2. SAP SOW FAR Machining 2022.10.31 - DRAFT.docx
DOCX document 31 KB Posted
- Attached to
- Machining of one final Columbia (CLB) Forward Alignment Ring (FAR) Federal contract opportunity
- Solicitation number
- N0016723Q0051
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice Forward Alignment Machining- Columbia Class.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Performance Work Statement (PWS) Forward Alignment Ring Machining
1.0 BACKGROUND: The Advanced Propulsor Management Office (APMO) in the Naval Architecture and Engineering Department of the NSWCCD is responsible for managing the Research and Development (R&D), design, testing, and delivery of United States Navy submarine propulsors.
2.0 DESCRIPTION OF SERVICES/INTRODUCTION: Naval Surface Warfare Center, Carderock Division (NSWCCD) Advanced Propulsor Management Office (Code 808) requires the machining of one COLUMBIA Class (CLB) Forward Alignment Ring (FAR) to support on-time delivery of a full scale CLB propulsor.
3.0 OBJECTIVE: The contractor shall fully machine one final CLB FAR in accordance with Reference 5.1 (C) utilizing Government Furnished Material (GFM). GFM material condition and composition is defined by Reference 5.2 (U) and Reference 5.3 (U). The contractor shall physically safeguard the GFM as CLASSIFIED once the machining of any hole feature is machined. The contractor shall complete all CNC programming and CNC Controller operations in a CLASSIFIED manner. All classified procedures shall be in compliance with Reference 5.4 (U). The Government shall be responsible for delivering the GFM to the contractor within 14 calendar days of contract award and the Government shall be responsible for picking up the completed CLB FAR within 30 calendar days of completion.
3.1 The contractor shall attain all required security approvals, per Reference 5.4, to CNC Machine one CLB FAR. Security tasks shall include but are not limited to:
· IT approvals for CNC programming
· CNC controller procedures
· Physical safeguarding plan during machining
· Physical storage plan after machining
3.2 The contractor shall machine one CLB FAR in accordance with Reference 5.1 (C) and furnish all labor, equipment, and materials necessary.
3.3 Upon completion of machining the contractor shall complete a certification package (CDRL A001), per Note 306 of Reference 5.1, showing conformance of the CLB FAR to all drawing requirements. Certification package will include a full dimensional first article inspection per Note 307 of Reference 5.1.
3.4 Upon completion and Government acceptance of Task 3.3, the contractor shall package the CLB FAR in accordance with Notes 601, 602 and 603 of Reference 5.1 and in accordance with Reference 5.4 for CLASSIFIED transport.
4.0 SPECIAL QUALIFICATIONS:
4.1 The contractor is responsible for ensuring all employees possess proper DoD security clearances when executing CLASSIFIED tasks of this contract in accordance with Reference 5.1.
4.2 The contractor shall notify the Government in their proposal if they cannot meet any of the certification package requirements of Note 306 in Reference 5.1 to complete the certification package.
5.0 APPLICABLE DOCUMENTS:
| Document Type |
| No./Version |
| Title / File Name |
| Classification |
| Date |
| Drawing |
| C24531112 |
| (5.1) CONFIDENTIAL_DISTRO_D_Columbia Class FWD Alignment Ring_C24531112.pdf |
| CONFIDENTIAL |
| 13 Jun 2019 |
| Drawing |
| 0291B |
| (5.2) CUI_DistD_DWG_0291B - Inconel 625 FAR.pdf |
| UNCLASSIFIED |
| 30 Mar 2018 |
| Certifications |
| S/N TBD |
| (5.3) GFM Certification Documents |
| UNCLASSIFIED |
| TBD |
| Security Manual |
| DoD 5220.22-M |
| (5.4) NATIONAL INDUSTRIAL SECURITY PROGRAM OPERATING MANUAL |
| UNCLASSIFIED |
| 28 Feb 2006 |
6.0 GOVERNMENT FURNISHED MATERIAL
6.1 Quantity of one Inconel 625 forging, Serial Number TBD, in accordance with Reference 5.2 (U) and Reference 5.3 (U).
7.0 DELIVERABLES
The contractor shall provide deliverables as described in the SOW and CDRLs. Format and delivery schedule for deliverables will be outlines in the CDRLs.
| Number |
| Name |
| Data Item Description |
| A001 |
| Technical Certification Package |
| DI-MISC-80678 |
| A002 |
| GFP |
| DI-MGMT-82146 |
8.0 SECURITY REQUIREMENTS: DD Form 254 applies to this order.
9.0 PERIOD OF PERFORMANCE: The overall Period of Performance shall be 120 days after date of award.
FAR Machining SOW CUI 2022.10.31
File details come from the government source that posted it. Updated .