2. Statement of Work.pdf
PDF 176 KB Posted
- Attached to
- Repair and Modify Lighted Panel, IFF and Panel, Lighted RH for U. S. Coast Guard Aircraft HC-144
- Solicitation number
- 70Z03827QL0000010
About this file
This is a Statement of Work (SOW) for the United States Coast Guard detailing repair and overhaul services for aviation components. The Coast Guard requires services from an Original Equipment Manufacturer (OEM), OEM Authorized Repair Center, or FAA Certified 145 Repair Center to inspect, repair, and/or overhaul two components: one Lighted Panel IFF (part number ECT410834A, NSN 1680-01-HS3-3934, quantity 1) and four Light RH Panels (part number ECT410839, NSN 5999-01-HS3-1748, quantity 4). Both components require repair and modification to Aviation Logistics Center (ALC) configuration.
The contractor must comply with OEM specifications, Component Maintenance Manuals (CMM), drawings, Service Bulletins, and Overhaul and Repair Instructions, and maintain ISO 9000 compliance or equivalent quality systems. The SOW specifies that repairs consist of inspection, failure analysis, defective part replacement, and testing to meet manufacturer requirements, while overhauls include complete teardown, inspection, cleaning, replacement of consumables and degraded components. The contractor must submit a Teardown and Inspection Report (TIR) within five calendar days identifying all parts requiring repair or replacement with associated part numbers, unit prices, labor hours, and rates. The required turn-around-time is ninety (90) days after receipt of material, with earlier delivery desired. All components must receive FAA airworthiness release or Certificate of Conformance documentation, comply with specified packaging and preservation standards, and be tracked through the Coast Guard's Aviation Computerized Maintenance System (ACMS) with documentation placed in shipping containers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3. Redacted Justification for Other Than Full and Open Competition.pdf | ||
| 4. Wage Determination.pdf | ||
| 1. Terms and Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Contractor Requirement
1. This requirement is to obtain services from the Original Equipment Manufacturer (OEM), an OEM Authorized Repair
Center, or a Federal Aviation Administration (FAA) Certified 145 Repair Center that is deemed to be acceptable to the Coast Guard for the inspection, repair and/or overhaul of the components per the attached schedule. If vendor claims to be or is considered to be OEM Authorized, the repair station shall provide documentation to confirm they are an OEM Authorized Repair Center. Repair Centers must comply with the OEM specifications, OEM Component Maintenance Manual (CMM), drawings, Service Bulletins, Overhaul and Repair Instructions (ORI), and the performance requirements set forth in the OEM technical specifications that are current at the time of contract award. The contractor shall be ISO 9000 compliant or have a quality system acceptable to the United States Coast Guard.
2.
NSN NOMENCLATURE PART NUMBER SERVICE QTY
1680-0l-HS3-3934 LIGHTED P ANEL,IFF ECT410834A REP AIR & MODIFY TO ALC 1
PIN 1100-48-1
5999-01-HS3-l 748 PANEL, LIGHT RH ECT410839 REP AIR & MODIFY TO ALC 4
PIN 1100-24-11
2. OEM drawings, Service Bulletins, CMMs are proprietary and cannot be provided by the Coast Guard. The contractor shall obtain the required OEM drawings, Service Bulletins, CMMs, and specifications.
3. Certain OEM components may include USCG modifications to the original configuration which may not be annotated in the OEM publications. These modifications are to be retained unless otherwise specified in the SOW. The USCG shall provide the supporting details/instructions that substantiate the modification. The contractor may request copies if not provided with the award.
4. Coating requirements where specifically called out shall be strictly adhered to where stated and alternatives should not be considered by the contractor.
5. Levels of repair:
a. Inspect/ Repair as necessary consists of inspection failure analysis, defective part replacement and testing required to meet the manufactures functional requirements IA W the applicable OEM publications:
b. Overhaul consists of complete teardown, inspection, cleaning, replacing all consumables, OEM recommended 100% replacement components and all components showing excessive degradation. Overhaul zeros out the components Time Since Overhaul (TSO).
6. During inspection and functional test, the presence of corrosion in a component shall constitute reason for a more thorough disassembly and inspection. Should corrosion be found, disassembly shall be made to the extent necessary to remove corrosion or replace the part, or parts, affected. Corroded parts shall be replaced, except in those cases where removal of corrosion from a part will not impair efficiency or safe operation of the part. Corrosion removal and treatment of affected areas will be accomplished IA W OEM specifications. Corrosion on Flight Critical components is not permitted and must be evaluated by the OEM for disposition.
7. The contractor may request an item to be determined Beyond Economical Repair (BER) if after initial inspection of the component the contractor feels that the part requires significant repair/overhaul outside of the scope of the normal repair/overhaul procedures provided in the OEM's CMM. The contractor's request shall be sent to the Contracting Officer (KO) for consideration. Only the USCG can determine a component is BER.
8. The Contractor shall, within fifteen calendar days of receipt of the unserviceable component, inspect for missing parts and notify the KO in writing of the part numbers of any missing parts.
9. The Coast Guard requires a Teardown and Inspection Report (TIR) that identifies part number(s) and nomenclature(s) for all parts that are required to be repaired or replaced for a complete Ready for Issue (RFI) component. The TIR shall include the part number and unit price for replacement parts, labor hours and labor rates required to repair the component, and other
File details come from the government source that posted it. Updated .