About this file
This is an Erosion and Sedimentation Control (E&S) Plan prepared by Alfred Benesch & Company for Pine Grove Township, Schuylkill County, Pennsylvania, detailing requirements for culvert channel grading work on Oak Grove Road (T-886). The project involves excavation and grading of a channel with a 4-foot bottom width and 2:1 side slopes extending 135 feet downstream to provide positive drainage from a previously installed 27-inch by 42-inch elliptical reinforced concrete pipe culvert. The total disturbance area is 0.31 acres, with work including channel sediment removal, temporary stream diversion devices (cofferdams), dewatering via pumping operations, riprap placement, and permanent stabilization through erosion control blankets and seeding. The plan mandates adherence to Pennsylvania Department of Environmental Protection (PADEP) standards and requires a preconstruction meeting at least 7 days prior to earth disturbance activities, with representatives from PADEP, Pennsylvania Fish and Boat Commission, local conservation district, and municipal officials. All activities must follow the specified construction sequence without deviation unless written approval is obtained from the local conservation district or PADEP. Site stabilization must achieve a minimum uniform perennial 70 percent vegetative cover or equivalent non-vegetative cover before project completion, with temporary erosion and sediment best management practices (BMPs) maintained until final stabilization is achieved.
The plan establishes comprehensive environmental compliance requirements including daily inspection and maintenance of all installed BMPs, prohibition of sediment-laden runoff from leaving the construction site, and immediate corrective action protocols for any BMP failures. Contractors must coordinate underground utility locations through the Pennsylvania One Call System at least 3 days prior to earth disturbance activities and comply with the Commonwealth of Pennsylvania's Clean Streams Law, which imposes penalties up to $10,000 per day in civil penalties and up to $25,000 in criminal penalties for violations. Specific BMP installation details are provided for high-volume filter bags, compost filter socks, temporary cofferdams with rock filters, temporary stream diversion devices, wood matting for wetland crossings, rock construction entrances, and rolled erosion control products with defined anchor patterns based on slope gradients. All fill material must be clean fill with documentation retained, topsoil placement requirements range from 2 to 4 inches depending on location, and mulch application must occur at 3.0 tons per acre during non-germinating seasons. The project site must maintain approved, stamped drawings at all times, with any plan modifications requiring written review and approval, and a comprehensive log documenting BMP inspections, deficiencies, and corrective actions must be retained for regulatory agency review.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev Date By Chk'd Description
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of
Date:Scale: Project No.: Sheet No.:AS NOTED 9/22/2026 0326-609038.02 OF
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
Alfred Benesch & Company
Pine Grove Township, Schuylkill County, Pennsylvania
P E
N
N S Y L V
A
N
I A
C O
M
M O
NW EALT
H
O
F
REGISTERED
PROFESSIONAL
ENGINEER
PE075322
RYAN T. FASNACHTk g o o d
O P
E R
A T
O R
F
IL
E N
A M
E : Y
P e n n s y lv a n ia \0
X
X -6
S
\0
-6
.2
P
G T w p
\E n g
D o c s \E
S \P la n s
C u lv e rt
N o
.1 G ra d in g
\0
E
S
G e n
N o te s
O G
R .d g n
S
E P
:1
P
L O
T T
E D
CULVERT NO.1 CHANNEL GRADING
OAK GROVE ROAD (T-886)
AT WWW.PAONECALL.ORG
COORDINATE YOUR PROJECTS VIA COORDINATE PA
PENNSYLVANIA ONE CALL SYSTEM SERIAL NUMBER
20262651891
START OF EXCAVATION.
THAN 10 BUSINESS DAYS PRIOR TO THE
THAN 3 BUSINESS DAYS NOR MORE
DIAL 8-1-1 OR 1-800-242-1776 NOT LESS
EROSION CONTROL POLICIES AND MAINTENANCE PROGRAM
ENVIRONMENTAL PROTECTION AND THE ENGINEERS REPRESENTATIVE:
GUIDELINES AS THEY ARE APPLICABLE AND IN ACCORDANCE TO THE INSTRUCTIONS OF THE DEPARTMENT OF
CONTROL EROSION, IT IS REQUIRED THAT THE CONTRACTOR FOR THIS PROJECT CONFORMS WITH THE FOLLOWING
IN ACCORDANCE WITH THE CURRENT POLICIES AND PRACTICES IN THE COMMONWEALTH OF PENNSYLVANIA TO
EROSION CONTROL POLICIES (CONTINUED)
CHANNEL DIMENSIONS ARE ACHIEVED AFTER PLACEMENT OF STONE.
ENSURE THAT SUFFICIENT OVER-EXCAVATION IS PROVIDED FOR RIPRAP CHANNELS SUCH THAT THE SPECIFIED
SURFACE WATER AND ON ALL OTHER DISTURBED AREAS SPECIFIED ON THE PLAN MAPS AND/OR DETAIL SHEETS.
EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER WITHIN 50 FEET OF A 28.
27.
DEBRIS, ACCUMULATED SEDIMENT, EXCESS VEGETATION, AND CONSTRUCTION MATERIAL/WASTES.
KEEP ALL CHANNELS FREE OF OBSTRUCTIONS INCLUDING BUT NOT LIMITED TO FILL, ROCKS, LEAVES, WOODY 26.
IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
UP TO $10,000 PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000
DEFINED IN SECTION 602 OF THE PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR
MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS
CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS
FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE 25.
OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS SHOULD BE DONE ONLY DURING THE GERMINATING SEASON.
OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION
TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL
AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY E&S BMPS MUST BE REMOVED OR CONVERTED 24.
OR PA DEP.
STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE LOCAL CONSERVATION DISTRICT
E&S BMPS MUST REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY 23.
FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND
PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER 22.
ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN
REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION
BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE
OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE
IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE 21.
PROJECT DISTURBANCE
CULVERT NO.1 CHANNEL GRADING DISTURBANCE = 0.31 ACRES
HARTLETON CHANNERY SILT LOAM, 15 TO 25 PERCENT SLOPES
BERKS CHANNERY SILT LOAM, 3 TO 8 PERCENT SLOPES
ALVIRA SILT LOAM, 0 TO 3 PERCENT SLOPES
MAP UNIT NAME
SYMBOL
MAP UNIT
HaC
BeB
AgA
SOILS LEGEND
SYMBOL
MAP UNIT
HaC
BeB
AgA
SOIL LIMITATIONS AND RATINGS
AND STREETS
LOCAL ROADS
SOMEWHAT LIMITED
SOMEWHAT LIMITED
VERY LIMITED
SOURCE
ROADFILL
POOR
POOR
FAIR
SOURCE
TOPSOIL
POOR
POOR
FAIR
RATING
HYDRIC
NON - HYDRIC
HYDRIC
HYDRIC
SOILS INFORMATION, LIMITATIONS AND RESOLUTIONS
LOCATION MAP
1" = 1000'
CULVERT NO.1 LOCATION
COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE
ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR 20.
HAY OR STRAW MULCH MUST BE APPLIED AT 3.0 TONS PER ACRE.19.
MINIMUM OF 2 INCHES OF TOPSOIL.
MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A
INCHES ON COMPACTED SOILS - PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A
AREAS WHICH ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES - 6 TO 12 18.
DRAWINGS.
ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN 17.
SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE
SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE 16.
OFFICIALS AT THE TIME OF INSPECTION.
THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE AVAILABLE TO REGULATORY AGENCY
A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND AND THE DATE 15.
REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE REQUIRED.
REMULCHING AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF E&S BMPS FAIL TO PERFORM AS EXPECTED, REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, INSPECTIONS OF ALL E&S BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND
UNTIL THE SITE IS STABILIZED, ALL E&S BMPS MUST BE MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE 14.
THIS PLAN, OVER UNDISTURBED VEGETATED AREAS.
ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN 13.
REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE OF A
THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-12.
PRIOR TO BEING ACTIVATED.
ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY PADEP FULLY IMPLEMENTED 11.
BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS, WASTES, OR UNUSED BUILDING MATERIALS SHALL BE
ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., ALL BUILDING MATERIALS AND WASTES MUST BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN 10.
THE REGIONAL OFFICE OF THE DEPARTMENT.
POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR
EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BMPS TO MINIMIZE THE
IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED 9.
PLACE STOCKPILES NO GREATER THAN 35' IN HEIGHT WITH SLOPES NO STEEPER THAN 2H:1V.8.
CLEARING AND GRUBBING OPERATIONS BEGIN.
BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE
AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE 7.
DESCRIBED IN THIS E&S PLAN.
SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS
COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BEST MANAGEMENT PRACTICES (BMPS)
THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT
CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF 6.
CONSERVATION DISTRICT OR PADEP PRIOR TO IMPLEMENTATION.
PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN WRITING FROM THE LOCAL
ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE 5.
THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR
AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA 4.
PRECONSTRUCTION MEETING.
REPRESENTATIVE FROM THE PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION (PADEP) TO AN ON-SITE
3742), A REPRESENTATIVE FROM THE PENNSYLVANIA FISH AND BOAT COMMISSION (717-626-0228) AND/OR A
OFFICIALS, THE E&S PLAN PREPARER, A REPRESENTATIVE FROM THE LOCAL CONSERVATION DISTRICT (570-622-
THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL
AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, 3.
SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT ITS DISCRETION.
PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING AGENCY MAY REQUIRE A WRITTEN
PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES TO THE APPROVED
APPROVED DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE
ACCORDANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL (E&S) PLAN. A COPY OF THE
ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILL SHALL BE DONE IN 2.
PROJECT SITE AT ALL TIMES.
KEEP A COPY OF THE APPROVED DRAWINGS STAMPED, SIGNED, AND DATED BY THE REVIEWING AGENCY AT THE 1.
OAK G
ROVE RD
GENERAL NOTES
EROSION AND SEDIMENTATION CONTROL
I-
SR 0
9/28/26
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of
Date:Scale: Project No.: Sheet No.:AS NOTED 9/22/2026 0326-609038.02 OF
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
Alfred Benesch & Company
Pine Grove Township, Schuylkill County, Pennsylvania
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE075322
RYAN T. FASNACHTk g o o d
O P
E R
A T
O R
F
IL
E N
A M
E : Y
P e n n s y lv a n ia \0
X
X -6
S
\0
-6
.2
P
G T w p
\E n g
D o c s \E
S \P la n s
C u lv e rt
N o
.1 G ra d in g
\0
E
S
G e n
N o te s
O
G R
.d g n S
E P
:1
P
L O
T T
E D
GENERAL NOTES
EROSION AND SEDIMENTATION CONTROL
CONSTRUCTION SEQUENCE
SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE.
EACH STAGE SHALL BE COMPLETED BEFORE ANY FOLLOWING STAGE IS INITIATED. CLEARING AND GRUBBING
ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE.
TO RESIST SLIDING AND OTHER MOVEMENTS.
DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT
70 PERCENT PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A
AREA SHALL BE CONSIDERED TO HAVE ACHIEVED FINAL STABILIZATION WHEN IT HAS A MINIMUM UNIFORM
BE REMOVED. AREAS DISTURBED DURING REMOVAL OF THE BMPS MUST BE STABILIZED IMMEDIATELY. AN
AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST 9.
STABILIZE ALL REMAINING DISTURBED AREAS.8.
OPERATION AND TEMPORARY DIVERSION DEVICES.
ESTABLISH PERMANENT FLOW THROUGH THE CHANNEL AND REMOVE THE TEMPORARY PUMPING 7.
EXCAVATE AND REMOVE CHANNEL SEDIMENT AND GRADE AS NECESSARY IN ACCORDANCE TO THIS PLAN. 6.
CAN BE COMPLETED IN ACCORDANCE WITH THIS PLAN.
ONCE THE TEMPORARY DIVERSION DEVICES ARE INSTALLED AND STABILIZED, WORK AREA DEWATERING 5.
PUMPING.
CONSTRUCT TEMPORARY STREAM DIVERSION DEVICES INCLUDING COFFERDAMS AND TEMPORARY 4.
.DISTURBANCE BOUNDARIES SHOWN ON THE DRAWINGS
ON THE PLAN. CONSTRUCTION VEHICLES ARE NOT PERMITTED TO ENTER AREAS OUTSIDE THE LIMIT OF
EARTH MOVING ACTIVITIES WITH SURVEY RIBBON AND/OR SURVEY STAKES, UNLESS OTHERWISE NOTED
BOUNDARIES, SPRING SEEPS, AND FLOODWAYS) AND ALL LIMITS OF DISTURBANCE PRIOR TO PROPOSED
IELD MARK ALL WATERS OF THE COMMONWEALTH BOUNDARIES (I.E. STREAM BUFFERS, WETLAND F3.
DESCRIBED IN THIS DOCUMENT.
CONSTRUCTION SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS
STRIPPING IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE
CONSTRUCTION SEQUENCE. DO NOT COMMENCE GENERAL SITE CLEARING, GRUBBING AND TOPSOIL
LIMIT CLEARING, GRUBBING, AND TOPSOIL STRIPPING TO THOSE AREA DESCRIBED IN EACH STAGE OF THE 2.
INSTALL TRAFFIC CONTROL DEVICES AND SIGNS FOR THE CORRESPONDING STAGE/LOCATION OF WORK.1.
NOT TO SCALE
AROUND IN-CHANNEL WORK AREAS
TEMPORARY COFFERDAM AND BYPASS
TO PREVENT BACKFLOW INTO THE WORK AREA.
MAY BE REPLACED BY AN IMPERVIOUS COFFERDAM
** FOR LOW GRADIENT CHANNELS, THE ROCK FILTER
EXCAVATE A SUMP FOR THE PUMP INTAKE.
EROSIVE MATERIAL, NO EARTH FILL. DO NOT
* SANDBAGS, JERSEY BARRIERS OR OTHER NON-
FROM ENTERING THE SYSTEM.
BOTTOM TO PREVENT SEDIMENT
A SUFFICIENT DISTANCE FROM
PUMP INTAKE SHALL BE MAINTAINED NOTE:
PUMPED WATER FILTER BAG
ROCK FILTER **
WORK AREA
PUMP
PIPE
DISCHARGE
TEMPORARY DAM *
PUMP
INTAKE PIPE
PLASTIC
DISSIPATOR OR SECURELY ANCHORED
PUMP DISCHARGE ENERGY
CULVERT NO.1 CHANNEL GRADING
OAK GROVE ROAD (T-886)
MINIMIZE IMPACTS TO THE WETLAND.
THE LOCATION OF THE WETLAND CROSSING AND ITS ORIENTATION MUST BE PLACED TO 3.
(INTERCONNECTED TIRE SIDEWALLS).
EXPANDED METAL GRATING (NON-GALVANIZED STEEL) ON GEOTEXTILE OR TIRE MATS
AT THE DISCRETION OF THE CONTRACTOR, WOOD MATS MAY BE SUBSTITUTED WITH 2.
A GEOTEXTILE UNDERLAYMENT SHALL BE USED UNDER THE WOOD MAT.1.
NOTES:
LOCATIONS
FOR WETLAND CROSSING/TEMPORARY IMPACT
TYPICAL WOOD MAT
NOT TO SCALE
ARE 4" X 4"
ALL WOOD MEMBERS
DIRECTION OF TRAVEL
3/16" GALVANIZED STEEL CABLE
3/16" CABLE CLAMPS
CONNECT LOOPS WITH
10'
2' 2'
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of
Date:Scale: Project No.: Sheet No.:AS NOTED 9/22/2026 0326-609038.02 OF
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
Alfred Benesch & Company
Pine Grove Township, Schuylkill County, Pennsylvania
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE075322
RYAN T. FASNACHTk g o o d
O P
E R
A T
O R
F
IL
E N
A M
E : Y
P e n n s y lv a n ia \0
X
X -6
S
\0
-6
.2
P
G T w p
\E n g
D o c s \E
S \P la n s
C u lv e rt
N o
.1 G ra d in g
\0
E
S
D e t0
O G
R .d g n
S
E P
:1
P
L O
T T
E D
DETAILS
EROSION AND SEDIMENTATION CONTROL
NOT TO SCALE
PUMPED WATER FILTER BAG
NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND 7.
WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED.
THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR ½ THE MAXIMUM SPECIFIED BY THE MANUFACTURER, 6.
AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER 5.
SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING
NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER 4.
MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING
MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES
AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS
BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT 3.
STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON
PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME ½ FULL OF SEDIMENT. SPARE BAGS SHALL BE
A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE 2.
HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:
DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS.
LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, 1.
NOTES:
PLAN VIEW
ELEVATION VIEW
AOS% RETAINED
UV RESISTANCE
MULLEN BURST
PUNCTURE
GRAB TENSILE
AVG WIDE WIDTH STRENGTH
PROPERTY
ASTM-D-4751
ASTM-D-4355
ASTM-D-3786
ASTM-D-4833
ASTM-D-4632
ASTM-D-4884
TEST METHOD
80 SIEVE
70%
350 PSI
110 LB
205 LB
60 LB/IN
MINIMUM STANDARD
FILTER BAG
FILTER BAG
WELL VEGETATED, GRASSY AREA
GRASSY AREA
WELL VEGETATED,
DISCHARGE HOSE
PUMP
INTAKE HOSE
CLAMPS
CLAMPS
PUMP
DISCHARGE HOSE
HOSE
INTAKE
(RECOMMENDED)
HEAVY DUTY LIFTING STRAPS
SANDBAGSIMPERVIOUS MEMBRANE
2 BAG MINIMUM HEIGHT ABOVE NORMAL BASE FLOW
NOT TO SCALE
SANDBAG DIVERSION DAM OR COFFERDAM
CULVERT NO.1 CHANNEL GRADING
OAK GROVE ROAD (T-886)
THE PROCESS OUTLINED IN PUBLICATION 408 SECTION 806.3(b).
PERMANENT ROLLED EROSION CONTROL PRODUCT SHOULD BE INSTALLED PER 2.
THAN DEPTH AND PER THE ROLLED EROSION CONTROL PRODUCTS DETAIL.
WATER COURSE LINING WILL BE INSTALLED TO A DEPTH EQUAL TO OR GREATER 1.
NOTES:
Culvert No.1
NOT TO SCALE
CHANNEL TABULATION
4 VARIES 4' TO 2' 2 2 RECP 1.C (SIDE SLOPES)
Location
B (FT)
WIDTH
BOTTOM
D (FT)
DEPTH
(FT)
Z1
(FT)
Z2 LINING, SEEDING
CHANNEL SECTION
BOTTOM WIDTH
D E
P T
H
Z1
INDICATED
LINING AS
LOOKING DOWNSTREAM
Z2
NO.
CHANNEL
SIDE SLOPE
GRASS
CHANNEL
PCSM
SINGLE-NET EROSION CONTROL BLANKET & OPEN WEAVE TEXTILE
PENNDOT DESCRIPTION
1.C
ID
LINING
LINING LEGEND
NOT TO SCALE
ROCK CONSTRUCTION ENTRANCE
DITCH BEING CROSSED.
SPECIFIED BY MANUFACTURER IS NOT OTHERWISE PROVIDED. PIPE SHALL BE SIZED APPROPRIATELY FOR SIZE OF
MOUNTABLE BERM SHALL BE INSTALLED WHEREVER OPTIONAL CULVERT PIPE IS USED AND PROPER PIPE COVER AS 3.
CONSTRUCTION ENTRANCE.
RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL BMP PRIOR TO ENTERING ROCK 2.
OVER FULL WIDTH OF ENTRANCE.
REMOVE TOPSOIL AS NECESSARY PRIOR TO INSTALLATION OF ROCK CONSTRUCTION ENTRANCE. EXTEND ROCK 1.
NOTES:
PROFILE
PLAN VIEW
IS NOT ACCEPTABLE.
ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES
ENTRANCE BY 50 FOOT INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK. WASHING THE
EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION
DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE IMMEDIATELY. IF
DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. ALL SEDIMENT
MAINTENANCE: ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED
ROCK OR TIMBER MATTING
REMAING 100' CAN EITHER BE
** FIRST 50' MUST BE ROCK. THE
PROVIDE PROPER COVER OVER PIPE
* MOUNTABLE BERM USED TO
M
IN
M
IN
M
IN
3'
ROADWAY
EXISTING
ROADWAY
EXISTING
EXISTING GROUND
GEOTEXTILE
MIN 8" AASHTO #1
EARTH FILL
PIPE AS NECESSARY
(6" MIN) *
MOUNTABLE BERM
** 150' MIN
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of
Date:Scale: Project No.: Sheet No.:AS NOTED 9/22/2026 0326-609038.02 OF
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
Alfred Benesch & Company
Pine Grove Township, Schuylkill County, Pennsylvania
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE075322
RYAN T. FASNACHTk g o o d
O P
E R
A T
O R
F
IL
E N
A M
E : Y
P e n n s y lv a n ia \0
X
X -6
S
\0
-6
.2
P
G T w p
\E n g
D o c s \E
S \P la n s
C u lv e rt
N o
.1 G ra d in g
\0
E
S
D e t0
O G
R .d g n
S
E P
:5
P
L O
T T
E D
DETAILS
EROSION AND SEDIMENTATION CONTROL
CULVERT NO.1 CHANNEL GRADING
OAK GROVE ROAD (T-886)
PUBLICATION 408.
PROVIDE ANCHORING DEVICES IN ACCORDANCE WITH SECTION 806.2(d) OF 6.
PLACE 21/2 ANCHORS/SY.5.
CHANNEL SIDE WHENEVER POSSIBLE.
EXTEND ROLLED EROSION CONTROL PRODUCTS 2'-0" - 3'-0" ABOVE THE CREST OF 4.
ROLLED EROSION CONTROL PRODUCTS WITHOUT SEPARATION FROM THE SOIL.
OF THE CHANNEL TO ENSURE WATER FLOW TRANSITIONS SMOOTHLY ONTO THE
EXCAVATE TERMINAL ANCHOR TRENCH 1'-0" DEEP AND 6" WIDEACROSS THE WIDTH 3.
DOWNSTREAM BENEATH THE ROLLED EROSION CONTROL PRODUCTS.
CONTROL PRODUCTS TO PREVENT LOOSE SOIL FROM BEING TRANSPORTED
THE CHANNEL AT 25'-0" TO 30'-0" ALONG THE LENGTH OF THE ROLLED EROSION
EXCAVATE INTERMITTENT CHECK SLOT 6" DEEP AND 6" WIDE ACROSS THE WIDTH OF 2.
PRODUCTS.
THE CHANNEL TO PREVENT UNDERMINING OF THE ROLLED EROSION CONTROL
EXCAVATE INITIAL ANCHOR TRENCH 1'-0" DEEP AND 6" WIDE ACROSS THE WIDTH OF 1.
NOTES:
NOT TO SCALE
ANCHOR PATTERN DETAILS
EROSION CONTROL PRODUCTS
SEE NOTE 1
INITIAL ANCHOR TRENCH
SEE NOTE 2
INTERMITTENT CHECK SLOT
SEE NOTE 3
TERMINAL ANCHOR TRENCH
EMBANKMENT MATERIAL (TYP)
FOR ANCHOR PATTERN
SEE SHEET 1
ANCHOR (TYP),FLOW
END
DOWNSTREAM
1'-0" 6"
COMPACTED
BACKFILL
FOR ANCHOR PATTERN
SEE SHEET 1
ANCHOR (TYP),
FLOW
6"
MATERIAL (TYP)
EMBANKMENT
WIDTH, AS INDICATED
FOR ANCHOR PATTERN
SEE SHEET 1
ANCHOR (TYP),
FLOWEND
UPSTREAM
2'-0" - 3'-0"
SEE NOTE 4
6"
DETAIL A
GROUND LINE
EXISTING
SEE NOTE 4
2'-0" - 3'-0"
12"
4"
NOT TO SCALE
ANCHOR PATTERNS FOR SLOPES
EROSION CONTROL PRODUCTS
ANCHORS (TYP)
3'-0"
3'-0"
1'-6"
3'-0"
1'-6"
3'-0"
1'-6" 1'-6"
SLOPES FLATTER THAN 3:1
ANCHOR PATTERN FOR
(INCLUDING 3:1)
BETWEEN 3:1 AND 2:1
ANCHOR PATTERN FOR SLOPES
(INCLUDING 2:1)
BETWEEN 2:1 AND 1:1
ANCHOR PATTERN FOR SLOPES
1:1 OR STEEPER
ANCHOR PATTERN FOR
1 ANCHOR/SY 1 1/2 ANCHORS/SY
2 ANCHORS/SY 2 1/2 ANCHORS/SY
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of
Date:Scale: Project No.: Sheet No.:AS NOTED 9/22/2026 0326-609038.02 OF
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
Alfred Benesch & Company
Pine Grove Township, Schuylkill County, Pennsylvania
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE075322
RYAN T. FASNACHTk g o o d
O P
E R
A T
O R
F
IL
E N
A M
E : Y
P e n n s y lv a n ia \0
X
X -6
S
\0
-6
.2
P
G T w p
\E n g
D o c s \E
S \P la n s
C u lv e rt
N o
.1 G ra d in g
\0
E
S
D e t0
O G
R .d g n
S
E P
:5
P
L O
T T
E D
DETAILS
EROSION AND SEDIMENTATION CONTROL
NOT TO SCALE
COMPOST FILTER SOCK
SPREAD AS A SOIL SUPPLEMENT.
IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH
UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT 7.
POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
BIODEGRADABLE FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. 6.
ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION.
SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED 5.
AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVEGROUND HEIGHT OF THE SOCK 4.
TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS.3.
DOWNSLOPE OF THE SOCK IF SO SPECIFIED BY THE MANUFACTURER.
AND SEDIMENT POLLUTION CONTROL PROGRAM MANUAL (363-2134-008). STAKES MAY BE INSTALLED IMMEDIATELY
SOCK SHALL NOT EXCEED THAT IN THE EROSION AND SEDIMENT CONTROL REPORT AND/OR THE PADEP EROSION
AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN SOCK ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY
COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE SOCK SHALL BE EXTENDED 2.
SHOWN IN TABLE BELOW.
SOCK FABRIC SHALL MEET STANDARDS AS SHOWN IN TABLE BELOW. COMPOST SHALL MEET THE STANDARDS AS 1.
NOTES:
COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
TWO-PLY SYSTEMS
SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS
MATERIAL TYPE
CHARACTERISTICS
MATERIAL
DIAMETERS
SOCK
MESH OPENING
STRENGTH
TENSILE
(ASTM-G-155)
STRENGTH
ORIGINAL
STABILITY %
ULTRAVIOLET
LONGEVITY
FUNCTIONAL
MINIMUM
3 MIL HDPE
DEGRADABLE
PHOTO-
18"
12"
3/8"
1000 HR
23% AT
6 MONTHS
5 MIL HDPE
DEGRADABLE
PHOTO-
32"
24"
18"
12"
3/8"
26 PSI
1000 HR
23% AT
9 MONTHS
5 MIL HDPE
DEGRADABLE
BIO-
32"
24"
18"
12"
3/8"
26 PSI
6 MONTHS
(MFPP)
POLYPROPYLENE
MULTI-FILAMENT
DEGRADABLE
PHOTO-
32"
24"
18"
12"
3/8"
44 PSI
1000 HR
100% AT
1 YEAR
(HDMFPP)
POLYPROPYLENE
MULTI-FILAMENT
HEAVY DUTY
DEGRADABLE
PHOTO-
32"
24"
18"
12"
1/8"
202 PSI
1000 HR
100% AT
2 YEARS
INNER CONTAINMENT NETTING
OUTER FILTRATION MESH
HDPE BIAXIAL NET
CONTINUOUSLY WOUND
FUSION-WELDED JUNCTURES
3/4" X 3/4" MAX APERTURE SIZE
MECHANICALLY FUSED VIA NEEDLE PUNCH)
(WOVEN LAYER AND NON-WOVEN FLEECE
COMPOSITE POLYPROPYLENE FABRIC
3 /16" MAX APERTURE SIZE
ALTERNATIVE.
TABLE BELOW. THE STANDARDS CONTAINED IN THE PENNDOT PUBLICATION 408 ARE AN ACCEPTABLE
THE PHYSICAL PARAMETERS OF THE COMPOST SHOULD COMPLY WITH THE STANDARDS AS SHOWN IN THE
ACCEPTABLE AS THE ORGANIC COMPONENT OF THE MIX.
AND BARK CHIPS, GROUND CONSTRUCTION DEBRIS OR REPROCESSED WOOD PRODUCTS ARE NOT
COMPOST PRODUCT SHOULD NOT RESEMBLE THE RAW MATERIAL FROM WHICH IT WAS DERIVED. WOOD
ODORS AND SHOULD BE SEASONABLY FREE (<1% BY DRY WEIGHT) OF MAN-MADE FOREIGN MATTER. THE
COMPOST SHOULD BE AEROBICALLY COMPOSTED. THE COMPOST SHOULD POSSESS NO OBJECTIONABLE
AGRICULTURE, FOOD, STUMP GRINDINGS, AND YARD OR WOOD/BARK ORGANIC MATTER SOURCES. THE
COMPOST SHOULD BE A WELL DECOMPOSED, WEED-FREE ORGANIC MATTER DERIVED FROM
COMPOST STANDARDS
SOLUBLE SALT CONCENTRATION
PARTICLE SIZE
MOISTURE CONTENT
pH
ORGANIC PORTION
ORGANIC MATTER CONTENT
5.0 DS/M (MMHOS/CM) MAXIMUM
30% - 50% PASS THROUGH 3/8" SCREEN
30% - 60%
5.5 - 8.5
FIBROUS AND ELONGATED
25% - 100% (DRY WEIGHT BASIS)
PLAN VIEW
AREA
UNDISTURBED
AREA
DISTURBED
PLACED 10' OC (TYP)
2" x 2" WOODEN STAKES COMPOST FILTER SOCK
F L O
W F L O
W
CONTOURS
EXISTING
JOINING DETAIL
MIN
12"
STAKE
UNDISTURBED AREADISTURBED AREA
M
IN
BLOWN / PLACED FILTER MEDIA COMPOST FILTER SOCK
2" x 2" WOODEN STAKES PLACED 10' OC
SECTION VIEW
CULVERT NO.1 CHANNEL GRADING
OAK GROVE ROAD (T-886)
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of
Date:Scale: Project No.: Sheet No.:AS NOTED 9/22/2026 0326-609038.02 OF
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
Alfred Benesch & Company
Pine Grove Township, Schuylkill County, Pennsylvania
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE075322
RYAN T. FASNACHTk g o o d
O P
E R
A T
O R
F
IL
E N
A M
E : Y
P e n n s y lv a n ia \0
X
X -6
S
\0
-6
.2
P
G T w p
\E n g
D o c s \E
S \P la n s
C u lv e rt
N o
.1 G ra d in g
\0
E
S
D e t0
O G
R .d g n
S
E P
:5
P
L O
T T
E D
DETAILS
EROSION AND SEDIMENTATION CONTROL
PERMANENT SEEDING APPLICATION RATE
AGRICULTURAL LIME 6 TONS 240 LB 2,480 LB
REQUIRED IN AGRICULTURAL FIELDS
OR AS PER SOIL TEST; MAY NOT BE
10-10-20 FERTILIZER 1,000 LB 25 LB 210 LB
REQUIRED IN AGRICULTURAL FIELDS
OR AS PER SOIL TEST; MAY NOT BE
TEMPORARY SEEDING APPLICATION RATE
AGRICULTURAL LIME
TOPSOIL STOCKPILES
TYPICALLY NOT REQUIRED FOR
SOIL AMENDMENT APPLICATION RATES EQUIVALENTS
BE SUBSTITUTED FOR THE SOIL AMENDMENTS SHOWN IN THE ABOVE TABLE.
A COMPOST BLANKET WHICH MEETS THE STANDARDS OF THE MANUAL MAY 1.
SOIL AMENDMENT PER ACRE PER 1000 SF PER 1000 SY NOTES
10-10-10 FERTILIZER
TOPSOIL STOCKPILES
TYPICALLY NOT REQUIRED FOR
1 TON 40 LB 410 LB
500 LB 12.5 LB 100 LB
SUPPLEMENTS
SCHEDULE OF SEEDING AND SOIL
SEEDING SEASON DATES:
ANCHORING METHOD:
RATE OF ANCHOR MATERIAL APPL:
ANCHOR MATERIAL:
MULCHING RATE:
MULCH TYPE:
LIMING RATE:
FERTILIZER APPL RATE
FERTILIZER TYPE:
APPLICATION RATE:
% PURE LIVE SEED:
SPECIES:(PERMANENT, WETLANDS)
LB/1000 SY
LB/1000 SY
LB/1000 SY
LB/1000 SY
LB/1000 SY
(X-X-X)
LB/1000 SY
NURSERY CROPS: ANYTIME ~ NATIVE: 10/15 TO 5/15
PER MANUFACTURERS' INSTRUCTIONS
STRAW
AS INDICATED BY SOIL TESTS
AS INDICATED BY SOIL TESTS
AS INDICATED BY SOIL TESTS
9.0
SEE TABLE A
FORMULA W
RECYCLED CELLULOSE FIBER
AND
WOOD FIBER
OR
PER MANUFACTURERS' INSTRUCTIONS
NONASPHALTIC EMULSION
OR
PER MANUFACTURERS' INSTRUCTIONS
POLYVINYL ACETATE
OR
RECYCLED CELLULOSE FIBER/WOOD FIBER MIXTURE
SEEDING SEASON DATES:
MULCHING RATE:
MULCH TYPE:
LIMING RATE:
FERTILIZER APPL RATE
FERTILIZER TYPE:
APPLICATION RATE:
% PURE LIVE SEED:
SPECIES:
/15 TO 6/1 & 8/1 TO 10/153
HAY
6.0
SEE TABLE A
FORMULA T(TEMPORARY)
LB/1000 SY
LB/1000 SY
LB/1000 SY
(X-X-X)
LB/1000 SY
10-20-20
AND
38-0-0 UREAFORM
OR
59 TO 50 AS DIRECTED
32-0-0 TO 38-0-0 SULFER COATED UREA
OR
31-0-0
TABLE B
T
W
FORMULA
TEMPORARY SEEDING
DRAINAGE CHANNELS, NON-STEEP WET AREAS
APPLICATION
(LB/ACRE)
LB/1000 SQ YD
SEEDING RATE
WEED SEED
MAX. %
GERMINATIONPURITY
MINIMUM %
FORMULA AND SPECIES
TABLE A
WEIGHT
% BY
2.67
4.44
1.11
1.67
2.67
1.67
0.33
1.67
3.33
1.67
1.11
1.67
3.33
66.67
66.67
GREEN BULRUSH (SCIRPUS ATROVIRENS)
FOWL BLUEGRASS (POA PALUSTRIS)
NORTHERN BLUE FLAG (IRIS VERSICOLOR)
BONESET (EUPATORIUM PERFOLIATUM)
SEEDBOX (LUDWIGIA ALTERNIFOLIA)
NODDING BUR MARIGOLD (BIDENS CERNUA)
ALLEGHENY MONKEYFLOWER (MIMULUS RINGENS)
SNEEZEWEED (HELENIUM AUTUMNALE)
SWAMP MILKWEED (ASCLEPIAS INCARNATA)
BLUE VERVAIN (VERBENA HASTATA)
SOFT RUSH (JUNCUS EFFUSUS)
LURID SEDGE (CAREX LURIDA)
PRAIRIE CORDGRASS (SPARTINA PECTINATA)
RIVERBANK WILDRYE (ELYMUS RIPARIUS)
FOX SEDGE (CAREX VULPINOIDEA)
PERMANENT SPECIES
CEREAL RYE (SECALE CEREALE) (FALL)
OATS (AVENA SATIVA) (SPRING)
NURSERY CROPS
0.2
0.1
0.1
0.24 (1.2)
0.4 (2.0)
0.1 (0.5)
0.15 (0.75)
0.24 (1.2)
0.15 (0.75)
0.03 (0.15)
0.15 (0.75)
0.09 (0.45)
0.45 (2.25)
0.3 (1.5)
0.15 (0.75)
0.1 (0.5)
0.15 (0.75)
0.3 (1.5)
6 (30)
6 (30)
9 (45) TOTALFORMULA W WETLAND CONSERVATION MIX: *
FORMULA T TEMPORARY GRASS MIX:
CEREAL RYE (SECALE CEREALE) (FALL)
OATS (AVENA SATIVA) (SPRING)
0.1
0.1
6 (30)
6 (30)
6 (30) TOTAL
SEED FORMULA SPECIFICATIONS
APPLICATION RATE FOR SLOPES LESS THAN 3:1
STRAW 3 TONS 140 LB 1240 LB
WEEDS, NOT CHOPPED OR FINELY BROKEN
EITHER WHEAT OR OAT STRAW, FREE OF
HAY 3 TONS 140 LB 1240 LB
OTHER NATIVE FORAGE GRASSES
TIMOTHY, MIXED CLOVER AND TIMOTHY OR
WOOD CHIPS 4-6 TONS 185-275 LB 1650-2500 LB
GRASSES AND LEGUMES
MAY PREVENT GERMINATION OF
HYDROMULCH 1 TON 47 LB 415 LB SEE NOTES
SLOPES 3:1 AND GREATER
MULCH BLANKET
EROSION CONTROL
MANUFACTURERS' INSTRUCTIONS
APPLY BLANKET AND ANCHOR PER
SC150 (2:1) OR APPROVED EQUALS
NORTH AMERICAN GREEN S150 (3:1) AND
MULCH APPLICATION RATES
3. THE APPLICATION RATE FOR ANY HYDROMULCH SHOULD BE 2,000 LB/ACRE AT A MINIMUM.
2. WOOD FIBER HYDROMULCH MAY BE APPLIED ON STEEPER SLOPES PROVIDED A TACKIFIER IS USED.
1. SHREDDED PAPER HYDROMULCH SHOULD NOT BE USED ON SLOPES STEEPER THAN 5%.
NOTES:
MULCH TYPE PER ACRE PER 1000 SF PER 1000 SY NOTES
CULVERT NO.1 CHANNEL GRADING
Copyright 2026, of Alfred Benesch & Company. All rights reserved. This plan and design content is the property of
Date:Scale: Project No.: Sheet No.:AS NOTED 9/22/2026 0326-609038.02 OF
570-622-4055
Pottsville, PA 17901
400 One Norwegian Plaza
Alfred Benesch & Company
Pine Grove Township, Schuylkill County, Pennsylvania
P E
N
N S Y L V
A
N
I A
C O
M
M O
REGISTERED
PROFESSIONAL
ENGINEER
PE075322
RYAN T. FASNACHTk g o o d
O P
E R
A T
O R
F
IL
E N
A M
E : Y
P e n n s y lv a n ia
\0 X
X -6
S
\0 -6
.2
P
G T w p \E n g D o c s \E
S \P la n s C u lv e rt
N o .1
G ra d in g \0
E
S P la n O
G R
.d g n
S
E P
:2
P
L O
T T
E D
PPL 36455-S44581
PPL 36462-S44565 PPL 36468-S44573 UG
PPL 36477-S44581
GARAGE
SHED
SHED PORCH
DWELLING
VERIZON BUILDING
BILCO
DRIVE
OAK GROVE ROAD (T-886)
B E
U C
H L E
R L
A N
E (T
-8
BRIDGE
WOOD FOOT
DRIVE
U N
T T
S W
A T
A R
A
C R
E E
K
MB
OAK GROVE ROAD (T-886)
MICHAEL EDWARD HATTER AND AMANDA M HATTER
21-09-0027.000
DB 2176 PG 2439
ANDREW J KINKA AND CHRISTINE L WYNN
21-09-0048.000
DB 2771 PG 0391
N54°07'55"E N52°39'07"E
N48°23'01"E 30 31
32 33
P T
P C
PT PC
P T
P C
WETLAND A
WETLAND B
WETLAND B
WETLAND A
P
TOWNSHIP LEGAL RIGHT-OF-WAY LINE
�OAK GROVE RD SURVEY & CONSTR
AgA
HaC
BeB
BeB
TOWNSHIP LEGAL RIGHT-OF-WAY LINE
43"x68" ERCP
EASEMENT
TEMPORARY CONSTRUCTION
TOWNSHIP LEGAL RIGHT-OF-WAY LINE
TOWNSHIP LEGAL RIGHT-OF-WAY LINE
CONSTRUCTION ACCESS
AgA BeB
POSITIVE DRAINAGE FROM PIPE
135' OF CHANNEL GRADING TO PROVIDE
TREE REMOVAL (APPROX. 6)
TREE REMOVAL (IF NECESSARY)
CULVERT NO.1 PLAN
EROSION AND SEDIMENTATION CONTROL
- LIMIT OF DISTURBANCE
- COMPOST FILTER SOCK, SIZE INDICATED
- PUMPED WATER FILTER BAG
MeB - SOIL TYPE
P - TEMPORARY PUMP/INTAKE/HOSE
- TEMPORARY DIVERSION DEVICES
- PARCEL IDENTIFICATION NUMBER
- LEGAL RIGHT-OF-WAY
- EXISTING MAJOR CONTOUR
- EDGE OF STREAM
- FLOW DIRECTION
- EXISTING MINOR CONTOUR
550'
- WETLAND
LEGEND
EASMENT
- TEMPORARY CONSTRUCTION
CULVERT NO.1 CHANNEL GRADING
0 5025 FEET