2-Labott Road Soil and Erosion Control Plans.pdf

PDF 5 MB Posted

Attached to
Labott Road Culvert Replacement
Solicitation number
US.262073
Issued by
York County, Pennsylvania

About this file

This file contains Soil and Erosion Control Plans prepared for the Labott Road Culvert Replacement project in Jackson Township, York County, Pennsylvania. The plans are technical engineering drawings generated from CAD files dated November 2, 2026, and include multiple sheets covering site plans, profiles, impacts assessments, erosion and sediment (E&S) control notes, and detailed specifications. The project involves the removal of an existing concrete-encased steel beam bridge structure and installation of a new precast concrete box culvert, with adjustments to existing drainage swales. Sealed bids for this work were to be received online via the PennBid Program until 10:00 A.M. on Tuesday, December 8, 2026, with public opening and reading of bids occurring electronically the same date. The contract timeline specifies two hundred ten (210) calendar days for project completion.

The bid documents require each bidder to submit a bid bond or certified check equal to 5% of the maximum bid amount payable to Jackson Township, along with evidence of qualifications to perform the work. The project is subject to Pennsylvania Prevailing Wage Act requirements (Act No. 442, P.L. 987, as amended). Contract award decisions will be made at a regularly scheduled Jackson Township supervisors meeting. The engineering drawings indicate coordination with drainage considerations and environmental controls necessary for culvert installation. Jackson Township reserves the right to accept any bid or reject any or all bids, with C.S. Davidson, Inc. authorized to open bids on behalf of the Township supervisors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K d w g C iv il G P .d w g

:5 :4

A M

11-03-2026 d w g C iv il G P .d w g

:5 :4

A d w g C iv il G P .d w g

:5 :4

K d w g C iv il G P .d w g

:5 :5 d w g C iv il G P .d w g

:5 :5 d w g C iv il G P .d w g

:5 :0 d w g C iv il G P .d w g

:5 :0

Sheets and Views
088880109_GP11-Site Plan
088880109_GP11-Profile
088880109_GP11-Impacts Plan
088880109_GP11-E&S Notes
088880109_GP11-E&S Notes (2)
088880109_GP11-E&S Details
088880109_GP11-E&S Details (2)

File details come from the government source that posted it. Updated .