About this file
This is a construction drawings document prepared by Barry Isett & Associates Inc., a multi-discipline engineering and consulting firm, for the Borough Hall Memorial Park Phase II Improvements project located in Mount Pocono, Monroe County, Pennsylvania. The project encompasses the construction of a new multipurpose restroom building (20' x 44') and related site improvements including paved trails, parking lot mill and overlay, utility installations (water, electrical, and sanitary sewer), concrete paving, site furnishings, and lawn restoration. The drawings package includes nine sheets detailing title sheet, existing features demolition plan, site plan, grading and utility plan, utility plan and profile, erosion and sediment controls plan, and construction details. The project was drawn by CB on June 12, 2026, with design approval by BNS and one addendum issued on April 21, 2026. A pre-engineered metal building (PEMB) structure is specified with dimensions of 20' x 44', featuring 24-gauge standing seam metal roofing, Port Orford cedar columns, northern white cedar stacked timber walls, and four functional areas including two unisex restrooms, concession area, and storage. Construction details include concrete foundations with reinforced footings, stacked timber wall construction with rigid foam insulation, electrical service requirements coordinated with PPL, and erosion and sediment control measures.
The construction specifications require 3,000 psi concrete compressive strength, ASTM A-305 deformed reinforcing steel, and compliance with state and local building codes. Sealed bids are due by 3:00 PM on Wednesday, July 15, 2026, via the PennBid program, with bidding documents available beginning June 15, 2026. A mandatory pre-bid meeting is not explicitly stated for this phase, though questions may be submitted through PennBid's Messages/Public Q&A tab by 3:00 PM on Wednesday, July 1, 2026. Bid bonds of 10 percent of the total bid amount are required from corporate sureties authorized in Pennsylvania, with Performance and Payment Bonds equal to 100 percent of contract value required upon award. Prevailing wage rates as established by the Pennsylvania Department of Labor & Industry apply to all work. The project is funded through the Bureau of Recreation and Conservation, Department of Conservation and Natural Resources, via the Keystone Recreation, Park and Conservation Fund, though the specific contract value is not disclosed in the drawings. Final completion is scheduled for February 15, 2027, with partial substantial completion of the restroom and wash bay facilities required by November 30, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawings
JOB:
313625.003
COPYRIGHT 2026
DRAWN:
CB
SCALE:
DATE:
06/12/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
1.
2. 3. 4. 5. 6. 7.
8. 9.
BO
R
O U
G H
H
AL
L M
EM
O
R
IA
L
PA
R K
PH
AS
E
II
IM
PR
O
VE
M
EN
TS
BO
R O
U G
H O
F M
O U
N T
PO
C
O N
O M
O N
R O
E C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LT
I-
DIS
CIP
LIN
E
EN
GI
NE
ER
S
AN
D
CO
NS
UL
TA
NT
S
BRY
AN
SM
ITH
PE
NN
SY
LV
AN
IA
RE
GIS
TR
AT
ION
NU
MB
ER
LA
-00
7-L
REG I STERED L
AN
DS
CA
PE
ARCHITECT
PLANS FOR THE CONSTRUCTION OF
BOROUGH HALL MEMORIAL PARK PHASE II IMPROVEMENTS
BID SET
1361 POCONO BLVD.
MOUNT POCONO, PA 18344
MONROE COUNTY, PA
JUNE 12, 2026
SITE LOCATION
BARRYISETT&associatesINC
MULTI- DISCIPLINE ENGINEERS AND CONSULTANTS
PLANS PREPARED BY
TI
TL
E
SH
EE
T
AS NOTED
TS-1
Know what's below.
before you dig.Call
R
COPYRIGHT 2026
DRAWN:
CB
SCALE:
DATE:
06/12/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
8. 9.
BO
R
O U
G H
H
AL
L M
EM
O
R
IA
L
PA
R K
PH
AS
E
II
IM
PR
O
VE
M
EN
TS
BO
R O
U G
H O
F M
O U
N T
PO
C
O N
O M
O N
R O
E C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LT
I-
DIS
CIP
LIN
E
EN
GI
NE
ER
S
AN
D
CO
NS
UL
TA
NT
S
BRY
AN
SM
ITH
PE
NN
SY
LV
AN
IA
RE
GIS
TR
AT
ION
NU
MB
ER
LA
-00
7-L
REG I STERED L
AN
DS
CA
PE
ARCHITECT
EX
IS
TI
N
G F
EA
TU
R
ES
D
EM
O
LI
TI
O N
P
LA
N
1" = 20'
EF-1
Know what's below.
COPYRIGHT 2026
DRAWN:
CB
SCALE:
DATE:
06/12/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
8. 9.
BO
R
O U
G H
H
AL
L M
EM
O
R
IA
L
PA
R K
PH
AS
E
II
IM
PR
O
VE
M
EN
TS
BO
R O
U G
H O
F M
O U
N T
PO
C
O N
O M
O N
R O
E C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LTI-
DISC
IPLIN
E
ENG
INEE
RS
AND
CO
NSU
LTA
NTS
BR
YA
N
SM
ITH
PE
NN
SY
LV
AN
IA
RE
GIS
TR
AT
ION
NU
MB
ER
LA
-00
7-L
REG I STERED
L
AN
DS
CA
PE
ARCHITECT
Know what's below.
before you dig.Call
R
SI
TE
P
LA
N
1" = 20'
SP-1
1.
A
D D
EN
D
U M
/2
1/
C
O
COPYRIGHT 2026
DRAWN:
CB
SCALE:
DATE:
06/12/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
8. 9.
BO
R
O U
G H
H
AL
L M
EM
O
R
IA
L
PA
R K
PH
AS
E
II
IM
PR
O
VE
M
EN
TS
BO
R O
U G
H O
F M
O U
N T
PO
C
O N
O M
O N
R O
E C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LTI-
DISC
IPLIN
E
ENG
INEE
RS
AND
CO
NSU
LTA
NTS
BR
YA
N
SM
ITH
PE
NN
SY
LV
AN
IA
RE
GIS
TR
AT
ION
NU
MB
ER
LA
-00
7-L
REG I STERED
L
AN
DS
CA
PE
ARCHITECT
Know what's below.
before you dig.Call
R
G R
AD
IN
G
U
TI
LI
TY
P
LA
N
1" = 20'
GU-1
COPYRIGHT 2026
DRAWN:
CB
SCALE:
DATE:
06/12/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
8. 9.
BO
R
O U
G H
H
AL
L M
EM
O
R
IA
L
PA
R K
PH
AS
E
II
IM
PR
O
VE
M
EN
TS
BO
R O
U G
H O
F M
O U
N T
PO
C
O N
O M
O N
R O
E C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LT
I-
DIS
CIP
LIN
E
EN
GI
NE
ER
S
AN
D
CO
NS
UL
TA
NT
S
BRY
AN
SM
ITH
PE
NN
SY
LV
AN
IA
RE
GIS
TR
AT
ION
NU
MB
ER
LA
-00
7-L
REG I STERED L
AN
DS
CA
PE
ARCHITECT
U
TI
LI
TY
P
LA
N A
N D
P R
O
FI
LE
H O
P
AP
PL
IC
AT
IO
N
PP-1
1"=20'
10/15/2025
JWS
GMB
BDS
SHEET: 1 OF 1
COPYRIGHT 2026
DRAWN:
CB
SCALE:
DATE:
06/12/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
8. 9.
BO
R
O U
G H
H
AL
L M
EM
O
R
IA
L
PA
R K
PH
AS
E
II
IM
PR
O
VE
M
EN
TS
BO
R O
U G
H O
F M
O U
N T
PO
C
O N
O M
O N
R O
E C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LT
I-
DIS
CIP
LIN
E
EN
GI
NE
ER
S
AN
D
CO
NS
UL
TA
NT
S
BRY
AN
SM
ITH
PE
NN
SY
LV
AN
IA
RE
GIS
TR
AT
ION
NU
MB
ER
LA
-00
7-L
REG I STERED L
AN
DS
CA
PE
ARCHITECT
ER
O
SI
O
N A
N D
S
ED
IM
EN
T C
O N
TR
O
LS
P
LA
N
1" = 20'
ES-1
Know what's below.
COPYRIGHT 2026
DRAWN:
CB
SCALE:
DATE:
06/12/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
8. 9.
BO
R
O U
G H
H
AL
L M
EM
O
R
IA
L
PA
R K
PH
AS
E
II
IM
PR
O
VE
M
EN
TS
BO
R O
U G
H O
F M
O U
N T
PO
C
O N
O M
O N
R O
E C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LTI-
DISC
IPLIN
E
ENG
INEE
RS
AND
CO
NSU
LTA
NTS
BR
YA
N
SM
ITH
PE
NN
SY
LV
AN
IA
RE
GIS
TR
AT
ION
NU
MB
ER
LA
-00
7-L
REG I STERED
L
AN
DS
CA
PE
ARCHITECT
.0
_E
S_
PL
AN
ES
-2
VALUE OF 9
STANDARD CONSTRUCTION DETAIL #4-1
COMPOST FILTER SOCK
COMPOST SOCK WASHOUT DETAIL #3-18
ES-2
STANDARD CONSTRUCTION DETAIL #4-16
FILTER BAG INLET PROTECTION - TYPE M INLET
AS NOTED
1.
A
D D
EN
D
U M
/2
1/
COPYRIGHT 2026
DRAWN:
CB
SCALE:
DATE:
06/12/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
8. 9.
BO
R
O U
G H
H
AL
L M
EM
O
R
IA
L
PA
R K
PH
AS
E
II
IM
PR
O
VE
M
EN
TS
BO
R O
U G
H O
F M
O U
N T
PO
C
O N
O M
O N
R O
E C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LTI-
DISC
IPLIN
E
ENG
INEE
RS
AND
CO
NSU
LTA
NTS
BR
YA
N
SM
ITH
PE
NN
SY
LV
AN
IA
RE
GIS
TR
AT
ION
NU
MB
ER
LA
-00
7-L
REG I STERED
L
AN
DS
CA
PE
ARCHITECT
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
AS NOTED
DE-1
107700-00-001 BLUE POST W/CAP 124i AL DB
MEMORIAL PARK
MOUNT POCONO BOROUGH
Funding assistance has been provided by the:
Bureau of Recreation and Conservation Department of Conservation and Natural Resources
Keystone Recreation, Park and Conservation Fund
PHASE II IMPROVEMENTS
1.
A
D D
EN
D
U M
/2
1/
COPYRIGHT 2026
DRAWN:
CB
SCALE:
DATE:
06/12/2026
P MGR:
APPRD:
BNS
CHK:
SMG
DSGN:
BNS
BNS
R
EV
IS
IO
N S
D
AT
E
BY
8. 9.
BO
R
O U
G H
H
AL
L M
EM
O
R
IA
L
PA
R K
PH
AS
E
II
IM
PR
O
VE
M
EN
TS
BO
R O
U G
H O
F M
O U
N T
PO
C
O N
O M
O N
R O
E C
O U
N
TY
, P A
BA
RR
Y
IS
ET
T& as so ci at es
INC
MU
LTI-
DISC
IPLIN
E
ENG
INEE
RS
AND
CO
NSU
LTA
NTS
BR
YA
N
SM
ITH
PE
NN
SY
LV
AN
IA
RE
GIS
TR
AT
ION
NU
MB
ER
LA
-00
7-L
REG I STERED
L
AN
DS
CA
PE
ARCHITECT
C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
AS NOTED
DE-2
PANEL
'PP'
120/240V
1PH
3#3 & 1#8 GRD IN 1 1/2"C.
PANEL PROVIDED WITH PREFABRICATED
BUILDING. INSTALLED BY BUILDING
INSTALLER.
PANEL
'DP'
120/240V
1PH
PROVIDE 30 CIRCUIT 200A MAIN CIRCUIT BREAKER, 120/240V -1Ø
PANEL, 10K AIC WITH ALUMINUM BUS , 100A-2P CIRCUIT
BREAKER TO FEED PANEL 'PP AND (15) 20A-SP SPARE CIRCUIT
BREAKERS IN A NEMA 3R ENCLOSURE. LOCATE ON REAR OF
TOILET ROOM BUILDING
120/240V-1Ø, 200A SELF CONTAINED METER BASE BY CONTRACTOR
METER BY PPL. CONTRACTOR SHALL REFER TO PPL WORK ORDER
#14831975 WHEN CONTACTING PPL TO SCHEDULE THIS PROJECT.
CONTRACTOR SHALL CONTACT PPL IMMEDIATELY UPON BEING
AWARDED THE PROJECT TO REVIEW SCHEDULE WITH PPL
3 #3/0 in 2 1/2" CONDUIT
#4 CU GROUND TO COLD WATER PIPE
#6 CU GROUND TO 5/8" x 10'-0"
LONG DRIVEN COPPER GROUND ROD.
3 #3/0 IN 2 1/2" SCHEDULE 40 PVC CONDUIT
TERMINATE IN WEATHERHEAD FOR CONNECTION
TO PPL UNDERGROUND CONDUCTORS
PREFABRICATED RESTROOM BUILDING
POLYMER CONCRETE HAND HOLE
24"X24" OPEN BOTTOM WITH NON TRAFFIC
RATED LID MARKED 'ELECTRIC' FOR USE IN
PULLING FUTURE POWER INTO PANEL 'DP'
INSTALL (2) 1 1/2" SCHEDULE 40 PVC
AND (2) 1" SCHEDULE 40 PVC
CONDUITS, EACH WITH A NYLON
PULL STRING, 24" BELOW FINISHED
GRADE. TERMINATE IN PANEL 'DP'
NOTES:
1. GENERAL CONTRACTOR IS RESPONSIBLE TO PROVIDE NEW ELECTRICAL
SERVICE FROM STREET TO BUILDING FOOTPRINT. ELECTRICAL SERVICE
WITHIN BUILDING FOOTPRINT TO BE BY BUILDING INSTALLER.
2. COORDINATE EXACT REQUIREMENTS TO PROVIDE NEW UNDERGROUND
ELECTRICAL SERVICE TO BUILDING WITH PPL.
3. ALL WORK SHALL BE IN ACCORDANCE WITH PPL REQUIREMENTS AND
SUBJECT TO THEIR APPROVAL.
4. GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH BUILDING
INSTALLER ON FINAL LOCATIONS OF BUILDING PANEL TO PROVIDE SERVICE.
5. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS IN WORK OR
SCHEDULES.
1.
A
D D
EN
D
U M
/2
1/
FRONT ELEVATION
2" X 12" ALASKAN YELLOW
CEDAR FASCIA
5" X 51/2" PORT ORFORD
CEDAR COLUMN (C-1)
RIGHT SIDE ELEVATION
LOW PITCH BEAM
STEEL BASESHOE (BS-1)
5" X 51/2" PORT ORFORD
CEDAR COLUMN
MENMEN
CUSTOM PAC 20' X 44'
MT. POCONO BOROUGH KLY-1605
3-5-26
1 OF 4INSULATED
KODY
REVISION DATES
DESCRIPTION:
Options:
DRAWING #OWNER INFO:
29ga METAL ROOFPossible
STANDING SEAM ROOF
CEDAR SHINGLES
METAL BASE SHOES
STEEL COLUMNS
CUSTOM ROOF PITCH
CUSTOM EAVE HEIGHT
2 TIER ROOF
NOT FOR CONSTRUCTION
WWW. CEDARFORESTPRODUCTS.COM
800-552-9495
WEST OLIVE, MI 49460
P.O. BOX 145 C Copyright 2026 these drawings are the intellectual property of C.F.P. CO. and shall not be copied or disclosed to any unauthorized parties in part or its entirety without our written permission, and they shall not be used for construction unless approved by a C.F.P. Representative.
PRELIMINARY
5. DETERMINE ALL DESIGN LOADS PER LOCAL CODES.
6. CONCRETE TO BE 3,000 P.S.I. COMPRESSIVE STRENGTH IN 28 DAYS.
8. ALL CONSTRUCTION SURVEYING AND FIELD VERIFACATION OF ALL DIMENSIONS.
9. PROVIDE AND INSTALL ALL CONCRETE, REINFORCING STEEL, & ANCHOR BOLTS.
2. ASSUMED SOIL BEARING CAPACITY = 1500 P.S.F. ALL FOOTINGS TO BEAR ON UNDISTURBED SOIL.
STRUCTURE(S) FOUNDATION MUST BE VERIFIED
THE FOLLOWING WILL BE THE RESPONSIBILITY OF OTHERS
3. CONSULT WITH A LOCAL REGISTERED STRUCTURAL
4. DESIGN, EXCAVATION AND CONSTRUCTION OF THE
BY A REGISTERED STRUCTURAL ENGINEER.
1. ALL CONSTRUCTION SHOULD MEET STATE & LOCAL BLDG. CODE RQMTS.
ENGINEER IF SOIL BEARING CONDITIONS ARE OTHER THAN ABOVE.
11. ERECTION OF THE STRUCTURE(S).
7. REINFORCING STEEL TO BE A.S.T.M. A-305 DEFORMED.
10. UNLOAD ALL TRUCK(S) DELIVERING C.F.P. MATERIALS.
12. THE USE ANY CONCRETE EPOXY ANCHORS MUST BE APPROVED BY A
STRUCTURAL ENGINEER
DATE:
DRAWN BY:
PAGE NUMBER :
REV: 3-16-26
REV:
REV:
REV:
24ga MED-LOK STANDING
SEAM METAL ROOFING
'-0
'-0
'-0
'-0
'-0
44'-0"
2'-0" 24'-0" 8'-0"8'-0"
'-0
2'-0"
'-0
STORAGE
LO
W
P
IT
C H B
EA
M
B -1
FLOOR PLAN
5" X 51/2" PORT ORFORD
CEDAR COLUMN (C-1)
'-3
'-3
' X
' R
O
LL
-U P
W
IN
D O
W
CONCESSION
UNISEXUNISEX
CUSTOM PAC 20' X 44'
MT. POCONO BOROUGH KLY-1605
3-5-26
2 OF 4INSULATED
KODY
REVISION DATES
DESCRIPTION:
Options:
DRAWING #OWNER INFO:
29ga METAL ROOFPossible
STANDING SEAM ROOF
CEDAR SHINGLES
METAL BASE SHOES
STEEL COLUMNS
CUSTOM ROOF PITCH
CUSTOM EAVE HEIGHT
2 TIER ROOF
NOT FOR CONSTRUCTION
WWW. CEDARFORESTPRODUCTS.COM
800-552-9495
WEST OLIVE, MI 49460
P.O. BOX 145 C Copyright 2026 these drawings are the intellectual property of C.F.P. CO. and shall not be copied or disclosed to any unauthorized parties in part or its entirety without our written permission, and they shall not be used for construction unless approved by a C.F.P. Representative.
PRELIMINARY
5. DETERMINE ALL DESIGN LOADS PER LOCAL CODES.
6. CONCRETE TO BE 3,000 P.S.I. COMPRESSIVE STRENGTH IN 28 DAYS.
8. ALL CONSTRUCTION SURVEYING AND FIELD VERIFACATION OF ALL DIMENSIONS.
9. PROVIDE AND INSTALL ALL CONCRETE, REINFORCING STEEL, & ANCHOR BOLTS.
2. ASSUMED SOIL BEARING CAPACITY = 1500 P.S.F. ALL FOOTINGS TO BEAR ON UNDISTURBED SOIL.
STRUCTURE(S) FOUNDATION MUST BE VERIFIED
THE FOLLOWING WILL BE THE RESPONSIBILITY OF OTHERS
3. CONSULT WITH A LOCAL REGISTERED STRUCTURAL
4. DESIGN, EXCAVATION AND CONSTRUCTION OF THE
BY A REGISTERED STRUCTURAL ENGINEER.
1. ALL CONSTRUCTION SHOULD MEET STATE & LOCAL BLDG. CODE RQMTS.
ENGINEER IF SOIL BEARING CONDITIONS ARE OTHER THAN ABOVE.
11. ERECTION OF THE STRUCTURE(S).
7. REINFORCING STEEL TO BE A.S.T.M. A-305 DEFORMED.
10. UNLOAD ALL TRUCK(S) DELIVERING C.F.P. MATERIALS.
12. THE USE ANY CONCRETE EPOXY ANCHORS MUST BE APPROVED BY A
STRUCTURAL ENGINEER
DATE:
DRAWN BY:
PAGE NUMBER :
REV: 3-16-26
REV:
REV:
REV:
NOM. 4" X 8" NORTHERN
WHITE CEDAR STACKED
TIMBER WALL - INSULATED
LO
W
P
IT
C H B
EA
M
B -2
CUSTOM PAC 20' X 44'
MT. POCONO BOROUGH KLY-1605
3-5-26
3 OF 4INSULATED
KODY
REVISION DATES
DESCRIPTION:
Options:
DRAWING #OWNER INFO:
29ga METAL ROOFPossible
STANDING SEAM ROOF
CEDAR SHINGLES
METAL BASE SHOES
STEEL COLUMNS
CUSTOM ROOF PITCH
CUSTOM EAVE HEIGHT
2 TIER ROOF
NOT FOR CONSTRUCTION
WWW. CEDARFORESTPRODUCTS.COM
800-552-9495
WEST OLIVE, MI 49460
P.O. BOX 145 C Copyright 2026 these drawings are the intellectual property of C.F.P. CO. and shall not be copied or disclosed to any unauthorized parties in part or its entirety without our written permission, and they shall not be used for construction unless approved by a C.F.P. Representative.
PRELIMINARY
5. DETERMINE ALL DESIGN LOADS PER LOCAL CODES.
6. CONCRETE TO BE 3,000 P.S.I. COMPRESSIVE STRENGTH IN 28 DAYS.
8. ALL CONSTRUCTION SURVEYING AND FIELD VERIFACATION OF ALL DIMENSIONS.
9. PROVIDE AND INSTALL ALL CONCRETE, REINFORCING STEEL, & ANCHOR BOLTS.
2. ASSUMED SOIL BEARING CAPACITY = 1500 P.S.F. ALL FOOTINGS TO BEAR ON UNDISTURBED SOIL.
STRUCTURE(S) FOUNDATION MUST BE VERIFIED
THE FOLLOWING WILL BE THE RESPONSIBILITY OF OTHERS
3. CONSULT WITH A LOCAL REGISTERED STRUCTURAL
4. DESIGN, EXCAVATION AND CONSTRUCTION OF THE
BY A REGISTERED STRUCTURAL ENGINEER.
1. ALL CONSTRUCTION SHOULD MEET STATE & LOCAL BLDG. CODE RQMTS.
ENGINEER IF SOIL BEARING CONDITIONS ARE OTHER THAN ABOVE.
11. ERECTION OF THE STRUCTURE(S).
7. REINFORCING STEEL TO BE A.S.T.M. A-305 DEFORMED.
10. UNLOAD ALL TRUCK(S) DELIVERING C.F.P. MATERIALS.
12. THE USE ANY CONCRETE EPOXY ANCHORS MUST BE APPROVED BY A
STRUCTURAL ENGINEER
DATE:
DRAWN BY:
PAGE NUMBER :
REV: 3-16-26
REV:
REV:
REV:
'-0
8"
2'-0"
'-0
'-0
(3) #4 BARS LENGTH OF FOOTING (NF)
8" CONTINUOUS CONC.
FOUNDATION (NF)
CONT. CONC. FOOTING (NF)
10" TIMBER SCREWS
@ 36" O.C. MIN. (TYP.)
THROUGH TIMBER WALL
3" x 5" LAMINATED
WALL STIFFENER
3" x 5" LAMINATED STIFFENER
SCREWED TO TIMBER WALL @ EVERY
THIRD COURSE w/ 6" TIMBER SCREWS
TIMBER WALL CROSS SECTION
2 "
1"x4" CEDAR TRIM
STEEL FLAT PLATE
CONNECTOR
SILL SEALER UNDER SILL PLATE
2" X 4" TRTD. SILL PLATE
CONTINUOUS 38" BEAD OF
ENERGY SEAL CAULKING CENTER
TONGUE OF EVERY COURSE
1"x4" CEDAR TRIM
5" WIDE LAMINATED
LOW PITCH BEAM (B-2)
2" X 12" ALASKAN YELLOW
CEDAR FASCIA
(NF) = NOT FURNISHED BY CFP
#4 VERTICAL BARS 18" O.C. (NF)
1"x4" CEDAR TRIM
WALL FLARE TO CARRY
DECKING AT GABLES
#4 HORIZONTAL BARS 12" O.C. (NF)
2" ANCHOR ROD F1554 W/
DOUBLE NUT & WASHER, OR
HEADED ANCHOR IN FOOTING
(EVERY COURSE)
#1 2"X 6" S.Y. PINE T & G DECKING
WITH VEE GROOVES ON FINISH FACE
4" CONCRETE SLAB (NF)
NOM. 4" X 8" NORTHERN
WHITE CEDAR STACKED
TIMBER WALL
NOTE: WALL INSULATION NOT SHOWN
6" FOAM INSULATION
16" OSB
(6) #6 VERTICAL BARS
EQUALLY SPACED (NF)
STEEL BASESHOE (BS-1)
'-0
2'-0"
3"
F1554 HEADED ANCHORS
4 - 3/4" ANCHOR BOLTS
12" EMBEDMENT
CONCRETE PIER DETAIL
2'-0"Ø CONC. PIER (NF)
STEEL FLAT PLATE
CONNECTOR
5" WIDE LAMINATED
LOW PITCH BEAM (B-1)
'-0
(NF) = NOT FURNISHED BY CFP
5" X 5-1/2" PORT ORFORD
CEDAR COLUMN (C-1)
(2) #4 CIRCULAR TIES AROUND
ANCHORS AND VERTICAL BARS
WITHIN TOP 5" OF PEIR (NF)
#4 CIRCULAR TIES
@ 8" O.C. (NF)
2"
3/4" X 7" MACH. BOLTS (TYP)
3/4" X 7" MACH. BOLTS (TYP)
4" CONCRETE SLAB (NF)
EXPANSION JOINT (NF)
6" FOAM INSULATION
16" OSB
#1 2"X 6" S.Y. PINE T & G DECKING
WITH VEE GROOVES ON FINISH FACE
2" X 12" ALASKAN YELLOW
CEDAR FASCIA
24ga MED-LOK STANDING
SEAM METAL ROOFING
24ga MED-LOK STANDING
SEAM METAL ROOFING
CUSTOM PAC 20' X 44'
MT. POCONO BOROUGH KLY-1605
3-5-26
4 OF 4INSULATED
KODY
REVISION DATES
DESCRIPTION:
Options:
DRAWING #OWNER INFO:
29ga METAL ROOFPossible
STANDING SEAM ROOF
CEDAR SHINGLES
METAL BASE SHOES
STEEL COLUMNS
CUSTOM ROOF PITCH
CUSTOM EAVE HEIGHT
2 TIER ROOF
NOT FOR CONSTRUCTION
WWW. CEDARFORESTPRODUCTS.COM
800-552-9495
WEST OLIVE, MI 49460
P.O. BOX 145 C Copyright 2026 these drawings are the intellectual property of C.F.P. CO. and shall not be copied or disclosed to any unauthorized parties in part or its entirety without our written permission, and they shall not be used for construction unless approved by a C.F.P. Representative.
PRELIMINARY
5. DETERMINE ALL DESIGN LOADS PER LOCAL CODES.
6. CONCRETE TO BE 3,000 P.S.I. COMPRESSIVE STRENGTH IN 28 DAYS.
8. ALL CONSTRUCTION SURVEYING AND FIELD VERIFACATION OF ALL DIMENSIONS.
9. PROVIDE AND INSTALL ALL CONCRETE, REINFORCING STEEL, & ANCHOR BOLTS.
2. ASSUMED SOIL BEARING CAPACITY = 1500 P.S.F. ALL FOOTINGS TO BEAR ON UNDISTURBED SOIL.
STRUCTURE(S) FOUNDATION MUST BE VERIFIED
THE FOLLOWING WILL BE THE RESPONSIBILITY OF OTHERS
3. CONSULT WITH A LOCAL REGISTERED STRUCTURAL
4. DESIGN, EXCAVATION AND CONSTRUCTION OF THE
BY A REGISTERED STRUCTURAL ENGINEER.
1. ALL CONSTRUCTION SHOULD MEET STATE & LOCAL BLDG. CODE RQMTS.
ENGINEER IF SOIL BEARING CONDITIONS ARE OTHER THAN ABOVE.
11. ERECTION OF THE STRUCTURE(S).
7. REINFORCING STEEL TO BE A.S.T.M. A-305 DEFORMED.
10. UNLOAD ALL TRUCK(S) DELIVERING C.F.P. MATERIALS.
12. THE USE ANY CONCRETE EPOXY ANCHORS MUST BE APPROVED BY A
STRUCTURAL ENGINEER
DATE:
DRAWN BY:
PAGE NUMBER :
REV:
REV:
REV:
REV:
Detail A
Exploded View
CEDAR TIMBER WALL
TAPE ALL SEAMS
4"
SALEM SQUARE
CORNER DETAIL
1 4
"TIMBER WALL
1-1/2" RIDGID FOAM
INSULATION
CEDAR TRIM
6" TIMBER SCREW
(1) PER COURSE
1"x4" CEDAR TRIM
1-1/2" RIDGID INS. R7.5
2" X 4" STRAPING @ 24" O.C.
1" X 8" PINE T&G
TIMBER WALL INSULATION DETAIL
4" CONC. SLAB
6 X 6 W4.5 X W4.5 (NF)
10" TIMBER SCREWS
@ 30" O.C. MIN. (LONG WALLS)
THROUGH TIMBER WALL
@ 36" O.C. MIN. (END WALLS)
2" X 4" TREATED SILL PLATE1" X 8" PINE T&G @ CONCESSION
2" X 4" STRAPING @ 24" O.C.
1-1/2" RIDGID INS. R7.5
2" X 4" STRAPING @ 24" O.C.
7/16" OSB
ROOF INSULATION DETAIL
2" X 12" ALASKAN YELLOW
CEDAR FASCIA
2" X 6" T&G ROOF DECK
6" RIGID FOAM INS.
FRP PANELING @ RESTROOMS
7/16" OSB @ STORAGE
| Sheets and Views |
| TS-1 TITLE SHEET |
| EF-1 EXISTING FEATURES - DEMOLITION PLAN |
| SP-1 SITE PLAN |
| GU-1 GRADING - UTILITY PLAN |
| 313625.003_Utility_HOP - UPP_HOP-1 |
| ES-1 EROSION AND SEDIMENT CONTROLS PLAN |
| 313625.003_ES_Plan - ES-2 |
| DE-1 CONSTRUCTION DETAILS |
| DE-2 CONSTRUCTION DETAILS |
File details come from the government source that posted it. Updated .