2-East Water Street Bridge Repairs Contract Drawings .pdf

PDF 5 MB Posted

Attached to
East Water Street Bridge Repairs
Solicitation number
US.256856
Issued by
Adams County, Gibraltar CDP, Pennsylvania

About this file

This file contains construction drawings for the East Water Street Bridge Repairs project over Stevens Run in Adams County, Gettysburg Borough, Pennsylvania. The project scope includes the replacement of three steel bridge girders and a portion of the concrete bridge deck and sidewalk. The drawings package consists of seven structural sheets plus erosion and sediment control (E&S) plans; however, the E&S measures shown are applicable to the project while the repairs depicted on those plans are not. Sealed bids will be received online via the PennBid Program until 10:00 AM on Tuesday, November 3, 2026, with bids publicly opened and read electronically on the same date. The contract time for this project is two hundred ten (210) calendar days. Gettysburg Borough, acting through C.S. Davidson, Inc., will award the contract at a regularly scheduled meeting following bid opening.

Each bidder must submit a bid bond or certified check payable to Gettysburg Borough in the amount of 5% of the maximum bid and provide evidence of qualifications to perform the work. This project is subject to the Pennsylvania Prevailing Wage Act (Act No. 442, P.L. 987), as amended. Bidding documents are available online at no cost via the PennBid Program at https://pennbid.bonfirehub.com. Gettysburg Borough reserves the right to accept any bid or reject any or all bids. Charles Gable, Borough Manager, serves as the point of contact for the municipality.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E WATER STREET BRIDGE REPAIRS

OVER STEVENS RUN

IN ADAMS COUNTY

GETTYSBURG BOROUGH

DRAWINGS

FOR

CONSTRUCTION

OF

K d w g S tr u c tu r a l\ S .d w g

:4 :3

P M

9/30/2026

K d w g S tr u c tu r a l\ S .d w g

:4 :3

P

9/30/2026

K d w g S tr u c tu r a l\ S .d w g

:4 :3

P

K d w g S tr u c tu r a l\ S .d w g

:4 :3 d w g S tr u c tu r a l\ S .d w g

:4 :3 d w g S tr u c tu r a l\ S .d w g

:4 :4 d w g S tr u c tu r a l\ S .d w g

:4 :4

K d w g S tr u c tu r a l\ S .d w g

:4 :4

The E&S plans were part of the 2023 Bridge Maintenance Program. While the E&S measures shown are applicable to this project, the repairs shown on these plans are not applicable. See the bridge plans for the scope of repairs.

238380925_S1-COVER
Bridge Plans
238380925_S1-S1
238380925_S1-S2
238380925_S1-S3
238380925_S1-S4
238380925_S1-S5
238380925_S1-S6
238380925_S1-S7
E&S Plans
Sheet 1
Sheet 2
Sheet 3
Sheet 4

File details come from the government source that posted it. Updated .