2. SOW Specs_Caretakers RR Repairs.pdf
PDF 327 KB Posted
- Solicitation number
- 12445224Q0002
- Issued by
-
Department of Agriculture Forest Service
About this file
This statement of work and project specifications document outlines requirements for a bathroom renovation project at the Cradle of Forestry Caretaker's Residence located in Pisgah National Forest in North Carolina. The scope of work includes complete renovation of two adjoining bathrooms, including demolition of existing partitions, flooring, and fixtures; installation of new partitions, subflooring, flooring, fixtures and associated plumbing and venting; and minor electrical modifications. Additionally, the project requires replacement of all existing copper water supply lines and cast iron waste piping with PEX and PVC piping respectively, as well as replacement of all crawlspace insulation and repairs to the vapor barrier. The specifications provide requirements for various construction elements and reference applicable industry standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER
NATIONAL FORESTS IN NORTH CAROLINA
PISGAH NATIONAL FOREST
PISGAH RANGER DISTRICT
TRANSYLVANIA COUNTY
STATEMENT OF WORK AND PROJECT SPECIFICATIONS
FOR
CRADLE OF FORESTRY CARETAKER’S RESIDENCE
BATHROOM RENOVATION
OCTOBER 2023
SPECIFICATION INDEX i
SPECIFICATION INDEX
DIVISION 1 – GENERAL REQUIREMENTS
SECTION 010000 - GENERAL
SECTION 013300 - SUBMITTALS
SECTION 014000 - QUALITY CONTROL
DIVISION 2 - SITE WORK
SECTION 024119 - SELECTIVE DEMOLITION
DIVISION 6 - WOOD
SECTION 061000 - ROUGH CARPENTRY
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
SECTION 072100 - THERMAL INSULATION
SECTION 072600 - VAPOR RETARDERS
DIVISION 9 - FINISHES
SECTION 092900 - GYPSUM BOARD
SECTION 093013 - CERAMIC TILING
SECTION 099123 - INTERIOR PAINTING
DIVISION 22 - PLUMBING
SECTION 221116 - DOMESTIC WATER PIPING
SECTION 221316 - SANITARY WASTE AND VENT PIPING
GENERAL 1
SECTION 010000 - GENERAL
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Project information.
2. Summary of Work.
3. Contractor's use of site and premises.
4. Storage and Protection of Materials
5. Progress Cleaning
6. Inspections
7. Closeout Procedures
1.2 PROJECT INFORMATION
A. Project Identification: Cradle of Forestry Caretaker’s Residence Bathroom Renovation
1. Project Location: The Caretaker’s Residence is located on the Cradle of Forestry in America’s Campus, 11250 Pisgah Hwy, Pisgah Forest, NC 28768.
2. After entering through the main gate, proceed past the gatehouse and take a right onto the gravel road. The Caretaker’s Residence is on the right-hand side directly across from the activity building and maintenance shop.
1.3 SUMMARY OF WORK
A. The Work of Project is defined by the Contract Documents and consists of four major tasks:
1. Complete renovation of two adjoining bathrooms, including:
a. Demolition of existing partition walls, flooring, and bathroom fixtures
b. Partition wall construction
c. Replacement of subfloor and flooring
d. Installation of new fixtures, and associated plumbing and venting
e. Minor electrical modifications
2. Replacement of all copper water supply lines within crawl space with PEX piping
a. Demolish all existing copper water supply lines, starting from valve at 1” supply and terminating at connections to fixtures.
b. Replace complete water distribution system PEX piping per Section 221116.
3. Replacement of all cast iron waste piping with PVC
a. Demolish all existing cast iron waste piping starting at fixtures and terminating at point where it penetrates the ground within the crawl space.
b. Replace complete sanitary waste piping system in kind with PVC per Section
221316
4. Replacement of all crawlspace insulation, and minor repairs to the vapor barrier.
GENERAL 2
a. See Sections 072100 and 072600 for full description of work.
B. Project will be constructed under a single contract.
1.4 CONTRACTOR'S USE OF SITE AND PREMISES
A. Contractor shall have full use of Project site for construction operations during construction period.
B. Limits on Use of Site: Limit use of Project site to areas within the Contract limits. Do not disturb portions of Project site beyond areas in which the Work is indicated.
C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Take all precautions necessary to protect building components, furnishings, and premises from damage during construction. Repair damage caused by construction operations.
D. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.
E. Smoking and Controlled Substance Restrictions: Use of tobacco products within the Residence, and use of alcoholic beverages and other controlled substances on Forest Service property, is not permitted.
1.5 STORAGE AND PROTECTION OF MATERIALS
A. The Contractor may store materials and equipment at the work site at their own risk. All materials must be kept in an area designated by the COR and be neat and orderly.
B. Deliver materials in undamaged condition, in manufacturer's original containers or packaging, with identifying labels intact and legible.
C. Store materials in accordance with manufacturer's instructions, with seals and labels accessible for inspection.
D. Interior Storage: Maintain temperature and humidity within the ranges required by manufacturer's instructions.
E. Exterior Storage:
1. Store products subject to damage by the elements in weathertight enclosures.
2. Store fabricated products above the ground, on blocking or skids; prevent soiling or staining. Cover products subject to damage or deterioration with impervious sheet coverings; provide adequate ventilation to avoid condensation.
F. Protection After Installation: Provide adequate coverings as necessary to protect installed materials from damage resulting from natural elements, traffic, and subsequent construction.
Remove when no longer needed.
GENERAL 3
1.6 PROGRESS CLEANING
A. Clean Project site and work areas daily, including common areas. Enforce requirements strictly.
Dispose of materials lawfully.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where Work is in progress to the level of cleanliness necessary for proper execution of the Work.
1.7 INSPECTIONS
A. The COR or inspector may inspect any and all work at any time during this project.
B. Any work that does not meet contract specifications shall be corrected by the contractor with no additional pay.
C. The COR shall inspect the existing framing following demolition (in bathroom and crawlspace) and before any repair work.
D. The COR shall inspect all framing repairs/additions and rough carpentry before floor and wall finishes or fixtures are installed.
E. The COR shall inspect water and waste lines before concealing or closing in.
F. The COR shall perform a pre-final inspection when work is substantially complete.
G. The COR shall perform a final inspection when all the work is complete.
1.8 CLOSEOUT PROCEDURES
A. At substantial completion, submit a request to the COR for a pre-final inspection. The COR will provide a punch list of items to be completed.
B. Three days prior to final completion, submit a request to the COR for a final inspection.
C. Perform a final cleaning. Leave the site clean and ensure no trash or debris is left behind. No dumpster is available, contractor must dispose of all materials offsite.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 010000
SUBMITTALS 4
SECTION 013300 - SUBMITTALS
PART 1 - GENERAL
1.1 SUMMARY
A. The work of this section consists of submittal requirements before and during construction.
B. The Contractor shall furnish the product submittals listed below to the COR for approval prior to ordering/purchasing. Additional submittals may be required if deemed necessary by the
COR.
1. Doors, frames, and hardware
2. Subfloor
3. LVT Flooring and Transitions
4. Fixtures
a. Vanities
b. Vanity Tops
c. Sink faucets and controls
d. Medicine Cabinets
e. Sconce Lighting
f. Lavatories
g. Shower Pan and Bathtub
h. Shower and bathtub faucets and controls
i. Grab Bars
j. Wall Tile and Backer Board
k. Insulation
l. Vapor Barrier
m. Paint
C. The contractor shall additionally submit the following informational submittals to the COR.
1. Schedule of Activities, showing beginning and completion of major tasks
2. Final plumbing layout, indicating size and length of pipes and location of valves.
1.2 SUBMITTAL FORMATS
A. All submittals shall be submitted via email in electronic PDF format.
B. Submittals shall be identified on a transmittal cover sheet that shall be signed by the contractor or representative. Include the following information in each submittal:
1. Project name.
2. Date.
C. Options: Identify options requiring selection by COR.
SUBMITTALS 5
1.3 SUBMITTAL PROCEDURES
A. Submit all submittal items required for each category of work concurrently.
B. All submittals will be evaluated by the COR and returned marked either approved, approved with notations, or rejected.
1.4 PRODUCT SUBMITTAL REQUIREMENTS
A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. Mark each submittal to show which products and options are applicable.
2. Include the following information, as applicable:
a. Manufacturer's catalog cuts.
b. Manufacturer's product specifications.
c. Standard color charts.
d. Statement of compliance with specified referenced standards.
e. Availability and delivery time information.
B. Incomplete submittals are unacceptable and will be returned for resubmittal without review.
C. COR will not accept submittals received from sources other than Contractor.
D. Shop Drawings: Prepare Project-specific information, drawn accurately to scale.
1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:
a. Identification of products.
b. Schedules.
c. Compliance with specified standards.
d. Notation of coordination requirements.
e. Notation of dimensions established by field measurement.
f. Relationship and attachment to adjoining construction clearly indicated.
g. Seal and signature of professional engineer if specified.
E. Samples: Submit Samples for review of type, color, pattern, and texture for a check of these characteristics with other materials.
1. Transmit Samples that contain multiple, related components, such as accessories together in one submittal package.
2. Identification: Permanently attach label on unexposed side of Samples that includes the following:
a. Project name and submittal number.
b. Generic description of Sample.
c. Product name and name of manufacturer.
d. Sample source.
SUBMITTALS 6
1.5 SUBSTITUTIONS:
A. If the Contractor intends to provide or install an item that is an "or equal" or differs from that which is specified, he/she shall submit all product data and information to the COR for review prior to ordering/purchase.
B. The contractor shall submit one digital copy of the manufacturer's description of all "or equals" proposed in lieu of name brands specified. This description shall include:
1. Product name and model number
2. Manufacturer
3. Product description
4. Technical data
5. Samples, as required by COR
C. A request for approval of “equals” constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 013300
QUALITY CONTROL 7
SECTION 014000 - QUALITY CONTROL
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for quality assurance and quality control.
1.2 DEFINITIONS
A. Experienced: When used with an entity or individual, "experienced," unless otherwise further described, means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.
B. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, subcontractor, or sub-subcontractor, to perform a particular construction operation, including installation, erection, application, assembly, and similar operations.
1.3 EXISTING CONDITIONS
A. Verification: Following demolition, but prior to construction, verify dimensions as shown on Drawings. If discrepancies are discovered, notify COR promptly.
B. Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine conditions of existing elements for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.
C. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.
1.4 QUALITY ASSURANCE
A. All work shall be performed in accordance with the latest editions of the North Carolina Building Code and Uniform Plumbing Code. Any portions of the plans and specifications which do not comply shall be immediately brought to the attention of the COR for resolution.
B. Qualifications paragraphs in this article establish the minimum qualification levels required;
individual Specification Sections specify additional requirements.
C. Installer Qualifications: A firm or individual experienced in installing, erecting, applying, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.
QUALITY CONTROL 8
D. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.
1. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety. Operational elements include the following:
a. Primary operational systems and equipment.
b. Plumbing piping systems.
c. Mechanical systems piping and ducts.
d. Conveying systems.
e. Electrical wiring systems.
2. Other Construction Elements: Do not cut and patch other construction elements or components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety. Other construction elements include but are not limited to the following:
a. Water, moisture, or vapor barriers.
b. Membranes and flashings.
c. Equipment supports.
d. Piping, ductwork, vessels, and equipment.
3. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in COR’s opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.
E. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of specified products and equipment.
1.5 QUALITY CONTROL
A. This work shall consist of providing quality control to ensure conformance with contract and manufacturer specifications. The Contractor shall provide all personnel, equipment, tests, and reports to meet the requirements of this specification.
B. The Contractor shall provide and maintain a quality control system that will ensure that all services, supplies, and construction required under this contract conform to the contract requirements. The Contractor shall perform, or cause to be performed, any sampling, inspection, and testing required to substantiate that all supplies, services, and construction conform to the contract requirements.
C. The Contractor shall furnish certificates or labels executed by the manufacturer, supplier, or vendor, stipulating that all products incorporated into the work meet the applicable requirements as shown on the drawings or specifications.
QUALITY CONTROL 9
D. Quality Control shall be considered incidental to the bid items and no additional payment will be made.
PART 2 - PRODUCTS (Not Used)
END OF SECTION 014000
SELECTIVE DEMOLITION 10
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Definitions
2. Materials Ownership
3. Field Conditions
4. Examination
5. Utility Services and Mechanical Systems
6. Protections
7. Selective Demolition, General
8. Selective Demolition Schedule
B. Related Requirements:
1. Section 010000 "General" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.
2. Section 014000 "Quality Control" for cutting and patching procedures and for general protection and work procedures for alteration projects.
1.2 DEFINITIONS
A. Remove/Demolish: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
1.3 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1.4 FIELD CONDITIONS
A. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
B. Notify COR of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
C. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
SELECTIVE DEMOLITION 11
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Owner will arrange to shut off indicated services/systems when requested by Contractor.
2. Disconnect, demolish, and remove plumbing, HVAC systems, equipment, and components indicated to be removed on Drawings or within specifications.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
2. Cover and protect furniture, furnishings, and equipment that have not been removed.
3.4 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
SELECTIVE DEMOLITION 12
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 6 hours after flame-cutting operations.
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
10. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
3.5 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
3.6 SELECTIVE DEMOLITION SCHEDULE
A. Remove the following elements:
1. All bathroom fixtures, finishes and structural elements as noted on the drawings.
2. All existing copper water supply lines, starting from valve at 1” supply and terminating at connections to fixtures.
3. All existing cast iron waste piping starting at fixtures and terminating at point where it enters the ground within the crawl space.
4. All floor insulation in crawl space, including OSB panels and 1x3 bracing.
END OF SECTION 024119
ROUGH CARPENTRY 13
SECTION 061000 - ROUGH CARPENTRY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Wood products.
2. Dimensional lumber framing.
3. Miscellaneous lumber.
4. Plywood backing panels.
5. Sheathing.
1.2 DEFINITIONS
A. Boards, Strips or Furring: Lumber of less than 2 inches nominal size in least dimension.
B. Dimension Lumber: Lumber of 2 inches nominal size or greater but less than 5 inches nominal size in least dimension.
C. Lumber grading agencies, and abbreviations used to reference them, include the following:
1. NeLMA: Northeastern Lumber Manufacturers' Association.
2. NLGA: National Lumber Grades Authority.
3. SPIB: The Southern Pine Inspection Bureau.
4. WCLIB: West Coast Lumber Inspection Bureau.
5. WWPA: Western Wood Products Association.
1.3 DELIVERY, STORAGE, AND HANDLING
A. Stack wood products flat with spacers beneath and between each bundle to provide air circulation. Protect wood products from weather by covering with waterproof sheeting, securely anchored. Provide for air circulation around stacks and under coverings.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS
A. Lumber: Comply with DOC PS 20 and applicable rules of grading agencies indicated.
1. Factory mark each piece of lumber with grade stamp of grading agency.
B. Maximum Moisture Content shall be 19%
ROUGH CARPENTRY 14
2.2 DIMENSION LUMBER FRAMING
A. Non-Load-Bearing Interior Partitions by Grade: Construction, Stud, or No. 3
1. Application: All interior partitions, framing and blocking
2. Species:
a. Hem-fir (north); NLGA.
b. Southern pine or mixed southern pine; SPIB.
c. Spruce-pine-fir; NLGA.
d. Hem-fir; WCLIB, or WWPA.
e. Spruce-pine-fir (south); NeLMA, WCLIB, or WWPA.
f. Northern species; NLGA.
g. Eastern softwoods; NeLMA.
h. Western woods; WCLIB or WWPA.
2.3 MISCELLANEOUS LUMBER
A. Provide miscellaneous lumber indicated and lumber for support or attachment of other construction, including the following:
1. Furring.
2. Shelving.
3. Blocking
B. Shelving and supports: Lumber with 19 percent maximum moisture content of any species.
Grade shal be Finish or 1 Common.
C. For blocking not used for attachment of other construction, Utility, Stud, or No. 3 grade lumber of any species may be used provided that it is cut and selected to eliminate defects that will interfere with its attachment and purpose.
D. For furring strips for installing plywood or hardboard paneling, select boards with no knots capable of producing bent-over nails and damage to paneling.
2.4 SUBFLOORING
A. Oriented-Strand-Board Subflooring: DOC PS 2, Structural I sheathing
1. Span Rating: Not less than 20
2. Nominal Thickness: Matching existing subfloor thickness.
3. Reference Product: Advantech OSB Subflooring
2.5 FASTENERS
A. General: Fasteners are to be of size and type indicated and comply with requirements specified in this article for material and manufacture. Provide nails or screws, in sufficient length, to penetrate not less than 1-1/2 inches into wood substrate.
B. Nails, Brads, and Staples: ASTM F1667.
ROUGH CARPENTRY 15
C. Power-Driven Fasteners: Fastener systems with an evaluation report acceptable to authorities having jurisdiction, based on ICC-ES AC70.
D. Screws for Fastening Sheathing to Wood Framing: ASTM C1002.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Framing Standard: Comply with AF&PA's WCD 1, "Details for Conventional Wood Frame Construction," unless otherwise indicated.
B. Set work to required levels and lines, with members plumb, true to line, cut, and fitted. Fit rough carpentry accurately to other construction. Locate furring, nailers, blocking, grounds, and similar supports to comply with requirements for attaching other construction.
C. Install metal framing anchors to comply with manufacturer's written instructions. Install fasteners through each fastener hole.
D. Do not splice structural members between supports unless otherwise indicated.
E. Provide blocking and framing as indicated and as required to support facing materials, fixtures, specialty items, and trim.
1. Provide metal clips for fastening gypsum board or lath at corners and intersections where framing or blocking does not provide a surface for fastening edges of panels. Space clips not more than 16 inches o.c.
F. Sort and select lumber so that natural characteristics do not interfere with installation or with fastening other materials to lumber. Do not use materials with defects that interfere with function of member or pieces that are too small to use with minimum number of joints or optimum joint arrangement.
G. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following:
1. Table 2304.10.1, "Fastening Schedule," in ICC's International Building Code (IBC).
3.2 INSTALLATION OF WOOD BLOCKING AND NAILERS
A. Install where indicated and where required for attaching other work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other work involved.
3.3 INSTALLATION OF WOOD FURRING
A. Install level and plumb with closure strips at edges and openings. Shim with wood as required for tolerance of finish work.
ROUGH CARPENTRY 16
B. Furring to Receive Gypsum Board or Plaster Lath: Install 1-by-2-inch nominal size furring vertically at 16 inches o.c.
3.4 INSTALLATION OF WALL AND PARTITION FRAMING
A. General: Provide single bottom plate and double top plates using members of 2-inch nominal thickness whose widths equal that of studs, except single top plate may be used for non-load-bearing partitions. Fasten plates to supporting construction unless otherwise indicated.
1. For interior partitions and walls, provide 2-by-4-inch size wood studs spaced 16 inches o.c. unless otherwise indicated.
2. Provide continuous horizontal blocking at midheight of partitions more than 96 inches high, using members of 2-inch nominal thickness and of same width as wall or partitions.
END OF SECTION 061000
THERMAL INSULATION 17
SECTION 072100 - THERMAL INSULATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Glass-fiber blanket insulation.
2. Wire mesh insulation support.
B. DESCRIPTION OF WORK
1. Work shall include the installation of new floor insulation and wire mesh support per drawing details.
2. New insulation shall provide complete coverage of residence footprint.
1.2 ACTION SUBMITTALS
A. Product Data: For all insulation and mesh wire support products
1. Insulation submittal shall include type, manufacturer and R-value.
PART 2 - PRODUCTS
2.1 GENERAL
1. Alternative types of insulation and support system may be recommended by contractor, subject to written approval of COR. Alternative materials and methods should meet all performance requirements of specified products.
2.2 GLASS-FIBER BLANKET INSULATION
A. Glass-Fiber Blanket Insulation, Kraft Faced: ASTM C665, Type II (nonreflective faced), Class C (faced surface not rated for flame propagation); Category 1 (membrane is a vapor barrier).
1. R Value shall be 19 or greater.
2. Labeling: Provide identification of mark indicating R-value of each piece of insulation 12 inches and wider in width.
2.3 WIRE MESH INSULATION SUPPORT
A. 16 ga AWG welded wire mesh, or thicker
B. Mesh may be coated or uncoated. Uncoated wire shall be galvanized.
C. Mesh size shall be 2 x 4 inches
THERMAL INSULATION 18
D. Mesh fasteners shall be minimum 9 ga, 1 1/2” galvanized barbed fencing staples
PART 3 - EXECUTION
3.1 INSTALLATION OF BLANKET INSULATION
A. Comply with insulation manufacturer's written instructions applicable to products and applications.
B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.
C. Install insulation with manufacturer's R-value label exposed after insulation is installed.
D. Extend insulation to envelop entire area to be insulated. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.
E. Fit tightly around obstructions and fill voids tightly with insulation to prevent gaps. Compact insulation to 1/2 of uncompacted size in small voids.
F. Provide sizes to fit applications and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units unless multiple layers are otherwise shown or required to make up total thickness or to achieve R-value.
G. Install blankets according to ASTM C1320. With faced blankets having stapling flanges, lap blanket flange over flange of adjacent blanket to maintain continuity of vapor retarder.
H. Tape joints and ruptures in vapor-retarder facings, and seal each continuous area of insulation to ensure airtight installation.
3.2 INSTALLATION OF SUPPORTS
A. Install welded wire mesh on underside of floor beams to support insulation at all points.
B. Attach welded wire mesh to joists using barbed fencing staples, 12” maximum spacing
C. Pull mesh tight between beams so that it does not sag greater than 2” from base of beam at any point
D. Cut and form mesh closely around obstructions and utilities. Resecure mesh to itself at cuts using wire or spare mesh.
END OF SECTION 072100
VAPOR RETARDERS 19
SECTION 072600 - VAPOR RETARDERS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Polyethylene vapor retarders.
B. DESCRIPTION OF WORK
1. Work shall include patching existing vapor barrier by installing new over all open ground within crawlspace, resulting in a complete thermal envelope of the building footprint.
2. Work shall also include the repair to existing vapor barriers as specified.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of vapor retarder and tape.
1.3 INFORMATIONAL SUBMITTALS
A. Product test reports.
PART 2 - PRODUCTS
2.1 POLYETHYLENE VAPOR RETARDERS
A. Polyethylene Vapor Retarders: ASTM D4397, 8-mil-thick sheet, with maximum permeance rating of 0.1 perm.
PART 3 - EXECUTION
3.1 INSTALLATION OF VAPOR RETARDERS IN CRAWL SPACES
A. Install vapor retarders over prepared grade. Lap joints a minimum of 12 inches and seal with manufacturer's recommended tape.
B. Extend vapor retarder over footings and seal to foundation wall or grade beam with manufacturer's recommended tape.
1. Extend vapor retarder vertically minimum 12 inches up walls in crawl space and secure to block foundation with manufacturer recommended adhesive.
VAPOR RETARDERS 20
C. Seal around penetrations such as utilities and columns in order to create a monolithic, airtight membrane at grade surface, perimeter, and all vertical penetrations.
D. Repair penetrations and gaps in existing vapor barrier. Seal all open laps with tape.
END OF SECTION 072600
GYPSUM BOARD 21
SECTION 092900 - GYPSUM BOARD
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Interior gypsum board.
2. Texture finishes.
1.2 DELIVERY, STORAGE AND HANDLING
A. Store materials inside under cover and keep them dry and protected against weather, condensation, direct sunlight, construction traffic, and other potential causes of damage. Stack panels flat and supported on risers on a flat platform to prevent sagging.
1.3 FIELD CONDITIONS
A. Do not install panels that are wet, moisture damaged, and mold damaged.
PART 2 - PRODUCTS
2.1 GYPSUM BOARD, GENERAL
A. Size: Provide maximum lengths and widths available that will minimize joints in each area and that correspond with support system indicated.
2.2 INTERIOR GYPSUM BOARD
A. Gypsum Wallboard: ASTM C1396/C1396M.
1. Thickness: 3/8 inch min
2. Long Edges: Tapered
B. Mold-Resistant Gypsum Board: ASTM C1396/C1396M. With moisture- and mold-resistant core and paper surfaces.
1. Core: 1/2 inch regular type
2. Long Edges: Tapered.
3. Mold Resistance: ASTM C1396, <5% water absorption after 2 hrs submersion
4. Reference Product: USG Sheetrock Brand UltraLight Mold Tough Drywall
GYPSUM BOARD 22
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas and substrates including support framing, with Installer present, for compliance with requirements and other conditions affecting performance of the Work.
B. Examine panels before installation. Reject panels that are wet, moisture damaged, and mold damaged.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION AND FINISHING OF PANELS, GENERAL
A. Comply with ASTM C840.
B. Install panels with face side out. Butt panels together for a light contact at edges and ends with not more than 1/16 inch of open space between panels. Do not force into place.
C. Locate edge and end joints over supports. Do not place tapered edges against cut edges or ends.
Stagger vertical joints on opposite sides of partitions. Do not make joints other than control joints at corners of framed openings.
D. Fastening Methods: Apply gypsum panels to supports with steel drill screws.
3.3 INSTALLATION OF TRIM ACCESSORIES
A. General: Attach trim according to manufacturer's written instructions.
B. Install trim at all outside corners.
3.4 FINISHING OF GYPSUM BOARD
A. General: Treat gypsum board joints, interior angles, edge trim, control joints, penetrations, fastener heads, surface defects, and elsewhere as required to prepare gypsum board surfaces for decoration. Promptly remove residual joint compound from adjacent surfaces.
B. Prefill open joints, and damaged surface areas.
C. Apply joint tape over gypsum board joints, except for trim products specifically indicated as not intended to receive tape.
D. Finish panels in exposed locations to Level 4, and in concealed locations to Level 3, in accordance with ASTM C840:
1. Primer and its application to surfaces are specified in Section 099123 "Interior Painting."
GYPSUM BOARD 23
3.5 PROTECTION
A. Protect adjacent surfaces from drywall compound and promptly remove from floors and other non-drywall surfaces. Repair surfaces stained, marred, or otherwise damaged during drywall application.
B. Protect installed products from damage from weather, condensation, direct sunlight, construction, and other causes during remainder of the construction period.
C. Remove and replace panels that are wet, moisture damaged, and mold damaged.
1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.
2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.
END OF SECTION 092900
CERAMIC TILING 24
SECTION 093013 - CERAMIC TILING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Ceramic wall tile.
2. Finishing and edge-protection profiles for walls and countertops.
3. Tile backing panels.
4. Thresholds.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.3 DELIVERY, STORAGE, AND HANDLING
A. Deliver and store packaged materials in original containers with seals unbroken and labels intact until time of use.
B. Store tile and cementitious materials on elevated platforms, under cover, and in a dry location.
1.4 FIELD CONDITIONS
A. Environmental Limitations: Do not install tile until construction in spaces is complete and ambient temperature and humidity conditions are maintained at the levels indicated in referenced standards and manufacturer's written instructions.
PART 2 - PRODUCTS
2.1 TILE PRODUCTS
A. Glazed Wall Tile Type:
1. Module Size: 6 by 6 inches
2. Thickness: 5/16 inch
3. Finish: Glossed.
4. Tile Color and Pattern: Ivory, stacked
5. Reference Product: Daltile Restore, Ivory Glossy 6”x6” Glazed Ceramic Wall Tile
6. Grout Color: 640 Arctic White
CERAMIC TILING 25
2.2 TILE BACKING PANELS
A. Manufacturers
1. Acceptable Manufacturer: Schluter Systems L.P., which is located at: 194 Pleasant Ridge
Road.; Plattsburgh, NY 12901-5841; ASD Toll Free Tel: 800-472-4588; Fax: 800-477- 9783; Email:specassist@schluter.com; Web:www.schluter.com/schluter-us/en_US/.
2. Requests for substitutions will be considered in accordance with provisions of Section
013300 SUBMITTALS.
2.3 WATERPROOF BUILDING PANEL FOR CERAMIC AND STONE TILE
A. Project specific warranty to be provided from Schluter Systems L.P. by Tile Contractor.
B. Schluter-KERDI-BOARD: Rigid extruded polystyrene foam building element panel, with reinforcement material and polypropylene fleece webbing laminated on both sides for thin-set ceramic tile and dimension stone Installations.
C. Panel Thickness: 1/2 inches (12.5 mm).
D. Panel Size: 48 x 96 inch (122 x 244 cm).
2.4 SETTING MATERIALS
A. Standard Dry-Set Mortar (Thinset): ANSI A118.1 and unmodified Dry-Set Mortar (Thinset):
ANSI A118.4.
1. For wall applications, provide mortar that complies with requirements for nonsagging mortar in addition to the other requirements in ANSI A118.1.
B. Mix mortars and grouts to comply with referenced standards and mortar and grout manufacturers' written instructions.
C. Add materials, water, and additives in accurate proportions.
D. Obtain and use type of mixing equipment, mixer speeds, mixing containers, mixing time, and other procedures to produce mortars and grouts of uniform quality with optimum performance characteristics for installations indicated.
2.5 FINISHING AND EDGE-PROTECTION PROFILES FOR WALLS AND COUNTERTOPS
A. Schluter-RONDEC: Bullnose-type profile with symmetrically rounded visible surface with 1/4 inch (6 mm) radius, integrated trapezoid-perforated anchoring leg, and integrated grout joint spacer.
1. Corners: Matching inside corners.
2. Profile Height: As required to coordinate with tile selection and setting system.
3. Material and Finish:
4. AC: Color-coated Aluminum.
a. W: White.
CERAMIC TILING 26
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions where tile will be installed, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
1. Verify that substrates for setting tile are firm; dry; clean; free of coatings that are incompatible with tile-setting materials, including curing compounds and other substances that contain soap, wax, oil, or silicone; and comply with flatness tolerances required by ANSI A108.01 for installations indicated.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION OF CERAMIC TILE
A. ANSI Tile Installation Standards: Comply with parts of ANSI A108 Series "Specifications for Installation of Ceramic Tile" that apply to types of setting and grouting materials and to methods indicated in ceramic tile installation schedules.
B. TCA Installation Guidelines: TCA's "Handbook for Ceramic Tile Installation." Comply with TCA installation methods indicated in ceramic tile installation schedules.
C. Accurately form intersections and returns. Perform cutting and drilling of tile without marring visible surfaces. Carefully grind cut edges of tile abutting trim, finish, or built-in items for straight aligned joints. Fit tile closely to electrical outlets, piping, fixtures, and other penetrations so plates, collars, or covers overlap tile.
D. Provide manufacturer's standard trim shapes where necessary to eliminate exposed tile edges.
E. Where accent tile differs in thickness from field tile, vary setting-bed thickness so that tiles are flush.
F. Jointing Pattern: Lay tile in grid pattern unless otherwise indicated. Lay out tile work and center tile fields in both directions in each space or on each wall area. Lay out tile work to minimize the use of pieces that are less than half of a tile. Use spacers to provide uniform joint widths.
G. Joint Widths: 1/16 inch
H. Metal Edge Strips: Install along full outside perimeter of shower niches, as indicated on plans.
3.3 INSTALLATION OF TILE BACKING PANELS
A. Install panels and treat joints according to ANSI A108.11 and manufacturer's written instructions for type of application indicated.
B. Attach panels to studs with manufacturer recommended anchors (KERDI-BOARD-ZT Washers).
CERAMIC TILING 27
C. All joints and penetrations to be sealed with KERDI-BAND and unmodified thin-set mortar per manufacturer’s written instructions.
3.4 ADJUSTING AND CLEANING
A. Remove and replace tile that is damaged or that does not match adjoining tile. Provide new matching units, installed as specified and in a manner to eliminate evidence of replacement.
B. Cleaning: On completion of placement and grouting, clean all ceramic tile surfaces so they are free of foreign matter.
1. Remove grout residue from tile as soon as possible.
2. Clean grout smears and haze from tile according to tile and grout manufacturer's written instructions but no sooner than 10 days after installation. Use only cleaners recommended by tile and grout manufacturers and only after determining that cleaners are safe to use by testing on samples of tile and other surfaces to be cleaned. Protect metal surfaces and plumbing fixtures from effects of cleaning. Flush surfaces with clean water before and after cleaning.
3.5 PROTECTION
A. Protect installed tile work with kraft paper or other heavy covering during construction period to prevent staining, damage, and wear. If recommended by tile manufacturer, apply coat of neutral protective cleaner to completed tile walls and floors.
B. Before final inspection, remove protective coverings and rinse neutral protective cleaner from tile surfaces.
END OF SECTION 093013
INTERIOR PAINTING 28
SECTION 099123 - INTERIOR PAINTING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Interior Paint
1.2 QUALITY ASSURANCE
A. All paints shall be furnished in original, unopened containers bearing the manufacturer’s label to include manufacturer’s name, type of paint of primer, manufacturer’s stock number, color, and instructions for application.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Benjamin Moore
2.2 PAINT PRODUCTS, GENERAL
A. Interior Paint shall be Benjamin Moore Eggshell White (OC-117) or equal top quality paint that is long lasting, fade resistant, cleaner over time, with high adhesion properties.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify suitability of substrates, including surface conditions and compatibility, with existing finishes and primers.
3.2 PREPARATION
A. Comply with manufacturer's written instructions and recommendations applicable to substrates and paint systems indicated.
B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted.
INTERIOR PAINTING 29
3.3 INSTALLATION
A. Apply 2 coats of paints according to manufacturer's written instructions. Back brushing and rolling are required if spraying.
B. Painting shall be smooth, free of brush marks, streaks, laps, drips, runs, and skipped or missed areas.
C. Keep brushes and rollers clean, dry, free from contaminants, and suitable for the finish required.
D. If spraying, overspray must be controlled and not permitted to reach areas or materials not intended to be painted as part of this project.
E. After completing paint application, clean and wash all adjacent areas to remove any splatter.
F. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.
END OF SECTION 099123
DOMESTIC WATER PIPING 30
SECTION 221116 - DOMESTIC WATER PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. PEX tube and fittings.
2. PVC pipe and fittings.
3. Piping joining materials.
4. Transition fittings.
5. Waterline disinfection
B. DESCRIPTION
1. Work shall include the replacement of hot and cold water piping.
2. Waterlines shall be installed in same configuration as existing, unless approved by COR.
3. If alternate piping layout is approved, contractor shall submit sketch of new layout as informational submittal at project closeout.
1.2 INFORMATIONAL SUBMITTALS
A. Disinfection test results.
PART 2 - PRODUCTS
2.1 PEX TUBE AND FITTINGS
A. Potable-water piping and components shall comply with NSF 14, NSF 61, and NSF 372.
B. Tube Material: Cross-linked polyethylene tubing (PEX): ASTM F 876 and F 877, SDR9
1. Color code hot and cold water piping as follows:
a. Hot – RED
b. Cold – BLUE or WHITE
C. Fittings:
1. Cold Expansion Fittings with PEX Reinforcing Rings – ASTM F 1960
2. Cold Expansion Fittings with Metal Compression Sleeves – ASTM F 2080
3. Copper Crimp Ring – ASTM F 1807, ASTM F 2159, ASTM 2434
D. Transition Fittins shall be:
1. Same size as pipes to be joined.
2. Pressure rating at least equal to pipes to be joined.
3. End connections compatible with pipes to be joined.
E. Pipe hanger shall be any of the following:
DOMESTIC WATER PIPING 31
1. Half clamp J-hook type
2. Suspension clamp
3. Standard pipe clamp
PART 3 - EXECUTION
3.1 INSTALLATION OF PIPING
A. Install PEX tubing in same configuration as existing, as needed for all current and proposed mechanical and plumbing fixtures.
B. Install domestic water piping level and plumb.
C. Install piping free of sags and bends.
D. PEX piping may be bent or swept at changes in direction per manufacturer’s instructions.
Alternatively, install fittings for changes in direction.
E. Install PEX tubing with loop at each change of direction of more than 90 degrees.
F. Install fittings at branch connections.
G. Install unions in copper tubing at final connection to each piece of equipment, machine, and specialty.
H. Support horizontal piping runs from beams at every crossing, or 36” minimum if running parallel to beam.
I. Pipes shall be sufficiently secured as to not cause knocking or vibrating sounds when plumbing is in use.
J. Install swing joints or expansion loops to allow for pipe expansion. Securely anchor pipes so expansion can occur at these joints.
3.2 JOINT CONSTRUCTION
A. Joints for PEX Tubing, ASTM: Join according to ASTM F1807 for metal insert and copper crimp ring fittings and ASTM F1960 for cold expansion fittings and reinforcing rings.
3.3 CONNECTIONS
A. Connect domestic water piping to exterior water-service piping directly downstream of existing shutoff valve using couplings compatible with materials of both piping systems.
B. Connect to mechanical equipment with union for ease of dismantling.
DOMESTIC WATER PIPING 32
3.4 FIELD QUALITY CONTROL
A. Do not enclose, cover, or put piping into operation until it has been inspected and approved by
COR.
B. Piping Tests:
1. Fill domestic water piping. Check components to determine that they are not air bound and that piping is full of water.
2. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired. If testing is performed in segments, submit a separate report for each test, complete with diagram of portion of piping tested.
3. Leave new, altered, extended, or replaced domestic water piping uncovered and unconcealed until it has been tested and approved. Expose work that was covered or concealed before it was tested.
4. Cap and subject piping to static water pressure of 50 psig above operating pressure, or 150 psig maximum, without exceeding pressure rating of piping system. Allow to stand for four hours. Correct leaks and loss in pressure and retest system.
C. Domestic water piping will be considered defective if it does not pass tests and inspections.
3.5 CLEANING
A. Clean and disinfect potable domestic water piping as follows:
1. Purge new piping and parts of existing piping that have been altered, extended, or repaired before using.
a. Flush piping system with clean, potable water until dirty water does not appear at outlets.
b. Fill and isolate system according to either of the following:
Fill system with water/chlorine solution with at least 50 ppm (50 mg/L) of chlorine. This is equivalent to 10 ounces of commercial hypochlorite powder to each 1,000 gallons of water.
1) Fill system or part thereof with water/chlorine solution with at least 200 ppm (200 mg/L) of chlorine. This is equivalent to 40 ounces of commercial hypochlorite powder to each 1,000 gallons of water.
c. Flush system with clean, potable water until no chlorine is in water coming from system after the standing time.
d. Repeat procedures if biological examination shows contamination.
e. Water samples shall be tested for biological contaminants. Provide results to
COR.
END OF SECTION 221116
SANITARY WASTE AND VENT PIPING 33
SECTION 221316 - SANITARY WASTE AND VENT PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. PVC pipe and fittings.
2. Transition Couplings
B. DESCRIPTION
1. Work shall include the replacement of sanitary waste piping and vents.
a. Replacement vent shall be connected to existing vent within roof if alignment of new partition wall allows. If vent does not match up, construct new vent, flash and patch roof.
2. Sanitary waste piping shall be installed in same configuration as existing, unless approved by COR.
a. If alternate piping layout is approved, contractor shall submit sketch of new layout as informational submittal at project closeout.
PART 2 - PRODUCTS
2.1 PIPING MATERIALS
A. Piping materials to bear label, stamp, or other markings of specified testing agency.
2.2 WASTE, AND VENT PIPE AND FITTINGS
A. Solid-Wall PVC Pipe: ASTM D2665, schedule 40 PVC
B. PVC Socket Fittings: ASTM D2665, made in accordance with ASTM D3311, drain, waste, and vent patterns and to fit Schedule 40 pipe.
C. Adhesive Primer: ASTM F656, and as recommended by manufacturer
D. Solvent Cement: ASTM D2564, and as…