2_Equipment list and Service Requirements Illumina 2153366.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- RFQ-NIAID-2153366
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vendor Compliance 52.204-26.pdf | ||
| 5_TC_FAR PART 52.212-5 DEC 2022.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| List of Equipment: | Location of Equipment: |
| QTY 3 NextSeq 550, S/N NB551574 and NB551182 | Hamilton, Montana and Bethesda, Maryland |
| QTY 2 MiSeq, S/N M03210 and M03264 | |
| Maintenance and Service Requirements: | |
| 2-day Priority On-Site Response | |
| All Labor | |
| All travel | |
| All OEM Parts | |
| Reagent replacement upon hardware failures (Illumina NextSeq or MiSeq Mid-Output and High-Output sequencing kits) | |
| One (1) PM | |
| Vendor coordinates PM on behalf of the lab | |
| Remote technical support 18 hours a day X 5 days a week (M-F) | |
| Only OEM parts are accepted for all repairs and servcies | |
| Software and Hardware coverage updates. Instrument control software (controls the instrument for sequencing runs) and hardware proprietary updates (can occur during scheduled preventative maintenance visits, unless critical for the operation of the instrument) | |
| *Additional systems check on MiSeq S/N M03210, MiSeq S/N M03264, NextSeq 500 S/N NB551574 and NextSeq 550 S/N NB551182 | |
| Include all labor, travel and replacement of all parts in the PM kit | |
| Component inspection | |
| Subsystem Maintenance | |
| System Requalification | |
| SHC Certification Document |
File details come from the government source that posted it. Updated .