2-IFB 2026 Dormont Sanitary Sewer Manhole Rehabilitation Contract.pdf
PDF 9 MB Posted
- Solicitation number
- Not on record
- Issued by
- Allegheny County, Pennsylvania
About this file
This is a bidding document package for the Borough of Dormont, Allegheny County, Pennsylvania for the 2026 Dormont Sanitary Sewer Manhole Rehabilitation Contract. The project encompasses internal rehabilitation of sanitary sewer manholes throughout the borough utilizing calcium aluminate and epoxy manhole lining materials with associated testing, invert and bench removal and replacement, grouting of joints and pipe openings, traffic control, resident notifications, site access, and site restoration. The work includes rehabilitation of approximately 100 vertical feet of sanitary manholes with calcium aluminate lining material, placement of 9 chimney seals, removal and replacement of inverts and benches at 4 locations, and inspection of 9 manholes. Sealed proposals must be submitted electronically via PennBid no later than 10:30 a.m. on Thursday, June 4, 2026, with bids to remain firm for 60 days following opening. Substantial completion is required within 60 calendar days of contract commencement, with final completion and readiness for payment within 90 calendar days; liquidated damages of $500 per calendar day apply for delays beyond the contract times. No pre-bid conference or site visit requirement is explicitly mandated, though bidders are encouraged to conduct thorough site examinations.
Bid security of 10 percent of the total proposal amount must accompany all submissions in the form of a certified check or surety bond authorized to do business in Pennsylvania. Pennsylvania Prevailing Wage Rates apply to this contract. The borough reserves the right to award to the lowest responsive, qualified, and responsible bidder based on quality of previous work, timely project completion history, payment records to subcontractors and suppliers, permanent place of business, equipment adequacy, technical experience, and financial stability. Bidders must demonstrate a minimum of 1,000 vertical feet of successful manhole rehabilitation installations within the preceding five years using the proposed materials and provide certified statements from the material manufacturer confirming approved installer status and crew training certifications. Performance and payment bonds, public liability and property damage certificates of insurance, and workers' compensation certificates are required upon contract award. The successful bidder must execute the agreement within 15 days of receiving the Notice of Award. A maintenance bond equal to 50 percent of the final contract value for a two-year period is required upon project completion prior to final payment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C-55122-2600
2026 DORMONT SANITARY SEWER MANHOLE
REHABILITATION CONTRACT
Dormont Borough
Allegheny County, Pennsylvania
This project includes the internal rehabilitation of sanitary sewer manholes located throughout the Borough, including but not limited to, calcium aluminate and epoxy manhole lining including testing; invert and bench removal and replacement; grouting of joints and pipe openings; traffic control; resident notifications; site access and site restoration; complete in place.
C O
N T
R A
C T
D O
C U
M E
N T
S
Bid Opening Date: June 4, 2026 Bid Opening Time: 10:30 AM
P R E P A R E D F O R
Dormont Borough 1444 Hillsdale Avenue Pittsburgh, PA 15216
P R E P A R E D B Y
The Gateway Engineers, Inc.
100 McMorris Road Pittsburgh, PA 15205
412.921.4030 PHONE
412.921.9960 FAX
www.gatewayengineers.com
PROJECT DIRECTORY
Copyright © 2017 The Gateway Engineers, Inc. All rights reserved.
00002-1
Project Directory
OWNER: Borough of Dormont
John P. Stinner, Borough Manager
1444 Hillsdale Avenue
Pittsburgh, PA 15216
Phone: 412-561-8900
ENGINEER: The Gateway Engineers, Inc.
Bryan W. Flaugh, P.E., Project Manager
100 McMorris Road
Pittsburgh, PA 15205
Phone: 412-409-2329
Fax: 412-921-9960
00010 Table of Contents Copyright © 2021 The Gateway Engineers, Inc. All rights reserved.
00010-1
TABLE OF CONTENTS
DIVISION 0 - BIDDING DOCUMENTS AND CONTRACT
00001 – Project Title Page
00002 – Project Directory
00010 – Table of Contents
00100 – Notice to Bidders – Advertisement
00110 – Bid and Proposal Form
00130 – Bid Bond
00180 – Non-Collusion Affidavit
00190 – Public Works Employment Verification Form
00200 – Instructions to Bidders
00490 – Bidding Addenda
00510 – Notice of Award
00520 – Agreement
00550 – Notice to Proceed
00605 – Certificate of Insurance
00610 – Performance Bond
00615 – Payment Bond
00620 – Application for Payment
00700 – General Conditions
00800 – Supplementary Conditions
00830 – PA Prevailing Wage Rates
00940 – Work Change Directive
00941 – Change Order
00942 – Field Order
DIVISION 1 – GENERAL REQUIREMENTS
01100 – Summary
01110 – General Project Requirements
01250 – Contract Modification Procedures
01270 – Unit Prices
01290 – Payment Procedures
01322 – Photographic or Video Documentation
01330 – Submittal Procedures
01770 – Closeout Procedures
DIVISION 2 – SITE CONSTRUCTION
02220 – Traffic Control and Notifications
02534 – Sanitary Sewer Manhole Rehabilitation
02850 – Incidental Restoration Requirements
02920 – Lawns and Grasses
ATTACHMENTS
Manhole Rehab Map
Manhole Inspection Form
Notice to Bidders Copyright © 2026 The Gateway Engineers, Inc. All rights reserved.
00100 - 1
NOTICE TO BIDDERS
BOROUGH OF DORMONT
ALLEGHENY COUNTY, PENNSYLVANIA
The Borough of Dormont will receive Sealed Proposals via PennBid until 10:30 AM on Thursday, June
4, 2026 for the following projects:
2026 DORMONT SANITARY SEWER TELEVISING AND CLEANING CONTRACT
This project includes sanitary sewer televising investigations of various size pipe, including the cleaning
(light and heavy), plugging/bypass pumping and manhole inspections throughout the Borough. All traffic control and resident notification in work locations are also included in this project. The Borough may add or subtract various sanitary or storm sewers throughout the Contract.
2026 BOROUGH OF DORMONT SANITARY SEWER MANHOLE REHABILITATION
CONTRACT
This project includes the internal rehabilitation of sanitary sewer manholes located throughout the Borough, including but not limited to, calcium aluminate and epoxy manhole lining including testing; invert and bench removal and replacement; grouting of joints and pipe openings; traffic control; resident notifications;
site access and site restoration; complete in place.
2026 BOROUGH OF DORMONT SANITARY SEWER LINING CONTRACT
This project involves sanitary sewer repairs including but not limited to: sanitary sewer full length manhole to manhole lining CIPP repairs; spot lining CIPP repairs; pre and post CCTV inspections; internal reinstatement of active service laterals; cutting of protruding taps; traffic control; resident and business notification; and site restoration, complete in place. The Borough may add or subtract various sanitary or storm sewers throughout the Contract.
2026 BOROUGH OF DORMONT SANITARY SEWER EXCAVATION REPAIR CONTRACT
This project involves sanitary sewer point repairs including but not limited to: sanitary sewer excavation point repairs; replacement of wye and lateral pipe; MH installation; CCTV verification of the repair locations; and the post repair NASSCO CCTV. All traffic control, notification, and restoration of disturbed areas are also included in the project. The Borough may add or subtract various sanitary or storm sewers throughout the Contract.
Pennsylvania Prevailing Wage Rates shall apply to all Contracts with the exception of the CCTV Contract.
Notice to Bidders Copyright © 2026 The Gateway Engineers, Inc. All rights reserved.
00100 - 2
Copies of Drawings, Specifications, Instructions to Bidders, General Conditions, Forms of Proposals and
Agreement, and all information related to this Solicitation are available at no cost on the PennBid site
(www.PennBid.net).
All proposals must be submitted electronically via PennBid (www.PennBid.net), before 10:30 a.m., prevailing time on June 4, 2026. At that time, Bids will be opened with results displayed publicly on
PennBid. No hard copy bids will be accepted.
The Proposals must be made to the Borough of Dormont, Allegheny County, Pennsylvania, and shall remain firm for a period of sixty (60) days. No Bidder may withdraw the Proposal during the sixty (60) day period without forfeiting the Proposal guarantee.
Bids must be accompanied by a Certified Check or Bidder's Bond from a Surety Company authorized to do business in Pennsylvania, made to the order of the Borough of Dormont, Allegheny County, Pennsylvania in an amount equal to ten (10%) percent of the total amount of the Proposal as a guarantee that, if the
Proposal is accepted, the successful Bidder will enter into an Agreement within fifteen (15) days after
Notice of the Award of the Contract.
The Borough retains the right to award Contracts to the lowest responsive, qualified, and responsible Bidder based on consideration of quality of previous work; record of completing projects on time; history of payments to subcontractors and suppliers; maintenance of a permanent place of business; adequacy of equipment and plant to do the work; technical experience; a solid financial base to guarantee contract completion and all other factors deemed relative by the Borough. However, Bidders are advised that the
Borough expressly reserves the right to reject all bids, and specifically reserves the right to award to the lowest responsible, responsive and qualified Bidder a contract for all or any portions of the work listed in the Proposal, and in awarding a contract for less than the total work listed, or less than all portions of the work listed, the contract price will be determined from the total quantities for each item listed and the unit price bid for each item listed.
Performance, Maintenance, and Labor and Material Payment Bonds, along with Public Liability and
Property Damage Certificates of Insurance in the amounts specified, as well as Certificates of Workman's
Compensation must be filed with the executed Agreement upon acceptance of the Proposal from the successful Bidder.
In addition, Bidders are advised that the Borough reserves the right to reject any or all Proposals, or any part thereof, for any reason; and reserves the right to waive any informality therein.
BY: John Stinner
Borough Manager
Dates of Publication
May 14, 2026
May 21, 2026 http://www.pennbid.net/ http://www.pennbid.net/
Bid Form and Proposal
00110 - 1
C-55122-2600 Proposal From________________________
BID FORM AND PROPOSAL
ARTICLE 1 – BID RECIPIENT
This Bid is submitted to: The Borough of Dormont
1444 Hillsdale Avenue
Pittsburgh, PA 15216
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding
Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – PROPOSAL FOR:
2026 BOROUGH OF DORMONT SEWER MANHOLE REHABILITATION CONTRACT
This project includes the internal rehabilitation of sanitary sewer manholes located throughout the Borough, including but not limited to, calcium aluminate and epoxy manhole lining including testing; invert and bench removal and replacement; grouting of joints and pipe openings; traffic control; resident notifications;
site access and site restoration; complete in place.
ARTICLE 3 – TIME OF COMPLETION
Bidder agrees that the Work will be substantially complete within sixty (60) calendar days after the date when the Contract Times commence to run as provided in Article 4 of the General Conditions, and will be completed and ready for final payment in accordance with Article 15 of the General Conditions within ninety (90) calendar days after the date when the Contract Times commence to run or liquidated damages in the amount of five hundred ($ 500.00) dollars per calendar day will be charged. As actual damages for any delay in completion are impossible to compute and ascertain with certainty as a basis of recovery by the Borough of Dormont of actual damages, the Contractor and its Surety shall be liable to Dormont the sum of five hundred ($ 500.00) dollars as fixed and agreed for each business day of delay until the Work is complete and accepted. Such liquidated damages are intended to represent actual damages and are not intended as a penalty. The Contractor shall pay to Dormont without limiting Dormont’s right to terminate this Agreement for default as provided elsewhere herein.
Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the Contract Times.
00110 - 2
ARTICLE 4 – BASIS OF BID
Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
Bid Schedule
Base Bid
The Borough reserves the right to award the Contract to the lowest responsive, qualified and responsible
Bidder based on consideration of the quality of previous work, record of completing projects on time, history of payments to subcontractors and suppliers, maintenance of a permanent place of business, adequacy of equipment and plant to do the work, technical expertise, a solid financial base to guarantee contract completion and all other factors deemed relative by the Borough.
All specified cash allowances are included in the price(s) set forth above and have been computed in accordance with Article 13 of the General Conditions.
Unit Prices have been computed in accordance with Article 13 of the General Conditions.
Item
No.
Description Unit Quantity Unit price Amount
Rehabilitation of Sanitary
Manholes with Calcium
Aluminate Lining Material, complete in place
V.F. 100 $____________ $____________
Purchase and Placement of
Chimney Seals, complete in place
EA. 9 $____________ $____________
Remove and Replace
Existing Inverts and
Benches, complete in place
EA. 4 $____________ $____________
Inspection of Manholes, complete in place
EA. 9 $____________ $____________
Traffic Control; Resident
Notification; Site Access and Site Restoration, complete in place
L.S. 1 $____________ $____________
TOTAL BASE BID $____________________________
00110 - 3
ARTICLE 5 – BIDDER'S ACKNOWLEDGEMENTS
Bidder acknowledges that estimated quantities are not guaranteed, and are solely for comparison of
Bids, and final payment for all Bid Items will be based on actual installed quantities, determined as provided in the Contract Documents. No additional compensation for “lost” overhead and profit will be considered for the reduction or complete elimination of quantity for any listed Bid Item.
Bidder accepts all the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for sixty
(60) days after the Bid opening, or for such longer period that Bidder may agree to in writing upon request of the Owner.
The Surety for the apparent low bidder shall supply a signed and notarized statement that they will provide the required bonding for the project in the event the apparent low bidder is more than fifteen (15%) percent lower than the second apparent low bidder. This statement shall be supplied to the Owner prior to award.
ARTICLE 6 – BIDDER'S REPRESENTATIONS
In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged:
Addendum No. Addendum Date
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all Federal, State and Local Laws and
Regulations that may affect cost, progress and performance of the Work.
D. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on 1) the cost, progress, and performance of the Work; 2) the means, methods, techniques, sequences, and procedures of construction to be employed by
Bidder; and 3) Bidder’s safety precautions and programs.
E. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding
Documents.
00110 - 4
F. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
G. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding
Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding and Contract Documents and any attached reports and certifies the written resolution thereof by Engineer is acceptable to Bidder unless further clarification is requested.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work for which this Bid is submitted.
J. The submission of this Bid constitutes an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, and that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the
Bidding Documents.
K. Bidder will submit written evidence of its authority to do business in the state where the Project is located not later than the date of its execution of the Agreement.
L. All notices, demands, requests, instructions, approvals, proposals, and claims must be in writing.
ARTICLE 7 – BIDDER’S CERTIFICATION
Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 7.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
00110 - 5
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract.
ARTICLE 8 – ATTACHMENTS TO THIS BID
The following documents are attached to and made a condition of this Bid:
A. Required Bid security in the form of a Certified Check or Surety Company Bond in the amount of ten (10%) percent in favor of Dormont Borough, as a proposal deposit which, it is understood, will be forfeited in case of failure to comply with the requirements and provisions of this proposal.
B. List of Proposed Subcontractors
C. List of Proposed Suppliers including specific materials proposed for use
D. Statement of Bidder’s Qualifications listing at least three (3) projects similar in nature to the project being contemplated performed within the past five (5) years. All listed projects shall have been conducted under the Bidder’s registered corporate name.
E. Non-Collusion Affidavit
F. Public Works Employment Verification Form
G. Evidence of meeting the following requirements.
1. A minimum of one thousand (1,000) vertical feet of successful manhole rehabilitation installations in the United States within the preceding five (5) years with the proposed bid product(s). Submit description of each project including material used, vertical linear feet of manhole rehabilitated and Owner’s contact information.
2. Certified statement from the material manufacturer that the Contractor is an approved installer of the material and/or system with certificates of training for each crew member involved with each process.
3. In the absence of meeting these experience requirements, a Manufacturer’s
Representative shall be required to be on-site during all phases of the work until the
Contractor receives written notice from the Owner that he has demonstrated sufficient ability to continue work independently of the Manufacturer’s Representative.
ARTICLE 9 – DEFINED TERMS
The terms used in this Bid with initial capital letters have meanings stated in the Instruction to Bidders, the
General Conditions, and the Supplementary Conditions.
00110 - 6
ARTICLE 10 – BID SUBMITTAL
This Bid submitted by:
If Bidder is:
An Individual
Name (typed or printed): _____________________________________________________
By: ______________________________________________________________ (SEAL)
(Individual’s signature)
Doing business as: __________________________________________________________
A Partnership
Partnership Name: __________________________________________________ (SEAL)
By: ______________________________________________________________________
(Signature of general partner)
Name (typed or printed): _____________________________________________________
A Corporation
Corporation Name: __________________________________________________ (SEAL)
State of Incorporation: _________________________________
Type (General Business, Professional, Service, Limited Liability): _____________________
By: _______________________________________________
(Signature )
Name (typed or printed): ______________________________
Title: _____________________________________________ (CORPORATE SEAL)
Attest _____________________________________________
Date of Authorization to do business in _________________________ is ____/____/____.
Bidder's Business Address _________________________________________________________
Telephone No. _________________________ Fax No. _____________________________
E-mail address: ___________________________________________________
Submittal Date: ________________________, 20____.
PENAL SUM FORM
Bid Bond EJCDC C-430 (2013 Edition)
000130-1
BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name, and Address of Principal Place of Business):
OWNER (Name and Address):
BID
Bid Due Date:
Description (Project Name— Include Location):
BOND
Bond Number:
Date:
Penal sum $
(Words) (Figures)
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this
Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title
Note: Addresses are to be used for giving any required notice.
Provide execution by any additional parties, such as joint venturers, if necessary.
Bid Bond EJCDC C-430 (2013 Edition)
000130-2
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be
Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding
Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by
Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States
Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
Non Collusion Affidavit Copyright © 2013 The Gateway Engineers, Inc. All rights reserved.
000180-1
NON_COLLUSION AFFIDAVIT
Contract/Bid No._______________
State of_________________________________:
:s.s.
County of_______________________________:
I state that I am_____________________________________________________________
(Title) of________________________________________________________________________
(Name of my firm) and that I am authorized to make this affidavit on behalf of my firm, and its owners, directors, and officers. I am the person responsible in my firm for the price(s) and the amount of this bid.
I state that:
(1) The price(s) and amount of this bid have been arrived at independently and without consultation, communication or agreement with any other contractor, bidder or potential bidder.
(2) Neither the price(s) nor the amount of this bid, and neither the approximate price(s) nor approximate amount of this bid, have been disclosed to any other firm or person who is a bidder or potential bidder, and they will not be disclosed before bid opening.
(3) No attempt has been made or will be made to induce any firm or person to refrain from bidding on this contract, or to submit a bid higher than this bid, or to submit any intentionally high or noncompetitive bid or other form of complementary bid.
(4) The bid of my firm is made in good faith and not pursuant to any agreement or discussion with, or inducement from, any firm or person to submit a complementary or other noncompetitive bid.
(5) _______________________________________, its affiliate’s subsidiaries, (Name of my firm) officers, directors and employees are not currently under investigation by any governmental agency and have not in the last four years been convicted or found liable for any act prohibited by State or Federal law in any jurisdiction, involving conspiracy or collusion with respect to bidding on any public contract, except as follows:
Non Collusion Affidavit
000180-2
I state that ________________________________understands and acknowledges
(Name of my firm) that the above representations are material important, and will be relied on by
(Name of public entity) in awarding the contract(s) for which this bid is submitted. I understand and my firm understands that any misstatement in this affidavit is and shall be treated as fraudulent concealment from ____________________________________of the true facts relating
(Name of public entity) to the submission of bids for this contract.
(Name)
(Title)
SWORN TO AND SUBSCRIBED
BEFORE ME THIS________DAY
OF____________________20____.
Notary Public My Commission Expires:
(Seal)
Public Works Employment Verification Form Copyright © 2015 The Gateway Engineers, Inc. All rights reserved.
000190-1
COMMONWEALTH OF PENNSYLVANIA
PUBLIC WORKS EMPLOYMENT VERIFICATION FORM
Date _______________________
Business or Organization Name (Employer)_______________________________________ Address ____________________________________________________________________ City _____________________________________ State___________ Zip Code __________
___Contractor ___ Subcontractor (check one)
Contracting Public Body ______________________________________________________ Contract/Project No __________________________________________________________ Project Description ___________________________________________________________ Project Location _____________________________________________________________
As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E‐Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired post January 1, 2013 are authorized to work in the United States.
It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.
I, _________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.
Authorized Representative Signature
Public Works Employment Verification Form Copyright © 2015 The Gateway Engineers, Inc. All rights reserved.
000190-2
Instructions to Bidders
00200 – 1
INSTRUCTIONS TO BIDDERS
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General
Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued.
B. Successful Bidder – The lowest, qualified, responsible bidder to whom the Owner (on the basis of Owner’s evaluation as hereinafter provided) makes an award.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the
Notice to Bidders may be obtained from the Issuing Office. The deposit is non-refundable.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor
Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
2.04 During the bidding period, Bidders may be furnished with Addenda for additions to or alterations of the plans or specifications which shall be included in the work covered by the Proposal and become part of the Contract Documents. Such Addenda shall be signed by the Bidder and submitted with the Bid.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within five days of Owner’s request, Bidder shall submit (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:
A. Evidence of Bidder’s authority to do business in the state where the Project is located.
B. Bidder’s state or other contractor license number, if applicable.
C. Subcontractor and Supplier qualification information; coordinate with provisions of Article
12 of these Instructions, “Subcontractors, Suppliers, and Others.”
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
3.05 If the Owner requires pre-qualification for the Project, the Bidder shall include the pre-qualification documentation for himself/herself/theirselves and his/her/their subcontractors and suppliers in the Bid documents.
00200 – 2
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION
OF SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. reports and drawings known to Owner relating to Hazardous Environmental
Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any
Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the
Supplementary Conditions. Bidder is responsible for any interpretation or conclusion
Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and
Engineer by owners of such Underground Facilities, including Owner, or others.
C. No claims for additional compensation will be allowed because of obstructions or conditions on the location of the work which may add to the difficulties or costs of construction, even though such obstructions or conditions are not shown on the Contract Plans. The bidder shall make his own investigation to determine all underground structures and utility lines.
D. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and
Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the
Site, if any, and possible changes in the Contract Documents due to any Hazardous
Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
00200 – 3
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the
Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the
General Conditions indicate, if an Owner safety program exists, it will be noted in the
Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the
Site by Owner or others (such as utilities and other prime contractors) and relates to the
Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
4.06 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given
Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
00200 – 4
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to
Technical Data in such reports and drawings;
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by
Bidder; and (3) Bidder’s safety precautions and programs;
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;
and
J. agree that the submission of a Bid will constitute an incontrovertible representation by
Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the
Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 A pre-Bid conference may be held in accordance with the requirements of the Bidding Documents and the Notice to Bidders. Representatives of Owner and Engineer will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
00200 – 5
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of
Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 10 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding
Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the
General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the
Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract
Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the
Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Bid Form and in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Project Specifications and Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by
Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received
00200 – 6 by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of
“or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or
Contractor to retain any Subcontractor, Supplier, or other individual or entity against which
Contractor has reasonable objection.
12.02 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after
Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for the Work. If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such
Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating
Bids and making the Contract award.
12.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the
Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then
Bidder may enter the words “No Bid” or “Not Applicable.”
13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature). The corporate address and state of incorporation shall be shown. The corporate seal shall be affixed and attested by the corporate secretary or an assistant corporate secretary.
00200 – 7
13.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .