2. Schedule.docx
DOCX document 14 KB Posted
- Attached to
- 127EAW23R0066 - Janes Reservoir Dam Repairs
- Solicitation number
- 127EAW23R0066
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains a schedule of items and notes for a federal construction contract to repair Janes Reservoir Dam. The contract involves mobilization, excavating dam fill to access an outfall pipe, removing and replacing 120 feet of 18-inch diameter C900 pipe, and replacing and compacting the dam fill/embankment. Pricing is provided on a lump sum basis for each item, with a total base price to be proposed. Notes indicate quantities are estimated and contractors must field verify requirements in the drawings, statement of work, and specifications. The related federal opportunity is solicitation number 127EAW23R0066 being conducted by the US Department of Agriculture Forest Service to repair Janes Reservoir Dam. Contractors should submit pricing based on the schedule of items by the response date for consideration in the award of this contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5. Davis-Bacon Act WD # CA20230007.pdf | ||
| 7. Supplemental Specifications.pdf | ||
| 4. Project Drawings - Revised.pdf | ||
| 1. Statement of Work.pdf | ||
| 3. Location Map.pdf | ||
| 6. RFI Form.docx | DOCX document | |
| 127EAW23R0066 - Janes Reservoir Dam Repairs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I—THE SCHEDULE
SECTION B-- SCHEDULE OF ITEMS
B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)
| Item |
| Construction Items |
| Qty |
| UOI |
| Total Price |
| 0001 |
| Mobilization |
| 1 |
| LS |
| $ |
| 0002 |
| Excavation of damn fill to reach pipe |
| 1 |
| LS |
| $ |
| 0003 |
| Remove and dispose of outfall pipe, replace with C900 pipe (estimated 120 feet, 18" diameter) |
| 1 |
| LS |
| $ |
| 0004 |
| Replacement of dam fill/Embankment, compaction placement method E or F, tolerance class A |
| 1 |
| LS |
| $ |
| BASE TOTAL: |
| $ |
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
| Company Name: |
| POC & Title: |
| Email: |
| Phone Number: |
| DUNS Number: |
| Tax ID: |