2-Drawings.pdf
PDF 1 MB Posted
- Attached to
- Beyond Violence - Building Upgrades
- Solicitation number
- Not on record
- Issued by
- Columbia County, Pennsylvania
About this file
Summary
This is a construction drawings and bidding document package for the Columbia County Redevelopment Authority regarding building upgrades at the Beyond Violence Women's Shelter located at 212 W 11th Street, Berwick, Pennsylvania 18603. The project consists of miscellaneous door, frame, and window replacements, masonry restoration and repainting, and HVAC upgrades to be executed in two phases. Phase 1 encompasses building openings, roof drainage, and exterior component renovations including replacement of front and rear window and door assemblies and renovation of gutters, downspouts, and roof finishes. Phase 2 includes mechanical and electrical installation, masonry restoration with repointing work, and site grading improvements. The project requires compliance with the 2021 International Building Code, 2021 International Existing Building Code, 2021 International Mechanical Code, 2021 International Plumbing Code, 2021 International Fire Code, 2020 National Electrical Code, and ICC/ANSI A117.1-2017 accessibility standards. A pre-bid meeting is scheduled for 10:00 AM on Thursday, May 21st, 2026 at the project site, and sealed bids must be submitted online via PennBid by 2:00 PM prevailing time on Friday, June 5th, 2026. Bids will be opened immediately following the deadline at the engineer's office. An abstract of bids will be available to bidders via PennBid following the submission deadline.
Bids must be accompanied by a bid bond with a corporate surety authorized to do business in Pennsylvania equal to 10% of the total bid amount, and the successful bidder must furnish a Performance and Payment Bond in the amount of 100% of the contract value. Prevailing wage rates apply to all work performed under this contract. Questions from prospective bidders may be submitted through PennBid's Messages/Public Q&A tab on or before 4:00 PM on Tuesday, May 26th, 2026, with responses provided to all registered parties. The Columbia County Redevelopment Authority reserves the right to accept or reject any or all bids, portions thereof, or to waive any informalities in the bidding process, and may withhold award for a period of up to sixty days. All bidding documents are available online at no cost through the PennBid Program beginning at 12:00 PM on Friday, May 15th, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Contract Documents and Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawings
MAIN ENTRANCE
TO LOBBY
REAR ENTRANCE
STAFF ROOM
OFFICE
BEYOND VIOLENCE WOMEN'S SHELTER
212 W 11TH STREET. BERWICK, PA 18603
PROJECT DESCRIPTION:
THIS PROJECT CONSISTS OF THE DEMOLITION AND RECONSTRUCTION OF THE
FAMILY CONSUMER SCIENCE ROOMS AT LOG COLLEGE MIDDLE SCHOOL AND
KLINGER MIDDLE SCHOOL
SITE MAP
KEY MAP
BARRY ISETT & ASSOCIATES
8 WEST BROAD STREET. SUITE 1100
HAZLETON, PA 18202
570-455-2999
CONTACT: RAYVEN KING-GRAY
LIST OF DRAWINGS
SHEET SHEET TITLE
CURRENT
REVISION
DATE
CURRENT
REVISION
CS COVER SHEET
D1.0 DEMOLITION - PLANS & ELEVATIONS
GA0.0 SCHEDULES, DETAILS, & NOTES
GA1.0 PROPOSED - PLANS & ELEVATIONS
ME0.0 MECHANICAL & ELECTRICAL INFORMATION SHEET
ME1.0 FLOOR PLANS - MECHANICAL & ELECTRICAL
ME2.0 MECHANICAL SPECIFICATIONS
APPLICABLE CODES GENERAL NOTES
GENERAL NOTES
1. THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS UNLESS NOTED OTHER WISE TO COMPLETE THE WORK.
2. ALL WORK WILL BE SUBJECT TO THE APPROVAL OF THE BUILDING OWNER AND PRIME DESIGN PROFESSIONAL.
3. ALL WORK IS TO BE COORDINATED WITH THE BUILDING OWNER, INCLUDING WORKING HOURS, DUMPSTER LOCATIONS, LOADING AREAS, ETC.
4. ALL WORK SHOWN ON THESE DRAWINGS HAS BEEN DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF THE "2021 INTERNATIONAL BUILDING CODE" AND 2021 IEBC
5. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES AND ORDINANCES.
6. MECHANICAL AND ELECTRICAL SYSTEMS SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES AND ORDINANCES.
7. CONTRACTOR SHALL BE COMPLETELY FAMILIARIZED WITH ALL CONTRACT DOCUMENTS. BY SUBMITTING A COST PROPOSAL TO COMPLETE THE WORK, THE CONTRACTOR REPRESENTS THAT THEY HAVE VISITED THE SITE AND ARE FAMILIAR WITH THE
CONDITIONS UNDER WHICH THE WORK WILL BE PERFORMED.
8. WORK NOT INDICATED ON A PART OF THE DRAWINGS BUT REASONABLY IMPLIED TO BE SIMILAR TO THAT SHOWN AT CORRESPONDING PLACES SHALL BE REPEATED.
9. JOBSITE SAFETY AND CONSTRUCTION PROCEDURES ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. REVIEW OF THE CONSTRUCTION BY THE DESIGN PROFESSIONAL IS FOR GENERAL CONFORMANCE WITH DESIGN ASPECTS ONLY, NOT TO REVIEW THE CONTRACTOR'S PROVISIONS FOR JOBSITE SAFETY. LACK OF COMMENT ON THE PART OF THE DESIGN PROFESSIONAL WITH REGARD TO JOBSITE SAFETY IS NOT TO BE INTERPRETED AS APPROVAL OF JOBSITE SAFETY PRACTICES.
10. THE CONTRACTOR SHALL COORDINATE OPENINGS, SLEEVES, CONCRETE HOUSEKEEPING PADS, INSERTS, AND DEPRESSIONS SHOWN ON THE PRIME PROFESSIONAL, MECHANICAL AND ELECTRICAL DRAWINGS.
11. ALL COSTS OF INVESTIGATION AND/OR REDESIGN DUE TO CONTRACTOR IMPROPER INSTALLATION OF ELEMENTS OR OTHER ITEMS NOT IN CONFORMANCE WITH THE CONTRACT DOCUMENTS SHALL BE AT THE CONTRACTOR'S EXPENSE.
12. ALL DRAWINGS SHALL BE USED IN CONJUNCTION WITH EACH OTHER. IF THERE IS A DISCREPANCY BETWEEN DRAWINGS AND SPECIFICATIONS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PRIME PROFESSIONAL PRIOR TO PERFORMING THE WORK.
IN THE CASE OF A CONFLICT, THE MORE STRINGENT IN COST OR QUALITY SHALL APPLY.
13. THE CONTRACTOR SHALL VERIFY ALL EXISTING BUILDING INFORMATION SHOWN (DIMENSIONS, EXISTING CONDITIONS, ELEVATIONS, ETC.) AND NOTIFY THE PRIME PROFESSIONAL OF ANY DISCREPANCIES PRIOR TO FABRICATION OR INSTALLATION OF ANY COMPONENTS. FAILURE TO NOTIFY PRIME PROFESSIONAL OF UNSATISFACTORY CONDITIONS CONSTITUTES ACCEPTANCE OF UNSATISFACTORY CONDITIONS.
14. IF THE EXISTING FIELD CONDITIONS DO NOT PERMIT THE INSTALLATION OF THE WORK IN ACCORDANCE WITH THE DETAILS SHOWN, THE CONTRACTOR SHALL NOTIFY THE PRIME PROFESSIONAL IMMEDIATELY AND PROVIDE A SKETCH OF THE CONDITION WITH THE PROPOSED MODIFICATION OF THE DETAILS SHOWN ON THE CONTRACT DOCUMENTS. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IS APPROVED BY THE PRIME PROFESSIONAL.
15. SHOP DRAWINGS FOR ALL MATERIALS ARE TO BE SUBMITTED TO THE PRIME DESIGN PROFESSIONAL FOR REVIEW PRIOR TO THE START OF FABRICATION OR COMMENCEMENT OF WORK. REVIEW PERIOD SHALL BE A MINIMUM OF TWO (2) WEEKS.
16. REPRODUCTION OF ANY PORTION OF THE CONTRACT DRAWINGS FOR RESUBMITTAL AS SHOP DRAWINGS IS PROHIBITED. SHOP DRAWINGS PRODUCED IN SUCH A MANNER WILL BE REJECTED AND RETURNED.
17. SHOP DRAWINGS SUBMITTED FOR REVIEW SHALL CONSIST OF THREE (3) SETS OF PRINTS. ONLY ONE (1) MARKED UP SET WITH THE COMMENTS WILL BE RETURNED TO THE CONTRACTOR.
18. SHOP DRAWINGS SHALL BEAR THE CONTRACTOR'S STAMP OF APPROVAL WHICH SHALL CONSTITUTE CERTIFICATION THAT THE CONTRACTOR HAS VERIFIED ALL CONSTRUCTION CRITERIA, MATERIALS, AND SIMILAR DATA AND HAS CHECKED EACH DRAWING FOR
COMPLETENESS, COORDINATION, AND COMPLIANCE WITH THE CONTRACT DOCUMENTS.
19. THE DRAWINGS HAVE BEEN PRODUCED ENTIRELY ON A CAD SYSTEM. ANY OTHER LETTERING, LINES OR SYMBOLS, OTHER THAN PROFESSIONAL STAMPS AND SIGNATURES, HAVE BEEN MADE WITHOUT THE AUTHORIZATION OF BIA AND ARE NOT VALID.
20. ALL MATERIALS SHALL BE STORED TO PROTECT THEM FROM EXPOSURE TO THE ELEMENTS, IN ACCORDANCE WITH MANUFACTURERS WRITTEN INSTRUCTIONS.
21. DEBRIS, WASTE OR OTHER UNUSED CONSTRUCTION MATERIALS SHALL NOT BE PERMITTED TO ACCUMULATE. EACH TRADE IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF THEIR RESPECTIVE DEBRIS. THE LOCATION OF DUMPSTER(S) ARE TO BE
APPROVED BY THE BUILDING OWNER.
22. UPON COMPLETION OF THE WORK, THE CONTRACTOR IS RESPONSIBLE FOR LEAVING THE SITE IN "BROOM-CLEAN" CONDITION.
23. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL FINISHES TO REMAIN, INCLUDING COMMON CORRIDORS, LOBBIES, STAIRS, LANDSCAPING, ETC.
24. THE CONTRACTOR SHALL PROVIDE AN ESTIMATED CONSTRUCTION WORK SCHEDULE. SCHEDULE SHALL BE UPDATED AS REQUIRED DUE TO CHANGES IN THE PROGRESS OF WORK AND UPON THE REQUEST OF THE BUILDING OWNER AND/OR PRIME DESIGN
PROFESSIONAL.
25. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE THE FOLLOWING SANITARY FACILITIES: TEMPORARY TOILETS, WASH FACILITIES, AND DRINKING WATER FOR USE OF CONSTRUCTION PERSONNEL. COMPLY WITH AUTHORITIES HAVING JURISDICTION FOR
TYPE, NUMBER, LOCATION, OPERATION, AND MAINTENANCE OF FIXTURES AND FACILITIES.
26. THE CONTRACTOR SHALL BE RESPONSIBLE TO SECURE ALL PERMITS REQUIRED BY AUTHORITIES HAVING JURISDICTION.
C O
VE
R
S H
EE
T
RKG
RKG
CS
JOB:
1021526.000
COPYRIGHT 2026
DRAWN:
SCALE:
AS NOTED
DATE:
05/14/2026
P MGR:
APPRD:
CHK
DSGN:
BE
YO
N D
V
IO
LE
N
C E
W O
M
EN
'S S
H
EL
TE
R
W . 1
1T H
S T.
B
ER
W
IC
K, P
A
C O
LU
M
BI
A
C O
U N
TY
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
BI
D
S U
BM
IS
SI
O
N S
ET
/1
4/
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
THIS PROJECT IS DESIGNED AND SHALL BE BUILT TO COMPLY WITH THE
FOLLOWING CODES LISTED BELOW:
INTERNATIONAL EXISTING BUILDING CODE (IEBC) - 2021 (PA AMENDMENTS)
LEVEL 1
INTERNATIONAL MECHANICAL CODE (IMC) - 2021 (PA AMENDMENTS)
INTERNATIONAL PLUMBING CODE (IPC) - 2021 (PA AMENDMENTS)
INTERNATIONAL FIRE CODE (IFC) - 2021 (PA AMENDMENTS)
NATIONAL ELECTRICAL CODE (NEC) - 2020
ICC / ANSI A117.1 (ACCESSIBLE & USABLE BUILDINGS) - 2017
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL
APPLICABLE CODES OF THE AUTHORITY HAVING JURISDICTION AND MUST
NOTIFY THE PROJECT ENGINEER OF ANY DISCREPANCIES INDICATED BY
THESE DOCUMENTS FOUND PRIOR TO OR DURING CONSTRUCTION.
NOTIFICATION MUST BE GIVEN TO THE ENGINEER PRIOR TO PROCEEDING
WITH CONSTRUCTION.
WORK SHALL BE COMPLETED IN TWO (2) PHASES. PROJECT SCOPE AND
CONSTRUCTION ACTIVITIES SHALL BE SEQUENCED IN ACCORDANCE WITH THE
FOLLOWING PHASE REQUIREMENTS:
PHASE 1 – BUILDING OPENINGS, ROOF DRAINAGE, AND EXTERIOR
COMPONENT RENOVATIONS
1. RENOVATION AND REPLACEMENT OF FRONT WINDOW AND DOOR
ASSEMBLIES.
2. RENOVATION AND REPLACEMENT OF REAR WINDOW AND DOOR
ASSEMBLIES.
3. RENOVATION AND REPLACEMENT OF GUTTERS, DOWNSPOUTS, ROOF
FINISHES AND ROOF DRAIN COMPONENTS.
PHASE 2 – HVAC, MASONRY RESTORATION, AND SITE GRADING
IMPROVEMENTS
1. MECHANICAL AND ELECTRICAL INSTALLATION
2. MASONRY RESTORATION AND REPOINTING WORK.
3. SITE GRADING, AND FILL INSTALLATION AT REAR OF BUILDING
PHASED CONSTRUCTION
AutoCAD SHX Text CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS FOR THE ENTIRE PROJECT BEFORE PROCEEDING WITH THE WORK.
AutoCAD SHX Text FILENAME: C:\Users\rking-gray\DC\ACCDocs\Barry Isett and Associates\1021526.000__CCHRA_Beyond_Violence_Shelter\Project Files\Arch-CAD\1021526.000_BV_Womens_Shelter.dwg - May 15, 2026 12:16 PM
AutoCAD SHX Text CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS FOR THE ENTIRE PROJECT BEFORE PROCEEDING WITH THE WORK.
PARKING
ALT. ALT.
EX. CONCENTRIC
VENTS
80'-0" - EXTENT OF "D7"
'-0
EX. ROOF SCUPPEREX. ROOF SCUPPER
EX. CMU BLOCK
EX. (3) 3" CAPPED
PVC VENTS
EX.
GUTTER
EX. WINDOW
AC UNIT
EX. WINDOW
AC UNIT
122'-6 9/16" +/- EXTENT OF "D7"
'-9
9' -5
5/
EX. CMU BLOCK
GENERAL DEMOLITION NOTES:
1. DEMOLITION PLANS AND KEYNOTES ARE FOR THE CONTRACTOR'S CONVENIENCE ONLY. THE CONTRACTOR SHALL REMOVE ALL MATERIALS THAT ARE NOT
REQUIRED IN THE FINISH WORK. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE PROTECTIVE COVERING FOR ALL FURNITURE AND EQUIPMENT
WITHIN THE WORK AREA AND IN AREAS ADJACENT.
2. ALL EXISTING ITEMS TO REMAIN IN THE WORK AREA SHALL BE PROTECTED DURING DEMOLITION AND NEW CONSTRUCTION.
3. ALL LOOSE ITEMS (ARTWORK, FRAMED PICTURES, ETC.) ON WALLS WILL BE REMOVED BY OWNER. FIXED ITEMS ON WALLS WILL REMAIN IN PLACE DURING
CONSTRUCTION UNLESS DESIGNATED FOR DEMOLITION OR HINDERING ACCESS TO THE WORK AREA.
4. ALL EQUIPMENT AND FURNISHINGS WITHIN THE RENOVATION AREA ARE TO BE REMOVED BY OWNER AND STORED OFF-SITE OR IN ON-SITE STORAGE PRIOR TO
THE START OF DEMOLITION.
5. ALL DEMOLISHED MATERIALS SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR IN A SAFE AND LEGAL MANOR.
6. THE CONTRACTOR SHALL REPAIR WALLS, FLOORS, AND CEILINGS TO MATCH EXISTING MATERIALS WHERE OTHER MATERIALS ARE REMOVED (I.E. INTERSECTIONS
OF WALLS, FLOORS, ETC.) IF CONDITIONS ARE EXPOSED IN THE FINAL WORK. ALL PATCH AND REPAIR MATERIALS SHALL MATCH EXISTING TYPE, PLANE, AND
FINISH UNLESS OTHERWISE NOTED.
7. IN ACCORDANCE TO STATE LAW, THE CONTRACTOR SHALL BE REQUIRED TO CALL PA ONE-CALL FOR UTILITY MARK-OUT IN ADVANCE OF ANY UTILITY
EXCAVATION.
8. ANY LEAD AND/OR ASBESTOS ABATEMENT PROCEEDINGS MUST BE REPORTED TO THE APPROPRIATE STATE AGENCY AND BE COMPLETED BY A LICENSED
AND/OR CERTIFIED PARTY.
9. MAINTAIN A NEGATIVE AIR PRESSURE ENVIRONMENT AND UTILIZE DUST BARRIERS BETWEEN WORK ZONES AND OCCUPIED AREAS.
10. ALL EXISTING WALLS SHALL BE REPAINTED AS SCHEDULED. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PREPARING WALLS AND MINOR PATCHING (IN
ADDITION TO SPECIFIC PATCHING AS NOTED). ALL EXISTING DOOR FRAMES SHALL BE REPAINTED. PREPARE EXISTING FRAMES PRIOR TO PAINTING.
11. THE GENERAL CONTRACTOR IS TO COORDINATE ALL DEMOLITION AND NEW CONSTRUCTION WITH PLUMBING, ELECTRICAL, AND MECHANICAL CONTRACTORS.
12. SEE MEP & STRUCTURAL DRAWINGS FOR ADDITIONAL DEMOLITION INFORMATION.
13. THE DOCUMENTS SHOW THE OVERALL EXTENT OF DEMOLITION REQUIRED. ALTHOUGH EACH COMPONENT MAY NOT BE SHOWN OR REFERENCED, REMOVE ITEMS
CONSISTENT WITH THE NATURE OF DEMOLITION INDICATED.
14. THE CONTRACTOR SHALL MAINTAIN ALL EXISTING REQUIRED PATHS OF EGRESS THROUGHOUT THE RENOVATION AREA AND SHALL NOT BLOCK A PATH OF
EGRESS. IF A PATH OF EGRESS MUST BE BLOCKED, AN ALTERNATE TEMPORARY PATH OF EGRESS MUST BE PROVIDED.
15. THE CONTRACTOR MUST MAINTAIN AND FOLLOW STRICT ACCESS PROTOCOLS TO PROTECT SENSITIVE DATA AND/OR SECURE ENVIRONMENTS. LIMIT SITE ENTRY
STRICTLY TO AUTHORIZED PERSONNEL.
16. ALL CONFIDENTIAL DOCUMENTATION AND SIGNAGE MUST BE REMOVED FROM WORK AREA BY OWNER PRIOR TO DEMOLITION.
17. ALL SALVAGED ITEMS MUST BE DOCUMENTED AND TURNED OVER TO THE OWNER AS DIRECTED, PREVENTING UNAUTHORIZED RETENTION OF SENSITIVE
PROPERTY.
18. VERIFY ALL EXISTING UTILITIES BEFORE DEMOLITION TO AVOID UNINTENDED SERVICE DISRUPTIONS TO SENSITIVE OR OCCUPIED ZONES.
19. ITEMS NOTED FOR SALVAGE MUST BE STORED SAFELY ON-SITE AND TURNED OVER TO THE OWNER, OR AS DESIGNATED.
20. REPORT ANY DISCREPANCIES IN SITE CONDITIONS TO THE OWNER OR ARCHITECT PRIOR TO PROCEEDING WITH WORK.
GEN. DEMOLITION KEYED NOTES
MARK NOTE
REMOVE EXISTING SIGNAGE ON ITEMS DESIGNATED
FOR DEMOLITION. PROTECT SIGNAGE DURING
REMOVAL TO PREVENT DAMAGE. STORE FOR
REUSE POST DEMOLITION.
REMOVE EXISTING WOOD-FRAMED PICTURE
WINDOW IN ITS ENTIRETY, INCLUDING FRAME, TRIM,
AND ASSOCIATED COMPONENTS. PREPARE
OPENING TO RECEIVE NEW WINDOW SYSTEM,
INCLUDING REQUIRED MODIFICATIONS TO BRICK OR
WOOD FRAME.
REMOVE EXISTING 3'-0" X 6'-8" EXTERIOR DOOR IN
ITS ENTIRETY, INCLUDING DOOR LEAFS, WOOD
FRAMES, JAMBS, EXTERIOR AND INTERIOR
CASING/TRIM, AND ALL ASSOCIATED HARDWARE.
REMOVE COMPONENTS TO FULLY CLEAR OPENINGS
AND EXPOSE ADJACENT SUBSTRATES AS
REQUIRED. PLACE DOOR AND EXISTING LOCKSET IN
STORAGE FOR REUSE POST DEMO.
"D3" ALTERNATE: REMOVE EXISTING 3'-0" X 6'-8"
EXTERIOR DOOR IN ITS ENTIRETY, INCLUDING DOOR
LEAFS, WOOD FRAMES, JAMBS, CASING/TRIM, AND
ALL ASSOCIATED HARDWARE. REMOVE
COMPONENTS TO FULLY CLEAR OPENINGS AND
EXPOSE ADJACENT SUBSTRATES AS REQUIRED.
REMOVE ALL EXISTING 3X4 DOWNSPOUTS
INCLUDING FASTENERS, STRAPS AND BRACKETS,
TRANSITIONS & ELBOWS.
CROSS-HATCHED AREAS INDICATE APPROXIMATE
AREAS OF CMU TO BE RESTORED. REFER TO CMU
BLOCK RESTORATION DETAILS ON GA0.0 FOR JOINT
REPOINTING, SEALING, AND WATERPROOFING.
PREPARE EXISTING MASONRY SURFACES TO
RECEIVE NEW PAINT FINISH. POWER WASH TO
REMOVE ALL PEELING, FLAKING, AND LOOSE PAINT,
AS WELL AS DIRT, DUST, AND DEBRIS. CLEAN AND
PROPERLY PREPARE SURFACE AS REQUIRED TO
ENSURE SOUND SUBSTRATE AND PROPER COATING
ADHESION. SURFACES TO BE CLEAN, DRY, AND
FREE OF CONTAMINANTS PRIOR TO APPLICATION
OF NEW PAINT.
REMOVE EXISTING 2X3 DOWNSPOUTS INCLUDING
SUBSTRATE APPROPRIATE FASTENERS, STRAPS
AND BRACKETS, TRANSITIONS, ELBOWS, AND
EXTENSIONS.
CUT BACK EXISTING 3" PVC ROOF DRAIN
PROTRUDING THROUGH WALL OR EXTENDING OVER
WALL AS REQUIRED TO ACCOMMODATE NEW PIPE
FITTINGS AND CONNECTIONS TO DIRECT WATER
AWAY FROM FACADE AND FOUNDATION.
CUT BACK 1" PVC DRAIN PIPE PROTRUDING
THROUGH WALL AS REQUIRED TO ACCOMMODATE
NEW PIPE FITTINGS AND CONNECTIONS TO DIRECT
WATER AWAY FROM FACADE AND FOUNDATION.
REMOVE EXISTING AC UNIT AND WINDOW
COMBINATION OPENINGS IN ITS ENTIRETY DOWN TO
BARE CMU BLOCK, INCLUDING WINDOW UNITS,
FRAMING, CASING, TRIM, AND ALL ASSOCIATED
COMPONENTS. REMOVE MATERIALS TO FULLY
CLEAR OPENINGS AND EXPOSE ADJACENT
SUBSTRATES. PATCH AND REPAIR SURROUNDING
WALL SURFACES AS NECESSARY TO PREPARE FOR
NEW WINDOW AND FRAMING. PLACE AC UNITS IN
STORAGE FOR REUSE POST DEMO.
REMOVE EXISTING WOOD-FRAMED WINDOW IN ITS
ENTIRETY DOWN TO BARE CMU BLOCK, INCLUDING
WINDOW UNITS, FRAMING, CASING, TRIM, AND ALL
ASSOCIATED COMPONENTS. REMOVE MATERIALS
TO FULLY CLEAR OPENINGS AND EXPOSE
ADJACENT SUBSTRATES AS REQUIRED. PREPARE
FOR NEW WINDOW.
REMOVE EXISTING AWNING LOCATED ABOVE REAR
DOUBLE 2'-6" X 7'-0" SWING DOORS IN ITS ENTIRETY,
INCLUDING ALL SUPPORTS, BRACKETS, AND
ATTACHMENT HARDWARE.
REMOVE EXCESS EXISTING SPRAY FOAM
INSULATION AT PIPE WALL PENETRATION. CUT
BACK 1" DEEP FROM FACE OF CMU. CLEAN AND
PREPARE SURROUNDING WALL SURFACE TO
RECEIVE NEW SIDING PIPE BOOT. ENSURE
SUBSTRATE IS SMOOTH, CONTINUOUS, AND FREE
OF DEBRIS TO ALLOW PROPER INSTALLATION AND
SEALING.
REMOVE WOOD PANEL AND ASSOCIATED DEBRIS
AT CMU OPENING. REMOVE EXCESS EXISTING
SPRAY FOAM INSULATION AROUND PIPE
PENETRATIONS BY CUTTING BACK UNTIL RECESSED
1" FROM EXISTING CMU SURFACE. CUT BACK 3"
DRAINS AS FAR BACK AS POSSIBLE FROM INTERIOR
OF BUILDING, THEN RECAP.
REMOVE EXISTING EXTERIOR WOOD CASING.
STAFF ROOM
PANEL BOX CLOSET SHELVES
14'-11 1/2"
'-2
/2
OFFICE LOBBY
D
EM
O
LI
TI
O
N
PL
AN
S
EL
EV
AT
IO
N S
RKG
RKG -
D1.0
EXISTING FRONT ELEVATION
SCALE: 3/16"=1'-0"
EXISTING RIGHT ELEVATION
SCALE: 3/16"=1'-0"
EXISTING REAR ELEVATION
SCALE: 3/16"=1'-0"
EXISTING STAFF ROOM - PLAN
SCALE: 3/16"=1'-0"
EXISTING LOBBY AND OFFICE - PLAN
SCALE: 3/16"=1'-0"
JOB:
1021526.000
COPYRIGHT 2026
DRAWN:
SCALE:
AS NOTED
DATE:
05/14/2026
P MGR:
APPRD:
CHK
DSGN:
BE
YO
N D
V
IO
LE
N
C E
W O
M
EN
'S S
H
EL
TE
R
W . 1
1T H
S T.
B
ER
W
IC
K, P
A
C O
LU
M
BI
A
C O
U N
TY
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
BI
D
S U
BM
IS
SI
O
N S
ET
/1
4/
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
AutoCAD SHX Text D1
AutoCAD SHX Text D2
AutoCAD SHX Text D3
AutoCAD SHX Text D4
AutoCAD SHX Text D5
AutoCAD SHX Text D6
AutoCAD SHX Text D7
AutoCAD SHX Text D8
AutoCAD SHX Text D9
AutoCAD SHX Text D10
AutoCAD SHX Text D11
AutoCAD SHX Text D12
AutoCAD SHX Text D13
AutoCAD SHX Text D14
AutoCAD SHX Text D15
AutoCAD SHX Text D16
AutoCAD SHX Text FILENAME: C:\Users\rking-gray\DC\ACCDocs\Barry Isett and Associates\1021526.000__CCHRA_Beyond_Violence_Shelter\Project Files\Arch-CAD\1021526.000_BV_Womens_Shelter.dwg - May 15, 2026 12:16 PM
CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS FOR THE ENTIRE PROJECT BEFORE PROCEEDING WITH THE WORK.
DOOR AND FRAME SCHEDULE
DOOR DATA FRAME DATA
ALTERNATE
Y/N SIZE
MARK QTY. W. HT. THK. TYPE MFR. LOCATION MATERIAL FINISH SWING GLASS FIRE-RATING HARDWARE
SET MATERIAL FINISH REMARKS
D100 2 3-0 6-8 1-3/4 EXISTING EXISTING EXTERIOR STEEL PT-1 RIGHT HAND
REVERSE EXISTING -- HS-2 ENGINEERED
WOOD PT-1 REMARKS 1, 2, 4, & 5
Y D100 2 3-0 6-8 1-3/4
RECTANGLE
4-LIGHT,
4-PANEL
JELD-WEN EXTERIOR STEEL MODERN
WHITE
RIGHT HAND
REVERSE
4-LITE,
CLEAR.
TEMPERED
-- HS-1 AURALAST
WOOD FRAME
MODERN
WHITE REMARKS 1, 3, & 5
Hardware Set
Hinges
Lockset
Dead Bolt
Panic Device
Flush Bolt
Strike
Closer
Threshold
Weatherstripping
Silencers
Wall Bumper
H-1
LS-1 LOCKSET: STANLEY QCL250-E-626-S4-478S-SC5-ZB QCL250 SERIES, LEVER TYPE, ENTRY/OFFICE LOCK
FUNCTION, GRADE 2, SATIN CHROME
LS-1
STANDARD
TH-1
WS-1
H-1 3 HINGES: (3) HEAVY WEIGHT BALL-BEARING HINGES (4-1/2" X 4-1/2")
TH-1 THRESHOLD: 4" ALUMINUM SADDLE THRESHOLD
WS-1 WEATHERSTRIPPING: DUAL WOOL PILE PERIMETER SEAL AND RUBBER SNAP-IN BOTTOM SWEEP
1.
2.
ALL HARDWARE SHALL COMPLY WITH ANSI A117.1-2017.
COORDINATE KEYING REQUIREMENTS WITH OWNER.
1.
REMARKS NOTES:
3. ALL DOORS AND FRAMES SHALL BE INSTALLED PLUMB, LEVEL, AND IN ACCORDANCE WITH MANUFACTURER REQUIREMENTS.
4. VERIFY ALL OPENING SIZES IN FIELD PRIOR TO FABRICATION.
5.
6.
COORDINATE HARDWARE PREPARATION WITH APPROVED HARDWARE SCHEDULE.
ALL DOORS TO SWING IN DIRECTION OF EGRESS WHERE REQUIRED BY CODE.
ADD KICK PLATE (8" HIGH STAINLESS)
GENERAL NOTES:
2. DOOR AND FRAME TO BE PREPPED FOR NEW PAINT FINISH.
3. STEEL EDGE [DOOR] FINISH
WINDOW DATA
SIZE - RO
MARK QTY. W. HT. HDR
HT. TYPE MFR. LOCATION MATERIAL FINISH GLASS FIRE-RATING SAFETY
GLAZING REMARKS COMMENTS
1 108" 53-1/2" 82" PICTURE KAWNEER
451T EXTERIOR EXTRUDED
ALUMINUM
DARK
BRONZE CLEAR -- YES 1, 2, 3, 4, 5, 6
1 121" 53-1/2" 82" PICTURE KAWNEER
451T EXTERIOR EXTRUDED
ALUMINUM
DARK
BRONZE CLEAR -- YES 1, 2, 3, 4, 5, 6
PAINT INTERIOR SIDE OF WINDOW
LOCATED IN LOBBY BLACK TO
MATCH EXISTING INTERIOR LOBBY
DOOR & WINDOW FINISH
1 64" 19" 94" AWNING JELD-WEN EXTERIOR VINYL WHITE CLEAR -- -- 1, 2, 4, 5, 6
1 26-1/4" 19" 94" AWNING JELD-WEN EXTERIOR VINYL WHITE CLEAR -- -- 1, 2, 4, 5, 6
1 29" 19" 94" AWNING JELD-WEN EXTERIOR VINYL WHITE CLEAR -- -- 1, 2, 4, 5, 6
A
B
C
D
E
4. DOOR AND FRAME TO BE PAINTED WITH FINISH PT-1: SHERWIN-WILLIAMS PRO INDUSTRIAL DTM ACRYLIC, COLOR: EXTRA WHITE.
H-1
STANDARD
TH-1
WS-1
EXISTING
REMARKS:
1. VERIFY ROUGH OPENING IN FIELD PRIOR TO SUBMITTING SHOP DRAWINGS.
2. GLASS TO BE CLEAR, 1” THICK INSULATED GLASS WITH ARGON FILL.
3. OUTTER PANE TO BE TEMPERED SAFETY GLASS.
4. MANUFACTURER'S ARE LISTED AS A BASIS-OF-DESIGN, APPROVED SUBSTITUTIONS WILL BE ENTERTAINED.
5. AROUND EXTERIOR AND INTERIOR OF NEW FRAMES: INSTALL CONTINUOUS BACKER ROD AND FLEXIBLE SEALANT MAXIMUM ½” DEEP. PROIVDE CONCAVE
FINISH IN JOINT, NO BURPS. INSTALL WITH CONSISTENT LINES ON WINDOW FRAME AND BUILDING OPENING MATERIAL. POOR CAULKING WILL BE REPLACED
BY THE CONTRACTOR AT THE CONTRACTORS EXPENSE.
6. ALL WINDOWS TO MEET THE INTERNATIONAL ENERGY CONSERVATION CODE, NOT ALL REQUIREMENTS LIST BELOW:
a. MAXIMUM .36 U-VALUE FOR FIXED WINDOWS:
b. MAXIMUM .45 U-VALUE FOR OPERABLE WINDOWS:
7. ALL DOORS TO HAVE THERMAL BREAK FRAME, INSULATED CORE, FULL PERIMETER WEATHERSTRIPPING, AND ADJUSTABLE THRESHOLD + SWEEP
8. ALL DOORS TO MEET THE INTERNATIONAL ENERGY CONSERVATION CODE MAXIMUM OF .40 U-VALUE OR BETTER.
5. PROVIDE AND INSTALL NEW ALUMINUM DOOR HEAD FLASHING
D100
EXISTING DOOR
NEW FRAME AND
ACCESSORIES
D100
NOTE "D3" NEW DOOR
ALTERNATE.
NEW FRAME AND
ACCESSORIES
MASONRY SEALER AND WATERPROOFING:
1. THOROUGHLY CLEAN CMU BLOCK.
2. PROSOCO CLEANING PRODUCTS ARE LISTED AS A BASIS OF DESIGN.
SUBSTITUTIONS WILL BE CONSIDERED DURING BIDDING PHASE ONLY.
3. CONSOLIDATOR AND SILOXANE PRODUCTS MUST BE COMPARABLE.
4. BOTH APPLICATIONS MUST BE FIELD TESTED AND RESULTS EVALUATED BY THE
CONTRACTOR, ENGINEER AND OWNER PRIOR TO USING FOR THE FULL SCOPE OF
RESTORATION AREAS. TESTING CAN BE COMPLETED ON THE BACK SIDE OF THE
EXISTING CHIMNEY.
5. PROTECT ADJACENT SURFACES NOT WITHIN THE SCOPE OF WORK. THIS INCLUDES
STONE, BRICK SURFACES, WINDOWS, ETC.
6. COORDINATE WITH OWNER FOUR DAYS IN ADVANCE OF APPLICATION FOR
PROTECTION OF VEHICLES AND PEDESTRIANS. IT MAY BE NECESSARY TO KEEP
THE PARKING LOT AND ADJACENT STREET EMPTY AND REDIRECT FOOT TRAFFIC
DURING APPLICATION.
7. DO NOT APPLY ON EXCESSIVELY WINDY DAYS.
8. PRIOR TO APPLYING THE CONSOLIDATOR OR SEALANT, ALL CMU BLOCK MUST BE
REPLACED (IF APPLICABLE) AND ALL JOINTS REPOINTED AND DRIED.
9. PREPARE SURFACES AND APPLY PRODUCT IN STRICT ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONS FOR SURFACE
PREPARATION, ON-SITE TESTING, PROTECTION, APPLICATION, CLEANUP,
POST-TREATMENT AND WARRANTY.
10. APPLY CONSOLIDATOR: PROSOCO OH100 CONSOLIDATION TREATMENT.
11. APPLY SEALANT: PROSOCO SILOXANE PD
REPOINTING CMU BLOCK JOINTS:
ALL MASONRY RESTORATION SHALL BE PERFORMED IN ACCORDANCE WITH GUIDELINES
ESTABLISHED BY THE INTERNATIONAL MASONRY INSTITUTE (IMI) AND APPLICABLE ASTM
STANDARDS. CONTRACTOR SHALL FIELD VERIFY CONDITIONS AND ADJUST METHODS
AS REQUIRED TO SUIT EXISTING CMU CONSTRUCTION.
1. REMOVE EXISTING DETERIORATED MORTAR FROM CMU JOINTS TO A MINIMUM
DEPTH OF 3/4" OR TWO (2) TIMES THE JOINT WIDTH, WHICHEVER IS GREATER, UNTIL
SOUND MORTAR IS REACHED. DO NOT REMOVE MORTAR IN EXCESS OF ONE-THIRD
THE DEPTH OF THE CMU UNIT. RAKE JOINTS UNIFORMLY TO FULL WIDTH TO FORM A
CONSISTENT “U”-SHAPED PROFILE. “V”-SHAPED OR IRREGULAR JOINT PROFILES
ARE NOT ACCEPTABLE.
2. REMOVE ALL LOOSE MATERIAL, DUST, AND DEBRIS FROM JOINTS BY BRUSHING,
LOW-PRESSURE AIR, OR WATER RINSING. ALLOW SURFACE TO DRY TO A DAMP
CONDITION (SSD – SATURATED SURFACE DRY) PRIOR TO MORTAR INSTALLATION.
3. THE REPOINTING MORTAR SHALL MEET ASTM C 270 SPECIFICATIONS AND SHALL BE
PREHYDRATED- NOT ALLOWING THE MORTAR TO SHRINK PRIOR TO PLACEMENT.
PREHYDRATED TYPE N MORTAR OR PREHYDRATED MORTAR FROM TYPE I CEMENT
IS SUITABLE. IMI RECOMMENDS THE FOLLOWING STEPS FOR MORTAR HYDRATION:
- PLACE DRY INGREDIENTS IN A MIXING BOX AND THOROUGHLY MIX ALL DRY
INGREDIENTS.
- ADD HALF THE AMOUNT OF WATER THAT WOULD BE USED FOR MORTAR IN
NEW CONSTRUCTION.
- MIX THE MORTAR UNTIL IT WILL HOLD SHAPE WHEN FORMED INTO A SOLID
BALL- NO FLOW OR SPREAD OF THE MORTAR.
- LET THE MIX HYDRATE FOR ONE TO TWO HOURS PER ASTM C 270
- ADD WATER AS NEEDED TO BE WORKABLE BUT REMAINING RELATIVELY
STIFF.
4. PLACING THE MORTAR:
- PRE-DAMPEN JOINTS PRIOR TO INSTALLATION. JOINTS TO BE MOISTENED
WITH SPRINKLE NOZZLE OR BRUSH AND BUCKET OF WATER.
- PLACE MORTAR IN THE JOINTS WITH 1/4" LIFTS TIGHTLY AND COMPLETELY
FILLING THE JOINTS. APPLY SUBSEQUENT LIFTS AFTER PREVIOUS MORTAR
IS IN "THUMBPRINT HARD" CONDITION.
- PRESS MORTAR INTO JOINTS TIGHTLY AND IN ONE DIRECTION ONLY TO
AVOID AIR POCKETS AND VOIDS.
- TOOL JOINTS TO MATCH EXISTING ADJACENT CMU PROFILE (CONCAVE) FOR
CONSISTENCY AND WEATHER RESISTANCE.
5. REMOVE EXCESS MORTAR FROM CMU SURFACES PRIOR TO FINAL SET TO PREVENT
SMEARING AND STAINING. CLEAN FINISHED WORK USING APPROPRIATE METHODS
AND CLEANING AGENTS COMPATIBLE WITH CMU. PROTECT COMPLETED WORK
FROM RAPID DRYING, FREEZING, AND PRECIPITATION UNTIL FULLY CURED.
CMU BLOCK RESTORATION DETAILS
ALL MASONRY WORK SHALL BE PERFORMED IN ACCORDANCE WITH GUIDELINES
ESTABLISHED BY THE INTERNATIONAL MASONRY INSTITUTE (IMI) AND APPLICABLE
ASTM STANDARDS. THE FOLLOWING SCOPE APPLIES TO NEW ROWLOCK BRICK
INSTALLATION AT BRICK FACADE CONDITIONS. ACTUAL FIELD CONDITIONS MAY
REQUIRE ADDITIONAL MEASURES.
1. SURFACE PREPARATION
PREPARE SUBSTRATE TO RECEIVE NEW ROWLOCK BRICK INSTALLATION. REMOVE
ALL LOOSE MATERIALS, DETERIORATED MORTAR, DUST, AND DEBRIS FROM
INSTALLATION AREA BY BRUSHING, LOW-PRESSURE AIR, OR WATER RINSING.
VERIFY SUPPORTING SURFACES ARE SOUND, CLEAN, LEVEL, AND CAPABLE OF
RECEIVING NEW MASONRY WORK.
PROVIDE THROUGH-WALL FLASHING AND WATER MANAGEMENT COMPONENTS
PRIOR TO INSTALLATION WHERE ROWLOCK COURSE OCCURS AT WINDOW
CONDITIONS. INSTALL FLASHING WITH END DAMS AND DRIP EDGE TO DIRECT
WATER TO EXTERIOR. PROVIDE WEEPS WHERE APPLICABLE.
2. MORTAR MATERIALS
MORTAR TO BE IN ACCORDANCE WITH ASTM C270. USE TYPE N MORTAR (UNLESS
NOTED OTHERWISE) COMPATIBLE WITH EXISTING BRICK AND ADJACENT MASONRY
CONDITIONS.
PREHYDRATE MORTAR IN ACCORDANCE WITH IMI RECOMMENDATIONS TO REDUCE
SHRINKAGE AND IMPROVE BOND:
THOROUGHLY MIX DRY INGREDIENTS
ADD APPROXIMATELY HALF THE REQUIRED WATER
MIX TO A STIFF, NON-SLUMP CONSISTENCY
ALLOW MIX TO HYDRATE FOR 1–2 HOURS
REMIX AND ADD WATER AS REQUIRED FOR WORKABILITY WHILE MAINTAINING A
RELATIVELY STIFF MIX
3. ROWLOCK BRICK INSTALLATION
INSTALL NEW ROWLOCK BRICK TO MATCH EXISTING SIZE, COLOR, TEXTURE, AND
BOND PATTERN. VERIFY ALIGNMENT, JOINT SPACING, AND COURSE ELEVATIONS
PRIOR TO INSTALLATION.
SET BRICK IN FULL MORTAR BED WITH SOLID HEAD AND BED JOINTS. FULLY BUTTER
ALL CONTACT SURFACES TO ELIMINATE VOIDS AND AIR POCKETS. INSTALL BRICK
LEVEL, PLUMB, AND TRUE WITH UNIFORM JOINT THICKNESS.
PROVIDE TEMPORARY SUPPORTS AS REQUIRED UNTIL MORTAR HAS ADEQUATELY
CURED. WHERE REQUIRED, INSTALL GALVANIZED MASONRY REINFORCEMENT OR
ANCHORS TO SECURE ROWLOCK COURSE TO BACKUP CONSTRUCTION.
TOOL JOINTS TO MATCH EXISTING ADJACENT BRICK JOINT PROFILE (TYPICALLY
CONCAVE) FOR CONSISTENT APPEARANCE AND WEATHER RESISTANCE. ENSURE
JOINTS ARE FULLY FILLED AND PROPERLY COMPACTED TO PREVENT WATER
INFILTRATION AT HORIZONTAL SURFACES.
4. CLEANING AND PROTECTION
REMOVE EXCESS MORTAR FROM BRICK SURFACES PRIOR TO FINAL SET TO
PREVENT SMEARING AND STAINING. CLEAN FINISHED WORK USING METHODS AND
CLEANING AGENTS APPROPRIATE FOR BRICK MASONRY.
PROTECT COMPLETED WORK FROM RAPID DRYING, FREEZING, PRECIPITATION, AND
CONSTRUCTION DAMAGE UNTIL FULLY CURED. FINAL INSTALLATION SHALL BE
CLEAN, UNIFORM, WEATHER-TIGHT, AND MATCH ADJACENT EXISTING BRICK
CONDITIONS.
REPLACEMENT BRICK:
ALL REPLACEMENT BRICK TO MATCH EXISTING AS CLOSE AS POSSIBLE.
BASIS OF DESIGN REPLACEMENT BRICK TO BE: RED CONCRETE STRAIGHT-EDGE BRICK.
SUBMIT SAMPLES FOR VERIFICATION.
NEW MORTAR TO BE FIELD VERIFY AND MATCH TO EXISTING.
INDIVIDUAL BRICK REPLACEMENT ALLOWANCE :
PROVIDE AN ALLOWANCE FOR THE REMOVAL AND
REPLACEMENT OF ROWLOCK BRICK BELOW
WINDOWS.
ROWLOCK BRICK REPLACEMENT DETAILS
SC
H
ED
U
LE
S, D
ET
AI
LS
N
O
TE
S
RKG
RKG -
GA0.0
JOB:
1021526.000
COPYRIGHT 2026
DRAWN:
SCALE:
AS NOTED
DATE:
05/14/2026
P MGR:
APPRD:
CHK
DSGN:
BE
YO
N D
V
IO
LE
N
C E
W O
M
EN
'S S
H
EL
TE
R
W . 1
1T H
S T.
B
ER
W
IC
K, P
A
C O
LU
M
BI
A
C O
U N
TY
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
BI
D
S U
BM
IS
SI
O
N S
ET
/1
4/
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
AutoCAD SHX Text FILENAME: C:\Users\rking-gray\DC\ACCDocs\Barry Isett and Associates\1021526.000__CCHRA_Beyond_Violence_Shelter\Project Files\Arch-CAD\1021526.000_BV_Womens_Shelter.dwg - May 15, 2026 12:16 PM
CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS FOR THE ENTIRE PROJECT BEFORE PROCEEDING WITH THE WORK.
EXTENT OF "P16"
A B
4' -5
/2
6' -1
0"
D100 D100
10'-1"9'-0"
PARKING
6' -0
80'-0" EXTENT OF "P11"
'-0
122'-6" +/- EXTENT OF "P11"
C
D
E
GENERAL PROPOSAL NOTES:
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE BUILDING CODES, INDUSTRY
STANDARDS, AND MANUFACTURER REQUIREMENTS.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND OPENINGS PRIOR
TO FABRICATION AND INSTALLATION. REPORT DISCREPANCIES TO DESIGN TEAM PRIOR TO
PROCEEDING.
3. COORDINATE ALL WORK WITH EXISTING BUILDING CONDITIONS, INCLUDING STRUCTURAL,
MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS. PROVIDE REQUIRED MODIFICATIONS FOR A
COMPLETE AND FUNCTIONAL INSTALLATION.
4. PROTECT EXISTING CONSTRUCTION, EQUIPMENT, AND FINISHES TO REMAIN. REPAIR OR REPLACE
ANY DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES.
5. ALL NEW WORK SHALL BE INSTALLED PLUMB, LEVEL, AND TRUE, AND SHALL ALIGN WITH ADJACENT
EXISTING CONSTRUCTION.
6. PROVIDE CONTINUOUS AIR, MOISTURE, AND WEATHER BARRIERS AT ALL NEW AND MODIFIED
EXTERIOR WALL CONDITIONS, INCLUDING PROPER FLASHING, SEALANTS, AND TRANSITIONS.
7. ALL PENETRATIONS THROUGH EXTERIOR WALLS SHALL BE SLEEVED, SEALED, AND FLASHED TO
MAINTAIN A WEATHER-TIGHT AND AIR-TIGHT BUILDING ENVELOPE.
8. PROVIDE BACKER ROD AND HIGH-PERFORMANCE ELASTOMERIC SEALANT AT ALL CONTROL JOINTS, PERIMETER JOINTS, AND MATERIAL TRANSITIONS.
9. MATCH EXISTING ADJACENT FINISHES, MATERIALS, PROFILES, AND COLORS WHERE WORK
INTERFACES WITH EXISTING CONSTRUCTION UNLESS OTHERWISE NOTED.
10. INSTALL ALL DOORS, WINDOWS, AND WALL SYSTEMS WITH PROPER FLASHING (SILL, JAMB, AND HEAD)
IN SHINGLE-LAP FASHION TO DIRECT WATER TO EXTERIOR.
11. PROVIDE ADEQUATE STRUCTURAL SUPPORT, BLOCKING, AND BACKING FOR ALL NEW EQUIPMENT, CASEWORK, AND WALL-MOUNTED ITEMS. VERIFY LOCATIONS IN FIELD.
12. ALL MATERIALS SHALL BE NEW, FREE FROM DEFECTS, AND INSTALLED IN ACCORDANCE WITH
MANUFACTURER SPECIFICATIONS.
13. MAINTAIN CLEAN AND SAFE WORK AREA AT ALL TIMES. FINAL CONDITION SHALL BE CLEAN, UNIFORM, AND READY FOR USE.
14. COORDINATE INSTALLATION SEQUENCING TO ENSURE PROPER INTEGRATION OF SYSTEMS,
INCLUDING FRAMING, SHEATHING, AIR/WATER BARRIERS, FINISHES, AND MECHANICAL INSTALLATIONS.
ASSESS IF ROWLOCK BRICK IS DAMAGED, LOOSE,
UNSUPPORTED, OR OTHERWISE DETERMINED UNSUITABLE
DURING WINDOW REMOVAL OR NEW WINDOW
INSTALLATION. REPLACE AFFECTED ROWLOCK BRICK AS
REQUIRED TO PROVIDE A PROPERLY SUPPORTED
OPENING FOR NEW WINDOW INSTALLATION. PROVIDE NEW
BRICK TO MATCH EXISTING BRICK AND NEW MORTAR.
ENSURE NEW MASONRY IS PROPERLY ALIGNED AND
INTEGRATED WITH ADJACENT CONSTRUCTION. REFER TO
SHEET GA0.0 FOR ADDITIONAL INFORMATION.
REINSTALL EXISTING 3'-0"X6'-8" DOOR WITH NEW
ENGINEERED WOOD JAMB ASSEMBLY. VERIFY EXISTING
CLEARANCES, ALIGNMENT, SWING, AND LATCHING
OPERATION.
1. INFILL GAPS WITH SPRAY FOAM.
2. INSTALL SELF-ADHERED SILL, JAMB, AND HEAD
FLASHING.
3. PROVIDE NEW WEATHER-RESISTANT ENGINEERED
WOOD JAMB ASSEMBLY WITH DEPTH TO MATCH EXISTING
WALL CONDITION. INSTALL FRAME PLUMB, LEVEL, SQUARE,
AND SECURELY ANCHORED TO ROUGH OPENING.
4. PROVIDE THREE (3) NEW HINGES TO MATCH EXISTING
HINGE SIZE, MORTISE STYLE, AND SWING CONFIGURATION.
5. PREP DOOR SURFACE FOR NEW PAINT AND
ACCESSORIES.
6. REINSTALL EXISTING LEVER LOCKSET AND KEYING.
7. PROVIDE NEW FULL-WIDTH THRESHOLD INSTALLED
OVER CONTINUOUS SEALANT BED.
8. SEAL ALL PERIMETER JOINTS, FASTENER
PENETRATIONS, AND TRANSITIONS WITH BACKER ROD AND
HIGH-PERFORMANCE ELASTOMERIC SEALANT.
9. PROVIDE NEW INTERIOR WOOD TRIM TO MATCH WIDTH,
PROFILE, AND FINISH OF REMOVED TRIM.
REFER TO SHEET GA0.0 FOR DOOR SCHEDULE AND
FINISHES. REFER TO NOTE “P12” FOR EXTERIOR TRIM
REQUIREMENTS.
"P3" NEW DOOR ALTERNATE: INSTALL NEW 3'-0" X 6'-8"
EXTERIOR DOOR IN PLACE OF EXISTING DOOR WITH NEW
DOOR JAMB, JAMB EXTENSION, THREE 4X4 HINGES, AND
COMPLETE HARDWARE PACKAGE INCLUDING LEVER
LOCKSET AND KEYING ON EXTERIOR SIDE. INSTALL NEW
FULL OPENING WIDTH THRESHOLD. INSTALL WOOD TRIM
AT INTERIOR THAT MATCHES WIDTH AND PROFILE OF
REMOVED TRIM. INSTALL COMPLETE ASSEMBLY IN
ACCORDANCE WITH MANUFACTURER REQUIREMENTS. SEE
SHEET GA0.0 FOR DOOR SCHEDULE. REFER TO NOTE “P12”
FOR EXTERIOR TRIM REQUIREMENTS.
PROVIDE NEW MORTAR IN NOTE "D6" AREAS REFERRED TO
ON SHEET D1.0. MORTAR SHALL COMPLY WITH ASTM C270
(TYPE N UNLESS OTHERWISE NOTED). PACK MORTAR
TIGHTLY INTO JOINTS IN LIFTS AS REQUIRED TO ENSURE
FULL BOND AND ELIMINATE VOIDS. TOOL JOINTS TO MATCH
EXISTING PROFILE. CURE MORTAR IN ACCORDANCE WITH
MANUFACTURER RECOMMENDATIONS AND INDUSTRY
STANDARDS. CLEAN ADJACENT MASONRY SURFACES OF
EXCESS MORTAR AND LEAVE FINISHED WORK NEAT AND
UNIFORM.
EXISTING GUTTER TO REMAIN. REPLACE 2X3
DOWNSPOUTS IN THEIR ENTIRETY, INCLUDING FASTENERS,
STRAPS, AND BRACKETS. INSTALL ALL COMPONENTS
PLUMB AND SECURELY ANCHORED TO ADJACENT
CONSTRUCTION. PROVIDE SEALANT AT ALL JOINTS,
TRANSITIONS, ELBOWS, AND EXTENSIONS TO ENSURE A
WATERTIGHT SYSTEM DIRECTED AWAY FROM
FOUNDATION. REMOVABLE EXTENSIONS TO BE MINIMUM
48" LENGTH.
PROVIDE AND INSTALL NEW 3X4 DOWNSPOUTS COMPLETE
WITH SUBSTRATE-APPROPRIATE FASTENERS, STRAPS,
AND BRACKETS. INSTALL ALL COMPONENTS PLUMB AND
SECURELY ANCHORED TO ADJACENT CONSTRUCTION.
PROVIDE SEALANT AT ALL JOINTS, TRANSITIONS, ELBOWS,
AND EXTENSIONS TO MAINTAIN A WATERTIGHT SYSTEM
DIRECTED AWAY FROM FOUNDATION. REMOVABLE
EXTENSIONS TO BE MAXIMUM 48" LENGTH. COORDINATE
INSTALLATION WITH EXISTING DOWNSPOUT SYSTEM AND
SITE DRAINAGE CONDITIONS.
MODIFY EXISTING 3X4 DOWNSPOUT. PROVIDE AND INSTALL
NEW 3X4 DOWNSPOUT EXTENSION PARTS ONLY. SUPPLY
AND INSTALL SUBSTRATE-APPROPRIATE FASTENERS,
STRAPS, AND BRACKETS. INSTALL ALL COMPONENTS
PLUMB AND SECURELY ANCHORED TO ADJACENT
CONSTRUCTION. PROVIDE SEALANT AT ALL JOINTS,
TRANSITIONS, ELBOWS, AND EXTENSIONS TO MAINTAIN A
WATERTIGHT SYSTEM DIRECTED AWAY FROM
FOUNDATION. REMOVABLE EXTENSIONS TO BE MINIMUM
48" LENGTH.
CONNECT NEW PIPE AND FITTINGS TO EXISTING 3" PVC
ROOF DRAIN PROTRUDING THROUGH REAR FACADE.
CONTINUE ROOF DRAIN PIPING WITH A MINIMUM SLOPE OF
1/8" PER FOOT UNLESS OTHERWISE REQUIRED BY CODE
OR SITE CONDITIONS. INSTALL CONTINUATION OF DRAIN
AS CLOSE TO FACE OF FACADE AS POSSIBLE. MAINTAIN
CONTINUOUS FALL WITH NO LOW POINTS OR BACK-PITCH.
PIPE SHALL BE PVC SCHEDULE 40. PROVIDE COMPATIBLE
FITTINGS, PRIMER, AND SOLVENT CEMENT PER
MANUFACTURER RECOMMENDATIONS. MAKE ALL
CONNECTIONS WATERTIGHT AND PROPERLY SEALED.
VERIFY FIELD CONDITIONS, ELEVATIONS, AND TIE-IN
LOCATIONS PRIOR TO INSTALLATION. INSTALL WITH FIXED
45 DEGREE ELBOW AT BASE AND REMOVABLE EXTENSION
WITH MINIMUM 48" LENGTH.
CONNECT NEW PIPE AND FITTINGS TO EXISTING 3" PVC
ROOF DRAIN EXTENDING OVER REAR FACADE. CUT BACK
DRAIN AND REPLACE PVC ELBOW FITTING SO THAT DRAIN
IS CLOSER TO GUTTER & FACADE. INSTALL CONTINUATION
OF DRAIN AS CLOSE TO FACE OF FACADE AS POSSIBLE.
MAINTAIN CONTINUOUS FALL WITH NO LOW POINTS OR
BACK-PITCH. PIPE SHALL BE PVC SCHEDULE 40. PROVIDE
COMPATIBLE FITTINGS, PRIMER, AND SOLVENT CEMENT
PER MANUFACTURER RECOMMENDATIONS. MAKE ALL
CONNECTIONS WATERTIGHT AND PROPERLY SEALED.
EXTENSIONS TO BE MINIMUM 48" LENGTH.
PROVIDE NEW HIGH-BUILD, 100% ACRYLIC ELASTOMERIC
MASONRY PAINT COATING FOR ALL EXTERIOR CMU
SURFACES. SHERWIN-WILLIAMS LOXON® XP OR
APPROVED EQUIVALENT. COATING SHALL BRIDGE
HAIRLINE CRACKS, RESIST RAIN, AND ACCOMMODATE
SUBSTRATE MOVEMENT. APPLY IN STRICT ACCORDANCE
WITH MANUFACTURER REQUIREMENTS. COLOR: EXTRA
WHITE. MINIMUM TWO COATS. SHEEN: FLAT. PRODUCT#
LX11W0051
PROVIDE AND INSTALL NEW EXTERIOR PVC CASING
AROUND EXTERIOR OF DOOR. ROYAL BUILDING PRODUCTS
OR APPROVED EQUAL, 2-1/4" WIDE, WM356 PROFILE,
COLOR: WHITE, WITH MITERED CORNERS. INSTALL OVER
CONTINUOUS SELF-ADHERED FLASHING MEMBRANE
ALONG PERIMETER OF OPENING. SEAL ALL JOINTS,
MITERS, AND PERIMETER CONDITIONS WITH TITEBOND
WEATHERMASTER HIGH-PERFORMANCE ELASTOMERIC
SEALANT OR APPROVED EQUAL, TO PROVIDE A
CONTINUOUS WEATHER AND AIR-TIGHT INSTALLATION.
INFILL EXISTING CMU OPENING AT (3)3" CAPPED DRAINS
AND SINGLE 1" DRAIN LOCATION WITH MORTAR. XTRIM
BACK EXPANDING FOAM MIN. 1" DEPTH FOR MORTAR
APPLICATION. APPLY A WEATHER-RESISTANT BARRIER
OVER THE SPRAY FOAM. INSTALL (3) LAYERS OF
GALVANIZED METAL MESH WITH MASONRY ANCHORS
DIRECTLY INTO THE CMU STRUCTURE TO SUPPORT
MORTAR BOND. HOLD THE MESH SLIGHTLY AWAY FROM
THE FOAM, ALLOWING MORTAR TO EMBED THE WIRES.
APPLY HIGH-QUALITY POLYMER-MODIFIED THIN-SET OR
SAND-MIX MORTAR, PACKED AND TOOLED TO MATCH
ADJACENT CMU FINISH. FINISH FLUSH WITH EXISTING CMU
WALL PLANE, BRUSH TEXTURED FINISH. SEAL MORTAR.
PAINT TO MATCH ADJACENT SURFACES.
INFILL EXISTING WINDOW OPENING WITH NEW CMU TO
MATCH ADJACENT WALL CONSTRUCTION. PREPARE
OPENING BY CLEANING AND ROUGHENING EXISTING
MASONRY SURFACES TO RECEIVE NEW WORK. PROVIDE
AND INSTALL CMU UNITS MATCHING EXISTING SIZE, TYPE,
AND FINISH. TIE NEW MASONRY TO EXISTING WALL USING
MECHANICAL TIES ANCHORED INTO EXISTING CMU.
INSTALL REINFORCEMENT AS REQUIRED TO MAINTAIN
STRUCTURAL INTEGRITY. LAY CMU IN RUNNING BOND WITH
TYPE S MORTAR. TOOL JOINTS TO MATCH EXISTING
ADJACENT MASONRY. GROUT SOLID AS REQUIRED AT
REINFORCED CELLS. PATCH, REPOINT, AND FINISH ALL
ADJACENT SURFACES TO MATCH EXISTING. PAINT
EXTERIOR AND INTERIOR CMU TO MATCH EXISTING.
"P14" CMU INFILL ALTERNATE: INFILL EXISTING OPENING
WITH PRESSURE-TREATED WOOD STUD FRAMING AT 12"
O.C. SECURE FRAMING TO EXISTING CMU WITH
APPROPRIATE FASTENERS. PROVIDE SOLID BLOCKING AS
REQUIRED FOR PANEL SUPPORT AND EDGE CONDITIONS.
VERIFY OPENING IS LEVEL, PLUMB, AND SQUARE PRIOR TO
INSTALLATION. PROVIDE AND INSTALL 1/2"
EXTERIOR-GRADE PLYWOOD SHEATHING,AND
CONTINUOUS AIR/WATER BARRIER OVER SHEATHING.
SEAL ALL SEAMS, PENETRATIONS, AND TRANSITIONS TO
MAINTAIN A CONTINUOUS WEATHER-TIGHT AND AIR-TIGHT
ENVELOPE. PROVIDE AND INSTALL INSULATED METAL
PANEL (IMP) SYSTEM AS EXTERIOR FINISH. INSTALL
PANELS IN ACCORDANCE WITH MANUFACTURER
REQUIREMENTS, INCLUDING ALL TRIM, FLASHING,
FASTENERS, SEALANTS, AND ACCESSORIES FOR A
COMPLETE AND WEATHER-TIGHT INSTALLATION. PROVIDE
SILL, JAMB, AND HEAD FLASHING AT OPENING PERIMETER.
PROVIDE BACKER ROD AND HIGH-PERFORMANCE
ELASTOMERIC SEALANT AT PERIMETER JOINT BETWEEN
NEW INFILL AND EXISTING CONSTRUCTION. ALIGN
FINISHED SURFACES WITH ADJACENT WALL AND MATCH
EXISTING PROFILE AND COLOR WHERE APPLICABLE.
INSTALL 1/2" SANDED PLYWOOD AT INTERIOR TO ENCASE
STUD FRAMING. FINISH EDGES WITH QUARTER ROUND.
PAINT TO MATCH EXISTING INTERIOR COLOR.
EXISTING SINGLE HUNG WINDOWS AT FRONT FACADE TO
REMAIN.
EXISTING METAL FRONT ENTRY DOOR AND WINDOW
ASSEMBLY TO REMAIN.
EXISTING FRONT AWNING OVER ENTRY DOOR TO REMAIN.
EXISTING REAR METAL DOORS WITH HOLLOW-CORE METAL
JAMBS TO REMAIIN.
PROVIDE NEWLY FRAMED OPENING FOR EXISTING AIR
CONDITIONING UNIT. VERIFY DIMENSIONS ON-SITE.
INCLUDE WATERPROOFING ASSEMBLY AND SEALANTS.
REFINISH INTERIOR WINDOW OPENING WITH NEW WOOD
CASING, SILL, AND TRIM. PAINT TO MATCH EXISTING.
LIFTED ROOF FLASHING: SECURE TO ADJACENT SURFACE
WITH APPROPRIATE FASTENERS AND SEALANT TO
MAINTAIN A WATERTIGHT CONDITION.
CUT BACK EXISTING 1" DRAIN PROTRUDING THROUGH
REAR FACADE. CONNECT NEW PIPE AND FITTINGS TO NEW
DRAIN. ROUTE DRAIN WITH A MINIMUM SLOPE OF 1/4" PER
FOOT AS CLOSE TO FACE OF FACADE AS POSSIBLE. PIPE
SHALL BE PVC SCHEDULE 40. PROVIDE COMPATIBLE
FITTINGS, PRIMER, AND SOLVENT CEMENT PER
MANUFACTURER RECOMMENDATIONS. MAKE ALL
CONNECTIONS WATERTIGHT AND PROPERLY SEALED.
PATCH AND REPAIR ADJACENT WALL SURFACES AS
REQUIRED FOLLOWING REMOVAL OF REAR AWNING ABOVE
DBL. 6-0 DOOR.
EXISTING RECESSED 3-0X6-8 DOOR AT FRONT FACADE TO
REMAIN.
PROVIDE AND INSTALL NEW PRESSURE-TREATED WOOD
BUCK AT CMU WALL OPENINGS TO CREATE LEVEL AND
SQUARE OPENINGS. ANCHOR BUCK TO MASONRY WITH
APPROPRIATE FASTENERS. PROTECT BUCK WITH
SELF-ADHERED FLASHING MEMBRANE. PROVIDE AND
INSTALL NEW VINYL AWNING WINDOWS. FLASH OPENINGS
WITH SLOPED SILL PAN, JAMB FLASHING, AND HEAD
FLASHING TO DIRECT WATER TO EXTERIOR. PROVIDE
WEEPS WHERE APPLICABLE. SEAL PERIMETER WITH
HIGH-PERFORMANCE ELASTOMERIC SEALANT TITEBOND
WEATHERMASTER OR APPROVED EQUIVALENT, AND
LOW-PRESSURE EXPANDING FOAM TO ACHIEVE
CONTINUOUS AIR AND MOISTURE BARRIER. RETOUCH
PAINT AT INTERIOR SILL WHERE APPLICABLE. INSTALL
EXTERIOR TRIM AND INTERIOR TRIM.
PROVIDE NEW CLEAN FILL AT SPECIFIED SUNKEN GRADE
LOCATIONS. COMPACT FILL IN LIFTS AND ESTABLISH
POSITIVE DRAINAGE WITH MINIMUM SLOPE AWAY FROM
BUILDING FOUNDATION (MIN. 5% FOR FIRST 10'-0" UNLESS
NOTED OTHERWISE). FINAL GRADE SHALL DIRECT WATER
AWAY FROM STRUCTURE AND PREVENT PONDING.
PROVIDE SUN & SHADE GRASS SEEDING WITH FERTILIZER
AT DISTURBED AREAS.
PROVIDE AND MAINTAIN A SLEEVE OR OPENING WITHIN
EXISTING CMU FOR CONDENSER LINES TO PASS TO
INTERIOR. SIZE AND LOCATE OPENING AS REQUIRED AND
COORDINATE WITH MECHANICAL. SEAL AROUND
PENETRATIONS WITH BACKER ROD AND
HIGH-PERFORMANCE ELASTOMERIC SEALANT FOR A
WEATHER-TIGHT CONDITION.
EXISTING STEEL LINTEL. WIRE BRUSH ALL RUSTED OR
BARE SPOTS AND SAND EXISTING PAINT FINISH SMOOTH.
PRIME ALL EXPOSED SURFACES AND APPLY (2) FINISH
COATS, COLOR “RED” TO MATCH BRICK.
REINSTALL HANDICAPPED PARKING SIGN AT 72" AFF TO
TOP.
STAFF
ROOM
PANEL BOX CLOSET SHELVES
OFFICE LOBBY
PROPOSED KEYED NOTES
MARK NOTE
PROVIDE AND INSTALL NEW ALUMINUM
STOREFRONT WINDOW SYSTEM. REFER TO WINDOW
SCHEDULE FOR BASIS OF DESIGN AND PERFORMANCE
REQUIREMENTS. ENSURE WINDOW SYSTEM IS PROPERLY
ALIGNED, PLUMB, LEVEL, AND SECURED TO EXISTING
ROUGH OPENING FRAMING. PROVIDE BACKER ROD AND
CONTINUOUS FLEXIBLE SEALANT AT INTERIOR AND
EXTERIOR PERIMETER OF WINDOW FRAME. REFER TO
WINDOW SCHEDULE FOR ADDITIONAL REQUIREMENTS. IF
NEW WINDOW FRAME DEPTH IS LESS THAN EXISTING
WINDOW CONDITION, REMOVE EXISTING INTERIOR WOOD
WINDOW SILL AND PROVIDE NEW EXTENSION JAMBS TO
MATCH NEW WINDOW DEPTH AND FINISHED WALL
CONDITION. INSTALL NEW SILL LEVEL AND SECURELY
FASTENED. PATCH AND REPAIR ADJACENT WALL
SURFACES AS REQUIRED FOR A CLEAN, CONTINUOUS
FINISH. SILL HORN AND NOSING TO MATCH EXISTING.
PAINT ALL NEW WORK AND ADJACENT SURFACES TO
MATCH EXISTING CONDITIONS.
PR
O
PO
SE
D
PL
AN
S
EL
EV
AT
IO
N S
RKG
RKG -
GA1.0
PROPOSED FRONT ELEVATION
SCALE: 3/16"=1'-0"
PROPOSED RIGHT ELEVATION
SCALE: 3/16"=1'-0"
PROPOSED REAR ELEVATION
SCALE: 3/16"=1'-0"
PROPOSED STAFF ROOM
SCALE: 3/16"=1'-0"
PROPOSED LOBBY AND OFFICE
SCALE: 3/16"=1'-0"
JOB:
1021526.000
COPYRIGHT 2026
DRAWN:
SCALE:
AS NOTED
DATE:
05/14/2026
P MGR:
APPRD:
CHK
DSGN:
BE
YO
N D
V
IO
LE
N
C E
W O
M
EN
'S S
H
EL
TE
R
W . 1
1T H
S T.
B
ER
W
IC
K, P
A
C O
LU
M
BI
A
C O
U N
TY
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
BI
D
S U
BM
IS
SI
O
N S
ET
/1
4/
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
AutoCAD SHX Text P2
AutoCAD SHX Text P3
AutoCAD SHX Text P4
AutoCAD SHX Text P5
AutoCAD SHX Text P6
AutoCAD SHX Text P7
AutoCAD SHX Text P8
AutoCAD SHX Text P9
AutoCAD SHX Text P10
AutoCAD SHX Text P11
AutoCAD SHX Text P12
AutoCAD SHX Text P13
AutoCAD SHX Text P14
AutoCAD SHX Text P15
AutoCAD SHX Text P16
AutoCAD SHX Text P17
AutoCAD SHX Text P18
AutoCAD SHX Text P19
AutoCAD SHX Text P20
AutoCAD SHX Text P21
AutoCAD SHX Text P22
AutoCAD SHX Text P23
AutoCAD SHX Text P24
AutoCAD SHX Text P25
AutoCAD SHX Text P26
AutoCAD SHX Text P27
AutoCAD SHX Text P28
AutoCAD SHX Text P29
AutoCAD SHX Text P1
AutoCAD SHX Text FILENAME: C:\Users\rking-gray\DC\ACCDocs\Barry Isett and Associates\1021526.000__CCHRA_Beyond_Violence_Shelter\Project Files\Arch-CAD\1021526.000_BV_Womens_Shelter.dwg - May 15, 2026 12:16 PM
CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS FOR THE ENTIRE PROJECT BEFORE PROCEEDING WITH THE WORK.
CONTROL EQUIPMENT
MANUAL MOTOR STARTER - OVERLOADS SIZED TO
ACCOMODATE MOTOR - 4'-0" AFF UNLESS OTHERWISE NOTED
COMBINATION MOTOR STARTER - TYPE/SIZE/NEMA
ENCLOSURE AS INDICATED - MOUNT 4'-6" AFF TO CENTERLINE
OF OPERATING HANDLE. PROVIDE OVERCURRENT AND
OVERLOADS IN ACCORDANCE WITH MANUFACTURERS'
RECOMMENDATIONS FOR MOTOR HP
MOTOR - HORSEPOWER AS INDICATED
DISCONNECT SWITCH - AMPS/POLES/FUSES/NEMA
ENCLOSURE AS INDICATED - MOUNT 4'-6" AFF TO CENTERLINE
OR OPERATING HANDLE
TRANSFORMER
M
T
30/3/NF/12
FVNR/SIZE1/3R
MS
NOTE:
NOT ALL ABBREVIATIONS AND SYMBOLS
INDICATED MAY APPEAR ON THESE CONTRACT
DRAWINGS. THIS IS FOR REFERENCE ONLY.
ABBREVIATIONS
SYMBOL DESCRIPTION
PIPING SYMBOLS
A
M
GENERAL NOTES
POINT OF CONNECTION-NEW TO EXISTING
H HUMIDISTAT
# DRAWING NOTE SYMBOL
# REVISION SYMBOL
# SECTION NUMBER
# DETAIL OR SECTION NUMBER
DIRECTION OF VIEW
MISCELLANEOUS SYMBOLS
T THERMOSTAT
DRAWING FROM WHICH SECTION OR
DETAIL IS TAKEN
DRAWING ON WHICH SECTION OR
DETAIL IS SHOWN
DESIGNATES SUPPLY DIFFUSER TYPE IN AREAS*
DESIGNATES RETURN DIFFUSER TYPE IN AREAR*
DESIGNATES EXHAUST GRILLE TYPE IN AREAE*
S SWITCH
POINT OF DEMOLITION CONCLUSION
CS
V
LPR
LPS
PCR
MPS
RS
RL
MPR
FOR
FOS
HG
FOV
HPR
HPS
HWR
HWS
D
CHS
CA
BF
CHR
CR
VFD (VARIABLE FREQUENCY DRIVE)
1. CONTRACT DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE
RELATION OF PIPING, DUCTWORK, CONNECTIONS, AND EQUIPMENT. THE
DRAWINGS DO NOT INDICATE ALL OFFSETS, ELBOWS, AND FITTINGS
THAT MAY BE REQUIRED. THEREFORE, THE CONTRACTOR SHALL
CAREFULLY INVESTIGATE THE STRUCTURAL AND FINISH CONDITIONS
AFFECTING THE WORK AND ACTUAL EQUIPMENT PROVIDED. THE
CONTRACTOR SHALL FURNISH ALL OFFSETS, ELBOWS, FITTINGS,
HANGERS, AND ACCESSORIES AS MAY BE REQUIRED TO MEET THESE
CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
2. INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH
THE CURRENTLY ADOPTED INTERNATIONAL MECHANICAL CODE, ALL
PERTINENT CODES, LAWS, ORDINANCES, REGULATIONS, AND
RESPECTIVE MANUFACTURER'S WRITTEN INSTRUCTIONS.
3. ALL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED IN STRICT
ACCORDANCE WITH SMACNA AND ASHRAE STANDARDS.
4. COORDINATE HVAC WORK WITH THE WORK OF ALL OTHER
CONTRACTORS AND OWNER.
5. THE HVAC CONTRACTOR SHALL ARRANGE THE PROGRESS OF HIS WORK
SO AS TO CONFORM TO THE PROGRESS OF THE TRADES AND SHALL
COMPLETE THE ENTIRE INSTALLATION AS SOON AS THE CONDITION OF
THE PROJECT WILL PERMIT.
6. ALL ITEMS OF LABOR, MATERIAL, AND EQUIPMENT NOT SPECIFICALLY
DESCRIBED HEREIN NOR DETAILED ON THE DRAWINGS BUT INCIDENTAL
TO OR NECESSARY FOR THE COMPLETION OF THE WORK, SHALL BE
CONSIDERED AS INCLUDED WITHOUT EXTRA COST.
7. COORDINATE EXACT LOCATIONS OF DIFFUSERS/DUCTWORK WITH
LIGHTS, SPRINKLERS, AND CEILING WITH REFLECTED CEILING PLAN AND
ARCHITECT.
8. PROVIDE INDIVIDUAL VOLUME DAMPERS FOR BALANCING ON ALL
SUPPLY, RETURN, RELIEF, AND EXHAUST MAIN BRANCH AND BRANCH
TAKE-OFFS. LOCATE VOLUME DAMPER AS CLOSE AS POSSIBLE TO TAKE
OFF POINTS. PROVIDE CABLE CONTROL VOLUME DAMPERS FOR ALL
INACCESSIBLE CEILINGS.
9. MOUNT ALL THERMOSTATS AT 48" AFF, TO THE TOP OF THE
THERMOSTAT BOX. COORDINATE ALL LOCATIONS WITH ARCHITECT
PRIOR TO ROUGH-IN AND INSTALLATION.
10. PROVIDE PROTECTION FOR ALL PENETRATIONS OF FIRE RESISTANCE
RATED ASSEMBLIES IN ACCORDANCE WITH THE REQUIREMENTS OF THE
CURRENTLY ADOPTED INTERNATIONAL BUILDING CODE.
11. UNLESS SPECIFICALLY STATED OTHERWISE OR APPROVED BY THE
ARCHITECT IN ADVANCE, NO EXPOSED CONDUIT OR PIPING WILL BE
ACCEPTABLE IN NEW CONSTRUCTION IN FINISHED SPACES AND NO
CONDUIT OR PIPING OF ANY KIND WILL BE PERMITTED IN THE CAVITY.
S*
SUPPLY/RETURN DIFFUSER TYPE
NECK SIZE
CFM
ME0.0: MECHANICAL & ELECTRICAL INFORMATION SHEET
ME1.0: FLOOR PLANS - MECHANICAL & ELECTRICAL
ME2.0: MECHANICAL SPECIFICATIONS
DRAWING LIST
A/C
AFF
AFG
AMB
AMP
AP
APROX
ARR
ATC
AUTO
AUX
AVG
BF
BHP
BOD
BOP
BOT
BP
BSMT
BTU
CA
CAP
CF
CFM
CL
CO
COL
CONC
CONN
CONT
CTR
D
DB
DDC
DEG
DET
DIA, Ø
DISC
DN
DWG
EA
EAT
EER
EFF
EJ
EL
ELEC
ENT
ESP
EVAP
EWT
EXH
EXP
EXST
EXT
F&T
FC
FDW
FLA
FLR
FO
FPM
FPS
FS
FT
GA
GAL
GALV
GND
GPH
GPM
GR
HD
HG
HGT
HMD
HORIZ
HP
HTD
HTR
Hz
INSUL
INTL
LAT
LBS
LIN
LP
LRA
LVL
LVR
LWT
MAN
MAX
MBH
MIN
MOD
MTD
MU
NA
NC
NEG
NIC
NO
NTS
OA
OED
OFCI
OV
PCR
PD
PG
PL
PNEU
PRESS
PROP
PSIG
QTY
REF
REQD
REV
RL
RM
RS
RTN
S
SCH
SD
SEC
SENS
SEP
SEQ
SER
SERV
SHT
SOL
SP
SPLY
SS
STL
SUCT
TD
TEMP
TH
THK
TSP
TYP.
UON
V
VAC
VAV
VB
VEL
VERT
VIB
VOL
VSD
VTR
W
WB
WMS
HERTZ
INSULATION
INTERNAL
LEAVING AIR TEMPERATURE
POUNDS
LINEAL
LOW PRESSURE
LOCKED ROTOR AMPS
LEVEL
LOUVER
LEAVING WATER TEMPERATURE
MANUAL
MAXIMUM
THOUSAND BRITISH THERMAL UNITS PER HOUR
MINIMUM
MODEL
MOUNTED
MAKEUP
NOT APPLICABLE
NORMALLY CLOSED
NEGATIVE
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
OUTSIDE AIR
OPEN END DUCT
OWNER FURNISHED CONTRACTOR INSTALLED
OUTLET VELOCITY
PUMPED CONDENSATE RETURN
PRESSURE DROP
RESSURE GAUGE
PLATE
PNEUMATIC
PRESSURE
PROPELLER
POUNDS PER SQUARE INCH GAUGE
QUANTITY
REFERENCE
REQUIRED
REVISION
REFRIGERANT LIQUID
ROOM
REFRIGERANT SUCTION
RETURN
SWITCH
SCHEDULE
SMOKE DAMPER
SECONDARY SECONDS
SENSIBLE
SEPARATE
SEQUENCE
SERIES
SERVICE
SHEET
SOLENOID
STATIC PRESSURE
SUPPLY
STAINLESS STEEL
STEEL
SUCTION
TEMPERATURE DIFFERENTIAL
TEMPERATURE
THERMOMETER
THICK
TOTAL STATIC PRESSURE
TYPICAL
UNLESS OTHERWISE NOTED
VENT OR VOLT
VACUUM
VARIABLE AIR VOLUME
VACUUM BREAKER
VELOCITY
VERTICAL
VIBRATION
VOLUME
VARIABLE SPEED DRIVE
VENT THRU ROOF
WATT, WIDTH OR WIDE
WET BULB
WIRE MESH SCREEN
AIR CONDITIONING
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AMBIENT
AMPERE
ACCESS PANEL
APPROXIMATE
ARRANGEMENT
AUTOMATIC TEMPERATURE CONTROL
AUTOMATIC
AUXILIARY
AVERAGE
BOILER FEED
BRAKE HORSEPOWER
BOTTOM OF DUCT
BOTTOM OF PIPE
BOTTOM
BACK PRESSURE
BASEMENT
BRITISH THERMAL UNIT
COMPRESSED AIR
CAPACITY
CUBIC FOOT (FEET)
CUBIC FOOT (FEET) PER MINUTE
CENTER LINE
CLEANOUT
COLUMN
CONCRETE OR CONCENTRIC
CONNECT OR CONNECTION
CONTINUATION
CENTER
DRAIN OR DEEP
DRY BULB
DIRECT DIGITAL CONTROL
DEGREE
DETAIL
DIAMETER
DISCONNECT
DOWN
DRAWING
EACH
ENTERING AIR TEMPERATURE
ENERGY EFFICIENCY RATIO
EFFICIENCY
EXPANSION JOINT
ELEVATION
ELECTRICAL
ENTERING
EXTERNAL STATIC PRESSURE
EVAPORATOR
ENTERING WATER TEMPERATURE
EXHAUST
EXPANSION
EXISTING
EXTERNAL
FLOAT & THERMOSTATIC
FLEXIBLE CONNECTION
FEED WATER
FULL LOAD AMPS
FLOOR
FUEL OIL
FOOT (FEET) PER MINUTE
FOOT (FEET) PER SECOND
FLOW SWITCH
FOOT (FEET)
GAUGE
GALLONS
GALVANIZED
GROUND
GALLONS PER HOUR
GALLONS PER MINUTE
GRAIN
HEAD
HOT GAS
HEIGHT
HUMIDITY
HORIZONTAL
HORSEPOWER
HEATED
HEATER
SHUT-OFF VALVE
GLOBE VALVE
CHECK VALVE
FLOW SETTER
ANGLE GATE VALVE
RELIEF OR SAFETY VALVE
SOLENOID VALVE
BUTTERYFLY VALVE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
PRESSURE REDUCING VALVE
UNION
STRAINER W/BLOW-OFF & CAP
PIPE GUIDE
PIPE ANCHOR
FLEXIBLE CONNECTOR
EXPANSION JOINT
THERMOMETER
PRESSURE GAUGE W/COCK
AUTOMATIC AIR VENT
MANUAL AIR VENT
DIRECTION OF FLOW
DIRECTION OF SLOPE
CONCENTRIC REDUCER
ECCENTRIC REDUCER
PIPE UP
PIPE DOWN
PIPE THROUGH
TOP TAKE-OFF
EXISTING TO REMAIN
EXISTING TO BE REMOVED
NEW WORK
BOILER FEED WATER
COMPRESSED AIR
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
CONDENSATE DRAIN OR DRAIN
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL TANK VENT
HOT GAS
HIGH PRESSURE CONDENSATE RETURN
HIGH PRESSURE STEAM SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
LOW PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM SUPPLY
MEDIUM PRESSURE CONDENSATE RETURN
MEDIUM PRESSURE STEAM SUPPLY
PUMPED CONSENSATE RETURN
REFRIGERANT LIQUID
REFRIGERANT SUCTION
VENT LINE
WIRING DEVICES
DUPLEX RECEPTACLE - NEMA 5-20R, MOUNT 1'-6" AFF UNLESS
OTHERWISE NOTED
GFI DUPLEX RECEPTACLE - MOUNT AT 1'-6" AFF UNLESS
OTHERWISE NOTED
PANELBOARDS
SURFACE MOUNTED PANEL
FLUSH MOUNTED PANEL
EXISTING SURFACE MOUNTED PANEL
EXISTING FLUSH MOUNTED PANEL
JOB:
1021526.000
COPYRIGHT 2026
DRAWN:
SCALE:
AS NOTED
DATE:
05/14/2026
P MGR:
APPRD:
CHK
DSGN:
BE
YO
N D
V
IO
LE
N
C E
W O
M
EN
'S S
H
EL
TE
R
W . 1
1T H
S T.
B
ER
W
IC
K, P
A
C O
LU
M
BI
A
C O
U N
TY
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
BI
D
S U
BM
IS
SI
O
N S
ET
/1
4/
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
M
EC
H
AN
IC
AL
E
LE
C
TR
IC
AL
IN
FO
R
M
AT
IO
N
S H
EE
T
SHC
SRA
SHC BIA
CM
ME0.0
AutoCAD SHX Text FILENAME: C:\Users\scook\DC\ACCDocs\Barry Isett and Associates\1021526.000__CCHRA_Beyond_Violence_Shelter\Project Files\MEP-CAD\1021526.000_ME_Drawings.dwg - May 13, 2026 12:56 PM
CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS FOR THE ENTIRE PROJECT BEFORE PROCEEDING WITH THE WORK.
FCU-1
HP-1
R L/
R S
C O
N D
STAFF
ROOM
(E)PANEL "200"
(E)PANEL "150"
(E)DISCONNECT
SWITCH
30/2/NF/3R
30/2/NF/1
WP 4
200-34,36
1 1
OFFICE LOBBY
JOB:
1021526.000
COPYRIGHT 2026
DRAWN:
SCALE:
AS NOTED
DATE:
05/14/2026
P MGR:
APPRD:
CHK
DSGN:
BE
YO
N D
V
IO
LE
N
C E
W O
M
EN
'S S
H
EL
TE
R
W . 1
1T H
S T.
B
ER
W
IC
K, P
A
C O
LU
M
BI
A
C O
U N
TY
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
BI
D
S U
BM
IS
SI
O
N S
ET
/1
4/
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
FL
O
O R
P
LA
N S
- M
EC
H
AN
IC
AL
E
LE
C
TR
IC
AL
SHC/MS
SRA
SHC/MS BIA
CM
ME1.0
1. VERIFY ALL EXISTING CONDITIONS BEFORE BEGINNING WORK. IF
EXISTING CONDITIONS DIFFER FROM PLANS, CONTACT ENGINEER
THROUGH WRITTEN COMMUNICATION.
GENERAL NOTES:
NO MECHANICAL OR ELECTRICAL SCOPE IN THIS AREA.
PIPE 3/4"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .