARED BY:
PROJECT MANAGER DATE
LOCATION MAP
MILE 1/2 SCALE : 1" =
PROJECT
32137.00
1 15
DRAWING NO.
OF
PROJECT LOCATION
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza thereof, is strictly prohibited, except by written permission of this firm.
Benesch. Use, reuse, reproduction or modification of this plan or design information, or any part
Copyright 2024, of Benesch. All rights reserved. This plan and design content is the property of
Tremont Township, Schuylkill County, Pennsylvania
Potable Water Storage Tank
Mountain Water Authority
GENERAL NOTES
Drawing Index
Drawing No. Title
1 COVER SHEET
EXISTING SITE PLAN
PROPOSED SITE PLAN
SITE DETAIL 1
SITE DETAIL 3
SITE DETAIL 2
TANK DETAILS 1
TANK DETAILS 2
ES PLAN
ES NOTES 1
ES NOTES 2
ES DETAILS 1
ES DETAILS 2
ES DETAILS 3
August 2025 dweist Image
31086.02 Y:\Pennsylvania\32100S\32137.00_Sch_MWA_Tank\Eng_Docs\Plans\02_GenNotes.dgn (Plot)jheffner 11\18\2024 12:33:59
Sheet No.:Drawn:
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: 32137.00 OF
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2024, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction
8/1/2024
MOUNTAIN WATER AUTHORITY
POTABLE WATER STORAGE TANK
Tremont Township, Schuylkill County, Pennsylvania
Checked: MJPDesigned: DJW
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE073238
MICHAEL J. PELESCHAK
GENERAL NOTES
OSHA STANDARDS 29CFR1926, SUBPART P.
ALL SHORING FOR WATERLINE TRENCHES WILL BE ACCORDING TO
"EROSION AND SEDIMENTATION CONTROL MANUAL".
NOTES ON DWG. NO. 11. ALL CONTROLS SHALL CONFORM TO
PHASES OF CONSTRUCTION. SEE SEDIMENT AND EROSION CONTROL
SHALL BE PROVIDED, INSTALLED AND MAINTAINED DURING ALL
ALL REQUIRED SOIL EROSION AND SEDIMENTATION CONTROLS
PIPE.
ALL FITTINGS SHALL USE MECHANICAL JOINT, DUCTILE IRON
1983 AND STATE PLANE COORDINATES, SOUTH ZONE.
HORIZONTAL COORDINATES BASED ON NORTH AMERICAN DATUM,
ELEVATIONS BASED ON NORTH AMERICAN VERTICAL DATUM, 1988.
APPROXIMATE.
RECORDED FROM SCHUYLKILL COUNTY TAX MAPS AND ARE
RIGHT-OF-WAY FOR TOWNSHIP ROADWAYS AND ALLEYS ARE
WORK.
CONTRACTOR MUST BE APPROVED BY THE ENGINEER PRIOR TO ANY
SPECIFICALLY SHOWN. CHANGES TO LIMIT OF WORK BY THE
LIMIT OF WORK SHOWN IS APPROXIMATE EXCEPT WHERE
ALL UTILITY EXCAVATIONS SHALL BE KEPT DRY AT ALL TIMES.
SPECIFICATIONS.
PENNSYLVANIA BASED ON THE CONTRACT DRAWINGS AND
STAKEOUTS BY SURVEYOR REGISTERED IN THE STATE OF
THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PROVIDE ALL
SERVICE.
PRE-ASSEMBLED FOR INSTALLATION TO MINIMIZE INTERUPTION OF
WATERLINE. INTERCONNECT FITTINGS AND VALVES SHALL BE
LINE IN THE FIELD PRIOR TO THE INSTALLATION OF THE NEW
CONTRACTOR TO LOCATE POINTS OF CONNECTION TO EXISTING
NO CIRCUMSTANCES SHALL A TRENCH REAMIN OPEN OVER NIGHT.
CONTRACTOR SHALL BACKFILL TRENCH ON A DAILY BASIS. UNDER
THE MOUNTAIN WATER AUTHORITY.
PRIOR APPROVAL HAS BEEN RECIEVED FROM THE ENGINEER AND
TIMES DURING THE INSTALLATION OF THE WATERLINE UNLESS
EXISTING WATERLINES SHALL REMAIN IN OPERATION AT ALL
INCIDENTAL TO WATERLINE INSTALLATION.
DURING WATERLINE INSTALLATION. THIS WORK SHALL BE
STEPS, WALLS, MAIL BOXES, FLOWER BEDS, ETC., DISTURBED
CONTRACTOR SHALL REPLACE IN KIND ANY PORTION OF CONCRETE
ABANDONED WITH A MINIMUM OF 2 CF OF CONCRETE.
CONTRACTOR TO CAP EXISTING WATERLINES THAT WILL BE
MAXIMUM ALLOWABLE AS PER MANUFACTURERS RECOMMENDATIONS.
JOINT DEFLECTION AND PIPE DEFLECTION SHOULD NOT EXCEED
COVER, OR FENCE EXCAVATION AREA DURING NON WORKING HOURS.
SHALL USE PROPER EXCAVATION SUPPORT SYSTEMS, BACKFILL,
AND APPLICABLE CODE ENFORCEMENT AGENCIES. CONTRACTOR
THIS PROJECT IS SUBJECT TO INSPECTION BY THE ENGINEER,
ALTERED WHERE REQUIRED BY THEIR RESPECTIVE OWNERS.
ALL UTILITY COMPANY FACILITIES ARE TO BE ADJUSTED OR
THIS WORK.
THE OWNER RESERVES THE RIGHT TO ELIMINATE ANY OR ALL OF
(UNDERGROUND UTILITY LINE PROTECTION LAW).
ACCORDANCE WITH THE REQUIREMENTS OF SECTION 5 OF ACT 38.
THE CONTRACTOR SHALL COMPLETE ALL EXCAVATIONS IN
PUBLICATION 408 IN IT'S LATEST REVISION.
PENNSYLVANIA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS
PENNDOT SPECIFICATIONS SHALL MEAN COMMONWEALTH OF
APPURTENANCES.
PIPING DURING CONSTRUCTION TO PREVENT DAMAGE TO PIPES AND
THAT THERE IS SUFFICIENT COVER ON EXISTING AND PROPOSED
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE
TO UNLESS OTHERWISE DIRECTED BY THE OWNER OR THE ENGINEER.
PLAN LOCATIONS AND DIMENSIONS SHALL BE STRICTLY ADHERED
GUARENTEE THAT ALL SUBSURFACE STRUCTURES ARE SHOWN.
AND PROVIDE FOR THEIR PROTECTION. THE OWNER DOES NOT
RESPONSIBILITY TO VERIFY AND ALLOW FOR THEIR LOCATIONS
AVAILABLE INFORMATION. IT SHALL BE THE CONTRACTOR'S
EXISTING UTILITIES ARE SHOWN IN ACCORDANCE WITH THE BEST
COMPANIES INVOLVED.
THE CONTRACTOR SHALL COORDINATE ALL WORK WITH UTILITY
OWNER.
AS DIRECTED BY THE ENGINEER AT NO ADDITIONAL COST TO THE
SHALL BE REPAIRED OR REPLACED TO THEIR ORIGINAL CONDITION
ALL AREAS DISTURBED OUTSIDE THE LIMITS OF CONSTRUCTION
AND VERIFIED IN THE FIELD BY THE CONTRACTOR.
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED
AND PAY THE REQUIRED FEE.
SITE. THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS
FEDERAL REGULATIONS APPLICABLE TO CONSTRUCTION OF THIS
THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE AND
GENERAL NOTES GENERAL NOTES (CONT)
BEARING ELEVATION.
WITH LEAN CONCRETE FILL AND THE FOUNDATION PLACED AT THE DESIGN
REQUIRED. ALTERNATIVELY THE EXCAVATED MATERIAL MAY BE REPLACED
FOUNDATION SHALL BE LOWERED AS
SHALL BE REMOVED BY EXCAVATION AND THE BEARING ELEVATION OF THE
ENCOUNTERED AT THE FOUNDATION BEARING ELEVATION, THIS MATERIAL
FIRM SOIL. WHERE SOFT, LOOSE, FROZEN OR WET MATERIAL IS
FOUNDATION: THE FOUNDATION SHALL BE PLACED ON DRY, NON-FROZEN,
THE SUBGRADE.
UNDERCUT AND REPLACED WITH SUITABLE MATERIAL. AFTER COMPACTION OF
PROOF-ROLLING, WHICH CANNOT BE STABILIZED AND COMPACTED, SHALL BE
SOFT, EXCESSIVELY WET OR FROZEN AREAS IDENTIFIED BY THE
DRY DENSITY AS DETERMINED IN ACCORDANCE WITH A.S.T.M. D 1557. ANY
PROOF-ROLLED AND COMPACTED TO 95% OF MAXIMUM
REACHING GRADE, THE AREA WITHIN THE FOUNDATION LIMITS SHALL BE
SITE PREPARATION: AFTER STRIPPING OFF THE TOPSOIL, AND UPON
SQUARE FOOT (SEE SECTION 02667 OF SPECIFICATIONS).
ASSUMED NET ALLOWABLE SOIL BEARING VALUE OF 4000 MIN. POUNDS PER
SOIL BEARING VALUE: THE FOUNDATION SHALL BE DESIGNED WITH AN
REPRESENTATIVES.
PROJECT OWNER OR ALFRED BENESCH & COMPANY, OR THEIR
UNDERGROUND UTILITIES IS ON THE CONTRACTOR, AND NOT ON THE
MISLOCATION OR MISUNDERSTANDING OF THE LOCATION OF THE
THE RISK OF FINANCIAL LOSS RESULTING FROM MISIDENTIFICATION,
TO AVOID ALL UNNECESSARY CONFLICTS THEREWITH.
UNDERGROUND UTILITIES PRIOR TO EXCAVATION OR DEMOLITION AND (3)
OWNERS INDEPENDENTLY, (2) TO DETERMINE THE EXACT LOCATION OF ALL
WITHOUT RELIANCE ON THESE PLANS: (1) TO CONTACT ALL UTILITY
CONTRACTOR IS RESPONSIBLE AT ITS SOLE COST AND EXPENSE AND
ONLY, AND IS NOT GUARANTEED TO BE COMPLETE OR ACCURATE.
UNDERGROUND UTILITIES IS FOR GENERAL INFORMATION AND GUIDANCE
DIMENSIONS, DEPTH, SIZE, LOCATION OR ANY OTHER FEATURE OF
NOTE: INFORMATION ON THESE PLANS CONCERNING THE CONDITIONS,
AVAILABLE SURFACE INFORMATION IS INDICATED ON THE DRAWINGS.
SHOWN ON THE PLANS. NO FIELD EXCAVATION HAS BEEN PERFORMED.
PLANS, OR THAT ALL UNDERGROUND INSTALLATION OR STRUCTURES ARE
UNDERGROUND UTILITY INSTALLATION OR STRUCTURES SHOWN ON THE
ASSURE EITHER THE ACCURACY OF THE LOCATION OF THE PRESENT
BENESCH & COMPANY DOES NOT GUARANTEE, REPRESENT, WARRANT OR
BENESCH & COMPANY FROM THE UTILITIES LISTED ABOVE. ALFRED
ACCORDANCE WITH INFORMATION THAT HAS BEEN PROVIDED TO ALFRED
WARNING! EXISTING UTILITIES, AS SHOWN ON THESE DRAWINGS, ARE IN
800-778-9140
USIC DISPATCH
INDIANAPOLIS, IN. 46240
9045 N RIVER ROAD SUITE 300
USIC LOCATING SERVICES LLC
570-208-3375
Michael.Navich@FTR.com
MICHAEL NAVICH
WILKES BARRE, PA. 18702
300 E LAIRD ST
FRONTIER COMMUNICATIONS OF PA INC
800-811-7981
USIC OFFICE PERSONNEL
CARMEL, IN. 46032
13085 HAMILTON CROSSING BLVD STE 200
C/O USIC LOCATING SERVICES INC
COMCAST CABLE COMMUNICATIONS INC
LIST OF UTILITIES:
PURPLE - NON-POTABLE WATER, IRRIGATION OR SLURRY LINES
WHITE - PROPOSED EXCAVATION
GREEN - SEWERS AND DRAIN LINES
BLUE - POTABLE WATER
CONDUIT
ORANGE - COMMUNICATION, ALARM OR SIGNAL LINES, CABLES OR
YELLOW - GAS, OIL, STEAM, PETROLEUM OR GASEOUS MATERIALS
RED - ELECTRIC POWER LINES, CABLES, CONDUIT AND LIGTING CODES
UTILITIES IN ACCORDANCE WITH UNIFORM COLOR CODES. KNOW THEM!
ACT NO. 187 STANDARDIZES THE COLOR-MARKING OF UNDERGROUND
SERIAL NO.: 20241581710
SYSTEM, INC. USE IT!
THIS PROJECT HAS A SERIAL NUMBER REGISTERED WITH THE ONE CALL
ANYWHERE IN THE COMMONWEALTH OF PENNSYLVANIA.
WHEN ENGAGED IN THE DESIGN PHASE. THESE REQUIREMENTS APPLY
LESS THAN 10 WORKING DAYS NOR MORE THAN 90 WORKING DAYS NOTICE
TUNNEL OR DEMOLISH. ACT NO. 187 REQUIRES DESIGNERS TO GIVE NO
DRILL, DRIVE-IN, GRADE, PLOW-IN, PULL-IN, RIP, SCRAPE, TRENCH,
EXPLOSIVES), ANCHOR, AUGER, BACKFILL, BLAST, BORE, DIG, DITCH,
CONTRACTORS WHO ARE ABOUT TO MOVE EARTH (WITH OR WITHOUT
NOR MORE THAN 10 WORKING DAYS NOTICE FROM EXCAVATORS/DEMOLITION
PROTECTION LAW, REQUIRES NO LESS THAN 3 WORKING DAYS NOTICE
PENNSYLVANIA ACT NO. 187 OF 1996, THE UNDERGROUND UTILITY LINE
1-800-242-1776
PENNSYLVANIA ONE CALL SYSTEM, INC.
STOP-CALL BEFORE YOU DIG!
GENERAL NOTES (CONT)
TESTED PRIOR TO INSTALLATION OF WATER STORAGE TANK.
SUGGESTED THAT THE 4" PVC BYPASS LINE BE INSTALLED AND
WATER SERVICE MUST NOT BE INTERUPTED AT ANY TIME. IT IS
GEOTECHNICAL REPORT PROVIDED.
DESIGN IN THE STATE OF PENNSYLVANIA.
SEALED BY A REGISTERED ENGINEER, REGISTERED AND LICENSED TO
AWWA D103 TO BE PROVIDED BY THE CONTRACTOR, SIGNED AND
DESIGN OF RINGWALL OR SLAB FOUNDATION IN ACCORDANCE WITH
IS APPROVED BY THE ENGINEER.
NO CONCRETE OR BACKFILL SHALL BE PLACED UNTIL THE SUBGRADE
WITH WATER BEFORE ANY GROUT IS PLACED.
TOP OF CONCRETE FOUNDATION SHALL BE THOROUGHLY SATURATED
CONSIDERED AS PART OF THE TOP OF THE WALL LEVELING GROUT.
HEIGHT. THE 1" OF GROUT UNDER THE TANK BOTTOM IS NOT TO BE
TOP OF WALL MAY BE LEVELED BY USING GROUT NOT TO EXCEED " IN
AND SHALL NOT VARY MORE THAN "± FROM ESTABLISHED ELEVATION.
TOP OF CONCRETE RINGWALL TO BE SMOOTH AND LEVEL WITHIN "±
(d) TESTING - MINIMUM OF 2 TESTS PER LIFT
(c) DENSITY - 95% MAXIMUM DRY DENSITY, ASTM D1557
(b) MAXIMUM LIFT THICKNESS - 6"
(a) MOISTURE - OPTIMUM ±2%
2. COMPACTION:
BORROW, AS REQUIRED.
1. MATERIAL - MATERIAL FROM THE PROJECT EXCAVATION OR FROM
GENERAL BACKFILL:
AND ADDITIONAL AS DIRECTED BY THE ENGINEER.
(d) TESTING - MINIMUM OF 6 TESTS PER LAYER PLACED
(c) DENSITY - 100% MAXIMUM DRY DENSITY, ASTM D1557
(b) MAXIMUM LIFT THICKNESS - 8"
(a) MOISTURE - OPTIMUM ±2%
2. COMPACTION:
PA NUMBER 2A STONE, TYPE A.
SPECIFICATIONS, IN IT'S LATEST EDITION; SECTION 703.2;
1. MATERIAL SPEC. - COMMONWEALTH OF PENNSYLVANIA PUB. 408
COMPACTED AGGREGATE BACKFILL:
A.C.I. 214 AND 308.
BE CONDUCTED IN ACCORDANCE WITH A.S.T.M. C31 AND C39 AND
OWNER. CURE CYLINDERS UNDER IN-PLACE CONDITIONS. TESTING TO
DAYS AND IF REQUIRED AT 28 DAYS AT NO ADDITIONAL COST TO THE
AND LOCATION AS SPECIFIED. CYLINDERS SHALL BE TESTED AT 7
CONCRETE TEST CYLINDERS SHALL BE CAST AND MARKED AS TO DATE
STANDARD 318-93.
BE IN ACCORDANCE WITH A.C.I. MANUAL 315-94 AND A.C.I.
A.S.T.M. A615-92, GRADE 60. DETAILING OF REINFORCEMENT SHALL
REINFORCING STEEL SHALL CONFORM TO THE REQUIREMENTS OF
CONTENT (BY VOLUME) OF 6% ± 1%.
WATER-CEMENT RATIO (BY WEIGHT)OF 0.46; TOTAL AIR
AT 28 DAYS; MAXIMUM SLUMP OF 4 INCHES; MAXIMUM
MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF 3500 P.S.I.
FOUNDATION CONSTRUCTION WITH THE FOLLOWING PROPERTIES.
FOUNDATION CONCRETE: PROVIDE NORMAL WEIGHT CONCRETE FOR
COMPACTION OPERATION.
75% DESIGN STRENGTH SO AS NOT TO BE DAMAGED BY THE
THE FOUNDATION, BUT ONLY AFTER THE FOUNDATION HAS CURED TO
BE BACKFILLED AS SOON AS PRACTICAL, AFTER INSTALLATION OF
WATER AND FREEZING CONDITIONS. FOUNDATION EXCAVATIONS SHALL
ALL FOUNDATION EXCAVATIONS SHALL BE PROTECTED FROM PONDED
PRIOR TO THE PLACEMENT OF REINFORCING STEEL AND CONCRETE.
OCCUR. ALL DISTURBED SUBGRADE MATERIAL SHALL BE RECOMPACTED
DURING EXCAVATION, DISTURBANCE OF THE SUBGRADE SOILS MAY
CONTRACTOR AT NO COST TO THE AUTHORITY.
ANY DAMAGE DURING INSTALLATION MUST BE REPAIRED BY THE
STORAGE TANK INCLUDING APPURTENANCES AND SITE GRADING
THE SCOPE OF THE PROJECT INCLUDES PLACEMENT OF THE WATER
TO THE ENGINEER.
PERMISSION FROM THE PROPERTY OWNER SHALL BE SUBMITTED
WORKING/OCCUPYING AREA BEYOND THE RIGHT-OF-WAY. WRITTEN
APPROVAL FROM THE ENGINEER OR THE OWNER PRIOR TO
THE CONTRACTOR SHALL PROVIDE 14 DAYS NOTICE AND RECEIVE
EXCAVATION.
OTHER IMPROVEMENTS. CONDITIONS MAY REQUIRE MANUAL
SUCH PRECAUTIONS TO PROTECT STRUCTURES, SHRUBS, UTILITIES OR
THE CONTRACTOR SHALL OPERATE IN SUCH A MANNER AND/OR TAKE
IMPROVEMENTS MAY LIMIT OR REDUCE THIS CORRIDOR.
AND/OR
DESCRIBED IN SPECIFICATIONS. PUBLIC OR PRIVATE STRUCTURES
AS
TO PUBLIC RIGHT-OF-WAY AS SHOWN ON PLANS OR UTILITY EASEMENT
EXCAVATION EQUIPMENT AND SURFACE DISTURBANCE SHALL BE LIMITED
WILL BE PERMITTED FROM MAY 15 TO AUGUST 15
STAGING/FALL SWARMING HABITAT. NO TREE REMOVAL
THE VICINITY OF THE NORTHERN LONG-EARED BAT SPRING
AVOIDANCE MEASURE: THE PROJECT IS LOCATED WITHIN
CONSTRUCTION LIMITS
WORK RESTRICTION
WATER VALVE
GAS VALVE
SILT FENCE
CORRUGATED METAL PIPE
DUCTILE IRON PIPE
CAST IRON PIPE
POLYVINYL CHLORIDE PIPE
TYPICAL
CONCRETE
FIRE HYDRANT
FLAG POLE
CLEANOUT
MANHOLE
GAS METER
WATER METER
LEGAL RIGHT-OF-WAY
NO TRENCH
OPEN CUT
PIT FOR TRENCHLESS TOOL
DETAIL NUMBER
SHEET NUMBER
STOCKPILE AREA
DWLG
BIT
CTV
E
UE
G 6"
S
P
T
W 4"
X
540.3
CO
GV
GM
FH
WV
WM
BO
WELL
SEPTIC
WV
GV
SF
TYP
FH
FP
CO
MH
GM
WM
CONC
PVC
CIP
DIP
CMP
NT
OC
TP
A4
W
BITUMINOUS
DWELLING
PROPOSED GATE VALVE
PROPOSED SERVICE LINE
PROPOSED WATERLINE
PROPOSED GATE VALVE
PROPOSED VALVE MANHOLE
LEGEND
EXT UNDERGROUND ELECTRIC LINE
EXT TV CABLE LINE
EXT ABOVE GROUND ELECTRIC LINE
EXT GAS LINE
EXT SANITARY SEWER LINE
EXT STORM SEWER LINE
EXT PETROLEUM PIPELINE
EXT TELEPHONE LINE
EXT WATER LINE
EXT FENCE
EXT DITCH OR SWALE
EXT CONTOURS
EXT SHRUB
EXT LIGHT STANDARD
EXT GROUND ELEVATION
EXT ROAD DELINEATION SIGN
EXT TREE/BRUSH LINE
EXT SHRUB ROW
EXT GUY WIRE
EXT INLET
EXT TRAFFIC SIGNAL POLE
EXT SEPTIC TANK
EXT BLOWOFF
EXT WATER METER
EXT WELL
EXT WATER VALVE
EXT GAS METER
EXT MANHOLE
EXT FIRE HYDRANT
EXT CLEANOUT
EXT POST/LAMP POST/BOLLARD
EXT SIGN AND POSTS
EXT MAILBOX
EXT SIGN
EXT GAS VALVE
EXT RAILROAD SIGNAL LIGHT
EXT RAILROAD CROSSING GATE
EXT RAILROAD SIGN
EXT BILLBOARD 1 SIDE
EXT BILLBOARD 2 SIDES
EXT WETLANDS
570-490-5684
17860 DOUG HAUPT dlhaupt@pplweb.com
437 BLUE CHURCH RD PAXINOS, PA.
PPL ELECTRIC UTILITIES CORPORATION
yerges@yahoo.com 570-695-2337
CHARLES YERGES kathleen
23 JOLIETT ST TREMONT, PA. 17981
MOUNTAIN WATER AUTHORITY OF JOLIETT
31086.02 Y:\Pennsylvania\32100S\32137.00_Sch_MWA_Tank\Eng_Docs\Plans\03_EX_Plan.dgn (Plot)jheffner 11\18\2024 12:34:02
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: 32137.00 OF
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2024, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction
8/1/2024
MOUNTAIN WATER AUTHORITY
POTABLE WATER STORAGE TANK
Tremont Township, Schuylkill County, Pennsylvania
Checked: MJPDesigned: DJW
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE073238
MICHAEL J. PELESCHAK
WV
WOODED
WOODED
CONC ENDWALL
3" METAL
INV=1624.16'
PANEL
CONTROL
CONC
TANK
WATER
DIRT/GRAVEL LANE
(BENT)
I PIN (FND)
(FND)
I PIN
(FND)
I PIN
GATE
PPL AN 12
CTCO 11
PPL 35735-S46710 UG
S46704
PPL 35730-
ELEC JB
BLDG
CONC
SPILLWAY
EARTH
PPL 35740-S46713
0 4020 FEET
WORK RESTRICTION
AUGUST 15
HABITAT. NO TREE REMOVAL WILL BE PERMITTED FROM MAY 15 TO
THE NORTHERN LONG-EARED BAT SPRING STAGING/FALL SWARMING
AVOIDANCE MEASURE: THE PROJECT IS LOCATED WITHIN THE VICINITY OF
EXISTING SITE PLAN
31086.02 Y:\Pennsylvania\32100S\32137.00_Sch_MWA_Tank\Eng_Docs\Plans\04_PR_Plan.dgn (Plot)dweist 08\09\2025 19:07:13
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: 32137.00 OF
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2024, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction
8/1/2024
MOUNTAIN WATER AUTHORITY
POTABLE WATER STORAGE TANK
Tremont Township, Schuylkill County, Pennsylvania
Checked: MJPDesigned: DJW
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE073238
MICHAEL J. PELESCHAK
WOODED
CONC ENDWALL
3" METAL
INV=1624.16'
PANEL
CONTROL
CONC
TANK
WATER
DIRT/GRAVEL LANE
(BENT)
I PIN (FND)
(FND)
I PIN
(FND)
I PIN
GATE
PPL AN 12
CTCO 11
PPL 35735-S46710 UG
S46704
PPL 35730-
ELEC JB
BLDG
CONC
SPILLWAY
EARTH
PPL 35740-S46713
0 4020 FEET
6" DIP
GATE VALVE W/BOX
REPLACE EXISTING 6"
AND FOUNDATION
DEMO EXISTING TANK
FENCE
DEMO EXISTING
VALVE AND SS MESH
SPLASH BLOCK W/FLAP
6" SCH 80 OVERFLOW
6" SCH 80 DRAIN PIPE
VALVE VAULT
PROPOSED
VERIFIED BY CONTRACTOR
6" DIP WATERLINE TO BE
LOCATION OF EXISTING
LINE
INFLOW/OUTFLOW
6" DIP
FENCE
CHAINLINK
FENCE
GRAVEL WITHIN
TANK FLOOR ELEV=1625.5
300,000 GAL
GATE
DOUBLE SWING
INCLUDE FENCE AS ALTERNATE
INCLUDE CANOPY AS ALTERNATE
EXISTING WATER LINE
CONNECTION TO
WORK RESTRICTION
AUGUST 15
HABITAT. NO TREE REMOVAL WILL BE PERMITTED FROM MAY 15 TO
THE NORTHERN LONG-EARED BAT SPRING STAGING/FALL SWARMING
AVOIDANCE MEASURE: THE PROJECT IS LOCATED WITHIN THE VICINITY OF
PROPOSED SITE PLAN
OVERFLOW PIPE TO BE TIED INTO DRAIN PIPE.3.
POTHOLING OR SIMILAR ACTION.
TO BE VERIFIED BY CONTRACTOR BY MEANS OF
EXISTING 6" DIP WATERLINE AT TIE-IN POINT 2.
BE DEMOLISHED AS PART OF THIS CONTRACT.
EXISTING TANK, FOUNDATION, AND FENCE TO 1.
NOTES
EXISTING VALVE
PROVIDE MJ CAP ON
31086.02 Y:\Pennsylvania\32100S\32137.00_Sch_MWA_Tank\Eng_Docs\Plans\05_SiteDet01.dgn (Plot)jheffner 11\18\2024 12:34:06
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: 32137.00 OF
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2024, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction
8/1/2024
MOUNTAIN WATER AUTHORITY
POTABLE WATER STORAGE TANK
Tremont Township, Schuylkill County, Pennsylvania
Checked: MJPDesigned: DJW
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE073238
MICHAEL J. PELESCHAK
1'
M
IN
DENSITY
TO 97% PROCTOR
#57 AASHTO - COMPACT 6
SURFACE AND COVER.
TRENCH PROFILE TO PROVIDE UNIFORM
ELIMINATE CONTOUR IRREGULARITIES ALONG
DRAINAGE. GRADE TRENCH AREA UNIFORMLY.
OR FORM SWALE TO MATCH EXISTING
ROUNDED TO PROVIDE FOR SETTLEMENT
OFF ROADWAY - EARTH TO BE SLIGHTLY
FOR WATERLINE - OFF ROAD
TYPICAL TRENCH DETAIL
UNDISTURBED
WATERLINE
COMPACTED SUBGRADE
1'-0" 1'-0"
NTS
3' MAX PAY LIMIT
BE ALLOWED
DIMENSION SHALL
THAN 6" IN ANY
NO STONES LARGER
97% STD PROCTOR
COMPACTED TO
BY ENGINEER;
MATERIAL APPROVED
SELECT BACKFILL
OD
ACCORDING TO SPECIFICATIONS
SEEDING AND SOIL SUPPLEMENT
LINE MARKER
BURIED UTILITY
DETECTABLE
TRACER WIRE
1'
M
IN
FOR WATERLINE - GRAVEL ROADWAY
TYPICAL TRENCH DETAIL
DENSITY
97% PROCTOR
COMPACT TO
#57 AASHTO-
SUBGRADE
COMPACTED
GROUND
EXISTING
GROUND
EXISTING
BE ALLOWED
DIMENSION SHALL
THAN 6" IN ANY
NO STONES LARGER
97% STD. PROCTOR
COMPACTED TO
BY ENGINEER;
MATERIAL APPROVED
SELECT BACKFILL
GRADE TO DRAIN
PROCTOR DENSITY
COMPACT TO 97%
4" OF 2A PENNDOT
1'-0"1'-0"
WATERLINE
3' MAX PAY LIMIT
OD
NTS
LINE MARKER
BURIED UTILITY
DETECTABLE
TRACER WIRE
BEND-UPWARD THRUST
ANCHOR BLOCK FOR VERTICAL
PAINT)
COATS ASPHALT
(PAINT W/ 2
E=REBAR SIZE
C
D
C
C UNDISTURBED EARTH
BLOCK
ANCHOR
CONC
6" TYP
TYPICAL THRUST BLOCKS FOR HORIZONTAL BENDS
LINE TERMINATION
90° BEND, TEE OR 45°, 22.5°, 11.25° BENDS SECTION B-B
B
B
D
THRUST BLOCKS.
PLACING CONCRETE, TYPICAL FOR ALL
W/ POLYETHELENE SHEETING BEFORE
ALL FITTINGS SHALL BE WRAPPED
NOTE:
4" WATERLINE
4" PVC WATERLINE
A
NTS
D/3
BEARING AREA
D/3
11.25° 22.5° 45° 90°
6.0'3.0'1.5'1.0'4"
BEARING AREA
24"
NTS
BLOCK
THRUST
CONC
BLOCK
THRUST
CONC
MIN SQ FT BEARING AREA
PIPE DIA
BLOCK
THRUST
CONC
B
SECTION C-C
B
B
ANCHOR BLOCK DIMENSIONS
12"
BEND 11.25° 22.5° 45°
8.0'6.0'4.5'A
B 3.0' 3.0' 4.0'
5.0'4.5'3.0'C
D 1.25' 2.17' 3.67'
NO. 9NO. 7NO. 5E
6" & 8"
BEND 11.25° 22.5° 45°
8.0'4.0'3.0'A
B 3.0' 3.0' 3.0'
4.0'3.0'2.0'C
D 1.25' 2.17' 3.67'
NO. 9NO. 7NO. 5E
D
M
T E R
IA
L
U N D
IS
T U R B E D
B E A R
IN
G
A R E A
SITE DETAILS 1
31086.02 Y:\Pennsylvania\32100S\32137.00_Sch_MWA_Tank\Eng_Docs\Plans\06_SiteDet02.dgn (Plot)dweist 08\09\2025 19:15:53
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: 32137.00 OF
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2024, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction
8/1/2024
MOUNTAIN WATER AUTHORITY
POTABLE WATER STORAGE TANK
Tremont Township, Schuylkill County, Pennsylvania
Checked: MJPDesigned: DJW
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE073238
MICHAEL J. PELESCHAK
x x x x x x x x x x xxxxxxxxxx xxxxxxxxxx x x x x x x x x x x x x x x x x x x x x xxxxxxxxxx
1 •"
3 •"
TYPICAL DOUBLE SWING GATE
12' GATE OPENING
BARBED WIRE
HOLE
PADLOCK
JOINTS
ALL
WELD
CENTER STOP
DRAINING
SEMI SELF
STD PIPE
1 †" OD GALV
STD PIPE
2" OD GALV
DEVICE
LOCKING
N O
M I
N
B R I
C
I
G H
T
H E I
G
T
N C
E
H E I
G
B R
E A
R A
N C
E
POST
GATE
4" OD
M I
N
ALTERNATE 1
CONCRETE
CLASS A
2'-0"
TYP
12" CONC FOOTER
TYPICAL CHAIN LINK FENCE DETAIL
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXX
UNIFORM SPACING OF POSTS
HORIZONTAL RAIL (AS REQ'D)
9"
BARBED WIRE TOP, 12• GAGE, 4-POINT
(TYP)
FENCE LINE
NO. 2A CRUSHED STONE
2" LIGHTLY COMPACTED
POST
CORNER
4" OD
#9 GA TENSION WIRE
10'-0" OC (MAX)
(POLY VINYL COATED)
2" WIRE MESH - #9 GA
1†" OD TOP RAIL
2'-0"
EXTERIOR.
WIRE ASSEMBLY TO OVERHANG FACILITY
MOUNTED RECEIVER FOR PADLOCKING.
DROP TYPE WITH HOLE TO MATCH POST
TYPE HINGE. LATCH TO BE POSITIVE PIVOT
2" OD MOUNTED ON BALL AND SOCKET
NOTE: GATE FRAME SHALL BE WELDED
POST
INTERMEDIATE
2…" OD
APPLY AS PER MFG
EPA APPROVED HERBICIDE
INOCULATE SUBGRADE WITH
ALTERNATE 1
NTS
VALVE VAULT SECTION
PRESSURE TRANSDUCER AND
1'-0"
EQUAL
PRODUCTS OR APPROVED
MANUFACTURED BY HALLIDAY
ALUMINUM ACCESS LADDER AS
EXTERIOR BITUMINOUS COATING
OR APPROVED EQUAL
PIPE SUPPORT BY STANDON
(TO LIMITS OF EXCAVATION)
MIN 6" AASHTO NO. 57 COARSE AGGREGATE
GRADE
PANEL)
WALL TO CONTROL
CONTROL WIRE (THRU
PRESSURE TRANSDUCER
VALVE (TYP)
6" MJ GATE
6" MJ TEE
4'-5 3/4"11'-11 3/8"
NTS
PRESSURE TRANSDUCER AND VALVE VAULT PLAN
PRESSURE TRANSDUCE
6" TAP WITH SADDLE FOR
SUMP PIT
LINK SEAL (TYP)
PSX GASKET OR
APPROVED EQUAL
BY HALLIDAY PRODUCTS MODEL NO. W1S3036 OR
WITH H20 LOADING CAPABILITIES, AS MANUFACTURED
30" x 36" ALUMINUM WATERTIGHT ACCESS HATCH
6" DIP
6" DIP
6" DIP
MJ END CAP
6" MJ TEE
16'-5"
6"15'-5"6"
CONDUIT TO TELEMETRY UNIT
DIMENSIONS
10'-0" x 10'-0" INTERIOR
PRECAST CONCRETE VAULT
PIPE STANDS
LINK SEAL AND GROUT
FROM TANK
AND DIGITAL READOUT
PRESSURE TRANSDUCER
NTS
NTS
SITE DETAILS 2
WITH HANDWHEEL
VALVE (TYP)
6" MJ GATE
WITH HANDWHEEL
6" MJ GATE VALVE AND BOX
31086.02 Y:\Pennsylvania\32100S\32137.00_Sch_MWA_Tank\Eng_Docs\Plans\07_SiteDet03.dgn (Plot)dweist 08\19\2025 15:01:27
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: 32137.00 OF
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2024, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction
8/1/2024
MOUNTAIN WATER AUTHORITY
POTABLE WATER STORAGE TANK
Tremont Township, Schuylkill County, Pennsylvania
Checked: MJPDesigned: DJW
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE073238
MICHAEL J. PELESCHAK
12"
7.25"
CANOPY ELEVATION
ALTERNATE 2
NTS
ALTERNATE 2
NTS
CANOPY SECTION
SITE DETAILS 3
O
D
12"O.D.12"
GRAVEL ROAD RESTORATION IN FIT OUT AREA
LEAVING THE SITE.
2A STONE AND PROOF ROLLED ON A DAILY BASIS PRIOR TO
MAINTAINED. ROADWAY MUST BE STABILIZED WITH CLEAN NO
3. ALL EXISTING GRADE BREAKS AND DRAINAGE FEATURES TO BE
COMPACTED LAYERS BEING PLACED.
DIAMETER GREATER THAN ONE-HALF THE THICKNESS OF THE
ORGANIC MATTER, FROZEN MATERIAL OR LARGE STONES WITH A
2. SUITABLE MATERIAL: MATERIAL CONTAINING NO DEBRIS,
1. ALL BACKFILL MATERIAL IS SUBJECT TO ENGINEER APPROVAL.
NOTES:
N
AND NPDES BOUNDARY
LIMIT OF DISTURBANCE
(10'-0" MAX)**
(4'-0" MAX)
PAY LIMIT
ROAD
EXISTING GRAVEL
M A
X
LINE MARKER
BURIED UTILITY
PROCTOR DENSITY
COMPACT TO 97%
2A STONE MATERIAL,
DENSITY IN 8" LIFTS
COMPACT TO 97% PROCTOR
SUITABLE BACKFILL MATERIAL,
UTILITY LINE
SUBGRADE
COMPACTED
** OR MATCH EXISTING WIDTH
PEA GRAVEL
6" AND BACKFILL WITH SAND OR
TRENCH BOTTOM, OVEREXCAVATE
WHERE ROCK IS ENCOUNTERED ON
SIMPSON PBS66 POST BASE
(NO COLOR, LEAVE NATURAL)
6x6" PT WOOD POST
1 †" UNISTRUT
(QUARRY PROCESS, QP/DGA STONE)
4" CRUSHED STONE
24 GAUGE, B-DECK CORRUGATED METAL ROOF
•" DIA. GALV. CARRIAGE BOLT
METAL ROOF RIDGE CAP
2x4 PT WOOD RAFTERS @ 12" OC
SIMPSON H1 CLIP @ RAFTERS
FINAL GRADE
‚" DIA. x 6" GALV. LAG SCREW (TYP.)
‚" @ CROSS BEAM (NOTCH SUPPORT BEAM)
•" DIA. GALV. CARRIAGE BOLTS
2x6 PT WOOD SUPPORT BEAM
SIMPSON RR RAFTER CONNECTOR
2X6 PT WOOD RIDGE BOARD
4x4 PT WOOD SUPPORT CROSS BEAM
4x4 PT WOOD SUPPORT BRACKET
THICKNESS)
RESISTANT, 0.4 - 0.6 MM
WEIGHT, COMMERCIAL GRADE PUNCTURE
PERMEABLE MEMBRANE (MEDIUM
PVC/COMPOSITE SHEET
BOTTOM ENCLOSURE ƒ"
PVC/COMPOSITE MATERIAL
FASCIA TRIM BOARD
3'-0•"
6"
FACTORY COLORED TO MATCH ROOF
ENCLOSE ENDS WITH ƒ" PVC/COMPOSITE SHEET, (COLOR AND MATERIAL TO MATCH ROOF MATERIAL)
INSTALL METAL FLASHING WITH 1" DRIP EDGE
ƒ" PVC/COMPOSITE SHEET
QP/DGA STONE)
(QUARRY PROCESS,
4" CRUSHED STONE
0.4 - 0.6 MM THICKNESS)
COMMERCIAL GRADE PUNCTURE RESISTANT,
PERMEABLE MEMBRANE (MEDIUM WEIGHT,
6"
11'-0" ƒ ƒ
10'-0"
CARRIAGE BOLT
•" GALV.
UNISTRUT
1†"
POST BASE
SIMPSON PBS66
FOUNDATION
3,000 PSI CONCRETE
12" DIA. x 4'-6", x 4" LAG SCREW)
POST WITH †" DIA
(TYP.) (MOUNT TO
UNISTRUT SUPPORT
FINAL GRADE
BRACKET
4x4 SUPPORT
SUPPORT BEAM
2x6 PT WOOD
CROSS BEAM
4x4 SUPPORT
2X6 PT WOOD RIDGE BOARD
2x4 PT WOOD RAFTERS @ 12" OC
31086.02 Y:\Pennsylvania\32100S\32137.00_Sch_MWA_Tank\Eng_Docs\Plans\08_TankDet01.dgn (Plot)jheffner 11\18\2024 12:34:10
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: 32137.00 OF
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2024, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction
8/1/2024
MOUNTAIN WATER AUTHORITY
POTABLE WATER STORAGE TANK
Tremont Township, Schuylkill County, Pennsylvania
Checked: MJPDesigned: DJW
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE073238
MICHAEL J. PELESCHAK
NTS
OVERFLOW
90 DEG ELL
SCH 80 PVC
45 DEG ELL
SCH 80 PVC
SCREEN ASSEMBLY
STAINLESS STEEL
(AS REQUIRED)
GALVANIZED BRACKETS
NTS
FOUNDATION DETAIL
24"
F O
O T I
G
P T
H
" 6
FOOTING TIE BARS
FOOTING CIRCUMFERENTIAL REBARS
(2) PER SHEET
3/8" X 3-1/2" X 11"
LEVELING PLATE
(1) PER SHEET
2" X 2" X 1/4"
FOUNDATION ANGLE
3/4" DIA. X 18" LONG
FOUNDATION BOLTS
BACKFILL
GRAVEL
EARTH
UNDISTURBED
REBAR
FLOOR MAT
FOUNDATION SHEET
BENTONITE (BOTTOM)
SEAL STRIPS GRAY (TOP)
(2) BUNDLED BARS
REBAR
CIRCUMFERENTIAL
CURB
(2) PER SHEET
1/2" DIA.
ANCHOR RODS
REBAR
CIRCUMFERENTIAL
FLOOR
LEVEL
GRADE
NOMINAL OUTSIDE DIAMETER
35.92' FOUNDATION
NOMINAL INSIDE DIAMETER
33.57' TANK
33.57' NOM. INSIDE DIA.
DOME ROOF
ALUMINUM
K
I
G H
T
LADDER
OUTSIDE
REQUIREMENTS
DESIGN
LOCATION PER
QUANTITY AND
STIFFENER
WEB TRUSS
SHELL SHEET
GRADE LEVEL
30" DIAMETER (2)
NOMINAL OPENING
ACCESS DOOR & SHEET
SHELL SHEET
TOP OF
LEVEL
FLOOR
NTS
WATER TANK ELEVATION
NTS
OVERFLOW FUNNEL
SCH 80 PVC
304 STAINLESS STEEL
TANK SHELL SHEET
FASTENERS
STAINLESS STEEL
TANK INTERIOR
SCH.80 PVC.
STEEL. OVERFLOW PIPE TO BE
FLANGE TO BE 304 STAINLESS
INTERIOR FUNNEL, ELBOW &
NOTE:
NTS
(W/ DAVIT) INSTALLATION
30" ROUND ACCESS DOORS
GASKET
NECK WELDMENT
DOOR PLATE
GLASS-FUSED-TO-STEEL
OUTER REINFORCING PLATE
GLASS-FUSED-TO-STEEL
ROUND ACCESS DOOR SHEET
PROJECT REQUIREMENTS
PLATE USAGE IS BASED ON
GLASS-FUSED-TO-STEEL
INNER REINFORCING PLATE
WELDMENT TO ACCESS DOOR SHEET BOLT JOINT.
ASSEMBLY. SEE DRAWING NUMBER 261337 FOR THE NECK
COMPLETED AND THE COMPONENTS ARE READY FOR FINAL
ONLY AFTER THE REAMING PROCEDURES HAVE BEEN
PROPERLY. SEALER IS APPLIED TO THE COMPONENTS
NECESSARY TO ALLOW THE BOLT HEADS TO SEAT
CHAMFER THE REAMED HOLES ON THE TANK INTERIOR AS
NOTE:
(2) 1/2" HEX NUTS
EYE BOLT WITH
(1) 1/2" WASHER.
(1) 1/2" NUT, AND
(30) 1/2" X 2" LONG HHCS,
(1) SPECIAL HEX WASHER.
(1) 1/2" NUT, AND
(1) 1/2" X 2-1/4" LONG HHCS,
WELDMENT
DAVIT
PLATE
DOOR
DETAIL "A"
SEE ENLARGED
ENLARGED DETAIL "A"
WELDMENT
DAVIT
SEE NOTE BELOW.
OF 1/2" DIA. STRUCTURE BOLTS.
ACCOMMODATE THE INSTALLATION
VERTICAL CENTERLINE) TO
HOLES (ON BOTH SIDES OF THE
INDICATED PERIMETER MOUNTING
REAM TO 1/2" DIA. THE
PLATE IS REQUIRED
DOOR SHEET WHEN THE INNER REINFORCING
ON THE INNER SURFACE OF THE ACCESS
HOLE PATTERNS. SEALER IS ALSO PLACED
AROUND EACH OF THE INDICATED BOLT
APPLY A CONTINUOUS BEAD OF SEALER
6" SCH 80 PVC PIPE
TIE INTO DRAIN LINE
TANK DETAILS 1
31086.02 Y:\Pennsylvania\32100S\32137.00_Sch_MWA_Tank\Eng_Docs\Plans\09_TankDet02.dgn (Plot)jheffner 11\18\2024 12:34:11
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: 32137.00 OF
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2024, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction
8/1/2024
MOUNTAIN WATER AUTHORITY
POTABLE WATER STORAGE TANK
Tremont Township, Schuylkill County, Pennsylvania
Checked: MJPDesigned: DJW
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE073238
MICHAEL J. PELESCHAK
NTS
ROOF VENT DETAIL
1 1/2"
12"
ALL AROUND
0 5/16 "
4 13/16 " ~ ‚ DIA REF
2 3/8 " ~ I DIA
1/4" THK C/S
FLANGED ADAPTER
GASKET
R E F
VACUUM PALLET
PRESSURE PALLET ASSY
METAL
ALUM EXPAND'D
SECTION C-C
B
B
SECTION B-B
C
C
2 1/8" 3 5/8"
0 5/8"3"
6" 6"2'-0"
2 3/8"
3 5/8"
SPLASH BLOCK
CONCRETE
COARSE AGGREGATE
AASHTO NO. 57
OVERFLOW SPLASHBLOCK DETAIL
NTS
CONCRETE SPLASH BLOCK
GEOTEXTILE
#4 @ 12" OC (TYP)
R-4 RIPRAP
INLET NOZZLE
VARIABLE ORIFICE
UPPER
TANK SHELL
CHECK VALVE
OUTLET
RISER
CROSS
CHECK VALVE
OUTLET
PIPE
INFLUENT
ORIFICE INLET NOZZLE
LOWER VARIABLE
FLOOR ELEV.
PIPE
INFLUENT
CHECK VALVES
OUTLET
TANK SHELL
TYP
MANUFACTURER.
AND TURN OVER CRITERIA DEVELOPED BY THE
TANK-SPECIFIC BASED ON HYDRAULICS, MIXING
AND/ OR OUTLET CHECK VALVES ARE
AND DISCHARGE ANGLES OF INLET NOZZLES
QUANTITY, SIZE, ELEVATIONS, LOCATIONS,
NOTE:
NTS
INLET PIPING DETAIL
SECTION B-B
SECTION A-A
W A
T
R
P T
H
I
N L
S C
H A
R G
E
B B
A
A
NOZZLE
ORIFICE INLET
UPPER VARIABLE
NOZZLE
ORIFICE INLET
LOWER VARIABLE
ELEV. 1925.00
PUMP OFF
ELEV. 1887.00
PUMP ONINLET NOZZLE
ORIFICE
VARIABLE
LOWER
(6 MINIMUM)
RECOMMENDATIONS
MANUFACTURER'S
SUPPORTS AS PER
NEW PIPE
INFLUENT PIPE
CHECK VALVES TO
CONNECT OUTLET
PIPE.
FASTEN CLAMP AROUND
WASHERS AND NUTS TO
FLATWASHERS, LOCK
5/8" S.S. BOLTS,
6" PVC PIPE. USE
CUT AND FORM TO FIT
STEEL FLAT 1/2x4
HOT ROLLED A-36
NTS
FLOOR PENETRATION
TANK OUTLET
6" DIP
DETAIL
FLOOR PENETRATION
DETAIL ABOVE FOR
SEE TANK INLET
6" PVC RISER
TANK DETAILS 2
31086.02 Y:\Pennsylvania\32100S\32137.00_Sch_MWA_Tank\Eng_Docs\Plans\10_ES_Plan.dgn (Plot)jheffner 11\18\2024 12:34:15
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: 32137.00 OF
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2024, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction
8/1/2024
MOUNTAIN WATER AUTHORITY
POTABLE WATER STORAGE TANK
Tremont Township, Schuylkill County, Pennsylvania
Checked: MJPDesigned: DJW
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE073238
MICHAEL J. PELESCHAK
WOODED
CONC ENDWALL
3" METAL
INV=1624.16'
PANEL
CONTROL
CONC
TANK
WATER
DIRT/GRAVEL LANE
(BENT)
I PIN (FND)
(FND)
I PIN
(FND)
I PIN
GATE
PPL AN 12
CTCO 11
PPL 35735-S46710 UG
S46704
PPL 35730-
ELEC JB
BLDG
CONC
SPILLWAY
EARTH
PPL 35740-S46713
0 4020 FEET
6" DIP
GATE VALVE W/BOX
REPLACE EXISTING 6"
AND FOUNDATION
DEMO EXISTING TANK
FENCE
DEMO EXISTING
VALVE AND SS MESH
SPLASH BLOCK W/FLAP 6" SCH 80 OVERFLOW
6" SCH 80 DRAIN PIPE
FENCE
CHAINLINK
FENCE
GRAVEL WITHIN
TANK FLOOR ELEV=1625.5
160,000 GAL
GATE
DOUBLE SWING
ENTRANCE
ROCK CONSTRUCTION
AT DISCHARGE POINT
R-4 ROCK RIPRAP APRON
COMPOSITE SOCK
VERIFIED BY CONTRACTOR
6" DIP WATERLINE TO BE
LOCATION OF EXISTING
SOIL STOCKPILE
LINE
INFLOW/OUTFLOW
6" DIP
VALVE VAULT
PROPOSED
WORK RESTRICTION
AUGUST 15
HABITAT. NO TREE REMOVAL WILL BE PERMITTED FROM MAY 15 TO
THE NORTHERN LONG-EARED BAT SPRING STAGING/FALL SWARMING
AVOIDANCE MEASURE: THE PROJECT IS LOCATED WITHIN THE VICINITY OF
OVERFLOW PIPE TO BE TIED INTO DRAIN PIPE.3.
POTHOLING OR SIMILAR ACTION.
TO BE VERIFIED BY CONTRACTOR BY MEANS OF
EXISTING 6" DIP WATERLINE AT TIE-IN POINT 2.
BE DEMOLISHED AS PART OF THIS CONTRACT.
EXISTING TANK, FOUNDATION, AND FENCE TO 1.
NOTES
PLAN
EROSION AND SEDIMENT POLLUTION CONTROL
31086.02 Y:\Pennsylvania\32100S\32137.00_Sch_MWA_Tank\Eng_Docs\Plans\11_ES_Notes01.dgn (Plot)jheffner 11\18\2024 12:34:16
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: 32137.00 OF
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian Plaza or modification of this plan or design information, or any part thereof, is strictly prohibited, except by written permission of this firm.
Copyright 2024, of Benesch. All rights reserved. This plan and design content is the property of Benesch. Use, reuse, reproduction
8/1/2024
MOUNTAIN WATER AUTHORITY
POTABLE WATER STORAGE TANK
Tremont Township, Schuylkill County, Pennsylvania
Checked: MJPDesigned: DJW
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE073238
MICHAEL J. PELESCHAK
EROSION CONTROL POLICIES
AND THE REPRESENTATIVE.
ACCORDANCE TO THE INSTRUCTIONS OF THE DEPARTMENT OF ENVIRONMENTAL PROTECTION
PROJECT CONFORMS WITH THE FOLLOWING GUIDELINES AS THEY ARE APPLICABLE AND IN
PENNSYLVANIA TO CONTROL EROSION, IT IS REQUIRED THAT THE CONTRACTOR FOR THIS
IN ACCORDANCE WITH THE CURRENT POLICIES AND PRACTICES IN THE COMMONWEALTH OF
CONSTRUCTION SEQUENCE
WORK RESTRICTION
PERMITTED FROM MAY 15 TO AUGUST 15.
LONG-EARNED BAT SPRING STAGING/FALL SWARMING HABITAT. NO TREE REMOVAL WILL BE
AVOIDANCE MEASURE: THE PROJECT IS LOCATED WITHIN THE VICINITY OF THE NORTHERN
APPROVED METHOD.
ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER
SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN 24.
FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.23.
BE INCORPORATED INTO FILLS.
FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT 22.
PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
OTHER FOREIGN OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR
FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR 21.
IN THICKNESS.
ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES 20.
WITH LOCAL REQUIREMENTS OR CODES.
BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE
SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT
ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, 19.
2 INCHES OF TOPSOIL.
PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF
TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN
TO 5 INCHES 6 TO 12 INCHES ON COMPACTED SOILS PRIOR TO PLACEMENT OF
AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 18.
ON THE PLAN DRAWINGS.
ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED 17.
OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED,
THE CONSTRUCTION SITE BY THE END OF EACH WORKDAY AND DISPOSED IN THE MANNER
SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO 16.
INSPECTION.
THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF
DEFICIENCIES FOUND AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON
A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY 15.
BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
PERFORMED IMMEDIATELY. IF E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT
REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE
PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR,
AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL
MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION
UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS MUST BE 14.
PROCEDURE DESCRIBED IN THIS PLAN, OVER UNDISTURBED VEGETATED AREAS.
ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE 13.
BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE
SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR
THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON 12.
TREMONT TOWNSHIP ENGINEER FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE 11.
BURIED, DUMPED, OR DISCHARGED AT THE SITE.
BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED,
REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO
RECYCLED OR DISPOSED OF IN ACCORDANCE WITH PA DEP'S SOLID WASTE MANAGEMENT
ALL BUILDING MATERIALS AND WASTES MUST BE REMOVED FROM THE SITE AND 10.
EROSION AND SEDIMENT POLLUTION AND NOTIFY THE HAZLE TOWNSHIP ENGINEER.
IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR
FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL
IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL 9.
MUST BE 2H:1V OR FLATTER.
PLAN DRAWINGS. STOCKPILE HEIGHTS MUST NOT EXCEED 35 FEET. STOCKPILE SLOPES
VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE
THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY
THE LOCATION(S) SHOWN ON THE PLAN MAP(S) IN THE AMOUNT NECESSARY TO COMPLETE
TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT 8.
BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
CLEARLY MARKED AND FENCED OFF IN CERTAIN LOCATIONS AS NOTED ON THE PLAN
LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE
AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE 7.
THIS E&S PLAN.
THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN
PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR
CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR
DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE
CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS 6.
REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
AREAS TO BE FILLED SHOULD BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO 5.
IMPLEMENTATION.
BE APPROVED IN WRITING FROM THE TREMONT TOWNSHIP ENGINEER PRIOR TO
SEQUENCE PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST
ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE 4.
UNDERGROUND UTILITIES.
INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE LOCATION OF EXISTING
EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM
AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR 3.
MEETING.
PREPARER, AND THE TREMONT TOWNSHIP ENGINEER TO AN ON-SITE PRECONSTRUCTION
CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN
CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL
AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING 2.
WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.
TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A
REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED PLAN PRIOR
APPLICABLE) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE
APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY AS
FILL SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE
ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND 1.
MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000 IN
THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000 PER DAY IN CIVIL
DEPARTMENT AS DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW.
ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE
CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN
RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE
FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN 36.
ONLY DURING THE GERMINATING SEASON.
REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS SHOULD BE DONE
OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID
STORMWATER MANAGEMENT BMP'S. AREAS DISTURBED DURING REMOVAL OR CONVERSION
SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION
AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND 35.
REMOVAL/CONVERSION OF THE E&S BMP'S.
CONTACT THE HAZLE TOWNSHIP ENGINEER TO SCHEDULE A FINAL INSPECTION PRIOR TO
STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL
UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT 34.
BEFORE SITE DISTURBANCE BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE BMP'S.
EROSION AND SEDIMENT BMP'S MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL 33.
TO THE GREATEST EXTENT POSSIBLE.
STABILIZED WITH VEGETATION ONCE FINAL GRADE IS REACHED SHOULD BE MINIMIZED
DATE AND SCHEDULE THE SEEDER). THE DISTURBED AREAS WHICH ARE TO BE
SHOULD BE MADE FOR SEEDING AND MULCHING TO BEGIN (ANTICIPATE THE COMPLETION
AS DISTURBED AREAS WITHIN THE PROJECT APPROACH FINAL GRADE, PREPARATIONS 32.
MATERIALS.
VEGETATION, ORGANIC MATERIAL, LARGE STONES, AND OTHER OBJECTIONABLE
FILL MATERIAL FOR EMBANKMENTS SHALL BE FREE OF ROOTS, OR OTHER WOODY 31.
SPECIFIED ON THE PLAN MAPS AND/OR DETAIL SHEETS.
STEEPER WITHIN 50 FEET OF A SURFACE WATER AND ON ALL OTHER DISTURBED AREAS
EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR 30.
GROUNDWATER SYSTEMS.
DRAWINGS. IN NO CASE SHALL IT BE ALLOWED TO ENTER ANY SURFACE WATERS OR
CONCRETE WASH WATER SHALL BE HANDLED IN THE MANNER DESCRIBED ON THE PLAN 29.
APPROVED BY THE TREMONT TOWNSHIP ENGINEER.
ARE PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP
E&S BMP'S MUST REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM 28.
MOVEMENTS.
SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER
DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES
PERCENT VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A
PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70 27.
PERMANENT STABILIZATION SPECIFICATIONS.
REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE
TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE
REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE
DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE
NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS
OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING
IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA 26.
OF THIS PLAN.
SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS
VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE
FINISHED GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE
ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING 25.
SLIDING, OR OTHER MOVEMENTS.
CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING,
NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION.
UNIFORM, PERENNIAL 70 PERCENT VEGETATIVE COVER OR OTHER PERMANENT
DURING THE GERMINATING SEASON. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM
REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS SHOULD BE DONE ONLY
REMOVAL OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID
COMPOST FILTER SOCK, CONCRETE WASHOUT AREAS, ETC. AREAS DISTURBED DURING
ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS MUST BE REMOVED INCLUDING
AFTER ALL WORK IS COMPLETED AND FINAL SITE STABILIZATION HAS BEEN ACHIEVED, 6.
REMOVAL OR CONVERSION OF ALL PERIMETER CONTROL BMP'S.
THE LUZERNE CONSERVATION DISTRICT FOR A PRE-FINAL INSPECTION PRIOR TO THE
STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATORS SHALL CONTACT
UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT 5.
PERMANENT STABILIZATION SPECIFICATIONS.
WORKDAY. SOIL SUPPLEMENTS, SEED AND MULCH MUST BE APPLIED ACCORDING TO
TRENCH SHOULD EXIST WHEN UTILITY LINE INSTALLATION CEASES AT THE END OF THE
PLACED ON THE UPSLOPE SIDE OF THE TRENCH. NO MORE THAN 50 LINEAL FEET OF OPEN
TRENCH AND BACK-FILLED IN ONE WORKING DAY. ALL EXCAVATED MATERIAL SHALL BE
BE GREATER THAN THE TOTAL LENGTH OF UTILITY LINE THAT CAN BE PLACED IN THE
INSTALLED, THE TOTAL LENGTH OF EXCAVATED TRENCH OPEN AT ANY ONE TIME SHOULD NOT
INCLUDING STORM SEWER, WATER LINES, AND ALL OTHER UNDERGROUND UTILITIES BEING
DOWNSTREAM TO UPSTREAM MANNER. FOR ALL UNDERGROUND UTILITY INSTALLATION
DRIVEWAY CULVERT CROSSING PIPE BEGINNING AT THE DOWNSTREAM END AND WORKING IN A
SPREADER, AND ANY ELECTRIC LINES. ALSO INSTALL ROCK LINED SWALE INCLUDING
WATER DISTRIBUTION LINES, TANK DRAIN LINES WITH SPLASH BLOCK AND THE LEVEL
ALSO CONSTRUCT TANK CONTROL BUILDING, AND ALL UTILITY INSTALLATION INCLUDING
IN CONJUNCTION WITH ROUGH GRADING, CONSTRUCT WATER TANK FOUNDATION AND TANK. 4.
DISCRETION.
PAVING CAN BE COMPLETED AT ANY TIME AFTER PLACEMENT OF STONE SUBBASE AT OWNER?S
SUBBASE TO ANY ACCESS DRIVE AND PARKING AREA UPON REACHING FINAL SUBGRADE.
DISTURBED AREAS THAT HAVE ACHIEVED FINAL GRADE. IMMEDIATELY INSTALL STONE
TOPSOIL. IMMEDIATELY IMPLEMENT PERMANENT VEGETATIVE STABILIZATION OF ALL
ANY AREA TO CONTAIN LAWN SHALL BE BROUGHT TO FINAL GRADE BY THE PLACEMENT OF
BEGIN ROUGH GRADING OF THE PROPOSED SITE, ACCESS DRIVE AND PARKING SPACES. 3.
NOTE: STEPS 3 AND 4 CAN BE COMPLETED SIMULTANEOUSLY.
COMPOST FILTER SOCK AS SHOWN ON THE E&S CONTROL PLAN AND DETAILS.
INSTALL ROCK CONSTRUCTION ENTRANCE RCE, CONCRETE WASHOUT AREA, AND ALL 2.
ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE DRAWINGS.
UNLESS OTHERWISE NOTED ON THE PLAN. CONSTRUCTION VEHICLES ARE NOT PERMITTED TO
PROPOSED EARTH MOVING ACTIVITIES WITH SURVEY RIBBON AND/OR SURVEY STAKES,
FIELD MARK THE LIMITS OF DISTURBANCE AS SHOWN ON THE E&SPC PLANS PRIOR TO 1.
DAYS OR LONGER REQUIRE TEMPORARY STABILIZATION.
NOTE: CESSATION OF ANY ACTIVITY SPECIFIED IN THE BELOW SEQUENCE FOR FOUR (4)
PREPARATIONS FOR SEEDING AND MULCHING IS NOT ACCEPTABLE.
BEING SEEDED AND MULCHED. WAITING UNTIL EARTHMOVING IS COMPLETED BEFORE MAKING
SQUARE FEET, WHICH IS TO BE STABILIZED BY VEGETATION, REACH FINAL GRADE WITHOUT
COMPLETION DATE AND SCHEDULE SEEDER). IN NO CASE SHOULD AN AREA EXCEEDING 15,000
SHOULD BE MADE FOR SEEDING AND MULCHING TO BEGIN (I.E. ANTICIPATE THE
NOTE: AS DISTURBED AREAS WITHIN A PROJECT APPROACH FINAL GRADE, PREPARATIONS
COMPLETED BEFORE PROCEEDING TO THE NEXT STEP, EXCEPT WHERE NOTED.
THE DEPARTMENT PRIOR TO IMPLEMENTATION. EACH STEP OF THE SEQUENCE SHALL BE
SEQUENCE MUST BE APPROVED BY THE AUTHORIZED COUNTY CONSERVATION DISTRICT OR BY
FOLLOWING SEQUENCE AS PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THE
NOTE: ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE
PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS DOCUMENT.
UNTIL THE E&S BMPS SPECIFIED BY THE CONSTRUCTION SEQUENCE FOR THAT STAGE OR
CLEARING, GRUBBING AND TOPSOIL STRIPPING IN ANY STAGE OR PHASE OF THE PROJECT
IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. DO NOT COMMENCE GENERAL SITE
NOTE: LIMIT CLEARING, GRUBBING, AND TOPSOIL STRIPPING TO THOSE AREAS DESCRIBED
1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
ACTIVITIES SHALL NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM INCORPORATED AT
EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, ALL CONTRACTORS INVOLVED IN THOSE
NOTE: AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR
DEPARTMENT OR AUTHORIZED CONSERVATION DISTRICT.
ACTIVITIES, THE PERMITTEE OR CO-PERMITTEE SHALL PROVIDE NOTIFICATION TO THE
AND AT LEAST 3 DAYS PRIOR TO PROCEEDING WITH THE BULK EARTH DISTURBANCE
NOTE: UPON INSTALLATION OR STABILIZATION OF ALL PERIMETER SEDIMENT CONTROL BMPS
PRECONSTRUCTION MEETING.
REPRESENTATIVE FROM THE AUTHORIZED COUNTY CONSERVATION DISTRICT TO AN ON-SITE
MUNICIPAL OFFICIALS, THE EROSION AND SEDIMENT CONTROL PLAN PREPARER, AND A
CONTRACTORS INVOLVED IN THOSE ACTIVITIES, THE LANDOWNER, ALL APPROPRIATE
(INCLUDING CLEARING AND GRUBBING), THE OWNER AND/OR OPERATOR SHALL INVITE ALL
NOTE: AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES
OF THE REVISIONS FROM THE SCHUYLKILL CONSERVATION DISTRICT.
APPROVED EROSION AND SEDIMENT CONTROL PLAN, THE OPERATOR MUST RECEIVE APPROVAL
PLAN OR REVISIONS TO OTHER PLANS WHICH MAY IMPACT THE EFFECTIVENESS OF THE
BEFORE INITIATING ANY REVISIONS TO THE APPROVED EROSION AND SEDIMENT CONTROL
LOCATIONS.
MAINTAINED FOR ALL SOIL AND/OR ROCK SPOIL AND BORROW AREAS, REGARDLESS OF THEIR
CONSERVATION DISTRICT, AND IS BEING PROPERLY AND COMPLETELY IMPLEMENTED AND
PREPARED BY THE APPLICANT, SUBMITTED TO AND APPROVED BY THE SCHUYLKILL
THE OPERATOR SHALL ASSURE THAT AN EROSION AND SEDIMENT CONTROL PLAN HAS BEEN
PROPERLY AND COMPLETELY IMPLEMENTED.
THE OPERATOR SHALL ASSURE THAT THE APPROVED EROSION AND SEDIMENT CONTROL PLAN IS
NOTES 1
31086.02 Y:\Pennsylvania\32100S\32137.00_Sch_MWA_Tank\Eng_Docs\Plans\12_ES_Notes02.dgn (Plot)jheffner 11\18\2024 12:34:18
Rev Date By Chk'd Description
Scale: AS NOTED Date: Project No.: 32137.00 OF
570-622-4055
Pottsville, Pennsylvania 17901
400 One Norwegian…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .