2 - E-111 Well tank and pump plans.pdf

PDF 581 KB Posted

Attached to
751/24242. TAP; McLain SP - Campgrund Improvements
Solicitation number
RFP-171-250000001967-1
Issued by
Houghton County, Michigan

About this file

This engineering drawing is a technical schematic for a 4" Well, Tank & Pump system prepared by the Michigan Department of Conservation for McLain State Park. The document shows detailed plans for a pump control panel, including front and side elevations, plan views of concrete slabs, and a comprehensive diagram of the water system infrastructure. The technical drawing provides precise measurements, component placements, and structural details for the installation of a water system pump and associated equipment.

The drawing includes specific technical specifications for the pump control panel, concrete slab foundations, and interconnected water system components. It appears to be a standard engineering design document intended to guide construction and installation of a water infrastructure system at McLain State Park, with meticulous attention to dimensional accuracy, equipment positioning, and structural integrity. The document is signed and includes revision information, suggesting it is an official engineering blueprint used for construction planning and implementation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .